CN105178452B - Hermetically sealed waterproof construction method - Google Patents

Hermetically sealed waterproof construction method Download PDF

Info

Publication number
CN105178452B
CN105178452B CN201510377130.1A CN201510377130A CN105178452B CN 105178452 B CN105178452 B CN 105178452B CN 201510377130 A CN201510377130 A CN 201510377130A CN 105178452 B CN105178452 B CN 105178452B
Authority
CN
China
Prior art keywords
waterproof
waterproof roll
basal plane
paving
roll
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510377130.1A
Other languages
Chinese (zh)
Other versions
CN105178452A (en
Inventor
卢桂才
伍盛江
朱方伍
申安云
卢海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiniupi Waterproof Technology Co., Ltd.
Original Assignee
GUANGXI GOLDEN UMBRELLA WATERPROOFING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI GOLDEN UMBRELLA WATERPROOFING CO Ltd filed Critical GUANGXI GOLDEN UMBRELLA WATERPROOFING CO Ltd
Priority to CN201510377130.1A priority Critical patent/CN105178452B/en
Publication of CN105178452A publication Critical patent/CN105178452A/en
Application granted granted Critical
Publication of CN105178452B publication Critical patent/CN105178452B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses hermetically sealed waterproof construction methods, are related to buildings waterproof construction field.The construction method refers to the method for carrying out compound construction using waterproof roll and waterproof sealing cream; refer to and carries out large area paving on basal plane to be onstructed using waterproof roll; node waterproof pretreatment is carried out to the position of joints on basal plane with waterproof sealing cream respectively before and after waterproof roll paving and node waterproof reinforcement is handled, finally does protective layer on waterproof roll surface;Wherein, waterproof roll is the waterproof roll that chemical crosslink reaction and the effect of physics mortise and tenon can occur with cast-in-place concrete, and waterproof sealing cream be chemical crosslinking can be carried out with cement or concrete and physics mortise and tenon cooperates with cohesive waterproof sealing cream.The method constructing operation of the present invention is simple, is easily mastered, low to basal plane and site environment requirement, can realize comprehensive, hermetically sealed waterproof effect, effectively make up the deficiency of conventional waterproof material and waterproof construction method, should be widely promoted use.

Description

Hermetically sealed waterproof construction method
Technical field
The present invention relates to buildings waterproof construction fields, more particularly, to a kind of hermetically sealed waterproof construction method.
Background technology
No matter basement or roofing or toilet are required for setting waterproof to building, according to waterproofing grade design requirement Number is set up defences using corresponding and different kind of material carries out waterproof or moisture-proof.Although waterproofing work budget only accounts for construction budget very A few part, but its effect is but extremely huge.If not carrying out building waterproof processing, basement, roofing can leak, and defend Between life, kitchen all can leak, this not only upsets the normal life, work, orders of life of people, but also directly influences whole and build Build the service life of object.
With the high speed development of capital construction cause, construction waterproofing engineering technology and various waterproof new materials, new process Exploitation is also continued to bring out with application.But current waterproof system still has some problems, and waterproof is caused to fail, specific reason Have:
1, the waterproof effect of waterproof roll is bad
Show that requirement of the waterproof roll to formation level is high first, if base surface out-of-flatness or peeling, dusting, contained Water rate is too high, will have a direct impact on coiled material and the bond effect of base, and coil waterproof layer is caused to generate drum alice phenomenon.Followed by On showing the cohesive force of waterproof roll and formation level not enough, general waterproof roll only has physics with cast-in-place concrete bottom plate Mortise and tenon active force be easy to cause the bonding failure of basal plane and coiled material, generates interlayer string water drainage.It is that market is common anti-again There are the insecure problems of edge fit for water coiled material, as used welded lap, are susceptible to solder skip, rosin joint, cross weldering phenomenon;Gluing is taken It connects, then adhesion strength is low, is easily detached from;Using hot melt, overlapped, and heating temperature is not easy control, and adhesion strength is uneven.
2, the processing of position of joints
During the waterproof construction of coiled material, when encounter on basal plane have negative and positive angle, construction joint, deformation joint, post-cast strip, wear When the position of joints such as wall coil, pile crown, drain gully, there is certain height in the connection transition position of these position of joints and basal plane Difference is then difficult to coiled material in special-shaped part and basal plane if being laid with coiled material and carrying out waterproof due to the thickness and elasticity of coiled material itself Connection transition position be closely bonded completely, bring leak, water of leaping up hidden danger;If using traditional polyurethane water-proof paint, Polymer waterproof coating material, hot melt ointment etc. are smeared at node, it may appear that water-repellent paint and all kinds of material bad adhesions, it is moist, Moisture surface can not bond, and these coating are incompatible with big face waterproof roll material, easily be detached from layering, there are very big percolating waters Hidden danger.
According to analysis, the generation of the leakage problems of waterproofing work 90% is all to be happened at few position of joints, at coiled material lapping Equal positions.Because traditional waterproof system belongs to shading type waterproof, can be played in the case of no breakthrough preferable anti- Water effect, but big face waterproof layer breaking point once occurs or overlap edge is not firm, and position of joints handles leakiness, just will appear Broken some leakage is a piece of, directly affects entire waterproof system, causes waterproof failure.
It follows that conventional waterproof material and waterproof construction method there is also many deficiencies, need to develop more green woods Material, new technology, new method and new process improve the safe and reliable effect of construction waterproofing engineering.
Invention content
It is an object of the invention to:In view of the above problems, a kind of safe and reliable hermetically sealed waterproof construction is provided Method, this method can be realized secured between waterproof roll and basal plane to be onstructed, between node sealing material and position of joints Seal bond can realize that the sealing of the lap-joint between waterproof roll lap-joint, waterproof roll and node sealing material is merged, to The waterproof effect realized hermetically sealed waterproof, prevent leakage.
To achieve the goals above, the technical solution adopted by the present invention is as follows:
Hermetically sealed waterproof construction method refers to the method for carrying out compound construction using waterproof roll and waterproof sealing cream, institute It refers to that large area paving is carried out on basal plane to be onstructed using waterproof roll to state compound construction, before and after waterproof roll paving respectively Node waterproof pretreatment is carried out to the position of joints on basal plane with waterproof sealing cream and node waterproof reinforcement is handled, finally in waterproof Coiled material surface does protective layer;
Wherein, waterproof roll of the present invention is that chemical crosslink reaction and the effect of physics mortise and tenon can occur with cast-in-place concrete Waterproof roll, the waterproof sealing cream can be carried out with cement or concrete chemical crosslinking and physics mortise and tenon cooperate with bonding Waterproof sealing cream.
Further, the compound construction refers to that large area paving is carried out on basal plane to be onstructed using waterproof roll, when When formation level is equipped with negative and positive angle, construction joint, deformation joint, post-cast strip class regular node, used before waterproof roll paving Enhancement layer is done in waterproof roll paving at node;When formation level is equipped with the irregular node of wall pipe, pile crown class, waterproof is used Sealing compound carries out node waterproof pretreatment to position of joints and node waterproof reinforcement is handled, and is finally protected on waterproof roll surface Layer;
The waterproof roll is the waterproof roll that chemical crosslink reaction and the effect of physics mortise and tenon can occur with cast-in-place concrete, The waterproof sealing cream is chemical crosslinking can be carried out with cement or concrete and physics mortise and tenon cooperates with cohesive waterproof sealing cream.
In the present invention, the waterproof roll chemical crosslink reaction can occur with cast-in-place concrete and physics mortise and tenon acts on, The waterproof roll is the multilayer using modification sealant layer, macromolecular sheet material layer and fibre structure protective layer with reactivity Material cladding forms.It can apply on October 9th, 2009 using the applicant and obtain the Chinese patent of mandate, title:With Concrete carries out the waterproof roll of chemical crosslinking and physics mortise and tenon collaboration bonding, anti-in number of patent application 200910114456.X Water coiled material, that is, the composition for using pitch to be mixed with functional aid, filler, thickener and water are made.
In the present invention, the sealing compound be commercial type common waterproof sealing cream or can be with cement or concrete Carry out the waterproof sealing cream of chemical crosslinking and physics mortise and tenon collaboration bonding.The sealing compound can with metal, plastics, rubber, ceramics, More material interfacial adhesions such as concrete, waterproof roll, and be livering state, facade brushing is not trickled, and is easily formed a film.This can be used Applicant's Chinese patent application submitted on November 10th, 2012, title:Modified emulsifying asphalt waterproof sealing cream and its preparation side Method, application number:Sealing compound in CN201210446557.9, that is, use rubber latex and functional aid, filler, thickener and The composition of water mixing is made.
The sealing compound can also use on 07 03rd, 2013 Chinese patent application submitted of the applicant, title:With The waterproof sealing cream of chemical crosslinking and physics mortise and tenon, number of patent application occur for cement:201310276909.5 that is, using synthesis rubber The composition that glue latex, emulsified asphalt, functional aid, thickener, filler, plasticizer, water mix is made.
The sealing compound can also use the applicant's in the November, 2012 year of the Chinese patent application submitted on the 10th, title: Reaction bonded type node sealing compound and preparation method thereof, number of patent application:201210446551.1 i.e. pitch, modifying agent, emulsification Agent, crosslinking agent, thickener, reinforcing agent and water.
Further, when being constructed, when have on basal plane to be onstructed concave-convex place need repairing when, can by cement with Water is 2-2.5 according to weight ratio:1 is mixed into cement mortar, and then the waterproof sealing cream of addition cement mortar total weight 3-8%, which is used as, repaiies Tonic is repaired.
Further, when protective layer is done on waterproof roll surface, one layer weight ratio of blade coating is 1:1-1:3 cement mortar, Form the protective layer that thickness is 3-5mm.
Further, large area paving waterproof roll may be used wet-laid process, empty laid process or using first brushing waterproof sealing The method that viscous paving waterproof roll is done after cream.
Wherein, use the specific method of empty laid process paving waterproof roll for:First by waterproof roll plane sky paving or facade Be fixed temporarily, then again casting concrete with waterproof roll is counter glues, form integral sealing effect.
Use the specific method of wet-laid process paving waterproof roll for:It is 2 by weight by cement and water:1 system of stirring evenly At cement mortar, a cement mortar is scraped in formation level, and after waterproof roll scrapes a cement mortar, waterproof roll is scraped and is coated with water The one side paving of mud scrapes exhaust among waterproof roll to formation level, with scraper plate to both sides, and coiled material is made fully completely to stick at On basal plane, finally the cement slurry for scraping discharge is returned and scrapes closing in sealing.
Use do after first brushing waterproof sealing cream the method for viscous paving waterproof roll for:Waterproof sealing cream is pressed with water first It is 0.8-1.2 according to volume ratio:A primary coat is done after 1 mixing, then the large area brushing waterproof sealing by the way of scumbling multipass Cream, coating layer thickness is 1.2-2.0mm after sealing layer of paste is solid;Then it is anti-that viscous one layer of paving paving is done on the sealing compound coating after solid Water coiled material.
In the present invention, the position of joints refers to drain gully, floor drain, Guan Gen, pile crown, negative and positive angle, crack, day on basal plane Ditch or eaves gutter.
In the present invention, the pretreated method of position of joints waterproof is:Before large area paving waterproof roll, with hairbrush by waterproof Sealing compound is uniformly applied to the connection transition position of position of joints and basal plane, keeps the connection transition position of position of joints and basal plane complete Sealing covering.
In the present invention, the method for position of joints waterproof reinforced processing is:It, will with hairbrush after large area paving waterproof roll Waterproof sealing cream is uniformly applied to position of joints and basal plane, the connection transition position of waterproof roll, makes position of joints and basal plane, waterproof The connection transition position of coiled material is all completely sealed covering.
The jail between waterproof roll and basal plane to be onstructed, between node sealing material and position of joints may be implemented in the present invention Gu seal bond can realize that the sealing of the lap-joint between waterproof roll lap-joint, waterproof roll and node sealing material is merged, from And the waterproof effect realized hermetically sealed waterproof, prevent leakage.The reason for this is that:
Secure seal bonding may be implemented between waterproof roll and basal plane to be onstructed:In waterproof roll used in the present invention added with Special modifying agent (see the authorized Chinese patent of the applicant, applying for 200910114456.X), passes through chemical crosslinking and object Manage the synergistic effect (Chemical Bonding and Physical Crosslinking Synergism) of mortise and tenon referred to as CPS, so that it may so that coiled material is wriggled in the basal planes process of setting such as cement, concrete penetrates into cement gel and concrete capillary Hole forms netted mortise and tenon, and is chemically reacted with cement related compounds, forms chemical crosslinking effect, plays CPS effects, make Waterproof roll reaches the adhesive effect that as closely linked as flesh and blood with concrete.It not only has self-adhesion during with concrete binding The aqueous performance of creep crack resistance, self-healing, wet bonding, the anti-channeling of coiled material, more highlights it in concrete interface bonding side The unique advantage in face, it is formation " interpenetrating grid type " interfacial structure between waterproof roll and concrete, to reach combination Closely, secured, irreversible as closely linked as flesh and blood bond effect, thoroughly solve modified bituminous pitch coiled material it is not big enough with basal plane cohesive force, Cohesive force not persistently, problem easily affected by environment, realize coiled material and basal plane formed bond it is irreversible, be not damaged integral type Hermetic water-proof structure layer makes hermetically sealed waterproof idea obtain perfect realization.
It is Nian Jie that secure seal may be implemented between node sealing material and position of joints:Due to the anti-watertight of node sealing material Envelope cream is that functional aid is added, passes through functional aid using synthetic rubber latex and modified rubber emulsified asphalt as raw material Coupled action makes synthetic rubber molecule be coupled into the macromolecular with reactivity, this macromolecular and cement with asphaltene molecule Or when concrete surface contact, rubber molecule and asphaltene molecule section form physical absorption with basal plane, and big with reactivity Chemical bonding suction-operated occurs for molecule and basal plane, generates very strong chemical interactions, therefore waterproof sealing cream and basal plane is viscous It is very strong to tie power, it is not easy to influenced by extraneous factor, can also with a variety of materials such as plastics, metal, ceramics etc. into Row effectively bonding in addition, waterproof sealing cream is aqueous, therefore can construct in moist basal plane.It is the thin of waterproof at node Weak link, the present invention pre-process node and reinforce handling twice treatment process, it can be ensured that the sealing at node is not leaked Water.
Secure seal fusion may be implemented in lap-joint between waterproof roll:Seam crossing between waterproof material is waterproof One of weak link is easy to fall off in seam crossing generation with traditional waterproof roll, and uses and concrete or cement gel energy Enough waterproof rolls for playing the common reaction bonded sealant layer for playing chemical crosslink reaction and physics mortise and tenon synergistic effect, cement, Wriggle during concrete setting and penetrate into cement gel and concrete pore, reach be tightly combined, be secured, irreversible bone Meat is connected bond effect, its bonding force is big, not only has physical absorption and mortise and tenon effect, but also at the mortise and tenon position gone down to the grass-roots units Chemical bonding effect is generated, so that two kinds of effect collaborations of mortise and tenon and chemical crosslinking is carried out, makes bonding more firm, can reach anti- Water layer and concrete be tightly combined, firm effect.
Strong bond may be implemented between waterproof roll and node sealing material:Large area waterproof roll and node sealing material Raw material are same materials used by expecting sealing compound, have good compatibility, therefore can ensure that the secure seal of the two is melted It closes.
In conclusion by adopting the above-described technical solution, the beneficial effects of the invention are as follows:
1, the present invention can play chemical crosslink reaction and the physics fourth of the twelve Earthly Branches jointly using the present inventor's research with cement, concrete The waterproof material and node sealing material of tenon synergistic effect are with modified rubber emulsified asphalt using synthetic rubber latex as raw material, Functional aid is added, by the coupled action of functional aid, synthetic rubber molecule is made to be coupled at anti-with asphaltene molecule Answer active macromolecular, when this macromolecular is contacted with cement or concrete surface, rubber molecule and asphaltene molecule section and basal plane Physical absorption is formed, and with basal plane chemical bonding suction-operated occurs for the macromolecular with reactivity, generates very strong chemistry Active force, therefore the cohesive force of waterproof sealing cream and basal plane is very strong, formation is tightly combined, is secured, irreversible as closely linked as flesh and blood Bond effect, so as to realize the jail between waterproof roll and basal plane to be onstructed, between node sealing material and position of joints Gu seal bond, waterproof roll seam crossing, waterproof roll are merged with the sealing between node sealing material.The present invention not only focuses on The effect of large area waterproof, and effective measures leak stopping is used for the node of each waterproof weakness, it can realize complete close Envelope, comprehensive waterproof, the waterproof effect for preventing leakage completely.
2, the present invention healant that washcoat uses in the construction process is according to weight ratio by cement and water for 2- 2.5:1 is mixed into cement mortar, and the sealing compound configuration of cement mortar total weight 3-8% is then added and is made, compared to tradition cement Mortar washcoat withouts waiting for the healant thoroughly solid construction that can be carried out next step, can shorten the construction period, especially The engineering for being suitble to the duration tight uses.
3, the present invention is before laying water-proof coiled material, according to volume ratio can be 0.8-1.2 by sealing compound and water:After 1 mixing A primary coat is done, basal plane wetting is played, enhances the effect of bonding force.
4, construction method of the invention does protective layer on waterproof layer, avoids being handed over by the later stage after waterproof construction The destruction that construction operation occurs is pitched, relative to 50mm thickness C20 pea gravel concretens are laid with, the construction protective layer of the invention can not only be protected Fine waterproofing protection effect is demonstrate,proved, while substantially reducing duration cost, largely saving construction cost cost.
5, the hermetically sealed waterproof construction method constructing operation of the present invention is simple, is easily mastered, to basal plane and site environment requirement It is low, it can realize comprehensive, hermetically sealed waterproof effect, effectively make up the deficiency of conventional waterproof material and waterproof construction method, Should be widely promoted use.
Specific implementation mode
A kind of present invention construction method of hermetically sealed waterproof to be protected passes through having for waterproof material and node sealing material Seal bond is imitated, can reach comprehensive, hermetically sealed, prevent the waterproof effect of leakage.Below by way of specific embodiment to this hair It is bright to be described in further detail.
Embodiment 1
Nanning cell shed deckhead, in September, 2013 construction, construction site have negative and positive angle, gutter, deformation joint, The nodes such as drain gully, wall pipe, construction environment is moister, is constructed using hermetically sealed waterproof construction method, and what is used is anti- Water coiled material is that the applicant applies and obtained the Chinese patent product of mandate, number of patent application on October 9th, 2009 Waterproof roll in 200910114456.X;The node sealing compound used is the applicant on November 10th, 2012 submits State's patent application, application No. is the sealing compounds in CN201210446557.9.
The sundries on basal plane to be onstructed is cleared up first, and the concave-convex place on basal plane is smooth with cement mortar repairing, in the moon With cement mortar rounding arc at external corner, at negative and positive angle, gutter, it is the waterproof roll paving of 500mm at node to use width Do enhancement layer;Wall pipe, drain gully node at, sealing compound is uniformly applied to the connection of position of joints and basal plane with hairbrush Place to be crossed, is brushed 2 times, overall thickness control is in 1-3mm, and the width that basal plane smears sealing compound is 60mm, and it is 50mm that facade, which smears height, The connection transition position of position of joints and basal plane is set to be completely covered.
Then it is layered on basal plane to be onstructed using wet-laid process laying water-proof coiled material, is 2 by weight by cement and water:1 It stirs evenly and cement mortar is made, scrape a cement mortar in formation level, and after waterproof roll scrapes a cement mortar, waterproof is rolled up Material scrapes the one side paving for being coated with cement mortar to formation level, scrapes exhaust to both sides among waterproof roll with scraper plate, makes coiled material It fully completely sticks on basal plane, finally returns to scrape the cement slurry for scraping discharge and receive head sealing.Meet wall pipe, the irregular section of pile crown class When point position, the paving number of plies of paving waterproof roll to position of joints edge, waterproof roll is 2 layers, adjacent two width waterproof roll Between when overlapping, previous width presses latter width to be overlapped, and effective lap width of adjacent two width waterproof roll is not less than 80mm, the One layer of waterproof roll tears facial mask after being laid with, and re-lays second layer waterproof roll, must be completely viscous between two layers of waterproof roll, on Coiled material lapping stitches the breadth 1/3 that need to be staggered between lower layer.After having spread waterproof roll, check that whether there is or not tearing, puncture, gas in all coiled material faces It steeps, overlap bad situation, when repairing cleans out rejected region, is carried out reinforcing sealing repairing with sealing compound;There is bubble portion Position cut exhaust, and on rejected region be capped size be 100-150mm × 100-150mm waterproof roll be used as extra play or Sealing compound is filled up.
Finally, in wall pipe, the irregular position of joints of pile crown class, sealing compound is uniformly applied to node with hairbrush again The connection transition position of position and basal plane is brushed 2 times, and in 1-3mm, the width that basal plane smears sealing compound is 60mm, is stood for overall thickness control It is 50mm that height is smeared in face, and position of joints and the connection transition position of waterproof roll, basal plane is made to be completely sealed covering;
In order to avoid waterproof layer is destroyed by construction in later period, it is 1 to scratch a layer weight ratio on waterproof roll surface:3 Cement mortar forms protective layer, protective layer thickness 3mm.
Engineering waterproofing construction finishes so far, and is tested by two rainy seasons, has not found leakage and seminess.
Embodiment 2
The roof of Guangxi building constructs, there is parapet, drain gully, roof vent pipe, drainpipe constant pitch for 01 month 2014 Point is constructed using hermetically sealed waterproof construction method, and the waterproof roll used is that the applicant applies on October 9th, 2009 And the Chinese patent product of mandate, the waterproof roll in number of patent application 200910114456.X are obtained;The node used is close Seal cream be the applicant in the Chinese patent application submitted on November 10th, 2012, application No. is in CN201210446551.1 Sealing compound.
The sundries on basal plane to be onstructed is cleared up first, and repairing at the bumps on basal plane is smooth, filled using healant Recess, it according to weight ratio is 2 that healant used, which is by cement and water,:1 is mixed into cement mortar, and cement mortar total weight is then added 8% sealing compound is configured and is made.It is the anti-of 50cm with cement mortar rounding arc, then lay width in the corner of parapet Sealing compound is uniformly applied to node by water coiled material enhancement layer at the nodes such as drain gully, roof vent pipe, drainpipe with scraper plate The connection transition position at position and basal plane is brushed 2 times, and in 1mm, the width that basal plane smears sealing compound is 100mm, is stood for overall thickness control It is 30mm that height is smeared in face, and the connection transition position of position of joints and basal plane is made to be completely covered.
Then waterproof roll is layered on using the method for doing viscous paving waterproof roll after first brushing waterproof sealing cream to be onstructed Basal plane on, according to volume ratio be 0.8-1.2 by sealing compound and water:A primary coat is done after 1 mixing, then uses scumbling multipass The pure sealing compound of mode large area brushing, coating layer thickness is 1.2-2.0mm after sealing compound is solid;Then the sealing compound after solid applies One layer of waterproof roll of viscous paving is done on layer.When meeting the irregular position of joints of wall pipe, pile crown class, paving waterproof roll to node Position edge.When being overlapped between adjacent width waterproof roll, previous width presses latter width to be overlapped, and adjacent two width waterproof roll has It imitates lap width and is not less than 80mm.After having spread waterproof roll, check that whether there is or not tearing, puncture, bubble, overlap joint are bad in all coiled material faces The case where, when repairing, cleans out rejected region, is carried out reinforcing sealing repairing with sealing compound;There is bubble position to cut exhaust, And it is capped the waterproof roll that size is 100-150mm × 100-150mm on rejected region and makees extra play or is filled up with sealing compound.
Finally, the position of joints such as at the nodes such as drain gully, roof vent pipe, drainpipe, again with scraper plate by sealing compound It is uniformly applied to position of joints and basal plane, the connection transition position of waterproof roll, is brushed 2 times, overall thickness control is applied in 1mm, basal plane The width for smearing sealing compound is 100mm, and it is 30mm that facade, which smears height, makes the connection transition of position of joints and waterproof roll, basal plane Place is completely sealed covering.
In order to avoid waterproof layer is destroyed by construction in later period, it is 1 to scratch a layer weight ratio on waterproof roll surface:1 Cement mortar forms protective layer, protective layer thickness 5mm.
Engineering waterproofing construction finishes so far, and is tested by 5 months rainy seasons, has not found that leakage and crackle are existing As.
Embodiment 3
The swimming pool of Guangxi club, construction, built the closely knit concrete self-waterproof layer of structure, adopted in March, 2014 It is constructed with hermetically sealed waterproof construction method, the waterproof roll used is that the applicant applies on October 9th, 2009 and Obtain the Chinese patent product authorized, the waterproof roll in number of patent application 200910114456.X;The node sealing compound used It is the applicant in the Chinese patent application submitted on July 3rd, 2013, application No. is the sealings in CN201310276909.5 Cream.
The sundries on basal plane to be onstructed is cleared up first, and repairing at the bumps on basal plane is smooth, filled using healant Recess, it according to weight ratio is 2.5 that healant used, which is by cement and water,:1 is mixed into cement mortar, and cement mortar gross weight is then added The sealing compound of amount 3% is configured and is made.In the corner of swimming pool cement mortar rounding arc, then use width for 30cm's Enhancement layer is done in waterproof roll paving at node;At the wall pipes root such as water inlet, water outlet, sealing compound is uniformly applied with hairbrush The connection transition position in position of joints and basal plane is smeared, is brushed 3 times, overall thickness control smears the width of sealing compound in 1-3mm, basal plane For 60mm, it is 50mm that facade, which smears height, and the connection transition position of position of joints and basal plane is made to be completely covered;
Then waterproof roll is layered on basal plane to be onstructed using empty laid process, waterproof roll plane sky is spread or stood first Face is fixed temporarily, then again casting concrete with waterproof roll is counter glues, form integral sealing effect.When meeting position of joints, paving For waterproof roll to position of joints edge, the paving number of plies of waterproof roll is 2 layers, preceding when being overlapped between adjacent width waterproof roll One width presses latter width to be overlapped, and effective lap width of adjacent two width waterproof roll is not less than 80mm, first layer waterproof roll Facial mask is torn after being laid with, and re-lays second layer waterproof roll, must be completely viscous between two layers of waterproof roll, coiled material between levels Overlapping the slot need to be staggered breadth 1/3.After having spread waterproof roll, check that whether there is or not tearing, puncture, bubble, overlap joint are bad in all coiled material faces The case where, when repairing, cleans out rejected region, is carried out reinforcing sealing repairing with sealing compound;There is bubble position to cut exhaust, And it is capped the waterproof roll that size is 100-150mm × 100-150mm on rejected region and makees extra play or is filled up with sealing compound.
Finally, at the wall pipes root such as water inlet, water outlet, sealing compound is uniformly applied to position of joints with hairbrush again It with the connection transition position of basal plane, brushes 2-3 times, in 1-3mm, the width that basal plane smears sealing compound is 60mm, is stood for overall thickness control It is 50mm that height is smeared in face, and position of joints and the connection transition position of waterproof roll, basal plane is made to be completely sealed covering.
The swimming pool so far, has not found leakage and seminess by use more than a year.

Claims (2)

1. hermetically sealed waterproof construction method refers to the method for carrying out compound construction using waterproof roll and waterproof sealing cream, special Sign is:The compound construction refers to that large area paving is carried out on basal plane to be onstructed using waterproof roll, is spread in waterproof roll Node waterproof pretreatment is carried out to the position of joints on basal plane with waterproof sealing cream respectively before and after patch and node waterproof reinforcement is handled, Finally protective layer is done on waterproof roll surface;
The waterproof roll is the waterproof roll that chemical crosslink reaction and the effect of physics mortise and tenon can occur with cast-in-place concrete, described Waterproof sealing cream is chemical crosslinking can be carried out with cement or concrete and physics mortise and tenon cooperates with cohesive waterproof sealing cream;
According to weight ratio it is 2-2.5 by cement and water when there is concave-convex place to need repairing on basal plane to be onstructed:1 is mixed into water Mud, the waterproof sealing cream that cement mortar total weight 3-8% is then added are repaired as healant;
When protective layer is done on waterproof roll surface, one layer weight ratio of blade coating is 1:1-1:3 cement mortar, it is 3- to form thickness The protective layer of 5mm;
The large area paving waterproof roll may be used wet-laid process, empty laid process or glue paving using being done after first brushing waterproof sealing cream The method for pasting waterproof roll;
Use the specific method of the empty laid process paving waterproof roll for:It is first that waterproof roll plane sky paving or facade is temporarily solid It is fixed, then again casting concrete with waterproof roll is counter glues, formation integral sealing effect;
Use the specific method of the wet-laid process paving waterproof roll for:It is 2 by weight by cement and water:1 system of stirring evenly At cement mortar, a cement mortar is scraped in formation level, and after waterproof roll scrapes a cement mortar, waterproof roll is scraped and is coated with water The one side paving of mud scrapes exhaust among waterproof roll to formation level, with scraper plate to both sides, and coiled material is made fully completely to stick at On basal plane, finally the cement slurry for scraping discharge is returned to scrape and receives head sealing;
It is described use do after first brushing waterproof sealing cream the method for viscous paving waterproof roll for:Waterproof sealing cream is pressed with water first It is 0.8-1.2 according to volume ratio:A primary coat is done after 1 mixing, then the large area brushing waterproof sealing by the way of scumbling multipass Cream, coating layer thickness is 1.2-2.0mm after sealing layer of paste is solid;Then it is anti-that one layer of viscous paving is done on the sealing compound coating after solid Water coiled material;
The pretreated method of position of joints waterproof is:It is with hairbrush that waterproof sealing cream is equal before large area paving waterproof roll The even connection transition position for being applied to position of joints and basal plane makes the connection transition position of position of joints and basal plane be completely sealed and covers Lid;
The method of position of joints waterproof reinforced processing is:After completing large area paving waterproof roll, with hairbrush by waterproof Sealing compound is uniformly applied to position of joints and basal plane, the connection transition position of waterproof roll, makes position of joints and basal plane, waterproof roll Connection transition position be completely sealed covering.
2. hermetically sealed waterproof construction method according to claim 1, it is characterised in that:The compound construction refers to using anti- Water coiled material carries out large area paving on basal plane to be onstructed, when formation level be equipped with negative and positive angle, construction joint, deformation joint, after pour When with the regular node of class, enhancement layer is done at node using 300-500mm wide waterproof roll pavings before waterproof roll paving; When formation level is equipped with the irregular node of wall pipe, pile crown class, node waterproof is carried out to position of joints with waterproof sealing cream Pretreatment and node waterproof reinforcement processing, finally do protective layer on waterproof roll surface;
The waterproof roll is the waterproof roll that chemical crosslink reaction and the effect of physics mortise and tenon can occur with cast-in-place concrete, described Waterproof sealing cream is chemical crosslinking can be carried out with cement or concrete and physics mortise and tenon cooperates with cohesive waterproof sealing cream.
CN201510377130.1A 2015-06-29 2015-06-29 Hermetically sealed waterproof construction method Active CN105178452B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510377130.1A CN105178452B (en) 2015-06-29 2015-06-29 Hermetically sealed waterproof construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510377130.1A CN105178452B (en) 2015-06-29 2015-06-29 Hermetically sealed waterproof construction method

Publications (2)

Publication Number Publication Date
CN105178452A CN105178452A (en) 2015-12-23
CN105178452B true CN105178452B (en) 2018-07-31

Family

ID=54900839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510377130.1A Active CN105178452B (en) 2015-06-29 2015-06-29 Hermetically sealed waterproof construction method

Country Status (1)

Country Link
CN (1) CN105178452B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327118A (en) * 2017-07-13 2017-11-07 郭春未 A kind of house floor heating heat supply kitchen and toilet waterproof construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1974703A (en) * 2006-11-29 2007-06-06 广西金雨伞防水装饰有限公司 Cold construction adhesive for waterproof rolled sheet
CN101694114A (en) * 2009-10-09 2010-04-14 广西金雨伞防水装饰有限公司 Waterproof roll capable of carrying out chemical bonding and physical crosslinking synergism with concrete
KR20100096761A (en) * 2009-02-25 2010-09-02 네오방수기업 주식회사 Complex waterproofing structure and construction method which use low melting point polymer modified asphalt waterproof material and silica sheet
CN102002983A (en) * 2010-10-19 2011-04-06 卢桂才 Wet lay-up and edge-jointing construction method of single-sided adhesive wet lay-up waterproof coiled material
CN102003190A (en) * 2010-10-09 2011-04-06 卢桂才 Construction method for pre-laying tunnel waterproof coiled material
CN103306384A (en) * 2013-07-03 2013-09-18 广西金雨伞防水科技有限公司 Construction method of smearing waterproof sealant before final setting of concrete
CN104153400A (en) * 2014-08-22 2014-11-19 中国建筑第二工程局有限公司 Soft soil foundation cast-in-place pile head waterproof and construction method thereof
CN104612254A (en) * 2013-11-05 2015-05-13 广西金雨伞防水装饰有限公司 Reaction joining waterproof roll paving waterproof construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1974703A (en) * 2006-11-29 2007-06-06 广西金雨伞防水装饰有限公司 Cold construction adhesive for waterproof rolled sheet
KR20100096761A (en) * 2009-02-25 2010-09-02 네오방수기업 주식회사 Complex waterproofing structure and construction method which use low melting point polymer modified asphalt waterproof material and silica sheet
CN101694114A (en) * 2009-10-09 2010-04-14 广西金雨伞防水装饰有限公司 Waterproof roll capable of carrying out chemical bonding and physical crosslinking synergism with concrete
CN102003190A (en) * 2010-10-09 2011-04-06 卢桂才 Construction method for pre-laying tunnel waterproof coiled material
CN102002983A (en) * 2010-10-19 2011-04-06 卢桂才 Wet lay-up and edge-jointing construction method of single-sided adhesive wet lay-up waterproof coiled material
CN103306384A (en) * 2013-07-03 2013-09-18 广西金雨伞防水科技有限公司 Construction method of smearing waterproof sealant before final setting of concrete
CN104612254A (en) * 2013-11-05 2015-05-13 广西金雨伞防水装饰有限公司 Reaction joining waterproof roll paving waterproof construction method
CN104153400A (en) * 2014-08-22 2014-11-19 中国建筑第二工程局有限公司 Soft soil foundation cast-in-place pile head waterproof and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
舟山粮库密封防水设计与施工;何小英;《中国建筑防水》;20150228;正文第39-41页 *

Also Published As

Publication number Publication date
CN105178452A (en) 2015-12-23

Similar Documents

Publication Publication Date Title
CN102002983B (en) Wet lay-up and edge-jointing construction method of single-sided adhesive wet lay-up waterproof coiled material
CN101914927B (en) Waterproof system for basement bottom plate and wall surface and construction method thereof
CN104929155A (en) Hermetically sealing waterproof construction method for basement
CN105401962B (en) The hermetically sealed waterproof construction method of side wall, engineering top surface
CN101792301B (en) Skin-type waterproof coating and construction method
CN110130506A (en) Now coil waterproof layer processed and its construction method
CN102003190B (en) Construction method for pre-laying tunnel waterproof coiled material
CN204983421U (en) Polyurethane waterproofing membrane and production facility, composite waterproof layer thereof
CN102211895B (en) Gelatinized asphalt film / felt sheet composite waterproof material for external waterproof of concrete structure
CN105089208A (en) Polyurethane waterproof roll, production equipment and process, composite waterproof layer and practice thereof
CN107190783A (en) Basement waterproof structure and construction method of basement outer wall waterproof structure
CN105002794B (en) Composite material and the method that non-fragment orbit waterproof repairment is carried out using composite material
CN112081146A (en) Construction method of polymer self-adhesive film waterproof coiled material capable of being constructed in rainy season
CN104612254B (en) The viscous waterproof roll paving waterproof construction method of reaction
CN201695411U (en) Waterproof system for basement bottom plate and wall surface
CN103806609A (en) Construction method of double-faced self-adhesion waterproof roll
CN104947809A (en) Full-seal waterproof system of concrete construction project
CN208906624U (en) A kind of waterproof roll sealing waterproof system
CN103306384B (en) The construction method of waterproof sealing cream is smeared before cement final set
CN105178452B (en) Hermetically sealed waterproof construction method
CN201826858U (en) Reaction bonding type sealing waterproof roll material for tunnel pre-paving
KR102092819B1 (en) The waterproof sheet with improved root isolation, the manufacturing method and the construction method thereof
CN108086490A (en) A kind of anti-water-stopping system and ground in underground, top surface and elevation construction method
CN106894450A (en) The bridging arrangement and construction method of a kind of waterproof roll
CN105040836A (en) Full-sealing waterproof construction method implemented by using sealant

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 530002 Donggouling Landscape Road, Xingning District, Nanning City, Guangxi Zhuang Autonomous Region, Lin18 Sunshine Green City, 1 Building, 1 Unit 4

Patentee after: Xiniupi Waterproof Technology Co., Ltd.

Address before: 530002 Donggouling Landscape Road, Xingning District, Nanning City, Guangxi Zhuang Autonomous Region, Lin18 Sunshine Green City, 1 Building, 1 Unit 4

Patentee before: Guangxi Golden Umbrella Waterproofing Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP02 Change in the address of a patent holder

Address after: 530216 scientific research building, Xiniu science and Technology Park, No. 68, team 4, naluopo, Sitang community, Santang Town, Xingning District, Nanning City, Guangxi Zhuang Autonomous Region

Patentee after: Xiniupi Waterproof Technology Co.,Ltd.

Address before: 530002 Donggouling Landscape Road, Xingning District, Nanning City, Guangxi Zhuang Autonomous Region, Lin18 Sunshine Green City, 1 Building, 1 Unit 4

Patentee before: Xiniupi Waterproof Technology Co.,Ltd.

CP02 Change in the address of a patent holder