CN105220833B - Interior girder system, shaped steel concrete filled steel tube cross section column and its construction method - Google Patents

Interior girder system, shaped steel concrete filled steel tube cross section column and its construction method Download PDF

Info

Publication number
CN105220833B
CN105220833B CN201510524336.2A CN201510524336A CN105220833B CN 105220833 B CN105220833 B CN 105220833B CN 201510524336 A CN201510524336 A CN 201510524336A CN 105220833 B CN105220833 B CN 105220833B
Authority
CN
China
Prior art keywords
steel
shaped steel
angle
cross
interior
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510524336.2A
Other languages
Chinese (zh)
Other versions
CN105220833A (en
Inventor
伍凯
曹平周
张贺
毛范燊
冯宁宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201510524336.2A priority Critical patent/CN105220833B/en
Publication of CN105220833A publication Critical patent/CN105220833A/en
Application granted granted Critical
Publication of CN105220833B publication Critical patent/CN105220833B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses a kind of interior girder system, shaped steel concrete filled steel tube cross section column and its construction method, wherein described shaped steel concrete filled steel tube cross section column includes outside steel pipe, interior fill concrete and interior girder system, it is criss-cross shaped steel that the interior girder system, which includes a cross section, cross section is the angle steel of Γ shapes, the pressure house on angle steel and shape steel web is longitudinally disposed at along girder system, the pull bar being fixedly connected respectively with the pressure house on the pressure house and angle steel on shape steel web with two ends, the angle steel is distributed in quadrangle;The angle steel is fixedly connected with outside steel pipe.The present invention improves load-bearing and the shear resistance of post component by steel pipe and interior girder system, and component ductility is significantly improved, structural seismic capacity enhancing;Interior truss plays the effect of plane outer support to the web of shaped steel, reduces the flakiness ratio and ratio of height to thickness of web, improves the stability of web.

Description

Interior girder system, shaped steel-concrete filled steel tube cross section column and its construction method
Technical field
The present invention relates to building Special-Shaped Column, especially a kind of shaped steel-steel core concrete column and its construction method.
Background technology
Load is not subject in the filling wall design of frame structure, the load of floor is finally all undertaken and transmitted by frame column To next layer.Gradually increase with the number of plies of building construction, the load that frame column undertakes also is improved constantly, and this requires column section Continuous increase.Traditional rectangle column section, because section is larger, can protrude metope, cause the occupancy of the interior space.To solve This problem, part building uses Special-Shaped Column at structure corner at present.
But existing Special-Shaped Column is the problem of also have a lot.
The content of the invention
Applicant has found after research and experiment:In order to further improve the vertical load and horizontal stroke of shaped rc columnses To load bearing capacity, the sectional area without increasing Special-Shaped Column can bury shaped steel in Special-Shaped Column, form steel reinforced concrete abnormity Post.Meanwhile, occur bond damage to avoid profile steel concrete column, stirrup should be set in Special-Shaped Column.But it is due to shaped steel in post It is irregular shape, stirrup can not be directly sleeved on shaped steel, it is necessary to blocked stirrup and be connected on shape steel web or in type Punched on steel and pass through stirrup.Therefore prior art not only reduces the stress performance of stirrup and shaped steel, and complex operation is numerous Trivial, time and fund cost are high.
Goal of the invention:One purpose is to provide a kind of shaped steel-concrete filled steel tube cross section column, to solve prior art presence Above mentioned problem.Further objective is that providing the construction method of above-mentioned shaped steel-concrete filled steel tube cross section column.
Technical scheme:A kind of shaped steel-concrete filled steel tube cross section column, it is characterised in that mixed including outside steel pipe, interior filling Native and interior girder system is coagulated, it is criss-cross shaped steel that the interior girder system, which includes a cross section, cross section is the angle steel of Γ shapes, Be longitudinally disposed at the pressure house on angle steel and shape steel web along girder system, and two ends respectively with the pressure sleeve on shape steel web The pull bar that pressure house on cylinder and angle steel is fixedly connected, the angle steel is distributed in quadrangle;The angle steel and outside steel pipe are consolidated Fixed connection.
In a further embodiment, the angle steel is equal leg angle.The outside steel pipe is multiple, and its cross section is ∏ shapes.The corner point of the outside steel pipe is fixedly connected with ribbed stiffener.The outside steel pipe and shaped steel are not less than for strength grade Q345 steel.
Further is criss-cross shaped steel there is provided a kind of interior girder system, including a cross section, and cross section is Γ shapes Angle steel, is longitudinally disposed at the pressure house on angle steel and shape steel web along girder system, and two ends respectively with shape steel web The pull bar that pressure house on pressure house and angle steel is fixedly connected, the angle steel is distributed in quadrangle.
In the above-described embodiments or in further embodiment, the angle steel is equal leg angle.
Finally there is provided a kind of method for preparing above-mentioned shaped steel-concrete filled steel tube cross section column, comprise the following steps:
Step 1. preparation outside steel pipe, shaped steel, angle steel and sleeve;
Step 2. is in each web region of shaped steel and the two sides welded sleeve of angle steel, in each web region of shaped steel Genesis analysis of the sleeve along shaped steel, distance of the sleeve away from shaped steel central shaft is equal, sleeve the indulging along angle steel in angle steel two sides To distribution;Ribbed stiffener is welded on outside steel pipe;
Step 3. installs pull bar, and clamp sleeve forms stable interior girder system;
Interior girder system is lifted into predetermined position by step 4., and shaped steel and angle steel are connected with dependency structure, positioning Afterwards, outside steel pipe is welded and fixed with angle steel, and the bottom of outside steel pipe and external structure is welded and fixed;
Step 5. casting concrete, maintenance to regulation age.
Beneficial effect:The present invention improves load-bearing and the shear resistance of post component by steel pipe and interior girder system, and Component ductility is significantly improved, structural seismic capacity enhancing;Further, interior truss carries out drawknot to steel pipe corner, The Confinement effect effect of steel pipe is improved, and interior truss plays the effect of plane outer support to the web of shaped steel, reduces web Flakiness ratio and ratio of height to thickness, improve web stability.In addition, the structure of the present invention solves prior art shaped steel location difficulty Defect, shaped steel registration, and work progress is simple, construction cost is low.Finally, component of the invention can be pre- in factory System, field operation content is few, and efficiency of construction is high, short time limit.
Brief description of the drawings
Fig. 1 is the cross-sectional view of shaped steel-concrete filled steel tube cross section column.
Fig. 2 is the dimensional structure diagram of interior girder system.
Fig. 3 is the work progress schematic diagram of shaped steel-concrete filled steel tube cross section column.
Embodiment
As shown in figure 1, shaped steel-concrete filled steel tube cross section column of the present invention mainly includes outside steel pipe 1, interior filling coagulation Soil 7 and interior girder system.Wherein, outside steel pipe is the component that four cross sections are ∏ shapes, and its corner point, which is fixedly connected with, to be added Strength rib 6.Outside steel pipe is fixedly connected with interior girder system, forms cross section for criss-cross cylinder.In the cylinder, shaped steel Positioned at the centerline of cylinder, the center superposition with cylinder.
Interior girder system mainly includes shaped steel 2, angle steel 4, pressure house 5 and pull bar 3.The cross section of shaped steel is cross, Its web is mutually perpendicular to or at grade, the end of web is provided with flange plate 21.The cross section of angle steel is Γ shapes, quantity For 4.On four webs of shaped steel, there is sleeve 5 along longitudinal uniform welding, often the axis of the straight line where row's sleeve and shaped steel Line is parallel and equal.On two sides of angle steel, there is rows of sleeve along longitudinal measure, often the straight line where row's sleeve and angle The linea angulata of steel is parallel and equal.Sleeve of the two ends of pull bar 3 respectively with shape steel web and angle steel side is fixedly connected, when pull bar will After the position of angle steel and shaped steel is fixed, interior girder system is formed.In the system, distance phase of the angle steel apart from shaped steel axis It is located at the edge of square Deng, angle steel, pull bar is located on four sides of square.
After the outside steel pipe welding when angle steel and ∏ shapes is can be seen that with reference to Fig. 1 and Fig. 2, that is, it is ten to form cross section There is cavity, Concrete Filled is in wherein in the cylinder of font, cylinder.
In a further embodiment, the angle steel is equal leg angle.The corner point of outside steel pipe, which is fixedly connected with, puts more energy into Rib 6, to strengthen the physical property of outside steel pipe, prevents that it from deforming during use and casting concrete.In general, outside The steel for being not less than Q345 for strength grade with shaped steel are managed by Baogang.
As shown in Figure 2 there is provided a kind of interior girder system, including a cross section is criss-cross shaped steel 2, and cross section is Γ shapes Angle steel 4, be longitudinally disposed at the pressure house 5 on angle steel and shape steel web along girder system, and two ends respectively with shape steel web On the pull bar 3 that is fixedly connected of pressure house and the pressure house on angle steel, the angle steel is distributed in quadrangle, false positioned at some At the corner for the quadrangle thought, see on the whole, angle steel can surround a square cylinder.In this embodiment, angle steel is Equal leg angle.
Further, Fig. 3 is gone to, the method for preparing above-mentioned shaped steel-concrete filled steel tube cross section column of the present invention, bag is described Include following steps:
Step 1. preparation outside steel pipe, shaped steel, angle steel and sleeve;
Step 2. is in each web region of shaped steel and the two sides welded sleeve of angle steel, in each web region of shaped steel Genesis analysis of the sleeve along shaped steel, distance of the sleeve away from shaped steel central shaft is equal, sleeve the indulging along angle steel in angle steel two sides To distribution;Ribbed stiffener is welded on outside steel pipe;
Step 3. installs pull bar, and clamp sleeve forms stable interior girder system;
Interior girder system is lifted into predetermined position by step 4., and shaped steel and angle steel are connected with dependency structure, positioning Afterwards, outside steel pipe is welded and fixed with angle steel, and the bottom of outside steel pipe and external structure is welded and fixed;
Step 5. casting concrete, maintenance to regulation age.
It can be seen that by the work progress:Make present method avoids the bander that matches somebody with somebody for carrying out cumbersome in construction, The Confinement effect effect of cross tube is improved using interior truss technology, being accurately positioned and installing for steel pipe and shaped steel is realized 。
From above-described embodiment it can be seen that:The outside steel pipe of steel core concrete column can play a part of stirrup, while outsourcing Steel pipe, which is also assisted in, undertakes vertical load.Therefore, the advantage of the comprehensive concrete filled steel tube of applicant and steel reinforced concrete structure, will Two kinds of technologies, which are combined, proposes shaped steel-concrete filled steel tube cross section column component.
Meanwhile, there are two technical difficulties in steel pipe and the prefabricated making of shaped steel to solve prior art:1. with tradition Circular section is different, and flakiness ratio of the star section geometry without stability and steel plate is larger, and plate is easily sent out in loading process Raw drum is bent, and which results in the weakening of chapped pipe Confinement effect.2.Shaped steel location difficulty in steel pipe, can not during construction and installation The distance and the mutual alignment relation of the two of accurate control shaped steel and steel pipe fitting.Applicant creatively proposes to use interior truss Technology, by high-strength pull bar, drawknot is carried out by the turning of steel pipe, is that the steel plate of chapped pipe creates more rigidity fulcrums, together When chapped pipe is entered be accurately positioned with shaped steel, drawknot is integrated.
Project case one
Shaped steel-concrete filled steel tube cross section column, it is characterised in that by outside steel pipe, shaped steel, high-strength pull bar, equal leg angle, Pressure house, ribbed stiffener and interior fill concrete are constituted.
Outside steel pipe thickness is 3~5mm, and steel section size is designed calculating according to bearing capacity demand.The two is using strong Grade be not less than Q345 grades of steel.
High-strength pull bar is formed using HRB500 grade high-strength reinforcement fabrications, and equal leg angle is using the shaped steel of L100 × 7.Pressure sleeve The selection of cylinder should meet《Steel concrete supporting general technology code》(JGJ107-2003)Regulation.
Ribbed stiffener use with outside steel pipe identical material, play a part of to steel pipe angle point strengthen, arrangement spacing be 300mm.Interior fill concrete uses C50 concrete.The web of equal leg angle and shaped steel passes through high-strength pull bar and pressure house Drawknot, forms the interior truss of geometrical stability.Interior truss is lifted, formulation position is placed to and carries out after the connection of bottom, is utilized Interior truss is positioned to outside steel pipe and shaped steel, and outside steel pipe is welded on to the acra of equal leg angle, and by outside steel pipe bottom Portion is welded on column root-plate.Then interior fill concrete is poured into steel pipe.In transport, hoisting process, moment of flexure is by interior truss System undertakes, and shears control in web and high-strength pull bar shared by shaped steel, work progress and deforms in elastic range, and Using 0.8 safety index.
During use, design xial feed is by outside steel pipe, shaped steel, interior fill concrete shared, lateral load Undertaken by the web of outside steel pipe and shaped steel, flexural deformation meets plane cross-section assumption.
In the case, the work progress of shaped steel-concrete filled steel tube cross section column is as follows:
The prefabrication of outside steel pipe and shaped steel is assembled:
According to the design size of shaped steel-concrete filled steel tube cross section column, welded on the web of shaped steel and on equal leg angle Connect pressure house.Ribbed stiffener is welded on outside steel pipe simultaneously.
High-strength pull bar and shaped steel and equal leg angle are subjected to assembled, compaction pressure sleeve, stable interior girder system is formed, Prefabrication completes.
Construction and installation process:Before lifting, should calculate shaped steel and high-strength pull bar and the interior truss of equal leg angle formation by Curved and shear capacity, and select rational Hoisting Program.The deformation of truss is in elastic range in being controlled during lifting, and is multiplied by 0.8 safety index.Interior truss is lifted into after predetermined installation site, carries out the connection of shaped steel, equal leg angle and substructure. Then, outside steel pipe and shaped steel are positioned using interior truss, outside steel pipe is welded on to the acra of equal leg angle, and will be outer Baogang's bottom of the tube is welded on column root-plate.Polishing outside steel pipe surface rusty stain, brushes antirust paint.After installing, internally Outside steel pipe pours interior fill concrete, maintenance to regulation age.
During use, design xial feed is by outside steel pipe, shaped steel, interior fill concrete shared, lateral load Undertaken by the web of outside steel pipe and shaped steel, flexural deformation meets plane cross-section assumption.After bearing load, interior fill concrete meeting Outwards expansion, due to the effect of high-strength pull bar, outside steel pipe can internal fill concrete form inside constraint, so as to produce bright Aobvious confined effect, and then make it that the Compressive Performance of fill concrete in mixed is improved;Also, in pressurized process Shaped Steel Web has the trend of lateral bucking, but is due to the drawknot effect of high-strength pull bar, and the trend of unstability can effectively be alleviated, The stress performance of post component obtains good raising.
The preferred embodiment of the present invention described in detail above, still, the present invention are not limited in above-mentioned embodiment Detail, in the range of the technology design of the present invention, a variety of equivalents can be carried out to technical scheme, this A little equivalents belong to protection scope of the present invention.

Claims (5)

1. prepare the method for shaped steel-concrete filled steel tube cross section column, it is characterised in that
The shaped steel-concrete filled steel tube cross section column includes outside steel pipe(1), interior fill concrete(7)With interior girder system, institute It is criss-cross shaped steel that interior girder system, which is stated, including a cross section(2), cross section is the angle steel of Γ shapes(4), it is vertical along girder system To the pressure house being arranged on angle steel and shape steel web(5), and two ends respectively with the pressure house and angle steel on shape steel web On the pull bar that is fixedly connected of pressure house(3), the angle steel is in quadrangle distribution;The angle steel and outside steel pipe, which are fixed, to be connected Connect;
Methods described comprises the following steps:
Step 1. preparation outside steel pipe, shaped steel, angle steel and sleeve;
Step 2. is in each web region of shaped steel and the two sides welded sleeve of angle steel, the sleeve in each web region of shaped steel Along the genesis analysis of shaped steel, distance of the sleeve away from shaped steel central shaft is equal, longitudinal direction of the sleeve along angle steel point in angle steel two sides Cloth;Ribbed stiffener is welded on outside steel pipe;
Step 3. installs pull bar, and clamp sleeve forms stable interior girder system;
Interior girder system is lifted into predetermined position by step 4., and shaped steel and angle steel are connected with dependency structure, after positioning, will Outside steel pipe is welded and fixed with angle steel, and the bottom of outside steel pipe and external structure are welded and fixed;
Step 5. casting concrete, maintenance to regulation age.
2. the method as claimed in claim 1 for preparing shaped steel-concrete filled steel tube cross section column, it is characterised in that the angle steel For equal leg angle.
3. the method as claimed in claim 1 for preparing shaped steel-concrete filled steel tube cross section column, it is characterised in that the outsourcing Steel pipe is multiple, and its cross section is ∏ shapes.
4. the method as claimed in claim 1 for preparing shaped steel-concrete filled steel tube cross section column, it is characterised in that the outsourcing The corner point of steel pipe is fixedly connected with ribbed stiffener(6).
5. the method as claimed in claim 1 for preparing shaped steel-concrete filled steel tube cross section column, it is characterised in that the outsourcing Steel pipe and shaped steel are not less than Q345 steel for strength grade.
CN201510524336.2A 2015-08-24 2015-08-24 Interior girder system, shaped steel concrete filled steel tube cross section column and its construction method Expired - Fee Related CN105220833B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510524336.2A CN105220833B (en) 2015-08-24 2015-08-24 Interior girder system, shaped steel concrete filled steel tube cross section column and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510524336.2A CN105220833B (en) 2015-08-24 2015-08-24 Interior girder system, shaped steel concrete filled steel tube cross section column and its construction method

Publications (2)

Publication Number Publication Date
CN105220833A CN105220833A (en) 2016-01-06
CN105220833B true CN105220833B (en) 2017-07-18

Family

ID=54990065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510524336.2A Expired - Fee Related CN105220833B (en) 2015-08-24 2015-08-24 Interior girder system, shaped steel concrete filled steel tube cross section column and its construction method

Country Status (1)

Country Link
CN (1) CN105220833B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223542B (en) * 2016-09-23 2018-07-13 中建八局第一建设有限公司 A kind of abnormity quick access formula steel column and its construction method
CN107489197A (en) * 2017-09-09 2017-12-19 北京工业大学 A kind of assembling type steel structure H profile steel post beam column node connection device with diagonal brace
CN107366362A (en) * 2017-09-09 2017-11-21 北京工业大学 A kind of assembling type steel structure Special-Shaped Column beam column node connection device with diagonal brace
CN108560823A (en) * 2018-03-28 2018-09-21 攀枝花学院 PBL puts more energy into type open steel box-concrete combination beam and construction method
CN109025062B (en) * 2018-08-24 2020-06-30 西安建筑科技大学 Special-shaped multi-cavity steel-concrete combined column
CN109610732B (en) * 2018-12-07 2021-06-11 中国建筑西北设计研究院有限公司 Steel pipe concrete special-shaped column with built-in framework
CN109610730A (en) * 2018-12-07 2019-04-12 中国建筑西北设计研究院有限公司 A kind of steel pipe concrete profiled pile for strengthening skeleton with inner corner trim
CN110056130A (en) * 2019-04-16 2019-07-26 武汉大学 FRP pipe profile sea sand fast hardening concrete coupled column
TWI721630B (en) * 2019-11-05 2021-03-11 建國科技大學 Test the structure of on-site concrete strength by shear test
CN112160502A (en) * 2020-09-18 2021-01-01 北京工业大学 Corrugated plate connected steel special-shaped column

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10231627A (en) * 1997-02-19 1998-09-02 Shimizu Corp Reinforcing method for reinforced concrete square column
WO2008133460A1 (en) * 2007-04-26 2008-11-06 M.C.S.Tech Composite concrete column and construction method using the same
CN103174260A (en) * 2013-04-09 2013-06-26 广西大学 Crossed steel concrete specially-shaped column with angle steel framework
CN203145193U (en) * 2013-03-12 2013-08-21 山东科技大学 Welding-combination type steel concrete specially-shaped column and steel girder semi-rigid node
CN103790243A (en) * 2014-02-27 2014-05-14 南京工业大学 Steel rib concrete cross-shaped column-steel beam connecting joint
CN104088399A (en) * 2014-07-02 2014-10-08 沈阳建筑大学 Cross-shaped steel pipe-steel rib recycled concrete combination column

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10231627A (en) * 1997-02-19 1998-09-02 Shimizu Corp Reinforcing method for reinforced concrete square column
WO2008133460A1 (en) * 2007-04-26 2008-11-06 M.C.S.Tech Composite concrete column and construction method using the same
CN203145193U (en) * 2013-03-12 2013-08-21 山东科技大学 Welding-combination type steel concrete specially-shaped column and steel girder semi-rigid node
CN103174260A (en) * 2013-04-09 2013-06-26 广西大学 Crossed steel concrete specially-shaped column with angle steel framework
CN103790243A (en) * 2014-02-27 2014-05-14 南京工业大学 Steel rib concrete cross-shaped column-steel beam connecting joint
CN104088399A (en) * 2014-07-02 2014-10-08 沈阳建筑大学 Cross-shaped steel pipe-steel rib recycled concrete combination column

Also Published As

Publication number Publication date
CN105220833A (en) 2016-01-06

Similar Documents

Publication Publication Date Title
CN105220833B (en) Interior girder system, shaped steel concrete filled steel tube cross section column and its construction method
CN208586936U (en) A kind of control protects brick mixed building joist and demolishes walls constructing device
CN102642247B (en) Prefabricated steel reinforced concrete (psrc) column using angle steels and method of constructing prefabricated steel reinforced concrete (psrc) column using angle steels
CN105696747B (en) The construction method of high-altitude long-span reinforced concrete beam
CN102817422A (en) Prestressed concrete constraining buckling-restrained brace
CN101538896A (en) Construction method for jettied structure at high attitude of high-rise building
CN106481023B (en) Assembled steel-concrete composite beam structure and its implementation method
CN104343214B (en) Bracket prefabricated reinforcement framework of pseudo-classic building, fabrication method of reinforcement framework, and construction method of reinforced concrete bracket of pseudo-classic building
CN107989447A (en) A kind of large-scale earthing concrete tank dome steel support structure and installation method
CN106346596A (en) Precast stair template matching system
CN103498533A (en) Prestressed H-shaped steel reinforced concrete superposed beam
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN106351445A (en) Bracing reinforcement system and installation construction method of steel reinforced concrete inclined shear wall form assembly
CN104314095A (en) Profile steel buttress for constructing super thick rafts, valve plate and construction method thereof
CN201738597U (en) Sectional steel and steel pipe combined type support system of beam with high and large cross section
CN104929294A (en) Concrete composite plate with built-in cross hollow square steel pipes
CN102808511B (en) Steel box column-concrete girder connection construction method
CN104110097B (en) A kind of end enhancement mode reinforcing bar concrete composite beam
CN206784659U (en) The Multicarity encased steel plate combined concrete shear wall of batten plate formula
CN203701549U (en) High-altitude large-span cantilever formwork
CN208310001U (en) A kind of built-in lattice stem concrete-filled steel square tubular column
CN203640257U (en) Support of overhanging type scaffold
KR101311207B1 (en) Column of steel framed reinforced precast concrete structure, manufacturing methods for the same, and construction methods for the same
CN105317146A (en) Steel structure earthquake-resistant floor for construction and manufacturing method
CN109914694A (en) A kind of steel-structure factory building load-bearing pillar and its manufacturing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170718

Termination date: 20210824

CF01 Termination of patent right due to non-payment of annual fee