CN105136110B - Firm embedded type sedimentation ring and soil body delaminating deposition amount monitoring system - Google Patents

Firm embedded type sedimentation ring and soil body delaminating deposition amount monitoring system Download PDF

Info

Publication number
CN105136110B
CN105136110B CN201510520550.0A CN201510520550A CN105136110B CN 105136110 B CN105136110 B CN 105136110B CN 201510520550 A CN201510520550 A CN 201510520550A CN 105136110 B CN105136110 B CN 105136110B
Authority
CN
China
Prior art keywords
ring
embedded type
sedimentation
firm
firm embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510520550.0A
Other languages
Chinese (zh)
Other versions
CN105136110A (en
Inventor
黄泰
李立新
于洋
张陆
张陆一
刑义
侯晋芳
李树奇
杨京方
喻志发
刘爱民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd
Tianjin Harbor Engineering Quality Inspection Center Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd
Tianjin Harbor Engineering Quality Inspection Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd, Tianjin Harbor Engineering Quality Inspection Center Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201810119515.1A priority Critical patent/CN108981654B/en
Priority to CN201510520550.0A priority patent/CN105136110B/en
Priority to CN201810117997.7A priority patent/CN108413928B/en
Publication of CN105136110A publication Critical patent/CN105136110A/en
Application granted granted Critical
Publication of CN105136110B publication Critical patent/CN105136110B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The invention discloses a kind of firm embedded type sedimentation ring and soil body delaminating deposition amount monitoring system, for the land soft soil foundation delaminating deposition amount of long term monitoring.Simple installation of the present invention, it is of low cost, can also be consolidated in embedded soil layer to be measured in the larger adverse circumstances of soil pressure, firm embedded type is enabled to settle ring as soil layer to be measured sinks, so that the measurement result of soil body delaminating deposition amount is accurate, the settling amount of the tested soil layer of measurement that can be promptly and accurately.

Description

Firm embedded type sedimentation ring and soil body delaminating deposition amount monitoring system
Technical field
The invention belongs to civil engineering quality-monitoring instrument, more particularly to a kind of firm embedded type sedimentation ring and soil body layering Settling amount monitors system.
Background technology
In port construction, usually using the delaminating deposition amount of tape sedimentometer monitoring soft soil base.Tape sedimentometer work It is as mode:The logical heart sedimentation pipe of pre-buried PVC material in soft soil foundation to be measured, and be cased with settling in logical heart sedimentation tube exterior subsection Magnet ring, the bottom nozzle of sedimentation pipe lowermost end are equipped with pig tail catheter seal head;Multiple sedimentation rings are distributed in sedimentation tube outer surface, There is magnet ring in sedimentation ring, be externally connected with shape radially outward in sedimentation ring simultaneously can anchor iron plate insertion quilt with the anchoring iron plate of folding and unfolding It surveys soil layer and to settle magnet ring with tested solum settlement;There is magnetic induction sensor in tape one end and passes through the signal adhered on tape Line is connected to the receiver of the tape other end, there is buzzer in recipient, and tape is marked with scale;Tape is manually carried gauge head End is put into PVC conduits, is held tape and is slowly moved down by gauge head, the magnet ring burial place in soil layer is reached when gauge head When, the buzzer of receiver will beep, and manually read depth dimensions of the tape at nozzle at this time, that is to say the magnetic Distance length of the ring apart from nozzle is the magnetic by the difference between the measured value at the length measurements and previous time point Soil layer is in the settling amount of this period where ring;The delaminating deposition amount of measurable each soil layer in this way.
Sedimentation ring is process for firm non-metallic material such as PVC material etc..As shown in Figure 1, Figure 2, Figure 3 shows, tradition sedimentation Ring (a) periphery is equipped with several foldable anchoring iron plates (b), for sedimentation ring to be made to be anchored in tested soil layer.Tradition sedimentation ring (a) surveyed in and be used to trigger the magnetic induction part in sedimentometer probe embedded with a circle magnet (c).It is during use that multiple sedimentation rings are advance It is sleeved on logical heart sedimentation pipe (d), its set on logical heart sedimentation pipe is determined according to the soil depth of each sedimentation ring premonitoring Holding position.Each sedimentation ring set install after successively longitudinal arrangement on logical heart sedimentation pipe (d), and sequence volume according to its present position Number.Such as eight sedimentation rings are cased on logical heart sedimentation pipe, the top is that No.1 sedimentation ring arranges in numerical order that be incremented to bottom be eight successively Number sedimentation ring.
As shown in Fig. 2, the anchoring iron plate (b) of tradition sedimentation ring is first firmly turned up before embedded and with water solubility Paper adhesive tape (e) fasten on logical heart sedimentation pipe (d) side wall.As shown in figure 3, heart sedimentation pipe (d) to be led to is buried, sedimentation ring has reached predetermined soil After layer depth, water-soluble Paper adhesive tape can be by water-solubleization in soil layer.Then anchoring iron plate (b) is supportted automatically due to natural resiliency It opens, is anchored in soil layer to be measured so that sedimentation ring sinks with soil layer to be measured.
This traditional sedimentation ring in practical applications, since soil body pressure is very big, and anchors the transverse direction of iron plate and the soil body Contact area is larger, causes anchoring iron plate that cannot fully strut, so that anchoring iron plate cannot be anchored in soil layer to be measured so that Sedimentation ring cannot sink with soil layer to be measured, and mistake occurs in the measurement result so as to cause soil body delaminating deposition amount, it is impossible in time The accurately settling amount of the tested soil layer of measurement.
The content of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of firm embedded type sedimentation ring and soil body layerings Settling amount monitors system, for the land soft soil foundation delaminating deposition amount of long term monitoring.Simple installation of the present invention, it is of low cost, It can also be consolidated in the larger adverse circumstances of soil pressure in embedded soil layer to be measured so that firm embedded type sedimentation ring can be with to be measured Soil layer sinks, so that the measurement result of soil body delaminating deposition amount is accurate, measurement that can be promptly and accurately is tested the heavy of soil layer Drop amount.
The present invention is realized using following technical scheme:
A kind of firm embedded type sedimentation ring, including a ring sleeve, it is characterised in that:The insertion of ring sleeve inner tubal wall is set It is useful for the magnet circle of triggering sedimentometer probe magnetic induction part;Ring sleeve outer tube wall, which is provided with, can outwards launch and can receive The ejection type anchor put;The ejection type anchor is by elongated keel of rigid high rigidity, bent tough corrosion-resistant Film, torque spring and hinge composition;The torque spring of the ejection type anchor is hinged on hinge, and torque spring One end holds out against ring sleeve, and the other end of torque spring is connected with the rigid elongated keel of high rigidity;Bent is tough corrosion-resistant The both sides of film connect ring sleeve and the elongated keel of rigid high rigidity respectively.
Moreover, the elongated keel of the rigidity high rigidity select elongated steel bar;The bent tough etching resistant film choosing With waterproof nylon cloth material, the preferably hinge is small-sized hinge structure.
Moreover, ring sleeve outer tube wall is set, there are four ejection type anchors.
Moreover, it is windmill after the ejection type anchor ejection expansion of firm embedded type sedimentation ring.
The application method of the firm embedded type sedimentation ring:Firm embedded type sedimentation ring set is located in logical heart sedimentation pipe, The ejection type anchor of firm embedded type sedimentation ring is turned up and fastens the side wall in logical heart sedimentation pipe with water-soluble Paper adhesive tape On;Then the logical heart sedimentation pipe for being set with firm embedded type sedimentation ring is embedded to vertically in tested soil layer;Water-soluble Paper adhesive tape After water-solubleization in soil layer, the tension of torque spring causes the elongated keel expansion of rigid high rigidity, the rigid elongated dragon of high rigidity Bone drives coupled bent tough etching resistant film horizontal cross to be unfolded and cut in tested soil layer while expansion, The pressure generated during tested solum settlement causes the elongated keel of rigid high rigidity and bent tough etching resistant film also with quilt It surveys soil layer synchronously to settle, so that firm embedded type sedimentation ring is synchronously settled with tested soil layer.
A kind of soil body delaminating deposition amount based on firm embedded type sedimentation ring monitors system:It sinks including the firm embedded type Ring, logical heart sedimentation pipe, conduit seal head, conduit connection ring and special measurement tape drop, and firm embedded type sedimentation ring set is located at logical In heart sedimentation pipe, logical heart sedimentation pipe is stitched together by conduit connection ring, and taper is set on the lowermost end mouth of logical heart sedimentation pipe Conduit seal head;One end of the special measurement tape is provided with magnetic induction gauge head, and the other end of special measurement tape is provided with Receiver is connected between magnetic induction gauge head and receiver by the signal wire being attached on tape, and special measurement tape is marked with Scale.
Moreover, buzzer is equipped in the receiver.
The application method of the soil body delaminating deposition amount monitoring system based on firm embedded type sedimentation ring is as follows It carries out:
Step 1:The ejection type anchor of firm embedded type sedimentation ring is turned up and is fastened with water-soluble Paper adhesive tape logical On the side wall of heart sedimentation pipe;
Step 2:Stratum is punched and the logical heart sedimentation pipe for being set with firm embedded type sedimentation ring is embedded to ground vertically In layer;
Step 3:For water-soluble Paper adhesive tape by after water-solubleization in soil layer, the tension of torque spring causes rigid high rigidity Elongated keel expansion, the rigid elongated keel of high rigidity drive coupled bent tough etching resistant film while expansion It is unfolded and consolidates in embedded tested soil layer;
Step 4:Solum settlement situation is measured using special measurement tape.
Moreover, in step 4, manually the magnetic induction gauge head end of special measurement tape is put into logical heart sedimentation pipe, is held Tape is slowly moved down by magnetic induction gauge head, when the firm embedded type sedimentation ring that magnetic induction gauge head is reached in soil layer is buried During position, the buzzer in receiver will beep, and manually read special measurement tape at this time in logical heart sedimentation pipe pipe Depth dimensions at mouthful that is to say the distance length of the logical heart sedimentation pipe nozzle of firm embedded type sedimentation ring distance, by the length Difference between measured value and the measured value at previous time point is soil layer where the firm embedded type sedimentation ring at this Between section settling amount.
The advantages of the present invention are:Ejection type anchor in firm embedded type sedimentation ring passes through torsion bullet The elongated keel of rigid high rigidity such as windmill is unfolded in the tension of spring, and the rigid elongated keel of high rigidity are driven while expansion and it Connected bent tough etching resistant film is unfolded and consolidates to be embedded into tested soil layer, is generated when tested solum settlement Pressure causes the elongated keel of rigid high rigidity and bent tough etching resistant film also synchronously to be settled with tested soil layer, so that Embedded type sedimentation ring must be consolidated synchronously to settle with tested soil layer;Due to the elongated keel of rigid high rigidity and bent tough corrosion resistant Erosion film is that horizontal cross is cut in soil layer, and the thickness of the rigid elongated keel of high rigidity and bent tough etching resistant film Very little is spent, therefore it cuts resistance suffered in soil layer compared to very little for the anchoring iron plate of traditional turnover structure so that The rigid elongated keel of high rigidity and bent tough etching resistant film also can be easily in the larger adverse circumstances of soil pressure So that firm embedded type sedimentation ring is consolidated and is embedded in soil layer to be measured, so as to ensure that firm embedded type in cutting into soil layer to be measured Settling ring can synchronously sink with soil layer to be measured, further ensure that the soil body delaminating deposition based on firm embedded type sedimentation ring Measure the accuracy of the measurement result of monitoring system.
Description of the drawings
Fig. 1 is tradition sedimentation ring structure.
Fig. 2 is that tradition sedimentation ring buries preceding state.
Fig. 3 is that tradition sedimentation ring buries rear state.
Fig. 4 is that firm embedded type sedimentation ring buries pre-structure sectional view.
Fig. 5 is that firm embedded type sedimentation ring buries rear structure sectional view.
Fig. 6 is that firm embedded type sedimentation ring buries pre-structure top view.
Fig. 7 is that firm embedded type sedimentation ring buries rear structure top view.
Fig. 8 is the structure diagram of the soil body delaminating deposition amount monitoring system based on firm embedded type sedimentation ring.
In Fig. 1-3:A is tradition sedimentation ring, and b is anchoring iron plate, and c is magnet, and d is logical heart sedimentation pipe, and e is water-soluble papery Adhesive tape.
In Fig. 4-8:1 settles ring for firm embedded type, and 2 be logical heart sedimentation pipe, and 3 be conduit seal head, and 4 connect for conduit Ring, 5 be receiver, and 6 be special measurement tape, and 7 be logical heart sedimentation pipe nozzle, and 8 be magnetic induction gauge head, and 9 be soil body surface layer, and 10 are Underground does not occur to settle rock stratum, and 11 be water-soluble Paper adhesive tape, and 1-1 is ring sleeve, and 1-2 is magnet circle, and 1-3 is high hard for rigidity Elongated keel are spent, 1-4 is bent tough etching resistant film, and 1-5 is torque spring, and 1-6 is hinge.
Specific embodiment
The technical solution further illustrated the present invention with reference to specific embodiment.
Embodiment one:Referring to attached drawing 4-7, a kind of firm embedded type sedimentation ring includes a ring sleeve 1-1, ring sleeve 1- The insertion of 1 inner tubal wall is provided with a circle magnet circle 1-2, for triggering the magnetic induction part in sedimentometer probe;Outside ring sleeve 1-1 Tube wall is set there are four can outwards launch and can be with the ejection type anchor of folding and unfolding, can level after the expansion of ejection type anchor It is embedded into tested soil layer, when tested soil layer settles, ejection type anchor drives entirely firm embedded type sedimentation ring 1 Synchronous sedimentation occurs with soil layer;
The ejection type anchor is by the elongated keel 1-3 of rigid high rigidity (such as elongated steel bar), bent tough Etching resistant film 1-4 (such as waterproof nylon cloth), torque spring 1-5 and hinge 1-6 (such as small-sized hinge) compositions, torque spring 1-5 is hinged on hinge 1-6, and one end of torque spring 1-5 holds out against ring sleeve 1-1, the other end and rigidity of torque spring 1-5 The elongated keel 1-3 connections of high rigidity;The both sides of bent tough etching resistant film 1-4 connect respectively ring sleeve 1-1 and just The elongated keel 1-3 of property high rigidity.Torque spring 1-5 can drive coupled rigid high rigidity elongated by the effect of tension Keel 1-3 is unfolded, so that the rigid elongated keel 1-3 of high rigidity drives coupled bent tough etching resistant film 1- 4 expansion, such as windmill (as best shown in figures 5 and 7) after expansion.
The application method of firm embedded type sedimentation ring is as follows:
Firm embedded type sedimentation ring 1 is set in logical heart sedimentation pipe 2 first, by the ejection type of firm embedded type sedimentation ring Anchor is turned up and water-soluble Paper adhesive tape 11 is used to fasten on the side wall of logical heart sedimentation pipe 2 (referring to attached drawing 4);
Then it is the logical heart sedimentation pipe (logical heart sedimentation pipe bottom needs to seal) for being set with firm embedded type sedimentation ring is vertical It is embedded in stratum;
After water-soluble Paper adhesive tape 11 is by water-solubleization in soil layer, the tension of torque spring 1-5 causes rigid high rigidity (referring to attached drawing 7), the rigid elongated keel of high rigidity drive coupled while expansion for elongated keel 1-3 such as windmill expansion Bent tough etching resistant film 1-4 is unfolded and consolidates in embedded tested soil layer, and being tested the pressure generated during solum settlement makes It obtains the rigid elongated keel of high rigidity and bent tough etching resistant film also synchronously to settle with tested soil layer, so that firm Embedded type settles ring 1, and with tested soil layer, synchronously sedimentation (when needing to measure solum settlement situation, is surveyed using special measurement tape Measure solum settlement situation).
Embodiment two:As shown in figure 8, a kind of soil body delaminating deposition amount based on firm embedded type sedimentation ring monitors system, It is described including firm embedded type sedimentation ring 1, logical heart sedimentation pipe 2, conduit seal head 3, conduit connection ring 4, special measurement tape 6 As described in embodiment one, firm embedded type sedimentation ring 1 is set in logical heart sedimentation pipe 2 structure of firm embedded type sedimentation ring 1, more A logical heart sedimentation pipe 2 is stitched together by conduit connection ring 4, and logical heart sedimentation pipe 2 is vertically arranged, and leads to the most bottom of heart sedimentation pipe 2 The pig tail catheter seal head 3 of sealing is set on port;One end of the special measurement tape 6 is provided with magnetic induction gauge head 8, specially The other end of measurement tape 6 is provided with receiver 5, the letter between magnetic induction gauge head 8 and receiver 5 by being attached on tape The connection of number line is equipped with buzzer in receiver 5, and special measurement tape 6 is marked with scale.
The application method of soil body delaminating deposition amount monitoring system based on firm embedded type sedimentation ring is as follows:
First several firm embedded types sedimentation rings 1 are set in logical heart sedimentation pipe 2, and pass through conduit connection ring 4 will be multiple Logical heart sedimentation pipe 2 is spliced to designated length, and the pig tail catheter seal head of sealing is set on the lowermost end mouth of logical heart sedimentation pipe 2 3, the ejection type anchor of firm embedded type sedimentation ring 1 is turned up and water-soluble Paper adhesive tape 11 is used to fasten in logical heart sedimentation pipe 2 Side wall on (referring to attached drawing 4);
Then stratum is punched and the logical heart sedimentation pipe 2 for being set with firm embedded type sedimentation ring 1 is embedded to ground vertically In layer, to reach underground according to technology requirement pig tail catheter seal head 3 and not occur to settle 10 position of rock stratum, lead to heart sedimentation pipe 2 most Top will expose soil body surface layer 9;
After firm embedded type sedimentation ring is embedded in stratum, water-soluble Paper adhesive tape 11 can be turned round by after water-solubleization in soil layer Power tension force of spring causes the elongated keel 1-3 of rigid high rigidity such as windmill expansion (referring to attached drawing 7), the rigid elongated dragon of high rigidity Bone 1-3 drives coupled bent tough etching resistant film 1-4 to be unfolded and consolidates embedded tested soil layer while expansion In, it is tested the pressure generated during solum settlement and causes the elongated keel 1-3 of rigid high rigidity and bent tough etching resistant film 1-4 is also synchronously settled with tested soil layer, so that firm embedded type sedimentation ring 1 is synchronously settled with tested soil layer;
When needing to measure solum settlement situation, solum settlement situation is measured using special measurement tape 6, it is described special One end of measurement tape 6 is provided with magnetic induction gauge head 8, and the other end of special measurement tape 6 is provided with receiver 5, and magnetic induction is surveyed It is connected between first 8 and receiver 5 by the signal wire being attached on tape, buzzer, special measurement tape is equipped in recipient 5 6 are marked with scale;Manually being put into logical heart sedimentation pipe 2 equipped with 8 end of magnetic induction gauge head special measurement tape is held tape and is allowed Magnetic induction gauge head 8 slowly moves down, when the firm embedded type that magnetic induction gauge head 8 is reached in soil layer settles ring burial place When, the buzzer in receiver will beep, and manually read special measurement tape at this time at logical heart sedimentation pipe nozzle 7 Depth dimensions, the distance length of the logical heart sedimentation pipe nozzle of firm embedded type sedimentation ring distance is that is to say, by the linear measure longimetry Difference between value and the measured value at previous time point is soil layer where the firm embedded type sedimentation ring in this period Settling amount;The delaminating deposition amount of measurable each soil layer in this way.
Illustrative description has been done to the present invention above, it should explanation, in the situation for the core for not departing from the present invention Under, any simple deformation, modification or other skilled in the art can not spend the equivalent substitution of creative work equal Fall into protection scope of the present invention.

Claims (5)

1. a kind of firm embedded type sedimentation ring, including a ring sleeve, it is characterised in that:The insertion of ring sleeve inner tubal wall is provided with For triggering the magnet circle of sedimentometer probe magnetic induction part;Ring sleeve outer tube wall is provided with and can outwards launch and can be with folding and unfolding Ejection type anchor;
The ejection type anchor by the elongated keel of rigid high rigidity, bent tough etching resistant film, torque spring and Hinge forms, and the torque spring of ejection type anchor is hinged on hinge, and one end of torque spring holds out against ring sleeve, turns round The other end of power spring is connected with the rigid elongated keel of high rigidity;The both sides difference connection ring of bent tough etching resistant film Shape casing and the elongated keel of rigid high rigidity.
2. firm embedded type sedimentation ring according to claim 1, it is characterised in that:The elongated keel choosing of rigidity high rigidity With elongated steel bar;The bent tough etching resistant film selects waterproof nylon cloth material.
3. firm embedded type sedimentation ring according to claim 1, it is characterised in that:The hinge is small-sized hinge structure.
4. firm embedded type sedimentation ring according to claim 1, it is characterised in that:There are four ring sleeve outer tube wall is set Ejection type anchor.
5. firm embedded type sedimentation ring according to claim 1, it is characterised in that:The ejection type of firm embedded type sedimentation ring It is windmill after anchor ejection expansion.
CN201510520550.0A 2015-08-21 2015-08-21 Firm embedded type sedimentation ring and soil body delaminating deposition amount monitoring system Active CN105136110B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201810119515.1A CN108981654B (en) 2015-08-21 2015-08-21 Use method of stable embedded settling ring
CN201510520550.0A CN105136110B (en) 2015-08-21 2015-08-21 Firm embedded type sedimentation ring and soil body delaminating deposition amount monitoring system
CN201810117997.7A CN108413928B (en) 2015-08-21 2015-08-21 Soil body layering settlement monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510520550.0A CN105136110B (en) 2015-08-21 2015-08-21 Firm embedded type sedimentation ring and soil body delaminating deposition amount monitoring system

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201810117997.7A Division CN108413928B (en) 2015-08-21 2015-08-21 Soil body layering settlement monitoring system
CN201810119515.1A Division CN108981654B (en) 2015-08-21 2015-08-21 Use method of stable embedded settling ring

Publications (2)

Publication Number Publication Date
CN105136110A CN105136110A (en) 2015-12-09
CN105136110B true CN105136110B (en) 2018-06-05

Family

ID=54721550

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201810117997.7A Active CN108413928B (en) 2015-08-21 2015-08-21 Soil body layering settlement monitoring system
CN201810119515.1A Active CN108981654B (en) 2015-08-21 2015-08-21 Use method of stable embedded settling ring
CN201510520550.0A Active CN105136110B (en) 2015-08-21 2015-08-21 Firm embedded type sedimentation ring and soil body delaminating deposition amount monitoring system

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201810117997.7A Active CN108413928B (en) 2015-08-21 2015-08-21 Soil body layering settlement monitoring system
CN201810119515.1A Active CN108981654B (en) 2015-08-21 2015-08-21 Use method of stable embedded settling ring

Country Status (1)

Country Link
CN (3) CN108413928B (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105606070B (en) * 2016-03-07 2018-01-09 三峡大学 A kind of building is vertically and horizontal to deformation test device and method
CN106592564B (en) * 2016-09-20 2019-09-17 中国电力科学研究院 Soil body layering settlement magnetic ring and soil body deep soil settlement survey device
CN108385740B (en) * 2018-03-11 2020-05-15 南京锦盛电力工程监理有限公司 Foundation settlement monitoring system
CN109357661A (en) * 2018-11-22 2019-02-19 天津城建大学 A kind of preboring formula soil layer layering measuring instrument
CN109631832A (en) * 2018-12-10 2019-04-16 中交天津港湾工程研究院有限公司 A kind of soil body delaminating deposition quantity monitoring method
CN109443309A (en) * 2018-12-10 2019-03-08 中交天津港湾工程研究院有限公司 A kind of soil body delaminating deposition amount monitoring system based on telescopic sedimentation ring
CN109724562B (en) * 2019-01-29 2021-01-12 长沙理工大学 Highway settlement measuring device
CN110132230B (en) * 2019-05-27 2021-07-30 浙江绿农生态环境有限公司 Pit is reclaimed with earth state monitoring devices that subsides
CN110093910B (en) * 2019-05-30 2024-05-24 华中科技大学 Magnetic ring type layered settlement testing device and testing method
CN110243272B (en) * 2019-07-12 2021-01-29 福州大学 Test device and method for measuring height of suction foundation penetration soil plug and water plug
CN110565615A (en) * 2019-08-28 2019-12-13 中交天津港湾工程研究院有限公司 Rotating blade type settlement ring, layered settlement observation device based on settlement ring and burying method of layered settlement observation device
US11879336B2 (en) * 2021-03-09 2024-01-23 China University Of Mining And Technology Monitoring device and method for dynamic development of overburden mining separated bed
CN112945188B (en) * 2021-03-09 2021-10-22 中国矿业大学 Rock stratum settlement magnetic induction monitoring device and operation method thereof
CN115247414B (en) * 2021-04-28 2023-07-21 深圳大学 Foundation settlement optical fiber sensing and measuring device
CN115247413B (en) * 2021-04-28 2023-07-21 深圳大学 Optical fiber sensing measuring ring for soil body layered settlement
CN115248027B (en) * 2021-04-28 2023-07-21 深圳大学 Optical fiber sensing monitoring device for soil settlement and settlement measuring method
CN112982357B (en) * 2021-05-13 2022-01-11 水利部交通运输部国家能源局南京水利科学研究院 Foundation layered settlement monitoring device and assembly method thereof
CN117026927A (en) * 2023-10-09 2023-11-10 邹城市巨力机械有限公司 Device for detecting foundation settlement

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103196421A (en) * 2013-01-22 2013-07-10 中交天津港湾工程研究院有限公司 Automatic inspection type layered settlement instrument
CN104457655A (en) * 2014-11-27 2015-03-25 同济大学 Folding blade knife type multi-point displacement meter anchor head for soft soil ground layer
CN104499511A (en) * 2014-11-27 2015-04-08 同济大学 Spring-arm-type multi-point displacement meter anchor head for soft soil ground layer
CN104612124A (en) * 2014-11-27 2015-05-13 同济大学 Vane type multipoint displacement meter anchor head
CN204944477U (en) * 2015-08-21 2016-01-06 中交天津港湾工程研究院有限公司 Firm embedded type sedimentation ring

Family Cites Families (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5006044A (en) * 1987-08-19 1991-04-09 Walker Sr Frank J Method and system for controlling a mechanical pump to monitor and optimize both reservoir and equipment performance
US4899501A (en) * 1988-08-11 1990-02-13 Victor Yates Expanding anchoring device
CN2460993Y (en) * 2000-11-23 2001-11-21 胡兵安 Testing equipment for erythrocyte sedimentation rate (erythrocyte sedimentation)
JP3728297B2 (en) * 2003-04-02 2005-12-21 大成建設株式会社 Ground subsidence measuring device and installation method thereof
CN2685821Y (en) * 2004-02-16 2005-03-16 长沙金码高科技实业有限公司 Laminated settlement meter
EP1988217A1 (en) * 2006-02-08 2008-11-05 Kiso-Jiban Consultants Co., Ltd. Searching method for acquiring ground information
CN201094020Y (en) * 2007-09-30 2008-07-30 中国铁道科学研究院铁道建筑研究所 Settlement plate and assembled laminate settlement apparatus
KR100879876B1 (en) * 2008-03-06 2009-01-22 신상열 The instrumentation apparatus for the settlement of the reclaimed ground or the measure of soil
EP2275642A1 (en) * 2009-07-17 2011-01-19 Agisco S.r.l. System for detection and monitoring of deep land subsidence
KR100955598B1 (en) * 2009-08-12 2010-05-03 (주)명성지오시스템 Methode and system for measuring layer settlement of soft ground
CN201567573U (en) * 2009-11-19 2010-09-01 湖南大学 Anchor rod
CN201600120U (en) * 2010-01-08 2010-10-06 浙江大学 Soil interior sedimentation measuring device
KR101190549B1 (en) * 2010-04-16 2012-10-16 케이앤씨컨설턴트 주식회사 A pin for measuring a tunnel convergence and crown settlement
CN202124851U (en) * 2011-06-08 2012-01-25 水利部交通运输部国家能源局南京水利科学研究院 Combined type layering settlement magnetic ring
CN202494442U (en) * 2012-03-27 2012-10-17 上海市电力公司 Stratum layering and settlement measuring device
CN102853812B (en) * 2012-07-12 2014-07-30 中交天津港湾工程研究院有限公司 Angular-displacement underwater settlement gauge
KR101371046B1 (en) * 2012-07-31 2014-03-25 우주기계 주식회사 Measurement device of the ground settlement and reinstalling method of the same
CN102878979B (en) * 2012-09-14 2014-11-26 中交天津港湾工程研究院有限公司 Automatic electric measurement type layered settlement instrument
CN102953364B (en) * 2012-11-23 2014-12-10 同济大学 Multilayer blade-typed multipoint displacement metre anchor head used for soft soil layer
CN102953365B (en) * 2012-11-23 2014-12-10 同济大学 Multilayer blade-typed multipoint displacement metre anchor head used for soft soil layer
CN103850237B (en) * 2012-12-03 2016-02-17 同济大学 A kind of angle of throat cut-in type weak soil multiple position extensometer anchor head
WO2014092662A1 (en) * 2012-12-13 2014-06-19 Kaya Cemalettin Anti-earthquake building system
CN103104270A (en) * 2013-02-19 2013-05-15 裴志胜 Shear type expansion anchor rod and extension application thereof
CN103196423B (en) * 2013-04-01 2015-09-23 水利部交通运输部国家能源局南京水利科学研究院 The sedimentation ring accurately self-align for deep soil settlement survey system and using method thereof
CN103321201B (en) * 2013-05-23 2015-07-29 上海港湾工程质量检测有限公司 Sealed liquid pressure reduction delaminating deposition takes into account that it is buried underground, measuring method
CN103266590B (en) * 2013-05-24 2015-07-08 浙江大学宁波理工学院 Mounting device for bead-string-type settlement plates of soil body layered settlement monitoring device
CN203224232U (en) * 2013-05-24 2013-10-02 浙江大学宁波理工学院 Lantern ring compressed spring type settlement plate installation device of soil layered-settlement monitoring equipment
CN103953025B (en) * 2014-05-13 2015-10-28 水利部交通运输部国家能源局南京水利科学研究院 Measure equipment and the method to set up thereof of Deep Thick Soft Ground or covering layer delaminating deposition
CN203869625U (en) * 2014-05-21 2014-10-08 西南交通大学 Single-pipe multi-rod layered settlement measuring device for indoor large-scale soil engineering model test
CN204214437U (en) * 2014-11-19 2015-03-18 浙江广川工程咨询有限公司 Profundal zone surface subsidence monitoring device
CN104532815B (en) * 2014-11-27 2016-08-24 同济大学 A kind of telescopic boom multipoint displacement meter anchor head for soft soil layer
CN104499474B (en) * 2014-11-27 2016-08-17 同济大学 A kind of folding blade-type multipoint displacement meter anchor head
CN104452726B (en) * 2014-12-04 2016-03-09 浙江广川工程咨询有限公司 Profundal zone soil body deep soil settlement survey device and method
CN204418149U (en) * 2014-12-04 2015-06-24 浙江广川工程咨询有限公司 Profundal zone soil body deep soil settlement survey device
CN204418237U (en) * 2015-01-20 2015-06-24 铁道第三勘察设计院集团有限公司 A kind of monitoring system of foundation sedimentation
KR101528831B1 (en) * 2015-02-02 2015-06-16 주식회사 하이드로넷 System for monitoring groundwater with function of detecting sinkhole
CN204456104U (en) * 2015-02-25 2015-07-08 陈少青 A kind of paddle type mill ground anchorage burying sleeve pipe for geotechnical engineering deep layer drill underground
CN204555955U (en) * 2015-04-16 2015-08-12 上海申元岩土工程有限公司 A kind of magnet ring type deep soil settlement survey device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103196421A (en) * 2013-01-22 2013-07-10 中交天津港湾工程研究院有限公司 Automatic inspection type layered settlement instrument
CN104457655A (en) * 2014-11-27 2015-03-25 同济大学 Folding blade knife type multi-point displacement meter anchor head for soft soil ground layer
CN104499511A (en) * 2014-11-27 2015-04-08 同济大学 Spring-arm-type multi-point displacement meter anchor head for soft soil ground layer
CN104612124A (en) * 2014-11-27 2015-05-13 同济大学 Vane type multipoint displacement meter anchor head
CN204944477U (en) * 2015-08-21 2016-01-06 中交天津港湾工程研究院有限公司 Firm embedded type sedimentation ring

Also Published As

Publication number Publication date
CN108413928B (en) 2020-07-28
CN108981654B (en) 2020-07-28
CN108981654A (en) 2018-12-11
CN108413928A (en) 2018-08-17
CN105136110A (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN105136110B (en) Firm embedded type sedimentation ring and soil body delaminating deposition amount monitoring system
CN105301193B (en) Sea bed lateral deformation and slip observation device and method
EP2545249B1 (en) Subterranean formation deformation monitoring systems
CN105277993B (en) Method for prospecting gold mine in sea area
JP4874418B2 (en) Survey method to obtain ground information
CN205808308U (en) A kind of device of quick detection tunnel surrounding internal displacement
CN204421889U (en) Ground layering perpendicular displacement monitoring device
CN203785669U (en) High-precision deep sea depth detection device
US20120193144A1 (en) Magnetic ranging system for controlling a drilling process
CN204401664U (en) A kind of castinplace pile pile bottom sediment and pile end groundwork checkout gear
CN106192971A (en) A kind of artesian water water-level observation well construction and the method for multilamellar water-level observation
CN103670386B (en) A kind of lithostratigraphy multi-point displacement laser measurement method and device
CN105019485B (en) A kind of excavation of foundation pit dead load test on pile foundation detection method
CN109238161A (en) A kind of observation device and observation method of tunnel surface absolute convergence amount
CN210571128U (en) Measuring device for rapidly measuring ground stress of soft rock stratum
CN204944477U (en) Firm embedded type sedimentation ring
CN102183230B (en) An anchoring device of a datum mark in a boring
WO2010058033A1 (en) Method and system for fixing an element in a borehole
CN103822863A (en) Instrument used for measuring soil permeability coefficient by onsite drilling and water injection
CN210426413U (en) Multipoint displacement measuring system based on magnetic displacement sensor
CN100565225C (en) A kind of with a single hole or the long method of contrast resistivity method measurement stake
CN108825136B (en) Building pile foundation detection device
CN206489183U (en) Wave direction measurement apparatus based on GPS
JP2007239444A (en) Investigation method for obtaining ground information
CN102022111B (en) Method for detecting azimuth of damaged oilfield downhole casing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Huang Tai

Inventor after: Liu Aimin

Inventor after: Li Lixin

Inventor after: Yu Yang

Inventor after: Zhang Luyi

Inventor after: Xing Yi

Inventor after: Hou Jinfang

Inventor after: Li Shuqi

Inventor after: Yang Jingfang

Inventor after: Yu Zhifa

Inventor before: Huang Tai

Inventor before: Liu Aimin

Inventor before: Li Lixin

Inventor before: Yu Yang

Inventor before: Zhang Luyi

Inventor before: Xing Yi

Inventor before: Hou Jinfang

Inventor before: Li Shuqi

Inventor before: Yang Jingfang

Inventor before: Yu Zhifa