CN105201459B - A kind of drilling rig tender parsing well system module stowage - Google Patents
A kind of drilling rig tender parsing well system module stowage Download PDFInfo
- Publication number
- CN105201459B CN105201459B CN201510632800.XA CN201510632800A CN105201459B CN 105201459 B CN105201459 B CN 105201459B CN 201510632800 A CN201510632800 A CN 201510632800A CN 105201459 B CN105201459 B CN 105201459B
- Authority
- CN
- China
- Prior art keywords
- derrick
- drilling
- well
- tender
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The present invention devises a kind of drilling rig tender parsing well system module stowage, main body is drilling rig tender, well system module includes derrick, drilling platforms, derrick sliding rail, well blowout preventing device, well drilling hoist, mud test room, V-arrangement ramp and URF suspension platforms, derrick is arranged at drilling rig tender deck center line, derrick side is equipped with drilling platforms, derrick sliding rail is arranged in the derrick other side, and the well drilling hoist, well blowout preventing device, mud test room, V-arrangement ramp and URF suspension platforms are arranged on the outside of upper brace.By doing sunykatuib analysis, simulation modeling to hoisting process, stability, finite element analysis etc. with scientific design software, and upgrading repacking is carried out to original ship shape facility.Effectively improve the cognition degree to the loading technology of drilling module, remedy technology field blank.
Description
Technical field:
The present invention relates to well system module more particularly to a kind of drilling rig tender parsing well system module loading sides
Method.
Background technology:
Drilling well is to utilize mechanical equipment, and stratum is drilled to the engineering of the cylindrical orifice with certain depth.It pressesRock is broken It is brokenMode and used tool type, and percussion drill and rotary drilling can be divided into.Geological workIn, it utilizesDrilling equipmentIt is drilled to underground
Diameter is smaller, column circular hole that depth is larger, also known as drill.Drilling well diameter and depth size depend on drilling well purposes and mine
Produce buried depth etc..Drill for oil, the drilling well diameter of natural gas and underground water it is all larger.Mainly function is:1. obtaining underground
Geological material, i.e., taken from drilling well rock core, the mine heart,Landwaste, liquid-like,Gaseous stateSample etc..2. asGeophysical logChannel,
It is various to obtain rock ore bedGeophysical fieldData.3. observing water table hydrogeology current intelligence as artificial channel.④
As visiting, adopting combination, tap ground water resources, the drilling well of oil gas, underground heat etc..
As the mankind are to oil gasResources development and utilizationIn-depth, oil-gas exploration and development is transferred to ocean from land.Therefore, drilling well
Engineer operation must also carry out in the vast oceans.When at sea carrying out oil/gas drilling construction, hundreds of tons of heavy drilling machines will have
The space of enough supports and placement, while also to there is drilling implementer's life to occupy residence, offshore drilling platforms are just carried on a shoulder pole
This important task is shouldered.Due to the destruction of changeable, the marine stormy waves and bathycurrent of sea climate, the stabilization of offshore drilling unit
Property and safety become more important.Support vessel is a kind of compact ship type, loads New well drilling system module and acquires a certain degree of difficulty, this skill
Art is also a blank at home.
Invention content:
To solve the above-mentioned problems, the present invention provides by with scientific design software to hoisting process, stability, limited
Meta analysis etc. does sunykatuib analysis, simulation modeling, and the technical solution of upgrading repacking is carried out to original ship shape facility:
A kind of drilling rig tender parsing well system module stowage, main body is drilling rig tender, well system module
It is flat including derrick, drilling platforms, derrick sliding rail, well blowout preventing device, well drilling hoist, mud test room, V-arrangement ramp and URF suspension
Platform, derrick are arranged at drilling rig tender deck center line, and derrick side is equipped with drilling platforms, and well is arranged in the derrick other side
Frame sliding track, well drilling hoist, well blowout preventing device, mud test room, V-arrangement ramp and URF suspension platforms are arranged on the outside of upper brace, bore
Well system module erection sequence is with derrick loading-drilling platforms-derrick sliding rail-well blowout preventing device-well drilling hoist-mud test
Room-V-arrangement ramp-URF suspension platforms are in turn mounted on drilling rig tender deck later in the past.
Preferably, derrick bottom is movably set with fixing device, fixing device includes shoe and holder, shoe cooperation
It is arranged in derrick bottom, derrick both ends bottom is provided with holder.
Preferably, further including guider, guider is equipped in shoe upper surface, guider and derrick
Bottom spud leg, which cooperates, to be arranged.
Preferably, further including module prepackage, the well system module is in installation to drilling rig tender deck upper surface
Carry out module prepackage first before.
Preferably, further include that module is weighed, the module weigh it is synchronous with module prepackage carry out, selected when module is weighed
Electronic vehicle weighing apparatus tool realizes that worst error is in 30kg.
The beneficial effects of the present invention are:
(1)The present invention does sunykatuib analysis by utilization scientific design software to hoisting process, stability, finite element analysis etc.,
Simulation modeling, and upgrading repacking is carried out to original ship shape facility.The cognition degree to the loading technology of drilling module is effectively improved, is made up
Technical field blank.
(2)The step of increasing prepackage module in invention solves the connections such as many loose equipment in part of module bottom
Part conflicts with the fixed component generation installed on deck, influences the problem of equipment uses.
Description of the drawings:
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is cross section structure schematic diagram of the present invention;
Fig. 3 is most economical structural schematic diagram;
Fig. 4 is pile shoe structure detail view.
Specific implementation mode:
To keep the goal of the invention, technical solution and advantage of the present invention clearer, below in conjunction with attached drawing to the present invention's
Embodiment is described in further detail.
Such as Fig. 1, shown in Fig. 2, the present invention devises a kind of drilling rig tender parsing well system module stowage, main body
For drilling rig tender 1, well system module includes derrick 2, drilling platforms 3, derrick sliding rail 4, well blowout preventing device 5, well drilling hoist
6, mud test room 7, V-arrangement ramp 8 and URF suspension platforms 9, derrick 2 are arranged at 1 deck center line of drilling rig tender, drilling well
2 side of frame is equipped with drilling platforms 3, and derrick sliding rail 4, well drilling hoist 6, well blowout preventing device 5, mud test is arranged in 2 other side of derrick
Room 7, V-arrangement ramp 8 and the setting of URF suspension platforms 9 are in 3 outside of upper brace, and well system module erection sequence is with derrick 2-
The drilling platforms 3- derricks well blowout preventing device 5- well drilling hoist 6- mud tests rooms sliding rail 4- 7-V shapes ramp 8-URF suspension platforms 9 are in the past
It is in turn mounted to later on 1 deck of drilling rig tender.By using scientific design software to hoisting process, stability, finite element fraction
Sunykatuib analysis, simulation modeling are done in analysis etc., and carry out upgrading repacking to original ship shape facility.Effectively improve the loading skill to drilling module
The cognition degree of art, remedy technology field blank.
Wherein 2 bottom of derrick is movably set with fixing device 10, fixing device 10 as shown in Figure 3 include shoe 10a and
Holder 10b, shoe 10a are equipped in 2 bottom of derrick, and 2 both ends bottom of derrick is provided with holder 10b.It is effective to increase
Derrick 2 when idle can keep enough stabilizations, prevent ship from being waved in stormy waves, damage derrick 2.It also wraps simultaneously
Include guider 11, as shown in figure 4, in loading process, even if sea situation very well inevitably will appear a variety of causes bring it is slight
It waves, there is still a need for the guider 11 that one supplementary module of design enters fixing device around the face plate of foundation of derrick 2, leads
The surfaces 10a in shoe are equipped with to device 11, guider 11 cooperates with 2 bottom spud leg of derrick to be arranged.
In addition, further including that module prepackage and module are weighed, well system module is in installation to drilling rig tender deck upper table
Carry out module prepackage before face first, module is weighed progress synchronous with module prepackage, selection electronic vehicle weighing apparatus work when module is weighed
Tool realizes that worst error is in 30kg.It solves and installs on the connectors such as many loose equipment in part of module bottom and deck
Fixed component generates conflict, influences the problem of equipment uses.
Above-described embodiment is presently preferred embodiments of the present invention, is not the limitation to technical solution of the present invention, as long as
Without the technical solution that creative work can be realized on the basis of the above embodiments, it is regarded as falling into patent of the present invention
Rights protection scope in.
Claims (1)
1. a kind of drilling rig tender parses well system module stowage, main body is drilling rig tender, it is characterised in that:It is described
Well system module includes derrick, drilling platforms, derrick sliding rail, well blowout preventing device, well drilling hoist, mud test room, V-arrangement ramp
And URF suspension platforms, the derrick are arranged at drilling rig tender deck center line, derrick side is equipped with drilling platforms, bores
Derrick sliding rail, the well drilling hoist, well blowout preventing device, mud test room, V-arrangement ramp and URF suspension platforms is arranged in the derrick other side
It is arranged on the outside of upper brace;The well system module erection sequence is anti-with derrick loading-drilling platforms-derrick sliding rail-
Blowout device-well drilling hoist-mud test room-V-arrangement ramp-URF suspension platforms are in turn mounted to drilling rig tender first from front to back
On plate;The derrick bottom is movably set with fixing device, and the fixing device includes shoe and holder, the shoe cooperation
It is arranged in derrick bottom, derrick both ends bottom is provided with holder;Further include guider, the guider is equipped with
In shoe upper surface, guider cooperates with derrick bottom spud leg to be arranged;Further include module prepackage, the well system
Module carries out module prepackage first before installing to drilling rig tender deck upper surface;Further include that module is weighed, the module
Weigh it is synchronous with module prepackage carry out, when module is weighed select electronic vehicle weighing apparatus tool realize, worst error is in 30kg.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510632800.XA CN105201459B (en) | 2015-09-30 | 2015-09-30 | A kind of drilling rig tender parsing well system module stowage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510632800.XA CN105201459B (en) | 2015-09-30 | 2015-09-30 | A kind of drilling rig tender parsing well system module stowage |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105201459A CN105201459A (en) | 2015-12-30 |
CN105201459B true CN105201459B (en) | 2018-07-24 |
Family
ID=54949372
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510632800.XA Active CN105201459B (en) | 2015-09-30 | 2015-09-30 | A kind of drilling rig tender parsing well system module stowage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105201459B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4819730A (en) * | 1987-07-24 | 1989-04-11 | Schlumberger Technology Corporation | Development drilling system |
CN102556293A (en) * | 2010-12-14 | 2012-07-11 | 上海船舶研究设计院 | Multifunctional module combined ocean platform and use method |
CN203007918U (en) * | 2012-11-09 | 2013-06-19 | 大连船舶重工集团有限公司 | Self-lifting type drilling platform based on truss-type stake legs |
CN203488156U (en) * | 2013-04-25 | 2014-03-19 | 德惠同利(北京)石油技术服务有限公司 | Offshore oil underwater operation system |
CN103924567A (en) * | 2014-05-06 | 2014-07-16 | 太重(天津)滨海重型机械有限公司 | Self-elevating drilling platform |
-
2015
- 2015-09-30 CN CN201510632800.XA patent/CN105201459B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4819730A (en) * | 1987-07-24 | 1989-04-11 | Schlumberger Technology Corporation | Development drilling system |
CN102556293A (en) * | 2010-12-14 | 2012-07-11 | 上海船舶研究设计院 | Multifunctional module combined ocean platform and use method |
CN203007918U (en) * | 2012-11-09 | 2013-06-19 | 大连船舶重工集团有限公司 | Self-lifting type drilling platform based on truss-type stake legs |
CN203488156U (en) * | 2013-04-25 | 2014-03-19 | 德惠同利(北京)石油技术服务有限公司 | Offshore oil underwater operation system |
CN103924567A (en) * | 2014-05-06 | 2014-07-16 | 太重(天津)滨海重型机械有限公司 | Self-elevating drilling platform |
Non-Patent Citations (1)
Title |
---|
基于虚拟仿真的钻井船大型钻井设备装配工艺研究;丁志成;《中国优秀硕士学位论文全文数据库 工程科技Ⅰ辑》;20150815;17-29 * |
Also Published As
Publication number | Publication date |
---|---|
CN105201459A (en) | 2015-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101688433A (en) | Parallel drilling and completion for a dry tree floating production facility | |
JP3945809B2 (en) | Submarine gas hydrate mining method and system | |
EA026856B1 (en) | Wellbore workstring | |
CN110261575B (en) | Test device and method for simulating multilayer rock sample | |
BR112015001943B1 (en) | y-junction block and method of performing a well maintenance service | |
CN1587640A (en) | Method and device for sea natural gas hydrate production and drilling | |
Qin et al. | A new cross‐borehole hydraulic caving technique in the coal seam with a soft layer for preventing coal and gas outbursts during coal roadway excavation | |
Zhang et al. | Permeability enhancement and methane drainage capacity of tree-type boreholes to stimulate low-permeability coal seams | |
CN101942993A (en) | Inter-well potential tomography imaging system and method while drilling | |
CN105201459B (en) | A kind of drilling rig tender parsing well system module stowage | |
CN206174871U (en) | From installing module ization ocean drilling rig | |
CN202391406U (en) | Testing apparatus for simulating pressurized operation | |
US20090173491A1 (en) | Method and system for extraction of hydrocarbons from oil shale and limestone formations | |
Spagnoli et al. | Underwater drilling rig for offshore geotechnical explorations for Oil & Gas structures | |
Zeng et al. | Challenges and solutions of an ultra-deepwater dry tree system for drilling and production in the Gulf of Mexico | |
Wang et al. | Coal and Gas Comining in the High‐Gas Detong Mine, China: Analytical and Numerical Parameter Optimization of Gas Extraction Boreholes | |
US5513929A (en) | Fixed offshore platform structures, using small diameter, tensioned, well casing tiebacks | |
de Dios et al. | Light Drilling, Well Completion and Deep Monitoring | |
Shute et al. | Conoco cuts North Sea drilling time by 40% | |
CN205823156U (en) | A kind of portable drill of truss structure | |
Li et al. | Research on Lateral Load Bearing Characteristics of Deepwater Drilling Conductor Suction Pile | |
Edmundson | Ten Technologies From the 1980s and 1990s That Made Today’s Oil and Gas Industry | |
KR101541312B1 (en) | Drilling Equipment Test System | |
Wang et al. | Study on Wellbore Stability Evaluation Method of New Drilled Well in Old Reservoir. Processes 2022, 10, 1334 | |
Jaculli et al. | Dynamic Behavior of a Novel Heave-Compensated Floating Platform for Well Interventions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 226000 No. 1, COSCO Road, Jiangsu, Nantong Patentee after: Nantong COSCO Shipping Engineering Co., Ltd. Address before: 226000 No. 1, COSCO Road, Jiangsu, Nantong Patentee before: COSCO Shipyard Group Co., Ltd. |
|
CP01 | Change in the name or title of a patent holder |