CN105156139A - Method for three-dimensional support by using long, medium, and short anchor rods - Google Patents

Method for three-dimensional support by using long, medium, and short anchor rods Download PDF

Info

Publication number
CN105156139A
CN105156139A CN201510318253.8A CN201510318253A CN105156139A CN 105156139 A CN105156139 A CN 105156139A CN 201510318253 A CN201510318253 A CN 201510318253A CN 105156139 A CN105156139 A CN 105156139A
Authority
CN
China
Prior art keywords
anchor pole
long
anchor
support
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510318253.8A
Other languages
Chinese (zh)
Inventor
王德超
丁国利
姜作华
董华旭
柳元伟
马帝涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longkou Mining Group Co Ltd
Original Assignee
Longkou Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longkou Mining Group Co Ltd filed Critical Longkou Mining Group Co Ltd
Priority to CN201510318253.8A priority Critical patent/CN105156139A/en
Publication of CN105156139A publication Critical patent/CN105156139A/en
Pending legal-status Critical Current

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention relates to a method for three-dimensional support by using long, medium, and short anchor rods. The method comprises first support and second support. The second support comprises: (1) applying short anchor rods to control surface surrounding rocks, to form a stable bearing arch to anchor and support; (2) applying medium-length anchor rods, to anchor the bearing arch formed by the short anchor rods on a relatively stable rock stratum, and forming a new thickened bearing arch at the same time, so the bearing arch becomes stable; (3) applying long anchor rods to further anchor the above bearing arches on a stable rock stratum. The method is advantaged in that characteristics of soft rocks determine that support of the soft rocks must be rapid and timely, and surrounding rocks are effectively sealed, to put an end to a channel which may continue weathering and peeling, strength of the surrounding rocks are maintained to the largest extent, so after roadway driving, rapid support with certain strength must be performed, and the surrounding rocks are sealed in time, to put an end to a channel which absorbs water and expands, thereby achieving an objective of roadway support.

Description

Utilize the method for the three-dimensional supporting of long, medium and short anchor pole
Technical field
Type of the present invention relates to a kind of method utilizing the three-dimensional supporting of long, medium and short anchor pole.
Background technology
Mine of Longkou Mining Area is the typical Tertiary Period " soft rock " mining area, and field with "nine squares" coal measure strata forms primarily of mud stone, Oil Shale, argillaceous rocks, charcoal mudrock, oil shale, coal and sandstone.Coal seam and roof and floor on a large scale in be the very poor yolk coal rock stratum of stability, the inner layer of its surrounding rock structure and outer layer all belong to unstable type, thus roadway maintenance is very difficult, and to mining influence and adopt that dark to increase reflection responsive, and has and more repair worse feature.And due to coal bed joints anormogenesis in district, there is very high degree of porosity and good gas permeability, the unidirectional compressive strength of the contiguous roof strata in coal seam is mostly 5.3 ~ 20MPa, angle of internal friction is 26.3 ~ 32 °, sillar saturated water absorption is close to 100%, be up to 291.77%, moisture content very easily enters inside, rock stratum, so the easy deliquescence weathering in tunnel, reduce very soon once be exposed to intensity in air, country rock surface moisture absorption deliquescing before this, the continuity along with the time develops into stream and becomes, and expands to the deep of country rock gradually.While water suction is softening, volume expands gradually to scope of freedom motion, and as closed not in time, this distortion is undertaken continuing.Visible, Liang Jia field with "nine squares" country rock belongs to typical soft rock strata.
Because the engineering stability of soft-rock tunnel is poor, short and have pressure manifestation characteristic from the steady phase, tunnel one is excavated, roof mudstone sandstone alternating layers are namely because delamination develops in depth and weathering and going to pot, for avoiding back inbreak, excavate in tunnel in 0.5 ~ 1.5h and must carry out bolt support to top board immediately, and because country rock has the rear strong dilatancy of water suction, slaking, the feature of rheological characteristic, therefore must carry out whitewashing in 7 ~ 8h to close, do not give country rock discharge space and the time fully of excavation, although therefore this emergent remedial supporting encloses side top in time, the expansion that effectively prevent loose crushing band is dark, but also exactly cause the reason of later stage stress integrated distribution again, strengthen the difficulty of supporting.
Summary of the invention
For overcoming the defect of prior art, the invention provides a kind of Deep Soft Rock Tunnel without stable rock stratum cable bolting method, technical scheme of the present invention is: a kind of method utilizing the three-dimensional supporting of long, medium and short anchor pole, comprising:
(1) once supporting: be Bolt net and jet, tunneling boring bolt interval=800 × 800mm, sprays thick 100 ~ 120mm;
(2) secondary supporting: be the three-dimensional supporting of anchor beam and reinforcement anchor pole, anchor beam spacing 1000mm, reinforcement bolt interval=800 × 800mm; Described reinforcement anchor pole comprises Short bolt, middle long anchor pole and long anchor pole; Injection Short bolt controls top layer country rock, and formation is stablized bearing-load arch and carried out anchoring support;
In injection, the bearing-load arch that Short bolt is formed is anchored in relatively stable rock stratum by long anchor pole, forms the bearing-load arch of new thickening simultaneously, makes it more to tend towards stability; The bearing-load arch of aforementioned formation is anchored in stable rock stratum by injection long anchor pole further.
The twisted steel anchor rod of described Short bolt to be length be 2250mm; The twisted steel anchor rod of long anchor pole to be length be 2500 ~ 3000mm in described; The twisted steel anchor rod of described long anchor pole to be length be 3500 ~ 4000mm.
The advantage of type of the present invention is: the characteristic of soft rock determines soft rock supporting must in time, rapidly, and accomplish country rock effectively closed, stop the channel continuing weathering off, keep country rock self-strength to greatest extent, therefore must carry out rapidly and have the supporting of some strength behind pick lane, close country rock in time, stop the channel of imbibition, reach the object of roadway support.
Detailed description of the invention
Further describe the present invention below in conjunction with specific embodiment, advantage and disadvantage of the present invention will be more clear along with description.But these embodiments are only exemplary, do not form any restriction to the scope of type of the present invention.It will be understood by those skilled in the art that and can the details of type technical scheme of the present invention and form be modified or be replaced under the spirit and scope not departing from type of the present invention, but these amendments and replacing all fall in the protection domain of type of the present invention.
The present invention relates to a kind of method utilizing the three-dimensional supporting of long, medium and short anchor pole, comprising:
(1) once supporting: be Bolt net and jet, tunneling boring bolt interval=800 × 800mm, sprays thick 100 ~ 120mm;
(2) secondary supporting: be the three-dimensional supporting of anchor beam and reinforcement anchor pole, anchor beam spacing 1000mm, reinforcement bolt interval=800 × 800mm; Described reinforcement anchor pole comprises Short bolt, middle long anchor pole and long anchor pole; Injection Short bolt controls top layer country rock, and formation is stablized bearing-load arch and carried out anchoring support;
In injection, the bearing-load arch that Short bolt is formed is anchored in relatively stable rock stratum by long anchor pole, forms the bearing-load arch of new thickening simultaneously, makes it more to tend towards stability; The bearing-load arch of aforementioned formation is anchored in stable rock stratum by injection long anchor pole further.
The twisted steel anchor rod of described Short bolt to be length be 2250mm; The twisted steel anchor rod of long anchor pole to be length be 2500 ~ 3000mm in described; The twisted steel anchor rod of described long anchor pole to be length be 3500 ~ 4000mm.
Adopt this technique to prevent two to help to squeeze in sprinkler body delamination, destroy, reduce tunnel repair for 2nd time rate.

Claims (2)

1. utilize a method for the three-dimensional supporting of long, medium and short anchor pole, it is characterized in that, comprising:
(1) once supporting: be Bolt net and jet, tunneling boring bolt interval=800 × 800mm, sprays thick 100 ~ 120mm;
(2) secondary supporting: be the three-dimensional supporting of anchor beam and reinforcement anchor pole, anchor beam spacing 1000mm, reinforcement bolt interval=800 × 800mm; Described reinforcement anchor pole comprises Short bolt, middle long anchor pole and long anchor pole; Injection Short bolt controls top layer country rock, and formation is stablized bearing-load arch and carried out anchoring support;
In injection, the bearing-load arch that Short bolt is formed is anchored in relatively stable rock stratum by long anchor pole, forms the bearing-load arch of new thickening simultaneously, makes it more to tend towards stability; The bearing-load arch of aforementioned formation is anchored in stable rock stratum by injection long anchor pole further.
2. the three-dimensional supporting method of length anchor pole according to claim 1, is characterized in that, the twisted steel anchor rod of described Short bolt to be length be 2250mm; The twisted steel anchor rod of long anchor pole to be length be 2500 ~ 3000mm in described; The twisted steel anchor rod of described long anchor pole to be length be 3500 ~ 4000mm.
CN201510318253.8A 2014-12-31 2015-06-11 Method for three-dimensional support by using long, medium, and short anchor rods Pending CN105156139A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510318253.8A CN105156139A (en) 2014-12-31 2015-06-11 Method for three-dimensional support by using long, medium, and short anchor rods

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN2014108473056 2014-12-31
CN201410847305 2014-12-31
CN201510318253.8A CN105156139A (en) 2014-12-31 2015-06-11 Method for three-dimensional support by using long, medium, and short anchor rods

Publications (1)

Publication Number Publication Date
CN105156139A true CN105156139A (en) 2015-12-16

Family

ID=54797141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510318253.8A Pending CN105156139A (en) 2014-12-31 2015-06-11 Method for three-dimensional support by using long, medium, and short anchor rods

Country Status (1)

Country Link
CN (1) CN105156139A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374680A (en) * 2018-03-12 2018-08-07 中国矿业大学 A kind of single hole is double to anchor assembled bolt and application method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101571049A (en) * 2009-04-19 2009-11-04 张京泉 Anchor net spray secondary supporting method under the condition of coal mine roadway construction
CN102226407A (en) * 2011-05-23 2011-10-26 中铁二院工程集团有限责任公司 Four-line large-span tunnel cable-arch combined primary support structure
CN102661158A (en) * 2012-05-28 2012-09-12 山西汾西矿业(集团)有限责任公司 Coal-rock composite roof difference scale anchor rod combined supporting method
CN103147778A (en) * 2013-03-23 2013-06-12 孟志强 Method for lane development and support in extremely crushed rock stratum

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101571049A (en) * 2009-04-19 2009-11-04 张京泉 Anchor net spray secondary supporting method under the condition of coal mine roadway construction
CN102226407A (en) * 2011-05-23 2011-10-26 中铁二院工程集团有限责任公司 Four-line large-span tunnel cable-arch combined primary support structure
CN102661158A (en) * 2012-05-28 2012-09-12 山西汾西矿业(集团)有限责任公司 Coal-rock composite roof difference scale anchor rod combined supporting method
CN103147778A (en) * 2013-03-23 2013-06-12 孟志强 Method for lane development and support in extremely crushed rock stratum

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
李茂臣: "复杂地质条件下地巷道支护技术研究", 《山东煤炭科技》 *
潘贵豪等: "高应力软岩巷道支护新理论及应用研究", 《湖南科技大学学报(自然科学版)》 *
王平等: "深部软岩巷道等应力承载拱强度理论研究", 《矿业工程研究》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374680A (en) * 2018-03-12 2018-08-07 中国矿业大学 A kind of single hole is double to anchor assembled bolt and application method

Similar Documents

Publication Publication Date Title
AU2015345830B2 (en) Coal mining method with digging, mining and filling parallel operations under control of cover rock cracks and surface subsidence
US20160201460A1 (en) An artificial dam of distributed coal mine underground reservoir and its constructing method
CN105041344B (en) High-pressure gas seam-expanding, grouting and water-plugging method for precutting trough of microfissure surrounding rock
CN108661705A (en) Item adopts goaf quaternity comprehensive treatment construction method
CN104632219A (en) Large mining height gob-side entry retaining method for thick coal seams
AU2013354613A1 (en) Method of local filling to control surface subsidence in worked-out area
CN103485808B (en) Electro-osmosis home position modified roadway anchoring method of underground swelling soft rock
WO2020098089A1 (en) Filling mining method for fully mechanized top coal caving working face
CN103306713A (en) Networked reinforcement method for cross-layer drilling of outburst coal seam
CN205260041U (en) Method of freezing supporting construction is spouted soon to level
CN113073983B (en) Enclosure type grouting construction method for submarine tunnel to penetrate through water-rich fault fracture zone
CN108301811A (en) A kind of efficient pumping method of hypotonicity coal-bed gas
CN102777180A (en) Method for actively and regionally preventing and controlling rock burst in coal mines
CN109751075A (en) Middle hard coal seam concordant drilling gas administering method
CN105804786A (en) Method for layer penetrating, drilling, pressing punching and permeability improving of soft coal seam floor
CN110130978A (en) A kind of small kiln destruction area high seam break up coal side method for blocking of filling second mining
CN101832137B (en) Pre-embedding method for coal seam roof strut
CN109882173A (en) Big thick ore body vertically Two step mining stope filling system and placement method
CN106437712B (en) Coal mine surrounding cities Strong tremor disaster reduction method
CN109779634A (en) Coal mine ground vertical well pressure break tight roof location determining method
CN108843390A (en) Mine absciss layer water hazard prediction method
CN108708722A (en) A method of being used for the efficient prevention bump of low air permeability coal seam
CN105484791B (en) A kind of synthesis sluicings of tunnel, depressurizes construction method at precipitation
CN205444232U (en) Stock - gravity type infiltration retaining wall
CN105156139A (en) Method for three-dimensional support by using long, medium, and short anchor rods

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151216