CN105178329A - 基坑地下连续墙的扶壁式支护结构及施工方法 - Google Patents
基坑地下连续墙的扶壁式支护结构及施工方法 Download PDFInfo
- Publication number
- CN105178329A CN105178329A CN201510482222.6A CN201510482222A CN105178329A CN 105178329 A CN105178329 A CN 105178329A CN 201510482222 A CN201510482222 A CN 201510482222A CN 105178329 A CN105178329 A CN 105178329A
- Authority
- CN
- China
- Prior art keywords
- wall
- diaphragm wall
- basement
- construction
- foundation ditch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本发明涉及一种基坑地下连续墙的扶壁式支护结构及施工方法,包括地下连续墙,其特征在于:在地下连续墙的顶部设置内导墙、外导墙和冠梁,冠梁位于地下连续墙的顶端并夹在内导墙、外导墙之间;在基坑的坑口处设置第一道支撑,所述第一道支撑与冠梁固定连接,形成上部支护结构;在基坑底部往上一层地下室高度以上的位置设置腰梁,所述腰梁与地下连续墙壁固定连接形成第二道支撑结构,即腰部支撑结构;在腰梁的下方设置短梁、以形成底层地下室结构支撑,在腰梁的上方设置扶壁、形成倒数第二层或顺数第二层地下室结构的扶壁式支撑结构;在基坑底部的地下连续墙壁设有排水沟。本发明具有提高连续墙的挡土和受压能力、结构简单、施工方便等有益效果。
Description
技术领域
本发明涉及一种基坑地下连续墙的扶壁式支护结构及施工方法,适用于基坑支护和施工。属于基坑施工技术领域。
背景技术
现有技术中,在基坑建设中地下连续墙被广泛使用,因为在基坑开挖时,地下连续墙可承受比较大的土压力,可以避免发生地基沉降或塌方事故,成为深基坑支护工程中必不可少的挡土结构。
然而,随着城市的不断发展和建设,需要不断向地下发展空间。房屋地下室层数越来越多,基坑也越来越深。因此,在基坑建设中,地下连续墙需要承受的压力越来越大,现有技术的地下连续墙结构已经难以承受深基坑的土压力,需要对地下连续墙设置支护结构。
现有技术中,由于没有使用支护结构对地下连续墙进行支撑,或者只设置简单的支护结构,因此,在进行深基坑施工时存在地下连续墙倒塌及安全隐患的问题。
发明内容
本发明的目的之一,是为解决现有技术在深基坑建设过程中由于连续墙承受较大压力容易倒塌的问题,提供一种基坑地下连续墙的扶壁式支护结构,具有提高连续墙的挡土和受压能力的特点。
本发明的目的之二,是为了提供一种基坑地下连续墙的扶壁式支护结构的施工方法。
本发明的目的之一可以通过采取以下技术方案实现:
基坑地下连续墙的扶壁式支护结构,包括地下连续墙,其结构特点在于:在地下连续墙的顶部设置内导墙、外导墙和冠梁,冠梁位于地下连续墙的顶端并夹在内导墙、外导墙之间;在基坑的坑口处设置第一道支撑,所述第一道支撑与冠梁固定连接,形成上部支护结构;在基坑底部往上一层地下室高度以上的位置设置腰梁,所述腰梁与地下连续墙壁固定连接形成第二道支撑结构,即腰部支撑结构;在腰梁的下方设置短梁、以形成底层地下室结构支撑,在腰梁的上方设置扶壁、形成倒数第二层或顺数第二层地下室结构的扶壁式支撑结构;在基坑底部的地下连续墙壁设有排水沟。
本发明的目的之一还可以通过采取以下技术方案实现:
进一步地,所述地下连续墙的厚度可以为800mm。
进一步地,所述地下连续墙的高度为三层至五层地下室的高度之和,优选为三层地下室的高度之和。
本发明的目的之二可以通过采取以下技术方案实现:
基坑地下连续墙的扶壁式支护结构的施工方法,其特征在于:
1)首先在平整场地上施工做好地下连续墙,然后在地下连续墙的顶部两侧施工做好内导墙做好内导墙、外导墙,再在地下连续墙的顶端施工做好冠梁;
2)分层分区进行基坑开挖至开挖面,首先施工做好第一道支撑,所述第一道支撑与冠梁固定连接,形成上部支护结构;然后在基坑底部往上一层地下室高度以上的位置设置腰梁,所述腰梁与地下连续墙壁固定连接形成第二道支撑结构,即腰部支撑结构;
3)开挖至基坑的开挖面-7.2m处,施工做好排水沟;
4)施工做好地下室底层底板及地下室倒数第二层楼板,同时浇筑支撑短梁,施工地下室侧壁至第二道支撑底标高处;
5)拆除第二道支撑结构,继续往上施工地下室至第一道支撑底标高,并同时浇筑扶壁;
6)最后拆除第一道支撑,地下室往上施工至首层楼板,回填侧壁与连续墙空隙,基坑施工完成。
本发明的目的之二还可以通过采取以下技术方案实现:
进一步地,在连续墙和地下室侧壁之间利用混凝土回填,使连续墙与地下室侧壁形成整体结构。
本发明具有如下突出的有益效果:
1、本发明通过在基坑的坑口处设置第一道支撑,所述第一道支撑与冠梁固定连接,形成上部支护结构;在基坑底部往上一层地下室高度以上的位置设置腰梁,所述腰梁与地下连续墙壁固定连接形成第二道支撑结构;在腰梁的下方设置短梁、以形成底层地下室楼板支撑,在腰梁的上方设置扶壁、形成倒数第二层或顺数第二层地下室楼板的扶壁式支撑结构;相当于设置多层次的对地下连续墙的支撑结构,并具扶壁式支撑结构特点,因此,能够现有技术在深基坑建设过程中由于连续墙承受较大压力容易倒塌的问题,具有提高连续墙的挡土和受压能力、结构简单、施工方便等有益效果。
2、本发明通过在基坑建设中的连续墙和地下室侧壁加上短梁和扶壁,形成一种扶壁式连续墙支护结构。该结构可以增加基坑建设中连续墙的受压能力,同时也起到加固地下室侧壁墙体结构的作用。
附图说明
图1为平整场地施工导墙、连续墙及冠梁的示意图。
图2为分层分区开挖至开挖面施工第一道支撑、第二道支撑结构的示意图。
图3为开挖至基坑开挖面至-7.2m施工排水沟的示意图。
图4为施做负三层底板及负二层楼板,并浇筑支撑短梁的示意图。
图5为拆除第二道支撑结构及浇筑扶壁的示意图。
图6为回填侧壁与连续墙空隙的示意图。
具体实施方式
以下结合附图及实施例对本发明作进一步的详细描述:
具体实施例1
参照图1至图6,本实施例中涉及的基坑地下连续墙的扶壁式支护结构,包括地下连续墙1,在地下连续墙1的顶部设置内导墙3-1、外导墙3-2和冠梁2,冠梁2位于地下连续墙1的顶端并夹在内导墙3-1、外导墙3-1之间;在基坑的坑口处设置第一道支撑4,所述第一道支撑4与冠梁2固定连接,形成上部支护结构;在基坑底部往上一层地下室高度以上的位置设置腰梁5,所述腰梁5与地下连续墙壁固定连接形成第二道支撑结构,即腰部支撑结构;在腰梁5的下方设置短梁7、以形成负三层地下室结构9支撑,在腰梁5的上方设置扶壁8、形成负二层地下室结构10的扶壁式支撑结构;在基坑底部的地下连续墙壁设有排水沟6。
本实施例中,所述地下连续墙1的厚度为800mm。所述地下连续墙1的高度为三层地下室的高度之和。施工完成后。基坑中共三层地下室结构,分别是地下室负三层结构9、地下室负二层构10和地下室负一层结构11,此外,在基坑上具有首层楼板结构12.
本实施例涉及的基坑地下连续墙的扶壁式支护结构的施工方法,其特征在于:
1)首先在平整场地上施工做好地下连续墙1,然后在地下连续墙1的顶部两侧施工做好内导墙3做好内导墙3-1、外导墙3-2,再在地下连续墙1的顶端施工做好冠梁2;
2)分层分区进行基坑开挖至开挖面13,首先施工做好第一道支撑4,所述第一道支撑4与冠梁2固定连接,形成上部支护结构;然后在基坑底部往上一层地下室高度以上的位置设置腰梁5,所述腰梁5与地下连续墙壁固定连接形成第二道支撑结构,即腰部支撑结构;
3)开挖至基坑的开挖面-7.2m处,施工做好排水沟6;
4)施工做好地下室负三层结构9及地下室负二层结构10,同时浇筑支撑短梁7,施工地下室侧壁至第二道支撑5底标高处;
5)拆除第二道支撑结构5,继续往上施工地下室至第一道支撑4底标高,并同时浇筑扶壁8;
6)最后拆除第一道支撑4,地下室往上施工至负一层结构11及首层楼板12处,回填侧壁与连续墙空隙14,基坑施工完成。
进一步地,在连续墙和地下室侧壁之间利用混凝土回填,使连续墙与地下室侧壁形成整体结构。
由于在侧壁与连续墙体之间加固了短梁和扶壁,其连续墙体与地下室侧壁整体结构更强,能加强挡土能力,从而加强地下室和连续墙的受压能力。
其他具体实施例:
本发明其他具体实施例的特点是:所述地下连续墙1的高度为四层或五层地下室的高度之和;在腰梁5的下方设置短梁7、以形成底层地下室结构支撑,在腰梁5的上方设置扶壁8、形成倒数第二层或顺数第二层地下室结构的扶壁式支撑结构。其余同具体实施例1.
以上所述,仅为本发明较佳的具体实施例,但本发明的保护范围并不局限于此,任何熟悉本技术人员在本发明揭露的范围内,根据本发明的技术方案及其构思加以等同替换或改变,都属于本发明的保护范围。本发明中没有详细叙述的内容均为本领域现有技术范围。
Claims (5)
1.基坑地下连续墙的扶壁式支护结构,包括地下连续墙(1),其特征在于:在地下连续墙(1)的顶部设置内导墙(3-1)、外导墙(3-2)和冠梁(2),冠梁(2)位于地下连续墙(1)的顶端并夹在内导墙(3-1)、外导墙(3-1)之间;在基坑的坑口处设置第一道支撑(4),所述第一道支撑(4)与冠梁(2)固定连接,形成上部支护结构;在基坑底部往上一层地下室高度以上的位置设置腰梁(5),所述腰梁(5)与地下连续墙壁固定连接形成第二道支撑结构,即腰部支撑结构;在腰梁(5)的下方设置短梁(7)、以形成底层地下室结构支撑,在腰梁(5)的上方设置扶壁(8)、形成倒数第二层或顺数第二层地下室结构的扶壁式支撑结构;在基坑底部的地下连续墙壁设有排水沟(6)。
2.根据权利要求1所述的基坑地下连续墙的扶壁式支护结构,其特征在于:所述地下连续墙(1)的厚度为800mm。
3.根据权利要求1所述的基坑地下连续墙的扶壁式支护结构,其特征在于:所述地下连续墙(1)的高度三层至五层地下室的高度之和。
4.根据权利要求1所述的基坑地下连续墙的扶壁式支护结构的施工方法,其特征在于:
1)首先在平整场地上施工做好地下连续墙(1),然后在地下连续墙(1)的顶部两侧施工做好内导墙(3)做好内导墙(3-1)、外导墙(3-2),再在地下连续墙(1)的顶端施工做好冠梁(2);
2)分层分区进行基坑开挖至开挖面,首先施工做好第一道支撑(4),所述第一道支撑(4)与冠梁(2)固定连接,形成上部支护结构;然后在基坑底部往上一层地下室高度以上的位置设置腰梁(5),所述腰梁(5)与地下连续墙壁固定连接形成第二道支撑结构,即腰部支撑结构;
3)开挖至基坑的开挖面-7.2m处,施工做好排水沟(6);
4)施工做好地下室底层结构及地下室倒数第二层结构,同时浇筑支撑短梁(7),施工地下室侧壁至第二道支撑底标高处;
5)拆除第二道支撑结构,继续往上施工地下室至第一道支撑底标高,并同时浇筑扶壁(8);
6)最后拆除第一道支撑(4),地下室往上施工至负一层结构及首层楼板,回填侧壁与连续墙空隙(14),基坑施工完成。
5.根据权利要求4所述的基坑地下连续墙的扶壁式支护结构的施工方法,其特征在于:在连续墙和地下室侧壁之间利用混凝土回填,使连续墙与地下室侧壁形成整体结构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510482222.6A CN105178329A (zh) | 2015-08-08 | 2015-08-08 | 基坑地下连续墙的扶壁式支护结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510482222.6A CN105178329A (zh) | 2015-08-08 | 2015-08-08 | 基坑地下连续墙的扶壁式支护结构及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105178329A true CN105178329A (zh) | 2015-12-23 |
Family
ID=54900718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510482222.6A Pending CN105178329A (zh) | 2015-08-08 | 2015-08-08 | 基坑地下连续墙的扶壁式支护结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105178329A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638622A (zh) * | 2017-02-20 | 2017-05-10 | 中车建设工程有限公司 | 防临近建筑物地基变形的基坑临时支护结构及基坑施工方法 |
CN107023021A (zh) * | 2017-05-31 | 2017-08-08 | 郑州安源工程技术有限公司 | 一种柔性复合地下连续墙支护结构的设计施工方法 |
CN107246017A (zh) * | 2017-08-07 | 2017-10-13 | 深圳市勘察研究院有限公司 | 一种钢‑混凝土结构装配式地下工程支护体系及施工工艺 |
CN108487252A (zh) * | 2018-03-13 | 2018-09-04 | 中铁第四勘察设计院集团有限公司 | 一种深基坑明挖顺作施工方法 |
CN109403632A (zh) * | 2018-12-08 | 2019-03-01 | 上海宝冶集团有限公司 | 一种地连墙冠梁与上部结构连接施工方法 |
CN115233694A (zh) * | 2022-08-20 | 2022-10-25 | 广州市岩土勘测设计有限公司 | 一种基坑抗浮柔性组合支护及其施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20080001711A (ko) * | 2006-06-29 | 2008-01-04 | 충주대학교 산학협력단 | 무지주 공법에 의한 지하 옹벽 시공방법 |
CN103452121A (zh) * | 2013-08-26 | 2013-12-18 | 中冶集团武汉勘察研究院有限公司 | 一种长短桩结合的单排桩+水平内支撑的桩撑支护结构及其施工方法 |
CN203716156U (zh) * | 2014-02-28 | 2014-07-16 | 中国建筑第四工程局有限公司 | 一种深基坑内设坑中坑城门洞式出土施工结构 |
CN203795435U (zh) * | 2014-03-12 | 2014-08-27 | 中国建筑西南勘察设计研究院有限公司 | 一种对撑加固结构 |
CN204098043U (zh) * | 2014-09-22 | 2015-01-14 | 中南勘察设计院(湖北)有限责任公司 | 留土后开挖结合内支撑双排桩支护结构 |
CN204898682U (zh) * | 2015-08-08 | 2015-12-23 | 广州市设计院 | 基坑地下连续墙的扶壁式支护结构 |
-
2015
- 2015-08-08 CN CN201510482222.6A patent/CN105178329A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20080001711A (ko) * | 2006-06-29 | 2008-01-04 | 충주대학교 산학협력단 | 무지주 공법에 의한 지하 옹벽 시공방법 |
CN103452121A (zh) * | 2013-08-26 | 2013-12-18 | 中冶集团武汉勘察研究院有限公司 | 一种长短桩结合的单排桩+水平内支撑的桩撑支护结构及其施工方法 |
CN203716156U (zh) * | 2014-02-28 | 2014-07-16 | 中国建筑第四工程局有限公司 | 一种深基坑内设坑中坑城门洞式出土施工结构 |
CN203795435U (zh) * | 2014-03-12 | 2014-08-27 | 中国建筑西南勘察设计研究院有限公司 | 一种对撑加固结构 |
CN204098043U (zh) * | 2014-09-22 | 2015-01-14 | 中南勘察设计院(湖北)有限责任公司 | 留土后开挖结合内支撑双排桩支护结构 |
CN204898682U (zh) * | 2015-08-08 | 2015-12-23 | 广州市设计院 | 基坑地下连续墙的扶壁式支护结构 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638622A (zh) * | 2017-02-20 | 2017-05-10 | 中车建设工程有限公司 | 防临近建筑物地基变形的基坑临时支护结构及基坑施工方法 |
CN107023021A (zh) * | 2017-05-31 | 2017-08-08 | 郑州安源工程技术有限公司 | 一种柔性复合地下连续墙支护结构的设计施工方法 |
CN107023021B (zh) * | 2017-05-31 | 2019-11-26 | 郑州安源工程技术有限公司 | 一种柔性复合地下连续墙支护结构的设计施工方法 |
CN107246017A (zh) * | 2017-08-07 | 2017-10-13 | 深圳市勘察研究院有限公司 | 一种钢‑混凝土结构装配式地下工程支护体系及施工工艺 |
CN108487252A (zh) * | 2018-03-13 | 2018-09-04 | 中铁第四勘察设计院集团有限公司 | 一种深基坑明挖顺作施工方法 |
CN109403632A (zh) * | 2018-12-08 | 2019-03-01 | 上海宝冶集团有限公司 | 一种地连墙冠梁与上部结构连接施工方法 |
CN115233694A (zh) * | 2022-08-20 | 2022-10-25 | 广州市岩土勘测设计有限公司 | 一种基坑抗浮柔性组合支护及其施工方法 |
CN115233694B (zh) * | 2022-08-20 | 2023-10-13 | 广州市岩土勘测设计有限公司 | 一种基坑抗浮柔性组合支护及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105178329A (zh) | 基坑地下连续墙的扶壁式支护结构及施工方法 | |
CN103912134B (zh) | 既有建筑原位地下空间结构及施工方法 | |
CN105155549A (zh) | 一种大面积深基坑分区顺逆工况下的支撑体系及施工方法 | |
CN102444130B (zh) | 深基坑工程中的快速换撑施工方法 | |
CN103938634A (zh) | 一种深基坑支护结构及施工方法 | |
CN105113540A (zh) | 在保护建筑下新建大型深基坑地下室的施工方法 | |
CN103924795A (zh) | 一种既有建筑移位地下空间结构及施工方法 | |
CN105421491A (zh) | 一种中隔墙拆除及两侧结构连接的施工方法 | |
CN103603434B (zh) | 一种钢管混凝土组合柱向钢筋混凝土柱的过渡节点 | |
CN202017210U (zh) | 一种地下室单排内撑结构 | |
CN204715366U (zh) | 一种大面积深基坑分区顺逆工况下的支撑体系 | |
CN204876019U (zh) | 一种新老管线沟通的逆作法井 | |
CN204898682U (zh) | 基坑地下连续墙的扶壁式支护结构 | |
CN203729348U (zh) | 蓄水构筑物抗浮装置 | |
CN205205832U (zh) | 一种地下建筑的换撑结构 | |
CN203821399U (zh) | 一种深基坑支护结构 | |
CN202730744U (zh) | 用于吹填淤泥浅层处理的真空预压和井点降水联合*** | |
CN207017169U (zh) | 一种高填路堤涵洞减荷结构 | |
CN203603162U (zh) | 一种位于基坑边的施工电梯荷载基础*** | |
CN205116183U (zh) | 一种用于基坑围护的支架结构 | |
CN104404967B (zh) | 刚性框架式基坑内支撑结构及施工方法 | |
CN103397668A (zh) | 一种铁路地道各节段地基不均匀沉降的整治方法 | |
CN202925551U (zh) | 一种坡道异形处基坑换撑施工结构 | |
CN203129169U (zh) | 基坑内独立柱支撑电梯基础结构 | |
CN206570712U (zh) | 棚硐硐顶防崩塌落石装配式橡胶消能板防护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151223 |