CN105178947B - A kind of horizontal well looks for water blockoff integral method - Google Patents

A kind of horizontal well looks for water blockoff integral method Download PDF

Info

Publication number
CN105178947B
CN105178947B CN201510598477.9A CN201510598477A CN105178947B CN 105178947 B CN105178947 B CN 105178947B CN 201510598477 A CN201510598477 A CN 201510598477A CN 105178947 B CN105178947 B CN 105178947B
Authority
CN
China
Prior art keywords
oil
water
tracer
oil pipe
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510598477.9A
Other languages
Chinese (zh)
Other versions
CN105178947A (en
Inventor
常莉静
吕亿明
王百
罗有刚
牛彩云
朱洪征
崔文昊
庞洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201510598477.9A priority Critical patent/CN105178947B/en
Publication of CN105178947A publication Critical patent/CN105178947A/en
Application granted granted Critical
Publication of CN105178947B publication Critical patent/CN105178947B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Pipe Accessories (AREA)

Abstract

The invention provides a kind of horizontal well to look for water blockoff integral method, and step includes:1st, hole angle is more than 45 ° and net horizontal section uses box cupling chamfering oil pipe, and all switch is in open mode;2nd, suppressed from oil pipe, pressure passes to oil pipe under pump by insert pump support base, and controllable cup packer packing element discharges opening under hydraulic action, realized setting;3rd, wellhead sampling, the type and content of tracer in production fluid is analyzed, determines water exit end;4th, water is filled from well head by sleeve pipe, is then suppressed according to instruction, pressure wave is passed to oil pumping through ball-and-seat and is pumped into end oil pipe, and water exit end switch is closed automatically after being connected to instruction.When needing to block again, ground repeats operation above and closed step by step.Water detecting and plugging pipe column is made up of packer, the tracer device of storing different model, control taps etc., and every section of production layer position is opened using packer card, and water exit end can be judged according to tracer in production fluid, is closed corresponding section and is switched, realizes the purpose looked for and block up integration.

Description

A kind of horizontal well looks for water blockoff integral method
Technical field
The present invention relates to the underground in oil field development to look for shutoff method technical field, and more particularly to a kind of horizontal well looks for water blockoff Integral method, applied to horizontal well water exploration and closure High water cut section etc..
Background technology
As horizontal well development scale constantly expands, extend oil well with the development time improving oil recovery rate and facing simultaneously The problem of water breakthrough, oil well productivity declines rapidly after water breakthrough, needs badly and carries out water detection measure, could targetedly implement water blockoff.Pass The horizontal well machinery water detection technology of system uses packer sealing test zone, is controlled and produced by derailing switch, finds water exit position.Should Method must can sample after formation fluid discharges pit shaft, long for the more horizontal well of transformation hop count, measure period.At present Conventional looks for shutoff method to have the following disadvantages:
1. first segmentation production, judges High water cut section;
2. tripping in packer and tubing string are blocked, activity duration length, complex procedures.
The content of the invention
It is an object of the invention to overcome above-mentioned the deficiencies in the prior art, there is provided a kind of horizontal well looks for water blockoff integration side Method, realize that horizontal well normally produces, wellhead sampling, water exit end, water exit end switch basis are judged according to tracer type and content Instruction is operated, and water blockoff integral process is looked in realization, and reliable basis are provided for horizontal well water and oil control measure.
The technical scheme is that:A kind of horizontal well looks for water blockoff integral method, comprises the following steps:
Step 1:Handle pit shaft:The step includes drifting, sand-flushing and scraping sleeve pipe;
Step 2:Connect tubing string:It is more than 45 ° in hole angle and net horizontal section uses box cupling chamfering oil pipe, all switch is in Open mode;
Step 3:Running string:Oil pipe is passed sequentially through from top to bottom is sequentially connected each production layer position device, every section of production layer Position device is made up of oil base tracer device, control taps, water base tracer device oil pipe connection from top to bottom, wherein oil Base tracer device and water base tracer device are an annular canister, and upper and lower ends are connected with oil pipe;Every section of production layer position device Between connected using controllable cup packer through oil pipe, the bottom of tubing string passes through oil pipe and connects plug, the production layer of the top Position device is sequentially connected controllable cup packer, telescopic joint and ball-and-seat, oil well pump by oil pipe from bottom to up, ball-and-seat, Oil well pump is connected to well head by oil pipe;Wherein oil base tracer device and water base tracer device put the tracer of different model Agent;
Step 4:Base sealed packer:Suppressed from oil pipe, by insert pump support base, i.e. pump barrel, ball seat, pressure is passed under pump Oil pipe, controllable cup packer packing element discharge opening under hydraulic action, realized setting;
Step 5:Completion produces:Lower insert pump pitching lower sucker rod completion;
Step 6:Judge water exit end:Wellhead sampling, the type of oil base tracer and water base tracer is tested from production fluid And concentration, production fluid reclaimed water, the concentration of oil are determined, the oil-water ratio of product fluid is obtained on this basis, determines water exit end;
Step 7:Block water exit end:Water is filled from well head by sleeve pipe, is then suppressed according to instruction, wherein the pressure suppressed More than 2-5MPa, pressure wave is passed to oil pumping through ball-and-seat and is pumped into end oil pipe, and water exit end switch is closed automatically after being connected to instruction;When need When blocking again, the operation that ground repeats the above is closed step by step.
The packing element of above-mentioned controllable cup packer is controllable type, and maximum outside diameter is less than casing inner diameter when packing element shrinks The tripping in of tubing string is not influenceed, and maximum outside diameter realizes interference seal more than casing inner diameter in underground when packing element discharges;Cup packer Mainly it is sequentially connected and is formed by top connection component, leather cup component and lower contact component, a piston bore is provided with lower contact component, Realize hydraulic setting and deblocking and multistage use.
Above-mentioned control taps is by the pipe nipple of tubular and the battery in the pipe nipple, pressure gauge, microprocessor, driving machine Structure, connecting rod, closure switch are formed, and wherein battery is electrically connected and powered with pressure gauge, microprocessor, drive mechanism respectively;Micro- place Reason device is connected with pressure gauge, drive mechanism respectively;Drive mechanism, connecting rod and closure switch are sequentially connected;The control taps with Lead to oil channel provided with layer position oil channel and levels bit string, the connecting seat that indoor design is provided with check valve passes through silk mouth phase Connect and be integrated and form.
Above-mentioned tracer is solid tracers, including oil base tracer and water base tracer, according to 1:The mixing of 1 ratio is mounted in In annular canister, it is placed on and corresponds to pay interval, in production process, is contacted with downhole fluid, wherein oil base tracer is dissolved in oil, water Base tracer is dissolved in water, and the tracer of different model is independent of each other.
Above-mentioned oil well pump uses insert pump, telescopic joint uncompensation distance is in interposition to above carrying after design attitude under tubing string Put, prevent controllable cup packer from wriggling.
Beneficial effects of the present invention:This horizontal well provided by the invention looks for water blockoff integral method, during water detection Quan Jinghe is arranged, and water exit end can be judged according to tracer in production fluid, is closed water exit end switch, is realized the mesh for looking for water blockoff integration 's.The present invention uses downhole tracer mode, judges High water cut interval, and timely and effective closure High water cut section.Downhole packer, Water is filled from well head by sleeve pipe, is then suppressed according to instruction, pressure wave is passed to oil pumping by ball-and-seat and is pumped into end oil pipe, and water exit end is opened Pass is closed automatically after being connected to instruction.When needing to block again, ground repeats operation above and closes water exit end paragraph by paragraph.The present invention Oil base tracer device, control taps, water base tracer device, controllable cup packer are brought into target zone using oil pipe, are sealed Every device sealing test interval, one-trip string is completed to look for water blockoff function, and testing efficiency is high, and process is simple.It can be applied to middle High water cut Horizontal well judges that water level postpones, and intelligence blocks High water cut interval, and then takes water and oil control measure.
Brief description of the drawings
Fig. 1 is the tubing string general structure schematic diagram that horizontal well looks for water blockoff integral method;
Fig. 2 is that horizontal well looks for water blockoff integrated pipe column structure chart;
Fig. 3 is horizontal well hydraulic control instruction oscillogram;
Fig. 4 is control structure of water tap figure.
Description of reference numerals:1st, oil well pump;2nd, ball-and-seat;3rd, telescopic joint;4th, controllable cup packer one;5th, water base tracer Agent A;6th, taps one is controlled;7th, oil base tracer B;9th, water base tracer X;10th, taps N is controlled;11st, oil base tracer Y;12、 Pipe nipple;13rd, circuit part;14th, drive mechanism;15th, connecting rod;16th, O-ring seal;17th, closure switch;18th, fluid hole;19th, become Buckle joint;20th, pressure gauge;21st, inlet opening;22nd, intercommunicating pore;23rd, connecting seat.
The present invention is described in further details below with reference to accompanying drawing.
Embodiment
Embodiment 1:
Referring to Fig. 1 and Fig. 2, the invention provides a kind of horizontal well to look for water blockoff integral method, comprises the following steps:
Step 1:Handle pit shaft:The step includes drifting, sand-flushing and scraping sleeve pipe;
Step 2:Connect tubing string:It is more than 45 ° in hole angle and net horizontal section uses box cupling chamfering oil pipe, all switch is in Open mode;
Step 3:Running string:Oil pipe is passed sequentially through from top to bottom is sequentially connected each production layer position device, every section of production layer Position device is made up of oil base tracer device, control taps, water base tracer device oil pipe connection from top to bottom, wherein oil Base tracer device and water base tracer device are an annular canister, and upper and lower ends are connected with oil pipe;Every section of production layer position device Between connected using controllable cup packer through oil pipe, the bottom of tubing string passes through oil pipe and connects plug, the production layer of the top Position device is sequentially connected controllable cup packer, telescopic joint and ball-and-seat, oil well pump by oil pipe, and ball-and-seat, oil well pump lead to Cross oil pipe and be connected to well head;Wherein oil base tracer device and water base tracer device put the tracer of different model;Wherein Maximum outside diameter is less than the tripping in that casing inner diameter does not influence tubing string when packing element shrinks, and maximum outside diameter is more than casing inner diameter when packing element discharges Interference seal is realized in underground;As illustrated, the tubing string of the present embodiment is made up of such as lower part successively from top to bottom:Oil well pump 1, Ball-and-seat 2, flexible 3, controllable cup packer 1, water base tracer A5, control taps 1, oil base tracer B7 ... Controllable cup packer two, water base tracer X9, control taps N10, oil base tracer 11 and plug.
Step 4:Base sealed packer:Suppressed from oil pipe, by insert pump support base, i.e. pump barrel, ball seat, pressure is passed under pump Oil pipe, controllable cup packer packing element discharge opening under hydraulic action, realized setting;Accompanying drawing 3 is that horizontal well hydraulic control refers to Make oscillogram.
Step 5:Completion produces:Lower insert pump pitching lower sucker rod completion;
Step 6:Judge water exit end:Wellhead sampling, the type and content of tracer in production fluid are analyzed, determines water exit end; The type and concentration of oil base tracer and water base tracer are tested i.e. from production fluid, determines production fluid reclaimed water, the concentration of oil, It is aqueous that product fluid is obtained on the basis of this(Oil-water ratio), determine water exit end;
Step 7:Block water exit end:Water is filled from well head by sleeve pipe, is then suppressed according to instruction, wherein the pressure suppressed More than pressure threshold 2-5MPa, the pressure threshold is depths pressure under forecasting tool, and pressure wave is passed to oil pumping through ball-and-seat and is pumped into Oil pipe, water exit end switch is held to be closed automatically after being connected to instruction;When needing to block again, the operation that ground repeats the above is closed step by step Close.
Embodiment 2:
On the basis of embodiment 1, the packing element of the controllable cup packer is controllable type, when packing element shrinks most Big external diameter is less than the tripping in that casing inner diameter does not influence tubing string, and maximum outside diameter was realized more than casing inner diameter in underground when packing element discharges It is full of sealing;Cup packer is mainly sequentially connected and formed by top connection component, leather cup component and lower contact component, lower contact component In be provided with a piston bore, realize hydraulic setting and deblocking and multistage use.
As shown in figure 4, control taps is mainly by the pipe nipple 12 of tubular, and battery in the pipe nipple, pressure gauge 20, Microprocessor, drive mechanism 14, connecting rod 15, closure switch 17 form, wherein battery respectively with pressure gauge 20, microprocessor, drive Motivation structure 14 is electrically connected and powered;Microprocessor is connected with pressure gauge 20, drive mechanism 14 respectively;Drive mechanism 14, connecting rod 15 And closure switch 17 is sequentially connected;The control taps is interior with leading to oil channel provided with layer position oil channel and levels bit string The connecting seat that portion's design and installation has check valve is connected with each other by silk mouth to be integrated to form.Specifically marked in figure positioned at control water Switch the pipe nipple 12 of upper end, the circuit part 13 including battery, microprocessor, drive mechanism 14, connecting rod 15, by piston and The closure of piston cylinder composition switchs O-ring seal 16, the fluid hole in piston cylinder side wall of 17, sealing piston and piston cylinder 18th, the change buckle joint 19 of connecting short section 12 and connecting seat 23, layer position oil channel inlet opening 21, gang up connecting for oil channel Hole 22 and position positioned at control taps lower end pressure gauge 20, etc. each part, wherein closure switch 17 is a piston;Should Control structure of water tap refers to patent:DH intellectual contactor, its patent No.:ZL200720084805.The tool of the drive mechanism Body structure refers to patent:A kind of DH intellectual contactor, its patent No.:ZL 2012203805761, the closure in the patent Driving structure for opening/closing is identical with the present embodiment, is no longer described in detail herein.
1. by the state of pressure waveform controlling switch, one group of corresponding pulsed pressure wave is injected on ground, it is corresponding Switch receives pressure signal, according to signal automatic control switch;
2. every grade of switch has different Stress control codings, it can accurately receive pressure wave signal;
3. switch carries ball-and-seat, it is ensured that oil pipe interior sealing when suppressing.
Intelligent switch device switch order " suppressing-release-to suppress " operates;After derailing switch receives and identifies instruction, by finger Order requires that generation acts, and opens the layer for needing to produce, and closes the layer that need not be produced.
The tracer is solid tracers, including oil base tracer and water base tracer, and ring is mounted in after tracer solidification In shape cylinder, it is placed on and corresponds to pay interval, in production process, is contacted with downhole fluid, wherein oil base tracer is dissolved in oil, water base Tracer is dissolved in water, and the tracer of different model is independent of each other.The oil well pump uses insert pump, to after design attitude under tubing string Above carrying makes telescopic joint uncompensation distance in an intermediate position, prevents controllable cup packer from wriggling.
The tracer is solid tracers, including oil base tracer and water base tracer, according to 1:The mixing of 1 ratio is mounted in In annular canister, it is placed on and corresponds to pay interval, in production process, is contacted with downhole fluid, wherein oil base tracer is dissolved in oil, water Base tracer is dissolved in water, and the tracer of different model is independent of each other.
The oil well pump uses insert pump, telescopic joint uncompensation distance is in interposition to above carrying after design attitude under tubing string Put, prevent controllable cup packer from wriggling.
Below in conjunction with accompanying drawing of the present invention, by taking Changqing oilfields a bite horizontal well as an example to the present invention in underground sectional sampling control Method processed is clearly and completely described.
The horizontal well is a bite pressure break horizontal well, 5 sections of fracturing reform, by analyzing flooding pattern and current mining by its stroke It is divided into 3 sections of progress underground sectional sampling water detections.
Step I:Handle pit shaft.Hole deviation depth 3090m, horizontal section length 800m, casing inner diameter 124.26mm, uses Φ The drifting of 118mm × 1.5m gauguste cutters is to artificial bottom of a well, backwash sand washing, sand-flushing to artificial bottom of a well, with Φ 134mm sleeve pipe scrapings Device carries out scraping to full well section internal surface of sleeve pipe.
Step II:Connect tubing string.From top to bottom successively by plug+oil pipe+oil base tracer device+control taps+water base Tracer device+controllable cup packer+oil pipe+...+controllable cup packer+telescopic joint+ball-and-seat+oil well pump+oil pipe is extremely Well head.Hole angle is more than 45 ° and net horizontal section uses box cupling chamfering oil pipe, and all switch is in open mode.
Tracer operation principle:
After tracer solidification in annular canister, it is placed on and corresponds to pay interval, in production process, is connect with downhole fluid Touch, oil base tracer is dissolved in oil, and water base tracer is dissolved in water, and the tracer of different model is independent of each other.
Control taps operation principle:
1. by the state of pressure waveform controlling switch, one group of corresponding pulsed pressure wave is injected on ground, it is corresponding Switch receives pressure signal, according to signal automatic control switch;
2. every grade of switch has different Stress control codings, it can accurately receive pressure wave signal;
3. switch carries ball-and-seat, it is ensured that oil pipe interior sealing when suppressing.
Step III:Running string.Oil well pump uses insert pump, under tubing string to above carry after design attitude make telescopic joint compensation away from From in an intermediate position, prevent packer from wriggling.
The present embodiment control structure of water tap used(Accompanying drawing 4), it is made up of control section and circuit part.Above-mentioned control unit Dividing includes the compositions such as driving mechanism, connecting rod, fluid hole, change buckle joint, inlet opening, intercommunicating pore, connecting seat.
Above-mentioned control taps switch order " suppressing-release-to suppress " operation.After derailing switch receives and identifies instruction, press Instruction requires that generation acts, and opens the layer for needing to produce, and closes the layer that need not be produced.
Step IV:Base sealed packer.Suppressed from oil pipe, pressure passes through insert pump support base(Pump barrel, ball seat)Pass under pump Oil pipe, controllable cup packer packing element discharge opening under hydraulic action, realized setting.
Step V:Completion produces.Lower insert pump pitching lower sucker rod completion.
Step VI:Judge water exit interval.Wellhead sampling, the type and content of tracer in production fluid are analyzed, determines water outlet Section.
Step VII:Block water exit end.Water is filled from well head by sleeve pipe, is then suppressed according to instruction, pressure wave is through ball-and-seat Incoming oil pumping is pumped into end oil pipe, and water exit end switch is closed automatically after being connected to instruction.When needing to block again, ground repeats above Operation close step by step.
There is no the known conventional means of the part category industry described in detail in present embodiment, do not chat one by one here State.It is exemplified as above be only to the present invention for example, do not form the limitation to protection scope of the present invention, it is every with this Same or analogous design is invented to belong within protection scope of the present invention.

Claims (5)

1. a kind of horizontal well looks for water blockoff integral method, it is characterised in that comprises the following steps:
Step 1:Handle pit shaft:The step includes drifting, sand-flushing and scraping sleeve pipe;
Step 2:Connect tubing string:It is more than 45 ° in hole angle and net horizontal section uses box cupling chamfering oil pipe, all switch is in opening State;
Step 3:Running string:Oil pipe is passed sequentially through from top to bottom is sequentially connected each production layer position device, every section of production layer position dress Put and be made up of from top to bottom oil base tracer device, control taps, water base tracer device oil pipe connection, wherein oil base shows Track agent device and water base tracer device are an annular canister, and upper and lower ends are connected with oil pipe;Between every section of production layer position device Connected using controllable cup packer through oil pipe, the bottom of tubing string connects plug, the production layer position dress of the top by oil pipe Put and be sequentially connected controllable cup packer, telescopic joint and ball-and-seat, oil well pump from bottom to up by oil pipe, ball-and-seat, oil pumping Pump is connected to well head by oil pipe;Wherein oil base tracer device and water base tracer device put the tracer of different model; In production process, contacted with downhole fluid, oil base tracer is dissolved in oil, and water base tracer is dissolved in water, the tracer of different model It is independent of each other;
Step 4:Base sealed packer:Suppressed from oil pipe, by insert pump support base, i.e. pump barrel, ball seat, pressure passes to oily under pump Pipe, controllable cup packer packing element discharge opening under hydraulic action, realized setting;
Step 5:Completion produces:Lower insert pump pitching lower sucker rod completion;
Step 6:Judge water exit end:Wellhead sampling, the type of oil base tracer and water base tracer and dense is tested from production fluid Degree, production fluid reclaimed water, the concentration of oil are determined, the oil-water ratio of product fluid is obtained on this basis, determines water exit end;
Step 7:Block water exit end:Water is filled from well head by sleeve pipe, is then suppressed according to instruction, wherein the pressure suppressed is more than 2-5MPa, pressure wave are passed to oil pumping through ball-and-seat and are pumped into end oil pipe, and water exit end switch is closed automatically after being connected to instruction;When need again During secondary closure, the operation that ground repeats the above is closed step by step.
2. a kind of horizontal well as claimed in claim 1 looks for water blockoff integral method, it is characterised in that the controllable leather cup packing The packing element of device is controllable type, and maximum outside diameter is less than the tripping in that casing inner diameter does not influence tubing string when packing element shrinks, and packing element is released Maximum outside diameter realizes interference seal more than casing inner diameter in underground when putting;Cup packer connects leather cup by top connection, and leather cup connects Lower contact composition is connect, a piston bore is provided with lower contact, realizes hydraulic setting and deblocking and multistage use.
3. a kind of horizontal well as claimed in claim 1 looks for water blockoff integral method, it is characterised in that the control taps is by cylinder The pipe nipple of shape(12)And battery, pressure gauge in the pipe nipple(20), microprocessor, drive mechanism(14), connecting rod(15)、 Closure switch(17)Form, wherein battery respectively with pressure gauge(20), microprocessor, drive mechanism(14)Electrically connect and power; Microprocessor respectively with pressure gauge(20), drive mechanism(14)Connection;Drive mechanism(14)Connect connecting rod(15), connecting rod(15)Even Connect closure switch(17);The control taps provided with layer position oil channel and levels bit string with leading to oil channel, indoor design peace Connecting seat equipped with check valve is connected with each other by silk mouth and is integrated to form.
4. a kind of horizontal well as claimed in claim 1 looks for water blockoff integral method, it is characterised in that the tracer is solid Tracer, including oil base tracer and water base tracer, according to 1:The mixing of 1 ratio is placed on corresponding production in annular canister Interval, in production process, contacted with downhole fluid, wherein oil base tracer is dissolved in oil, and water base tracer is dissolved in water, different model Tracer be independent of each other.
5. a kind of horizontal well as claimed in claim 1 looks for water blockoff integral method, it is characterised in that the oil well pump uses bar Formula pump, make telescopic joint uncompensation distance in an intermediate position to above carrying after design attitude under tubing string, prevent that controllable cup packer is compacted It is dynamic.
CN201510598477.9A 2015-09-18 2015-09-18 A kind of horizontal well looks for water blockoff integral method Active CN105178947B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510598477.9A CN105178947B (en) 2015-09-18 2015-09-18 A kind of horizontal well looks for water blockoff integral method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510598477.9A CN105178947B (en) 2015-09-18 2015-09-18 A kind of horizontal well looks for water blockoff integral method

Publications (2)

Publication Number Publication Date
CN105178947A CN105178947A (en) 2015-12-23
CN105178947B true CN105178947B (en) 2018-04-03

Family

ID=54901302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510598477.9A Active CN105178947B (en) 2015-09-18 2015-09-18 A kind of horizontal well looks for water blockoff integral method

Country Status (1)

Country Link
CN (1) CN105178947B (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108019191B (en) * 2016-11-01 2020-02-18 中国石油化工股份有限公司 Tubular column and well completion method
CN106593422A (en) * 2016-12-01 2017-04-26 中国石油天然气股份有限公司 Storage type test method and pipe column in horizontal well oil pipe
CN107035349A (en) * 2017-06-10 2017-08-11 山东恒驰石油装备有限责任公司 A kind of interlayer pressure difference cyclic water stimulation pumping pipe string
CA3085002A1 (en) * 2017-12-13 2019-06-20 Source Rock Energy Partners Inc. Inflow testing systems and methods for oil and/or gas wells
CN110230489B (en) * 2018-03-05 2023-07-14 中国石油化工股份有限公司 Multi-section fracturing horizontal well liquid production profile testing equipment and method
CN108505990A (en) * 2018-07-05 2018-09-07 西南石油大学 A kind of down-hole oil tube tracer transmission groundwater prospecting method and device
CN109025977B (en) * 2018-10-08 2022-03-04 西南石油大学 Low-cost long-acting intelligent password water finding and controlling system and method
CN109267998B (en) * 2018-10-09 2021-11-30 中国石油天然气股份有限公司 Water plugging finding pipe column and method for separate mining and separate measurement of casing well completion horizontal well
CN109162706A (en) * 2018-11-06 2019-01-08 西安石油大学 A kind of well-case perforating horizontal well liquid production section test device, production test integral tubular column and test method
CN111271048A (en) * 2018-12-04 2020-06-12 中国石油化工股份有限公司 Device and method for testing liquid production section of horizontal well
CN110566189A (en) * 2019-09-27 2019-12-13 西安石油大学 Slow-release tracer agent real-time water exploration device, horizontal well real-time water exploration and water shutoff integrated tubular column and implementation method
CN111188590A (en) * 2020-01-06 2020-05-22 陕西隆基斯特石油科技有限公司 Plugging integrated efficient water plugging pipe column and oil extraction method
CN111382528B (en) * 2020-05-29 2020-08-28 西南石油大学 Multi-stage fracturing natural gas horizontal well tracing method based on artificial intelligence
CN114198055B (en) * 2020-09-02 2023-07-28 中国海洋石油集团有限公司 Sampling injection switching valve and sampling injection method thereof
CN114482908B (en) * 2020-10-26 2024-05-24 中国石油化工股份有限公司 Multi-layer section one-trip pipe column water finding pipe column and use method thereof
CN112302579B (en) * 2020-11-04 2021-08-10 中国石油大学(北京) Horizontal well subsection sand prevention water plugging system and method
CN112267880B (en) * 2020-11-04 2021-12-17 中国石油大学(北京) Horizontal well subsection sand prevention and water control pipe string and design method thereof
CN112360387A (en) * 2020-12-08 2021-02-12 中国石油天然气股份有限公司 Balanced production water control pipe column and method for casing completion horizontal well
CN113107473B (en) * 2021-04-01 2024-02-13 陕西靖瑞能源科技股份有限公司 Intelligent water shutoff finding method and system for horizontal well

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2256773C1 (en) * 2004-02-02 2005-07-20 Открытое акционерное общество "Всероссийский нефтегазовый научно-исследовательский институт им. акад. А.П. Крылова" Device for determining water influx intervals and water influx isolation in slanted and horizontal wells
CN100540841C (en) * 2007-02-08 2009-09-16 兰群 Producing well derailing switch water detection under production status, ask and produce and shutoff method
CN201148844Y (en) * 2007-12-28 2008-11-12 濮阳市东昊机械电子有限公司 Mechanical water research and water shutoff integrated pipe column
CN201273188Y (en) * 2008-10-08 2009-07-15 中国石油天然气股份有限公司 Integrated water exploration pipe column of casing tube well-completion horizontal well
CN201546710U (en) * 2009-11-04 2010-08-11 中国石油天然气股份有限公司 Sectionalized water-exploration testing pipe column of casing well-completion horizontal well
RU2480574C1 (en) * 2011-08-29 2013-04-27 Общество с ограниченной ответственностью "Газпром добыча Ямбург" Design of low-angle or horizontal well with possibility of control of inflow and selective water isolation
CN102587896B (en) * 2012-03-15 2015-08-05 中国石油天然气股份有限公司 Machinery water detection water blockoff is tested and is altered combined string
CN202596684U (en) * 2012-06-08 2012-12-12 中国石油天然气股份有限公司 Testing process pipe column for casing pipe well completion horizontal well multistage subsection production and water detection
CN104100234B (en) * 2013-04-03 2016-12-28 中国石油天然气股份有限公司 Multistage pressure break horizontal well in segments samples searching pipe column and method of work thereof simultaneously
CN104121013B (en) * 2013-04-25 2016-08-17 中国石油化工股份有限公司 For the water detection device of horizontal well and use its method determining water exit position
CN204252844U (en) * 2014-10-23 2015-04-08 中国石油天然气股份有限公司 A kind of horizontal well tubing string and horizontal well

Also Published As

Publication number Publication date
CN105178947A (en) 2015-12-23

Similar Documents

Publication Publication Date Title
CN105178947B (en) A kind of horizontal well looks for water blockoff integral method
CN106014346B (en) A kind of mating plunger lift water pumping gas production method and device of speed column
CN103306643B (en) A kind of water drainage gas production device and method
CN106194112B (en) A kind of oil well pipe cleaning sand washing integrated apparatus and pipe cleaning sand washing method
CN104179485B (en) Cementation and fracture technique string
CN104533356B (en) The method and oil production by layer method of a kind of two-layer automatic control oil production by layer
CN104695915A (en) Sand washing and prevention integrated completion pipe string and control method thereof
CN104213846A (en) Cased hole completion multi-section-fractured horizontal well selective production pipe column and working method thereof
CN104481489B (en) A kind of gas well straight well coiled tubing pressure break and completion integral process
CN103912257B (en) A kind of dragging multiple fracturing device with pressure
CN109138904B (en) Double-packer layered grouting water stop device and use method thereof
CN203321480U (en) Cased hole completion multi-stage fracturing horizontal well selective mining pipe column
RU131068U1 (en) IMPLOSION DEVICE FOR CLEANING BOTTOM ZONE AND WELL BOTTOM FROM RESULTS OF SONOCHEMICAL TREATMENT
CN203729968U (en) Simulation structure for bottom water control
CN103452531A (en) Method for underbalanced tubing descending, non-well-killing gas lifting, rotary pumping, pump maintaining and tubing maintaining
CN107558951A (en) A kind of hydraulic selector circulation slide sleeve
CN108131114A (en) Chemical drive injection well shut-in well process
CN103711452A (en) Gel plug packing well control method
CN204252929U (en) Oil recovery water plugging string
CN206418985U (en) A kind of new ground-dipping uranium extraction drilling physical cleaning device
CN210087252U (en) Underground continuous pipe cable separation sealing adapter
CN104895526A (en) Hydraulic cement basket
CN203879424U (en) Novel continuous sand removal device for oil and water well
CN215804489U (en) Reverse gravel filling device
CN105298443A (en) Oil pipe float valve and blowout prevention, gas lift and fracture combined operation method for underbalance well completion oil pipe descending

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant