CN105205202A - Current carrying capacity calculation method - Google Patents
Current carrying capacity calculation method Download PDFInfo
- Publication number
- CN105205202A CN105205202A CN201510413551.5A CN201510413551A CN105205202A CN 105205202 A CN105205202 A CN 105205202A CN 201510413551 A CN201510413551 A CN 201510413551A CN 105205202 A CN105205202 A CN 105205202A
- Authority
- CN
- China
- Prior art keywords
- current
- cable
- model
- carrying capacity
- many group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
- Electric Cable Installation (AREA)
Abstract
Disclosed is a cable current carrying capacity calculation method. A finite element method adopts finite element software as a tool. The method comprises the two main steps of simulating calculation of a cable group temperature field and numerical calculation of the current carrying capacity by using the temperature field as the condition. The method can solve the problems that the calculation process is difficult and complex and obtained data are not accurate when an existing method is adopted for calculating the cable current carrying capacity.
Description
Technical field
The invention belongs to electrical and information engineering field, be specifically related to a kind of current-carrying capacity of cable computing method.
Background technology
The current-carrying capacity of cable is the important parameter determining cable transmission ability, steady state operating current when it refers to that cable core temperature reaches 90 DEG C.Its importance relates to operation and the cable life problem of safe and reliable, the economical rationality of transmission line of electricity.The current-carrying capacity of cable is bigger than normal, and cable core working temperature can be caused to exceed permissible value, and the life-span of insulation will shorten than desired value; Current-carrying capacity is less than normal, then cable core copper material or aluminium just can not be fully utilized, and causes unnecessary waste.The determination of current-carrying capacity is a difficulty and loaded down with trivial details problem, particularly for the occasion of service condition complexity, if any the situation that a large amount of directly buried installations and comb lay.Along with the development in city, the application of these system of layings is more and more extensive, and the dense degree of cable laying is also more and more higher, and the environment of operation also becomes more complicated.Traditional calculating current-carrying capacity method is the analytical Calculation based on IEC60287, and it have ignored the proximity effect between loop, and cable conductor is visualized as isothermal surface, ignores the impact etc. of soil moisture, there is many deficiencies.Therefore a lot of experts and scholars start to be devoted to the process of iteration based on numerical evaluation, although process of iteration can obtain the exact value of current-carrying capacity theoretically, but in actual computation process, iteration all needs to do a finite element simulation each time, if iteration convergence comparatively fast may only need to do finite element simulation several times just can obtain desirable result, otherwise need to do tens of even hundreds of finite element stimulation.
Summary of the invention
Technical matters to be solved by this invention is for above-mentioned the deficiencies in the prior art, and a kind of current-carrying capacity of cable computing method provided, when it can solve and adopt the current-carrying capacity of existing method to cable to calculate, the coarse problem of computation process data that are difficult, loaded down with trivial details and that obtain.
The object of invention is achieved in that
A kind of carrying current calculation method, it comprises the following steps:
One, computation model cell type is defined;
Two, according to cable material and lay Environment Definition material properties;
Three, cable-soil-air aggregation model is set up;
Four, model is carried out folded point of operation and gives characteristic to model making the corresponding corresponding material properties of the different Element of model by Boolean calculation;
Five, FEM meshing;
Six, imposed load and constraint;
Seven, solve and obtain model temperature cloud charts;
Eight, apply many group electric currents and obtain corresponding Temperature Distribution cloud atlas, be i.e. many group conductor temperature values;
Nine, the respective function of conductor temperature and conductor current can be tried to achieve according to above many group current values and many group conductor temperature values;
Ten, according to trying to achieve current value corresponding to conductor temperature 90 DEG C and current-carrying capacity with superior function.
2, carrying current calculation method according to claim 1, is characterized in that: the numerical evaluation of described current-carrying capacity is that curve calculates.
3, carrying current calculation method according to claim 1, is characterized in that: described material properties and lay environment and specifically comprise coefficient of heat conductivity, density, elastic modulus, the cable laying degree of depth, air themperature, the soil moisture, cable pitch arrangement mode.
Adopt above-mentioned computing method, obtain following beneficial effect: computing method eliminate loaded down with trivial details and are difficult to the thermal resistance parameters of accurate Calculation, simultaneously also the alternating current resistance of calculating conductor namely need not can obtain current-carrying capacity at varying environment temperature and temperature parameter, and the current-carrying capacity Comparative result IEC standard calculated is closer to actual value, the safety of transmission line of electricity and economy and its life problems is made to have had good guarantee like this, the transmission capacity of transmission line of electricity is improved to greatest extent under ensureing the prerequisite of safety, control the transmission line of electricity loading current aging accident of minimizing cable of effective operation in the scope that current-carrying capacity allows for a long time, even reduce the fire failure that cable causes.
Embodiment
A kind of carrying current calculation method, it comprises the following steps:
One, computation model cell type is defined;
Two, according to cable material and lay Environment Definition material properties;
Three, cable-soil-air aggregation model is set up;
Four, model is carried out folded point of operation and gives characteristic to model making the corresponding corresponding material properties of the different Element of model by Boolean calculation;
Five, FEM meshing;
Six, imposed load and constraint;
Seven, solve and obtain model temperature cloud charts;
Eight, apply many group electric currents and obtain corresponding Temperature Distribution cloud atlas, be i.e. many group conductor temperature values;
Nine, the respective function of conductor temperature and conductor current can be tried to achieve according to above many group current values and many group conductor temperature values;
Ten, according to trying to achieve current value corresponding to conductor temperature 90 DEG C and current-carrying capacity with superior function.
The numerical evaluation of described current-carrying capacity is that curve calculates.
Described material properties and lay environment and specifically comprise coefficient of heat conductivity, density, elastic modulus, the cable laying degree of depth, air themperature, the soil moisture, cable pitch arrangement mode.
With YJLW02-64/110kv.1 × 300mm
2cable is calculated as example: construction of cable parameter is as subordinate list 1, and cable laying condition is as subordinate list 2, and cable material parameter is as subordinate list 3.
First in Ansys software, define its cell type is plane 6 node two-order unit; According to table 3 material parameter, material properties is set; So two dimensional model is built according to table 2 cable laying condition and table 1 construction of cable parameter; Boolean calculation is carried out folded point of operation and is made the corresponding corresponding material properties of the different material layer of model to model imparting characteristic; To finite element model stress and strain model; Load and the condition that imposes restriction; Calculating solves and obtains cable temperature cloud charts.Repeatedly secondary loading current obtain many group conductor temperature values can the respective function curve of matching conductor temperature and conductor current; Current value corresponding to conductor temperature 90 DEG C and current-carrying capacity is tried to achieve according to function curve.
Table 1 construction of cable parameter
Table 2 cable laying condition
Table 3 cable material property parameters
Claims (3)
1. a carrying current calculation method, is characterized in that, it comprises the following steps:
One, computation model cell type is defined;
Two, according to cable material and lay Environment Definition material properties;
Three, cable-soil-air aggregation model is set up;
Four, model is carried out folded point of operation and gives characteristic to model making the corresponding corresponding material properties of the different Element of model by Boolean calculation;
Five, FEM meshing;
Six, imposed load and constraint;
Seven, solve and obtain model temperature cloud charts;
Eight, apply many group electric currents and obtain corresponding Temperature Distribution cloud atlas, be i.e. many group conductor temperature values;
Nine, the respective function of conductor temperature and conductor current can be tried to achieve according to above many group current values and many group conductor temperature values;
Ten, according to trying to achieve current value corresponding to conductor temperature 90 DEG C and current-carrying capacity with superior function.
2. carrying current calculation method according to claim 1, is characterized in that: the numerical evaluation of described current-carrying capacity is that curve calculates.
3. carrying current calculation method according to claim 1, is characterized in that: described material properties and lay environment and specifically comprise coefficient of heat conductivity, density, elastic modulus, the cable laying degree of depth, air themperature, the soil moisture, cable pitch arrangement mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510413551.5A CN105205202B (en) | 2015-07-14 | 2015-07-14 | A kind of carrying current calculation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510413551.5A CN105205202B (en) | 2015-07-14 | 2015-07-14 | A kind of carrying current calculation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105205202A true CN105205202A (en) | 2015-12-30 |
CN105205202B CN105205202B (en) | 2017-12-12 |
Family
ID=54952881
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510413551.5A Active CN105205202B (en) | 2015-07-14 | 2015-07-14 | A kind of carrying current calculation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105205202B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106294963A (en) * | 2016-08-04 | 2017-01-04 | 国网上海市电力公司 | Direct-buried cable carrying current calculation method |
CN106326572A (en) * | 2016-08-26 | 2017-01-11 | 国网四川省电力公司电力科学研究院 | Calculation method of real-time current-carrying capacity of cable connector |
CN113128080A (en) * | 2019-12-31 | 2021-07-16 | 安波福电气***有限公司 | Method and apparatus for predicting temperature of wire harness |
CN113177182A (en) * | 2021-04-29 | 2021-07-27 | 中国电力工程顾问集团中南电力设计院有限公司 | GIL current-carrying capacity calculation method in tunnel |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102663412A (en) * | 2012-02-27 | 2012-09-12 | 浙江大学 | Power equipment current-carrying fault trend prediction method based on least squares support vector machine |
CN102880747A (en) * | 2012-09-06 | 2013-01-16 | 上海海事大学 | Method for modeling, calculating and analyzing temperature fields of photoelectric composite submarine cable |
CN103793558A (en) * | 2014-01-15 | 2014-05-14 | 西安交通大学 | Cable group cable core transient temperature calculation method based on finite element method |
CN104484536A (en) * | 2014-12-30 | 2015-04-01 | 深圳供电局有限公司 | Method and system for optimizing carrying capacity of cable bundle |
CN104597343A (en) * | 2015-01-08 | 2015-05-06 | 国网电力科学研究院武汉南瑞有限责任公司 | Dynamic carrying capacity assessment method for high voltage cable lines |
-
2015
- 2015-07-14 CN CN201510413551.5A patent/CN105205202B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102663412A (en) * | 2012-02-27 | 2012-09-12 | 浙江大学 | Power equipment current-carrying fault trend prediction method based on least squares support vector machine |
CN102880747A (en) * | 2012-09-06 | 2013-01-16 | 上海海事大学 | Method for modeling, calculating and analyzing temperature fields of photoelectric composite submarine cable |
CN103793558A (en) * | 2014-01-15 | 2014-05-14 | 西安交通大学 | Cable group cable core transient temperature calculation method based on finite element method |
CN104484536A (en) * | 2014-12-30 | 2015-04-01 | 深圳供电局有限公司 | Method and system for optimizing carrying capacity of cable bundle |
CN104597343A (en) * | 2015-01-08 | 2015-05-06 | 国网电力科学研究院武汉南瑞有限责任公司 | Dynamic carrying capacity assessment method for high voltage cable lines |
Non-Patent Citations (6)
Title |
---|
GARRIDO C, OTERO A F, CIDRAS J.: "Theoretical Model to Calculate Steady-State and Transient Ampacity and Temperature in Buried Cables", 《IEEE TRANSACTIONS ON POWER DELIVERY》 * |
孟凡凤, 李香龙等: "地下直埋电缆温度场和载流量的数值计算", 《绝缘材料》 * |
梁永春, 柴进爱: "基于FEM的直埋电缆载流量与外部环境关系的计算", 《电工电能新技术》 * |
范玉军: "一种电缆载流量及温度参数的换算方法", 《电线电缆》 * |
郑雁翎,许志亮: "采用MATLAB仿真的变电站高压进线温度场和载流量数值计算", 《高电压技术》 * |
黄诗雅,吴勇,李磊: "土壤直埋敷设单芯电力电缆温度场与载流量计算", 《武汉大学学报(工学版)》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106294963A (en) * | 2016-08-04 | 2017-01-04 | 国网上海市电力公司 | Direct-buried cable carrying current calculation method |
CN106326572A (en) * | 2016-08-26 | 2017-01-11 | 国网四川省电力公司电力科学研究院 | Calculation method of real-time current-carrying capacity of cable connector |
CN113128080A (en) * | 2019-12-31 | 2021-07-16 | 安波福电气***有限公司 | Method and apparatus for predicting temperature of wire harness |
CN113177182A (en) * | 2021-04-29 | 2021-07-27 | 中国电力工程顾问集团中南电力设计院有限公司 | GIL current-carrying capacity calculation method in tunnel |
CN113177182B (en) * | 2021-04-29 | 2023-06-27 | 中国电力工程顾问集团中南电力设计院有限公司 | GIL current-carrying capacity calculation method in tunnel |
Also Published As
Publication number | Publication date |
---|---|
CN105205202B (en) | 2017-12-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103048568B (en) | Three-core cable laid in cable duct current-carrying method for determination of amount and certainty annuity | |
CN103699744B (en) | Wind power master control cabinet heat management analysis and optimization method based on finite element method | |
CN105205202A (en) | Current carrying capacity calculation method | |
CN103001214B (en) | A kind of power distribution network Three Phase Power Flow based on neutral point excursion | |
CN107526872A (en) | A kind of thermal stress of 500kV extra-high-tension cables and the computational methods of deformation quantity | |
CN103793558A (en) | Cable group cable core transient temperature calculation method based on finite element method | |
CN103616588B (en) | The defining method in a kind of undersea cable current capacity and temperature field | |
CN110633496B (en) | Method for determining thermal stress and temperature in lithium ion battery discharging process based on thermal-force coupling model | |
CN102403716A (en) | Dynamic equalizing method for multi-infeed alternating/direct-current power grid | |
CN106655234B (en) | The analysis method that a kind of line impedance and dominant eigenvalues influence broad sense short-circuit ratio | |
CN107122577A (en) | A kind of current-carrying capacity of cable computational methods dynamic in real time and system | |
CN108565852B (en) | Three-stage progressive fault screening and sorting method for large power grid voltage stability evaluation | |
CN105071447A (en) | Alternating current/direct-current hybrid connection multi-infeed direct-current receiving end power grid strength obtaining method | |
CN104052053B (en) | Based on the power distribution network double line terminal section impedance analysis method of Linear Regression Model in One Unknown | |
CN106482848B (en) | Three-core cable conductor temperature dynamic acquisition method based on M-P generalized inverse | |
CN111539147A (en) | Seabed umbilical cable temperature field analysis based on finite element simulation | |
CN109167362B (en) | Power distribution network load flow calculation method considering cable thermal characteristics | |
CN105529736B (en) | Crow bar puts into double-fed fan motor group of planes fault current Equivalent Model computational methods | |
CN107944079B (en) | Method for rapidly acquiring temperature rise of pipe-arranging laying three-phase cable group based on transfer matrix | |
CN103199566A (en) | Cascading failure analytical method of alternating current and direct current multiple-series electric system | |
CN107577841A (en) | The optical fiber composite submarine cable analysis of Temperature Characteristics method of overload operation | |
CN107796533B (en) | Method for acquiring temperature of cable joint cable core | |
CN104407247B (en) | Two determination method and apparatus of parallel direct-burried cabling current-carrying capacity | |
CN107368632B (en) | Load distribution optimization method for calandria cable laying | |
Rabby et al. | Bifurcation analysis to identify voltage collapse in bangladesh power system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |