CN105201459B - A kind of drilling rig tender parsing well system module stowage - Google Patents

A kind of drilling rig tender parsing well system module stowage Download PDF

Info

Publication number
CN105201459B
CN105201459B CN201510632800.XA CN201510632800A CN105201459B CN 105201459 B CN105201459 B CN 105201459B CN 201510632800 A CN201510632800 A CN 201510632800A CN 105201459 B CN105201459 B CN 105201459B
Authority
CN
China
Prior art keywords
derrick
drilling
well
tender
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510632800.XA
Other languages
Chinese (zh)
Other versions
CN105201459A (en
Inventor
万家平
郭晓东
苑爱松
刘占斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong COSCO Shipping Engineering Co., Ltd.
Original Assignee
Cosco Shipyard Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cosco Shipyard Group Co Ltd filed Critical Cosco Shipyard Group Co Ltd
Priority to CN201510632800.XA priority Critical patent/CN105201459B/en
Publication of CN105201459A publication Critical patent/CN105201459A/en
Application granted granted Critical
Publication of CN105201459B publication Critical patent/CN105201459B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The present invention devises a kind of drilling rig tender parsing well system module stowage, main body is drilling rig tender, well system module includes derrick, drilling platforms, derrick sliding rail, well blowout preventing device, well drilling hoist, mud test room, V-arrangement ramp and URF suspension platforms, derrick is arranged at drilling rig tender deck center line, derrick side is equipped with drilling platforms, derrick sliding rail is arranged in the derrick other side, and the well drilling hoist, well blowout preventing device, mud test room, V-arrangement ramp and URF suspension platforms are arranged on the outside of upper brace.By doing sunykatuib analysis, simulation modeling to hoisting process, stability, finite element analysis etc. with scientific design software, and upgrading repacking is carried out to original ship shape facility.Effectively improve the cognition degree to the loading technology of drilling module, remedy technology field blank.

Description

A kind of drilling rig tender parsing well system module stowage
Technical field:
The present invention relates to well system module more particularly to a kind of drilling rig tender parsing well system module loading sides Method.
Background technology:
Drilling well is to utilize mechanical equipment, and stratum is drilled to the engineering of the cylindrical orifice with certain depth.It pressesRock is broken It is brokenMode and used tool type, and percussion drill and rotary drilling can be divided into.Geological workIn, it utilizesDrilling equipmentIt is drilled to underground Diameter is smaller, column circular hole that depth is larger, also known as drill.Drilling well diameter and depth size depend on drilling well purposes and mine Produce buried depth etc..Drill for oil, the drilling well diameter of natural gas and underground water it is all larger.Mainly function is:1. obtaining underground Geological material, i.e., taken from drilling well rock core, the mine heart,Landwaste, liquid-like,Gaseous stateSample etc..2. asGeophysical logChannel, It is various to obtain rock ore bedGeophysical fieldData.3. observing water table hydrogeology current intelligence as artificial channel.④ As visiting, adopting combination, tap ground water resources, the drilling well of oil gas, underground heat etc..
As the mankind are to oil gasResources development and utilizationIn-depth, oil-gas exploration and development is transferred to ocean from land.Therefore, drilling well Engineer operation must also carry out in the vast oceans.When at sea carrying out oil/gas drilling construction, hundreds of tons of heavy drilling machines will have The space of enough supports and placement, while also to there is drilling implementer's life to occupy residence, offshore drilling platforms are just carried on a shoulder pole This important task is shouldered.Due to the destruction of changeable, the marine stormy waves and bathycurrent of sea climate, the stabilization of offshore drilling unit Property and safety become more important.Support vessel is a kind of compact ship type, loads New well drilling system module and acquires a certain degree of difficulty, this skill Art is also a blank at home.
Invention content:
To solve the above-mentioned problems, the present invention provides by with scientific design software to hoisting process, stability, limited Meta analysis etc. does sunykatuib analysis, simulation modeling, and the technical solution of upgrading repacking is carried out to original ship shape facility:
A kind of drilling rig tender parsing well system module stowage, main body is drilling rig tender, well system module It is flat including derrick, drilling platforms, derrick sliding rail, well blowout preventing device, well drilling hoist, mud test room, V-arrangement ramp and URF suspension Platform, derrick are arranged at drilling rig tender deck center line, and derrick side is equipped with drilling platforms, and well is arranged in the derrick other side Frame sliding track, well drilling hoist, well blowout preventing device, mud test room, V-arrangement ramp and URF suspension platforms are arranged on the outside of upper brace, bore Well system module erection sequence is with derrick loading-drilling platforms-derrick sliding rail-well blowout preventing device-well drilling hoist-mud test Room-V-arrangement ramp-URF suspension platforms are in turn mounted on drilling rig tender deck later in the past.
Preferably, derrick bottom is movably set with fixing device, fixing device includes shoe and holder, shoe cooperation It is arranged in derrick bottom, derrick both ends bottom is provided with holder.
Preferably, further including guider, guider is equipped in shoe upper surface, guider and derrick Bottom spud leg, which cooperates, to be arranged.
Preferably, further including module prepackage, the well system module is in installation to drilling rig tender deck upper surface Carry out module prepackage first before.
Preferably, further include that module is weighed, the module weigh it is synchronous with module prepackage carry out, selected when module is weighed Electronic vehicle weighing apparatus tool realizes that worst error is in 30kg.
The beneficial effects of the present invention are:
(1)The present invention does sunykatuib analysis by utilization scientific design software to hoisting process, stability, finite element analysis etc., Simulation modeling, and upgrading repacking is carried out to original ship shape facility.The cognition degree to the loading technology of drilling module is effectively improved, is made up Technical field blank.
(2)The step of increasing prepackage module in invention solves the connections such as many loose equipment in part of module bottom Part conflicts with the fixed component generation installed on deck, influences the problem of equipment uses.
Description of the drawings:
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is cross section structure schematic diagram of the present invention;
Fig. 3 is most economical structural schematic diagram;
Fig. 4 is pile shoe structure detail view.
Specific implementation mode:
To keep the goal of the invention, technical solution and advantage of the present invention clearer, below in conjunction with attached drawing to the present invention's Embodiment is described in further detail.
Such as Fig. 1, shown in Fig. 2, the present invention devises a kind of drilling rig tender parsing well system module stowage, main body For drilling rig tender 1, well system module includes derrick 2, drilling platforms 3, derrick sliding rail 4, well blowout preventing device 5, well drilling hoist 6, mud test room 7, V-arrangement ramp 8 and URF suspension platforms 9, derrick 2 are arranged at 1 deck center line of drilling rig tender, drilling well 2 side of frame is equipped with drilling platforms 3, and derrick sliding rail 4, well drilling hoist 6, well blowout preventing device 5, mud test is arranged in 2 other side of derrick Room 7, V-arrangement ramp 8 and the setting of URF suspension platforms 9 are in 3 outside of upper brace, and well system module erection sequence is with derrick 2- The drilling platforms 3- derricks well blowout preventing device 5- well drilling hoist 6- mud tests rooms sliding rail 4- 7-V shapes ramp 8-URF suspension platforms 9 are in the past It is in turn mounted to later on 1 deck of drilling rig tender.By using scientific design software to hoisting process, stability, finite element fraction Sunykatuib analysis, simulation modeling are done in analysis etc., and carry out upgrading repacking to original ship shape facility.Effectively improve the loading skill to drilling module The cognition degree of art, remedy technology field blank.
Wherein 2 bottom of derrick is movably set with fixing device 10, fixing device 10 as shown in Figure 3 include shoe 10a and Holder 10b, shoe 10a are equipped in 2 bottom of derrick, and 2 both ends bottom of derrick is provided with holder 10b.It is effective to increase Derrick 2 when idle can keep enough stabilizations, prevent ship from being waved in stormy waves, damage derrick 2.It also wraps simultaneously Include guider 11, as shown in figure 4, in loading process, even if sea situation very well inevitably will appear a variety of causes bring it is slight It waves, there is still a need for the guider 11 that one supplementary module of design enters fixing device around the face plate of foundation of derrick 2, leads The surfaces 10a in shoe are equipped with to device 11, guider 11 cooperates with 2 bottom spud leg of derrick to be arranged.
In addition, further including that module prepackage and module are weighed, well system module is in installation to drilling rig tender deck upper table Carry out module prepackage before face first, module is weighed progress synchronous with module prepackage, selection electronic vehicle weighing apparatus work when module is weighed Tool realizes that worst error is in 30kg.It solves and installs on the connectors such as many loose equipment in part of module bottom and deck Fixed component generates conflict, influences the problem of equipment uses.
Above-described embodiment is presently preferred embodiments of the present invention, is not the limitation to technical solution of the present invention, as long as Without the technical solution that creative work can be realized on the basis of the above embodiments, it is regarded as falling into patent of the present invention Rights protection scope in.

Claims (1)

1. a kind of drilling rig tender parses well system module stowage, main body is drilling rig tender, it is characterised in that:It is described Well system module includes derrick, drilling platforms, derrick sliding rail, well blowout preventing device, well drilling hoist, mud test room, V-arrangement ramp And URF suspension platforms, the derrick are arranged at drilling rig tender deck center line, derrick side is equipped with drilling platforms, bores Derrick sliding rail, the well drilling hoist, well blowout preventing device, mud test room, V-arrangement ramp and URF suspension platforms is arranged in the derrick other side It is arranged on the outside of upper brace;The well system module erection sequence is anti-with derrick loading-drilling platforms-derrick sliding rail- Blowout device-well drilling hoist-mud test room-V-arrangement ramp-URF suspension platforms are in turn mounted to drilling rig tender first from front to back On plate;The derrick bottom is movably set with fixing device, and the fixing device includes shoe and holder, the shoe cooperation It is arranged in derrick bottom, derrick both ends bottom is provided with holder;Further include guider, the guider is equipped with In shoe upper surface, guider cooperates with derrick bottom spud leg to be arranged;Further include module prepackage, the well system Module carries out module prepackage first before installing to drilling rig tender deck upper surface;Further include that module is weighed, the module Weigh it is synchronous with module prepackage carry out, when module is weighed select electronic vehicle weighing apparatus tool realize, worst error is in 30kg.
CN201510632800.XA 2015-09-30 2015-09-30 A kind of drilling rig tender parsing well system module stowage Active CN105201459B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510632800.XA CN105201459B (en) 2015-09-30 2015-09-30 A kind of drilling rig tender parsing well system module stowage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510632800.XA CN105201459B (en) 2015-09-30 2015-09-30 A kind of drilling rig tender parsing well system module stowage

Publications (2)

Publication Number Publication Date
CN105201459A CN105201459A (en) 2015-12-30
CN105201459B true CN105201459B (en) 2018-07-24

Family

ID=54949372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510632800.XA Active CN105201459B (en) 2015-09-30 2015-09-30 A kind of drilling rig tender parsing well system module stowage

Country Status (1)

Country Link
CN (1) CN105201459B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4819730A (en) * 1987-07-24 1989-04-11 Schlumberger Technology Corporation Development drilling system
CN102556293A (en) * 2010-12-14 2012-07-11 上海船舶研究设计院 Multifunctional module combined ocean platform and use method
CN203007918U (en) * 2012-11-09 2013-06-19 大连船舶重工集团有限公司 Self-lifting type drilling platform based on truss-type stake legs
CN203488156U (en) * 2013-04-25 2014-03-19 德惠同利(北京)石油技术服务有限公司 Offshore oil underwater operation system
CN103924567A (en) * 2014-05-06 2014-07-16 太重(天津)滨海重型机械有限公司 Self-elevating drilling platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4819730A (en) * 1987-07-24 1989-04-11 Schlumberger Technology Corporation Development drilling system
CN102556293A (en) * 2010-12-14 2012-07-11 上海船舶研究设计院 Multifunctional module combined ocean platform and use method
CN203007918U (en) * 2012-11-09 2013-06-19 大连船舶重工集团有限公司 Self-lifting type drilling platform based on truss-type stake legs
CN203488156U (en) * 2013-04-25 2014-03-19 德惠同利(北京)石油技术服务有限公司 Offshore oil underwater operation system
CN103924567A (en) * 2014-05-06 2014-07-16 太重(天津)滨海重型机械有限公司 Self-elevating drilling platform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
基于虚拟仿真的钻井船大型钻井设备装配工艺研究;丁志成;《中国优秀硕士学位论文全文数据库 工程科技Ⅰ辑》;20150815;17-29 *

Also Published As

Publication number Publication date
CN105201459A (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN101688433A (en) Parallel drilling and completion for a dry tree floating production facility
JP3945809B2 (en) Submarine gas hydrate mining method and system
EA026856B1 (en) Wellbore workstring
CN110261575B (en) Test device and method for simulating multilayer rock sample
BR112015001943B1 (en) y-junction block and method of performing a well maintenance service
CN1587640A (en) Method and device for sea natural gas hydrate production and drilling
Qin et al. A new cross‐borehole hydraulic caving technique in the coal seam with a soft layer for preventing coal and gas outbursts during coal roadway excavation
Zhang et al. Permeability enhancement and methane drainage capacity of tree-type boreholes to stimulate low-permeability coal seams
CN101942993A (en) Inter-well potential tomography imaging system and method while drilling
CN105201459B (en) A kind of drilling rig tender parsing well system module stowage
CN206174871U (en) From installing module ization ocean drilling rig
CN202391406U (en) Testing apparatus for simulating pressurized operation
US20090173491A1 (en) Method and system for extraction of hydrocarbons from oil shale and limestone formations
Spagnoli et al. Underwater drilling rig for offshore geotechnical explorations for Oil & Gas structures
Zeng et al. Challenges and solutions of an ultra-deepwater dry tree system for drilling and production in the Gulf of Mexico
Wang et al. Coal and Gas Comining in the High‐Gas Detong Mine, China: Analytical and Numerical Parameter Optimization of Gas Extraction Boreholes
US5513929A (en) Fixed offshore platform structures, using small diameter, tensioned, well casing tiebacks
de Dios et al. Light Drilling, Well Completion and Deep Monitoring
Shute et al. Conoco cuts North Sea drilling time by 40%
CN205823156U (en) A kind of portable drill of truss structure
Li et al. Research on Lateral Load Bearing Characteristics of Deepwater Drilling Conductor Suction Pile
Edmundson Ten Technologies From the 1980s and 1990s That Made Today’s Oil and Gas Industry
KR101541312B1 (en) Drilling Equipment Test System
Wang et al. Study on Wellbore Stability Evaluation Method of New Drilled Well in Old Reservoir. Processes 2022, 10, 1334
Jaculli et al. Dynamic Behavior of a Novel Heave-Compensated Floating Platform for Well Interventions

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 226000 No. 1, COSCO Road, Jiangsu, Nantong

Patentee after: Nantong COSCO Shipping Engineering Co., Ltd.

Address before: 226000 No. 1, COSCO Road, Jiangsu, Nantong

Patentee before: COSCO Shipyard Group Co., Ltd.

CP01 Change in the name or title of a patent holder