CN105155910A - 一种采用v字型组合串的单回路开断钢管杆塔 - Google Patents

一种采用v字型组合串的单回路开断钢管杆塔 Download PDF

Info

Publication number
CN105155910A
CN105155910A CN201510562148.9A CN201510562148A CN105155910A CN 105155910 A CN105155910 A CN 105155910A CN 201510562148 A CN201510562148 A CN 201510562148A CN 105155910 A CN105155910 A CN 105155910A
Authority
CN
China
Prior art keywords
arm
cross
cut
cross beam
tower body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510562148.9A
Other languages
English (en)
Other versions
CN105155910B (zh
Inventor
于永洋
王力
罗正帮
朱晓鹏
谈韵
赵晖
刘西民
陈彦焰
郑少将
梁东跃
周转
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Economic and Technological Research Institute of State Grid Anhui Electric Power Co Ltd (OV)
Hefei Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
Anhui Huadian Engineering Consulting and Design Co Ltd
Hefei Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Huadian Engineering Consulting and Design Co Ltd, Hefei Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Anhui Huadian Engineering Consulting and Design Co Ltd
Priority to CN201510562148.9A priority Critical patent/CN105155910B/zh
Publication of CN105155910A publication Critical patent/CN105155910A/zh
Application granted granted Critical
Publication of CN105155910B publication Critical patent/CN105155910B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

一种采用V字型组合串的单回路开断钢管杆塔。它包括塔身、顶层地线横担、上层导线横担、中层导线横担、下层导线横担,所述顶层地线横担自塔身背向开断侧布置一边垂直于目标开断线路的横担,面向开断侧布置一边三角型横担,所述三角形横担的三边横担呈等腰三角形布置,自塔身固定三角形横担的顶角,三角形横担的底边平行目标开断线路方向;所述上层导线横担自塔身平行目标开断线路布置两边横担,面向开断侧垂直目标开断线路布置一边横担;所述中层导线横担自塔身平行目标开断线路布置两边横担,自塔身垂直目标开断线路布置两边横担;所述下层导线横担自塔身平行目标开断线路布置两边横担。本发明仅采用一基杆塔实现了单回路开断的问题,减少了新建杆塔数量,开断后形成不同相序排列双回路继续走线,降低导线空间电场强度,避免双回路分支杆的使用,不改变相邻杆塔的导线布置方式,降低了邻塔改造的可能。

Description

一种采用V字型组合串的单回路开断钢管杆塔
技术领域:
本发明涉及高压输电线路技术领域,尤其涉及一种采用V字型组合串的单回路开断钢管杆塔。
背景技术:
高压输电线路中,将单回路开断形成双回线路接入新建变电站是常见***方案之一,现有单回路开断方案主要分以下两种:
1)在被开断线路下方新建一基双回路耐张杆,耐张杆横担平行被开断线路方向布置,采用钢管杆架设的单回线路通常呈“上”字型排列,采用钢管杆架设的双回线路两侧导线通常呈垂直排列,易造成相邻直线塔导线悬垂串偏离铅直状态,存在不能满足原单回路杆塔电气间隙要求的可能。
2)在被开断线路下方新建两基单回路耐张杆,将线路开断后接入双回路耐张杆继续走线,新建单回路耐张杆塔数量较多,占地较大,走廊较宽,工程投资及实施难度较大。
以上两种方案为降低输电线路周边电磁环境的影响,需将双回线路两侧导线相序按不同相序布置,以降低导线空间电场强度。
发明内容:
本发明的目的是提供一种采用V字型组合串的单回路开断钢管杆塔,仅采用一基杆塔实现了单回路开断的问题,减少了新建杆塔数量,开断后形成不同相序排列双回路继续走线,降低导线空间电场强度,避免双回路分支杆的使用,不改变相邻杆塔的导线布置方式,降低了邻塔改造的可能。
为了解决背景技术中存在的问题,本发明采用以下技术方案:它包括塔身、顶层地线横担、上层导线横担、中层导线横担、下层导线横担,所述塔身顶端设置有顶层地线横担,顶层地线横担下方设置有上层导线横担,上层导线横担下方设置有中层导线横担,中层导线横担下方设置有下层导线横担;
所述顶层地线横担自塔身背向开断侧布置一边垂直于目标开断线路的横担,面向开断侧布置一边三角型横担,所述三角形横担的三边横担呈等腰三角形布置,自塔身固定三角形横担的顶角,三角形横担的底边平行目标开断线路方向;
所述上层导线横担自塔身平行目标开断线路布置两边横担,面向开断侧垂直目标开断线路布置一边横担;
所述中层导线横担自塔身平行目标开断线路布置两边横担,自塔身垂直目标开断线路布置两边横担;
所述下层导线横担自塔身平行目标开断线路布置两边横担;
所述上层导线横担、中层导线横担中垂直于目标开断线路方向的横担上设置有V型组合绝缘子串,所述V型组合绝缘子串由顺线路方向水平布置的两个耐张串对接,同时在两个耐张串对接处垂直线路方向上连接V型连接金具,V型连接金具再与横担连接。
本发明具有以下优点:
1)不改变目标开断线路导线布置,降低了目标开断线路相邻杆塔难以满足电气间隙要求的可能;
2)仅利用1基本专利杆塔即可完成单回路开断,新建杆塔数量较少,节约投资;
3)开断形成双回线路继续走线,原四回路分支塔可根据现场实际情况采用直线杆(或小角度转角杆)代替,降低了杆塔使用条件,缩减了线路走廊;
4)三角形横担有利于抵消目标开断线路与开断后形成线路对横担的受力,整体结构更稳定。
5)在目标开断线路侧绝缘子串采用“V型”组合绝缘子串设计。在不改变目标开断线路方向线路的悬垂特性,可压缩塔头宽度。
附图说明:
图1为本发明的结构示意图;
图2为图1的右视图;
图3为顶层地线横担的结构示意图;
图4为上层导线横担的结构示意图;
图5为中层导线横担的结构示意图;
图6为下层导线横担的结构示意图;
图7为本发明接线示意图;
图8为V型组合绝缘子串的结构示意图;
图9为图8中V型连接金具的左视图。
具体实施方式:
参照图1-2,本发明它包括塔身1、顶层地线横担2、上层导线横担3、中层导线横担4、下层导线横担5,所述塔身1顶端设置有顶层地线横担2,顶层地线横担2下方设置有上层导线横担3,上层导线横担3下方设置有中层导线横担4,中层导线横担4下方设置有下层导线横担5。
参照图3,所述顶层地线横担2自塔身1背向开断侧布置一边垂直于目标开断线路的横担,面向开断侧布置一边三角型横担,所述三角形横担的三边横担呈等腰三角形布置,自塔身固定三角形横担的顶角,三角形横担的底边平行目标开断线路方向。
参照图4,所述上层导线横担3自塔身1平行目标开断线路布置两边横担,面向开断侧垂直目标开断线路布置一边横担。
参照图5,所述中层导线横担4自塔身1平行目标开断线路布置两边横担,自塔身1垂直目标开断线路布置两边横担。
参照图6,所述下层导线横担5自塔身1平行目标开断线路布置两边横担。
所述顶层地线横担2、上层导线横担3、中层导线横担4、下层导线横担5长度及间距需考虑导线间和导地线间电气距离、导线与塔身的电气距离、上下层相邻导线间的最小水平偏移距离。
参照图7-9,于目标开断线路下方新建一基本发明杆塔,上层导线横担及中层导线横担中垂直于目标开断线路方向的横担上设置V型组合绝缘子串6悬挂原线路导线,所述V型组合绝缘子串由顺线路方向水平布置的两个耐张串7对接,同时在两个耐张串7对接处垂直线路方向上连接V型连接金具8,V型连接金具8再与横担连接。上层导线横担、中层导线横担、下层导线横担中平行于原线路方向的横担上悬挂开断后形成线路导线,顶层地线横担背向开断侧布置的横担悬挂原线路地线,面向开断侧布置的三角型横担的两个顶点处悬挂原线路及开断后线路地线。
接线方式完成开断后形成不同相序排列的双回路线路,平行原线路的上层导线横担悬挂开断后线路的上相导线,通过跳线与原线路的中相导线连接,平行原线路的中层导线横担悬挂开断后线路的中相导线,通过跳线及跳串与一侧边相连接,通过跳线与另一侧边相连接;平行原线路的下层导线横担悬挂开断后线路的下相导线,通过跳线及跳串与一侧边相连接,通过跳线与另一侧边相连接,顶层地线横担的垂直于目标开断线路导线的一边横担悬挂目标开断线路的地线,三角型地线横担的底边横担的顶点处悬挂开断线路地线及开断后形成线路地线。

Claims (1)

1.一种采用V字型组合串的单回路开断钢管杆塔,其特征在于,它包括塔身、顶层地线横担、上层导线横担、中层导线横担、下层导线横担,所述塔身顶端设置有顶层地线横担,顶层地线横担下方设置有上层导线横担,上层导线横担下方设置有中层导线横担,中层导线横担下方设置有下层导线横担;
所述顶层地线横担自塔身背向开断侧布置一边垂直于目标开断线路的横担,面向开断侧布置一边三角型横担,所述三角形横担的三边横担呈等腰三角形布置,自塔身固定三角形横担的顶角,三角形横担的底边平行目标开断线路方向;
所述上层导线横担自塔身平行目标开断线路布置两边横担,面向开断侧垂直目标开断线路布置一边横担;
所述中层导线横担自塔身平行目标开断线路布置两边横担,自塔身垂直目标开断线路布置两边横担;
所述下层导线横担自塔身平行目标开断线路布置两边横担;
所述上层导线横担、中层导线横担中垂直于目标开断线路方向的横担上设置有V型组合绝缘子串,所述V型组合绝缘子串由顺线路方向水平布置的两个耐张串对接,同时在两个耐张串对接处垂直线路方向上连接V型连接金具,V型连接金具再与横担连接。
CN201510562148.9A 2015-09-07 2015-09-07 一种采用v字型组合串的单回路开断钢管杆塔 Active CN105155910B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510562148.9A CN105155910B (zh) 2015-09-07 2015-09-07 一种采用v字型组合串的单回路开断钢管杆塔

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510562148.9A CN105155910B (zh) 2015-09-07 2015-09-07 一种采用v字型组合串的单回路开断钢管杆塔

Publications (2)

Publication Number Publication Date
CN105155910A true CN105155910A (zh) 2015-12-16
CN105155910B CN105155910B (zh) 2018-03-13

Family

ID=54796916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510562148.9A Active CN105155910B (zh) 2015-09-07 2015-09-07 一种采用v字型组合串的单回路开断钢管杆塔

Country Status (1)

Country Link
CN (1) CN105155910B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106555497A (zh) * 2016-09-26 2017-04-05 安徽华电工程咨询设计有限公司 一种单回架空输电线路电缆t接引下耐张塔
CN111927189A (zh) * 2020-07-28 2020-11-13 国网安徽省电力有限公司经济技术研究院 一种单回路可调相开断塔

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2256758C1 (ru) * 2004-03-04 2005-07-20 ЗАО Сибирская высоковольтная энергетическая компания "ВЭЛ" Одностоечная свободностоящая опора линии электропередачи
CN203160799U (zh) * 2013-02-19 2013-08-28 中国电力工程顾问集团西南电力设计院 海拔5500m以下32.5m风区220kV输电线路单回耐张塔
CN203412351U (zh) * 2013-08-06 2014-01-29 安徽华电工程咨询设计有限公司 F形窄基三角钢管塔
CN203412348U (zh) * 2013-08-06 2014-01-29 安徽华电工程咨询设计有限公司 一种y形横担布置的双回路单侧回路开断输电钢管杆
CN203412346U (zh) * 2013-08-06 2014-01-29 安徽华电工程咨询设计有限公司 一种新型单回路开断杆塔
CN103972835A (zh) * 2014-03-24 2014-08-06 王力 一种采用v型组合串型的新型输电线路杆塔
CN205046913U (zh) * 2015-09-07 2016-02-24 安徽华电工程咨询设计有限公司 一种采用v字型组合串的单回路开断钢管杆塔

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2256758C1 (ru) * 2004-03-04 2005-07-20 ЗАО Сибирская высоковольтная энергетическая компания "ВЭЛ" Одностоечная свободностоящая опора линии электропередачи
CN203160799U (zh) * 2013-02-19 2013-08-28 中国电力工程顾问集团西南电力设计院 海拔5500m以下32.5m风区220kV输电线路单回耐张塔
CN203412351U (zh) * 2013-08-06 2014-01-29 安徽华电工程咨询设计有限公司 F形窄基三角钢管塔
CN203412348U (zh) * 2013-08-06 2014-01-29 安徽华电工程咨询设计有限公司 一种y形横担布置的双回路单侧回路开断输电钢管杆
CN203412346U (zh) * 2013-08-06 2014-01-29 安徽华电工程咨询设计有限公司 一种新型单回路开断杆塔
CN103972835A (zh) * 2014-03-24 2014-08-06 王力 一种采用v型组合串型的新型输电线路杆塔
CN205046913U (zh) * 2015-09-07 2016-02-24 安徽华电工程咨询设计有限公司 一种采用v字型组合串的单回路开断钢管杆塔

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106555497A (zh) * 2016-09-26 2017-04-05 安徽华电工程咨询设计有限公司 一种单回架空输电线路电缆t接引下耐张塔
CN111927189A (zh) * 2020-07-28 2020-11-13 国网安徽省电力有限公司经济技术研究院 一种单回路可调相开断塔

Also Published As

Publication number Publication date
CN105155910B (zh) 2018-03-13

Similar Documents

Publication Publication Date Title
CN203412348U (zh) 一种y形横担布置的双回路单侧回路开断输电钢管杆
CN105178682A (zh) 双回路单侧开断电缆引下直线塔
CN105155914A (zh) 一种单回输电线路开断角钢塔
CN105298201A (zh) 输电线路电缆终端立体引下装置
CN103046790A (zh) 一种新型单回路t接输电杆塔
CN205116866U (zh) 输电线路电缆终端立体引下装置
CN107386758B (zh) 一种双回输电线路开断钢管杆塔及***
CN102005712B (zh) 双回紧凑型输电线路跳线为水平绕跳的耐张转角塔
CN105155910A (zh) 一种采用v字型组合串的单回路开断钢管杆塔
CN202810314U (zh) 220kV丁字形同塔双回钻越塔
CN202167811U (zh) 输电线路刚性跳线非对称v型绝缘子串布置结构
CN104196301A (zh) 一种新型交叉换位塔
CN105257067A (zh) 一种采用v字型组合串的双回路双侧开断钢管杆塔
CN105155909A (zh) 一种单回路开断成不同相序排列的钢管杆塔
CN205046913U (zh) 一种采用v字型组合串的单回路开断钢管杆塔
CN202954612U (zh) 一种新型单回路t接输电杆塔
CN206016392U (zh) 一种双回路双侧开断输电线路杆塔
CN205046915U (zh) 一种采用v字型组合串的双回路双侧开断钢管杆塔
CN205046931U (zh) 一种采用三角形横担布置的双回路双侧开断钢管杆塔
CN202131820U (zh) Y形钢管铁塔
CN105155911A (zh) 一种采用三角形横担布置的双回路双侧开断钢管杆塔
CN205000712U (zh) 一种单回路开断成不同相序排列的钢管杆塔
CN103259234B (zh) 输电线路刚性跳线非对称v型绝缘子串布置结构
CN203412350U (zh) 一种双回路单侧回路电缆方式开断的输电钢管杆
CN205046914U (zh) 一种采用三角形横担的单回路开断钢管杆塔

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Xie Tao

Inventor after: Chen Yanyan

Inventor after: Zheng Shaojiang

Inventor after: Liang Dongyue

Inventor after: Zhou Zhuan

Inventor after: Yu Yongyang

Inventor after: Wang Li

Inventor after: Luo Zhengbang

Inventor after: Mu Hong

Inventor after: Zhu Xiaopeng

Inventor after: Tan Yun

Inventor after: Zhao Hui

Inventor after: Liu Ximin

Inventor before: Yu Yongyang

Inventor before: Liang Dongyue

Inventor before: Zhou Zhuan

Inventor before: Wang Li

Inventor before: Luo Zhengbang

Inventor before: Zhu Xiaopeng

Inventor before: Tan Yun

Inventor before: Zhao Hui

Inventor before: Liu Ximin

Inventor before: Chen Yanyan

Inventor before: Zheng Shaojiang

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20171214

Address after: Jinzhai road in Baohe District of Hefei city of Anhui Province, No. 122 230022

Applicant after: Anhui Huadian Engineering Consultating & Design Co., Ltd.

Applicant after: Guo Wang Anhui Power Company Hefei Power Supply Company

Applicant after: State Grid Anhui Electric Power Company

Applicant after: Economic Technology Research Institute of State Grid Anhui Electric Power Company

Address before: Jinzhai road in Baohe District of Hefei city of Anhui Province, No. 122 230001

Applicant before: Anhui Huadian Engineering Consultating & Design Co., Ltd.

Applicant before: Guo Wang Anhui Power Company Hefei Power Supply Company

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant