CN105203864A - Substation automatic test method and system - Google Patents

Substation automatic test method and system Download PDF

Info

Publication number
CN105203864A
CN105203864A CN201410290778.0A CN201410290778A CN105203864A CN 105203864 A CN105203864 A CN 105203864A CN 201410290778 A CN201410290778 A CN 201410290778A CN 105203864 A CN105203864 A CN 105203864A
Authority
CN
China
Prior art keywords
tested
equipment
test
type
default
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410290778.0A
Other languages
Chinese (zh)
Inventor
冯善强
黄曙
马凯
胡春潮
侯艾君
汪溢
曹丽娟
谈树峰
张晓悦
王红星
何杰
杨占杰
杨颖安
程志远
马碧燕
竹之涵
苏忠阳
魏长春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Ptswitch Electric Power Technology Co Ltd
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Ptswitch Electric Power Technology Co Ltd
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Ptswitch Electric Power Technology Co Ltd, Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Guangzhou Ptswitch Electric Power Technology Co Ltd
Priority to CN201410290778.0A priority Critical patent/CN105203864A/en
Publication of CN105203864A publication Critical patent/CN105203864A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a substation automatic test method and system and belongs to the smart grid technical field. The method includes following steps of: selecting a device to be tested contained in an SCD file, and introducing the configuration information of the test to be tested; generating a test link according to the configuration information of the device to be tested; obtaining a preset test plan corresponding to the type of the device to be tested according to the type of the device to be tested; and operating the preset test plan corresponding to the type of the device to be tested in a loopback test environment corresponding the test link so as to carry out automatic testing. With the substation automatic test method and system of the invention adopted, reliance on test personnel can be decreased, and test efficiency can be improved, and the efficiency of operation and regular maintenance of a substation can be improved.

Description

A kind of transformer station's automatic test approach and system
Technical field
The invention belongs to intelligent power grid technology field, particularly relate to a kind of transformer station automatic test approach and system.
Background technology
At present, before Digitized transformation stands in and puts into operation or prophylactic repair time the test carried out all rely on tester, there is no available automatization test system, need tester to the on-the-spot equipment manual configuration test link according to overhauling, design test scheme, and judge that whether test result is correct according to professional knowledge accumulation.There is test period length, situ configuration intricate operation, need to arrange testing scheme, cannot automatically generate test result report etc. in existing transformer station method of testing.
Summary of the invention
Embodiments provide a kind of transformer station automatic test approach and system, be intended to solve existing transformer station method of testing and rely on tester, there is situ configuration intricate operation, need the problem that testing scheme is set and automatically cannot generates test result report.
On the one hand, provide a kind of transformer station automatic test approach, described method comprises:
The equipment to be tested selecting SCD file to comprise, imports the configuration information of described equipment to be tested;
According to the configuration information of described equipment to be tested, generate test link;
According to the type of described equipment to be tested, obtain the default testing scheme corresponding with described type;
In the loopback test environment that described test link is corresponding, run the described default testing scheme corresponding with described type and automatically test.
On the other hand, provide a kind of transformer station Auto-Test System, described system comprises:
Testing server and equipment to be tested, wherein, described testing server comprises
Equipment acquiring unit, the equipment to be tested comprised for selecting SCD file, imports the configuration information of described equipment to be tested;
Link generation unit, for the configuration information according to described equipment to be tested, generates test link;
Schemes generation unit, for the type according to described equipment to be tested, obtains the default testing scheme corresponding with described type;
Testing of equipment unit, in the loopback test environment that described test link is corresponding, runs the described default testing scheme corresponding with described type and automatically tests;
Described equipment to be tested comprises:
Information feedback unit, due to the default testing scheme exported according to testing server, sends feedback signal to testing server.
In the embodiment of the present invention, the equipment to be tested selecting SCD file to comprise, imports the configuration information of described equipment to be tested; According to the configuration information of described equipment to be tested, generate test link; According to the type of described equipment to be tested, obtain the default testing scheme corresponding with described type; In the loopback test environment that described test link is corresponding, run the described default testing scheme corresponding with described type automatically to test, the present invention, reduces the dependence to tester, improve testing efficiency, improve transformer station and putting into operation or the efficiency of prophylactic repair.
Accompanying drawing explanation
Fig. 1 is the realization flow figure of transformer station's automatic test approach that the embodiment of the present invention one provides;
Fig. 2 is the concrete structure block diagram of transformer station's Auto-Test System that the embodiment of the present invention two provides.
Embodiment
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
In embodiments of the present invention, the equipment to be tested selecting SCD file to comprise, imports the configuration information of described equipment to be tested; According to the configuration information of described equipment to be tested, generate test link; According to the type of described equipment to be tested, obtain the default testing scheme corresponding with described type; In the loopback test environment that described test link is corresponding, run the described default testing scheme corresponding with described type and automatically test.
Below in conjunction with specific embodiment, realization of the present invention is described in detail:
Embodiment one
Fig. 1 shows the realization flow of transformer station's automatic test approach that the embodiment of the present invention one provides, and details are as follows:
In step S101, the equipment to be tested selecting SCD file to comprise, imports the configuration information of described equipment to be tested.
In the present embodiment, described SCD file is the file of the configuration information preserving transformer station's test macro, described configuration information includes but not limited to the configuration link information of list of devices and each equipment, and wherein, list of devices includes but not limited to device id, device type.Described testing apparatus comprises transformer, motor, generator and capacitor.By importing SCD file in the man machine operation interface of testing server, receiving the equipment to be tested that user selects SCD file to comprise, being automatically imported the configuration information of described equipment to be tested.
As a preferred version, before step S101, also comprise the default testing scheme that the type that pre-sets all described equipment to be tested is corresponding.
Wherein, described default testing scheme includes but not limited to route protection, tranformer protection, bus protection, motor protection, generator protection, capacitor protection, and it is specifically stored in testing server with scheme base form.
In step s 102, according to the configuration information of described equipment to be tested, generate test link.
In the present embodiment, testing server, according to the configuration information of described equipment to be tested, generates test link.
In step s 103, according to the type of described equipment to be tested, obtain the default testing scheme corresponding with described type.
In the present embodiment, testing server organizes the status switch of each equipment to be tested in advance, as SMV, GOOSE message, and is matched in the SMV of default testing scheme and the link information of GOOSE message by the link information of equipment to be tested.
In step S104, in the loopback test environment that described test link is corresponding, run the described default testing scheme corresponding with described type and automatically test.
In the present embodiment, after tester clicks and starts testing button, testing server exports first cycle tests, and receives the feedback signal of equipment to be tested, whether export second cycle tests according to feedback signal automatic decision and still jump to other cycle tests, until test terminates.
Concrete, this step comprises the following steps:
S11. corresponding to described type default testing scheme carries out SMV and GOOSE coding, generates some status switches of described default testing scheme;
S12. described status switch is run to the equipment described to be tested of access;
S13. receive the feedback signal of described equipment to be tested, status switch described in automatic redirect, described feedback signal comprises breaker tripping and closing signal.
Concrete, feedback signal comprises GOOSE breaker tripping and closing signal.
As another preferred version, also comprise after step s 104 according to the described selected feedback signal of equipment to be tested and the contrast situation of described default feedback signal, generate test report.
Concrete, feedback signal comprises GOOSE breaker tripping and closing signal.Testing server, according to the described selected feedback signal of equipment to be tested and the contrast situation of described default feedback signal, generates test report.
The present embodiment, can be reached through the automation of transformation substations loopback test that self-organization is in advance given out a contract for a project fast, reduce the dependence to tester, improve testing efficiency, improve transformer station and putting into operation or the efficiency of prophylactic repair, simultaneously, according to test result, automatically generate test report.
Embodiment two
Fig. 2 shows the concrete structure block diagram of transformer station's Auto-Test System that the embodiment of the present invention two provides, and for convenience of explanation, illustrate only the part relevant to the embodiment of the present invention.In the present embodiment, this transformer station's Auto-Test System comprises: testing server 1 and equipment to be tested 2.
Wherein, described testing server 1 comprises
Equipment acquiring unit 11, the equipment to be tested comprised for selecting SCD file, imports the configuration information of described equipment to be tested;
Link generation unit 12, for the configuration information according to described equipment to be tested, generates test link;
Schemes generation unit 13, for the type according to described equipment to be tested, obtains the default testing scheme corresponding with described type;
Testing of equipment unit 14, in the loopback test environment that described test link is corresponding, runs the described default testing scheme corresponding with described type and automatically tests;
The present embodiment, can be reached through the automation of transformation substations loopback test that self-organization is in advance given out a contract for a project fast, improve transformer station putting into operation or the efficiency of prophylactic repair, reducing the dependence to tester, improve testing efficiency.
Described equipment to be tested 2 comprises:
Information feedback unit 21, due to the default testing scheme exported according to testing server, sends feedback signal to testing server.
Further, described testing of equipment unit 14 carries out SMV and GOOSE coding specifically for the default testing scheme corresponding to described type, generates some status switches of described default testing scheme; Described status switch is run to the equipment described to be tested of access; Receive the feedback signal of described equipment to be tested, status switch described in automatic redirect, described feedback signal comprises breaker tripping and closing signal.
Further, described testing server 1 also comprises:
Report generation unit 15, for according to the described selected feedback signal of equipment to be tested and the contrast situation of described default feedback signal, generates test report.
In the present embodiment, testing server 1, according to test result, generates test report automatically.
Further, described testing server 1 also comprises:
Scheme presets unit 16, the default testing scheme that the type for pre-setting all described equipment to be tested is corresponding.
Transformer station's Auto-Test System that the embodiment of the present invention provides can be applied in the embodiment of the method one of aforementioned correspondence, and details, see the description of above-described embodiment one, do not repeat them here.
It should be noted that in said system embodiment, included unit is carry out dividing according to function logic, but is not limited to above-mentioned division, as long as can realize corresponding function; In addition, the concrete title of each functional unit, also just for the ease of mutual differentiation, is not limited to protection scope of the present invention.
In addition, one of ordinary skill in the art will appreciate that all or part of step realized in the various embodiments described above method is that the hardware that can carry out instruction relevant by program has come, corresponding program can be stored in a computer read/write memory medium, described storage medium, as ROM/RAM, disk or CD etc.The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.

Claims (8)

1. transformer station's automatic test approach, is characterized in that, described method comprises:
The equipment to be tested selecting SCD file to comprise, imports the configuration information of described equipment to be tested;
According to the configuration information of described equipment to be tested, generate test link;
According to the type of described equipment to be tested, obtain the default testing scheme corresponding with described type;
In the loopback test environment that described test link is corresponding, run the described default testing scheme corresponding with described type and automatically test.
2. the method for claim 1, is characterized in that, in the described test environment corresponding at described test link, the default testing scheme corresponding with described type described in running carries out automatic test and specifically comprise:
The default testing scheme corresponding to described type carries out SMV and GOOSE coding, generates some status switches of described default testing scheme;
Described status switch is run to the equipment described to be tested of access;
Receive the feedback signal of described equipment to be tested, status switch described in automatic redirect, described feedback signal comprises breaker tripping and closing signal.
3. the method for claim 1, is characterized in that, described method also comprises:
According to the described selected feedback signal of equipment to be tested and the contrast situation of described default feedback signal, generate test report.
4. the method as described in claim 1,2 or 3, is characterized in that, described method also comprises:
Pre-set the default testing scheme that the type of all described equipment to be tested is corresponding.
5. transformer station's Auto-Test System, is characterized in that, described system comprises: testing server and equipment to be tested, and wherein, described testing server comprises
Equipment acquiring unit, the equipment to be tested comprised for selecting SCD file, imports the configuration information of described equipment to be tested;
Link generation unit, for the configuration information according to described equipment to be tested, generates test link;
Schemes generation unit, for the type according to described equipment to be tested, obtains the default testing scheme corresponding with described type;
Testing of equipment unit, in the loopback test environment that described test link is corresponding, runs the described default testing scheme corresponding with described type and automatically tests;
Described equipment to be tested comprises:
Information feedback unit, due to the default testing scheme exported according to testing server, sends feedback signal to testing server.
6. system as claimed in claim 5, is characterized in that, described testing of equipment unit carries out SMV and GOOSE coding specifically for the default testing scheme corresponding to described type, generates some status switches of described default testing scheme; Described status switch is run to the equipment described to be tested of access; Receive the feedback signal of described equipment to be tested, status switch described in automatic redirect, described feedback signal comprises breaker tripping and closing signal.
7. system as claimed in claim 5, it is characterized in that, described testing server also comprises:
Report generation unit, for according to the described selected feedback signal of equipment to be tested and the contrast situation of described default feedback signal, generates test report.
8. the system as described in claim 5,6 or 7, is characterized in that, described testing server also comprises:
Scheme presets unit, the default testing scheme that the type for pre-setting all described equipment to be tested is corresponding.
CN201410290778.0A 2014-06-24 2014-06-24 Substation automatic test method and system Pending CN105203864A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410290778.0A CN105203864A (en) 2014-06-24 2014-06-24 Substation automatic test method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410290778.0A CN105203864A (en) 2014-06-24 2014-06-24 Substation automatic test method and system

Publications (1)

Publication Number Publication Date
CN105203864A true CN105203864A (en) 2015-12-30

Family

ID=54951646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410290778.0A Pending CN105203864A (en) 2014-06-24 2014-06-24 Substation automatic test method and system

Country Status (1)

Country Link
CN (1) CN105203864A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105717390A (en) * 2016-01-28 2016-06-29 东南大学 Cloud platform based testing platform and method for intelligent transformer station
CN106713037A (en) * 2016-12-27 2017-05-24 北京奇虎科技有限公司 Test method, test server and test system of data path
CN109638972A (en) * 2019-02-01 2019-04-16 国网江苏省电力有限公司 Net load interaction control method, terminal and the storage medium of adaptive part throttle characteristics
CN109815130A (en) * 2018-12-26 2019-05-28 中链科技有限公司 The storage method and system of software compatibility test based on block chain
CN115914063A (en) * 2023-02-17 2023-04-04 四川景诺电子有限公司 Intelligent terminal automatic testing method and system based on 5G communication

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103439612A (en) * 2013-09-02 2013-12-11 上海毅昊自动化有限公司 Intelligent transformer substation automatic testing system based on SCD
CN103439592A (en) * 2013-06-27 2013-12-11 国家电网公司 Method for intelligently testing intelligent substation on site
CN103529377A (en) * 2013-10-11 2014-01-22 国家电网公司 Automatic testing system and method for intelligent transformer substation digital protection device
JP2014041158A (en) * 2006-09-11 2014-03-06 Dspace Digital Signal Processing & Control Engineering Gmbh Method for testing electronic control system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014041158A (en) * 2006-09-11 2014-03-06 Dspace Digital Signal Processing & Control Engineering Gmbh Method for testing electronic control system
CN103439592A (en) * 2013-06-27 2013-12-11 国家电网公司 Method for intelligently testing intelligent substation on site
CN103439612A (en) * 2013-09-02 2013-12-11 上海毅昊自动化有限公司 Intelligent transformer substation automatic testing system based on SCD
CN103529377A (en) * 2013-10-11 2014-01-22 国家电网公司 Automatic testing system and method for intelligent transformer substation digital protection device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105717390A (en) * 2016-01-28 2016-06-29 东南大学 Cloud platform based testing platform and method for intelligent transformer station
CN105717390B (en) * 2016-01-28 2019-03-01 东南大学 A kind of intelligent substation test platform and test method based on cloud platform
CN106713037A (en) * 2016-12-27 2017-05-24 北京奇虎科技有限公司 Test method, test server and test system of data path
CN109815130A (en) * 2018-12-26 2019-05-28 中链科技有限公司 The storage method and system of software compatibility test based on block chain
CN109638972A (en) * 2019-02-01 2019-04-16 国网江苏省电力有限公司 Net load interaction control method, terminal and the storage medium of adaptive part throttle characteristics
US11204592B2 (en) 2019-02-01 2021-12-21 State Grid Jiangsu Electric Power Co., Ltd Grid load interactive control method and terminal based on adaptive load characteristics, and storage medium
CN115914063A (en) * 2023-02-17 2023-04-04 四川景诺电子有限公司 Intelligent terminal automatic testing method and system based on 5G communication

Similar Documents

Publication Publication Date Title
CN102193504B (en) Safety and stability control system modeling method in power system dynamic simulation
CN105203864A (en) Substation automatic test method and system
Jóhannsson et al. Wide-area assessment of aperiodic small signal rotor angle stability in real-time
CN105576660B (en) Local distribution network in-circuit emulation analytical equipment and system
WO2014153764A1 (en) Method and device for automatic test of relay protection function of intelligent substation
CN103529418A (en) Method and device for dynamically testing synchronized phasor measurement unit (PMU) in power system
CN103713214A (en) Intelligent transformer station relay protection closed loop test system
CN102879662A (en) Device and method for detecting secondary virtual loop of intelligent transformer substation
CN104090194A (en) Intelligent substation relay protection noninvasive test system and method
CN104133146A (en) On-site test method for feeder automation fault treatment logic
CN102290811B (en) Method for evaluating accident prearranged plan and running way
CN103605021A (en) A detection method for a line relay protection device
CN104090259A (en) Automatic gauge test platform and method based on Python script
CN103616660B (en) The testing arrangement of power down process reliability and method under intelligent electric energy meter interference environment
CN104459385A (en) Relay protection automatic testing method
CN104571082A (en) Data reproduction system and method for feeder automation testing
CN205229349U (en) A test system and looped netowrk cabinet for looped netowrk cabinet
CN103592531B (en) A kind of parameter detection method of wind energy turbine set static reacance generator and system
CN102426309A (en) Method for testing area spare power automatic switching system in engine room environment of master station
CN110954769A (en) Hardware-in-loop test system and method for distribution automation feeder terminal equipment
Shum et al. The development of a smart grid co-simulation platform and case study on Vehicle-to-Grid voltage support application
CN105158636A (en) Automatic faulty background studying and judging method based on marketing and distribution data run-through
CN102508052A (en) Test method for field band channel operation of automatic bus transfer system of area network
CN105021921A (en) Method for recognizing loop closing and opening of power grid based on topology analysis
CN104135077A (en) Power-distribution-network state simulation and evaluation system based on tree topology structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151230