CN105133909A - 一种山区抗上拔直线塔 - Google Patents
一种山区抗上拔直线塔 Download PDFInfo
- Publication number
- CN105133909A CN105133909A CN201510627874.4A CN201510627874A CN105133909A CN 105133909 A CN105133909 A CN 105133909A CN 201510627874 A CN201510627874 A CN 201510627874A CN 105133909 A CN105133909 A CN 105133909A
- Authority
- CN
- China
- Prior art keywords
- arm
- phase
- hanging
- wire
- conducting wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
一种山区抗上拔直线塔,包括塔体,塔体由塔头和塔身组成,塔头顶部设有地线支架,塔头中部设有导线横担,塔头下部设有上曲臂和下曲臂;地线支架上设有用于挂设地线的第一地线挂点和第二地线挂点;导线横担的最左端、中部和最右端分别设有导线横担左挂点,导线横担中挂点和导线横担右挂点;导线横担左挂点处挂有悬挂三相导线左相的绝缘子,导线横担中挂点处挂有悬挂三相导线中相的绝缘子,导线横担右挂点处挂有悬挂三相导线右相的绝缘子。使用本发明,利于缩短导线横担的长度,使得设计排杆时不受Kv值控制,比采用耐张塔开断减少塔重约15%,相应基础混凝土量可节省25%。
Description
技术领域
本发明涉及输电线路工程,具体涉及一种山区抗上拔直线塔。
背景技术
山区输电线路杆塔排位时,常出现导线对地距离满足要求,水平档距及垂直档距均不大,但是Kv值很小的情况,需要通过升高塔高或者采取耐张塔开断等措施,这样,均会导致铁塔工程量的增加。
发明内容
本发明要解决的技术问题是,克服现有技术存在的上述缺陷,提供一种有利于减小塔重、节省工程量的山区抗上拔直线塔。
本发明解决其技术问题所采用的技术方案是:
一种山区抗上拔直线塔,包括塔体,塔体由塔头和塔身组成,塔头顶部设有地线支架,塔头中部设有导线横担,塔头下部设有上曲臂和下曲臂;地线支架上设有用于挂设地线的第一地线挂点和第二地线挂点;导线横担的最左端设有导线横担左挂点,导线横担的中部设有导线横担中挂点,导线横担的最右端设有导线横担右挂点;导线横担左挂点处挂有悬挂三相导线左相的绝缘子,导线横担中挂点处挂有悬挂三相导线中相的绝缘子,导线横担右挂点处挂有悬挂三相导线右相的绝缘子;悬挂三相导线左相的绝缘子下端与水平第一横担一端相连;悬挂三相导线右相的绝缘子下端与水平第二横担一端相连;悬挂三相导线中相的绝缘子下端与第一斜向绝缘子上端相连,悬挂三相导线中相的绝缘子下端还与第二斜向绝缘子上端相连。
进一步,所述水平第一横担另一端固接于上曲臂的左侧、下曲臂的左侧或曲臂左侧与下曲臂左侧的交接点处;水平第二横担另一端固接于上曲臂的右侧、下曲臂的右侧或上曲臂右侧与下曲臂右侧的交接点处;第一斜向绝缘子下端固接于下曲臂左侧和上曲臂左侧的交接点处;第二斜向绝缘子下端固接于下曲臂右侧和上曲臂右侧的交接点处。
进一步,所述塔体呈酒杯型。
进一步,所述塔身从上至下坡度不变。
进一步,塔身由角钢构成。
进一步,所述塔头由角钢和复合材料构成。塔头的地线支架、导线横担、上曲臂和下曲臂由角钢构成。第一横担和第二横担由复合材料构成,具体可采用江苏神马电力股份有限公司生产的增强纤维环氧树脂玻璃钢横担。
使用时,三相导线呈水平排列,三相导线的左相导线置于悬挂三相导线左相的绝缘子下端,左相导线由悬挂三相导线左相的绝缘子、水平第一横担固定,以防止左相导线风偏摆动。三相导线的右相导线置于悬挂三相导线右相的绝缘子下端,右相导线由悬挂三相导线右相的绝缘子、水平第二横担固定,以防止右相导线风偏摆动。三相导线的中相导线置于悬挂三相导线中相的绝缘子下端,中相导线由悬挂三相导线中相的绝缘子、第一斜向绝缘子和第二斜向绝缘子固定,以防止中相导线风偏摆动。
本发明结构简单、紧凑,三相导线的中相导线由三串绝缘子(即悬挂三相导线中相的绝缘子、第一斜向绝缘子和第二斜向绝缘子)固定,三相导线的左相导线和右相导线分别在水平第一横担、水平第二横担的作用下,防止风偏摆动,以利于缩短导线横担的长度,使得设计排杆时不受Kv值控制,比采用耐张塔开断减少塔重约15%,相应基础混凝土量可节省25%。
附图说明
图1是山区抗上拔直线塔结构布置示意图。
图中:1——塔头;1-1——第一地线挂点;1-2——第二地线挂点;1-3——导线横担左挂点;1-4——导线横担中挂点;1-5——导线横担右挂点;1-6——三相导线左相的绝缘子;1-7——三相导线中相的绝缘子;1-8——三相导线右相的绝缘子;1-9——第一斜向绝缘子;1-10——第二斜向绝缘子;1-11——水平第一横担;1-12——水平第二横担;1-13——地线支架;1-14——导线横担;1-15——上曲臂;1-16——下曲臂;2——塔身。
具体实施方式
以下结合附图和实施例对本发明作进一步说明。
参照图1,一种山区抗上拔直线塔,包括塔体,所述塔体呈酒杯型,塔体由塔头1和塔身2组成,塔头1顶部设有地线支架1-13,塔头1中部设有导线横担1-14,塔头1下部设有上曲臂1-15和下曲臂1-16;地线支架1-13上设有用于挂设地线的第一地线挂点1-1和第二地线挂点1-2;导线横担1-14的最左端设有导线横担左挂点1-3,导线横担1-14的中部设有导线横担中挂点1-4,导线横担1-14的最右端设有导线横担右挂点1-5;导线横担左挂点1-3处挂有悬挂三相导线左相的绝缘子1-6,导线横担中挂点1-4处挂有悬挂三相导线中相的绝缘子1-7,导线横担右挂点1-5处挂有悬挂三相导线右相的绝缘子1-8;悬挂三相导线左相的绝缘子1-6下端与水平第一横担1-11一端相连,水平第一横担1-11另一端固接于上曲臂1-15的左侧、下曲臂1-16的左侧或上曲臂1-15左侧与下曲臂1-16左侧的交接点处。水平第一横担1-11的数量至少为两根。为了简便起见,本实施例中仅示出了两根,其中一根水平第一横担1-11的另一端固接于上曲臂1-15的左侧,另一根水平第一横担1-11的另一端固接于下曲臂1-16左侧和上曲臂1-15左侧的交接点处。悬挂三相导线右相的绝缘子1-8下端与水平第二横担1-12一端相连,水平第二横担1-12另一端固接于上曲臂1-15的右侧、下曲臂1-16的右侧或上曲臂1-15右侧与下曲臂1-16右侧的交接点处。水平第二横担1-12的数量至少为两根。为了简便起见,本实施例中仅示出了两根,其中一根水平第二横担1-12的另一端固接于上曲臂1-15的右侧,另一根水平第二横担1-12的另一端固接于下曲臂1-16右侧和上曲臂1-15右侧的交接点处。悬挂三相导线中相的绝缘子1-7下端与第一斜向绝缘子1-9上端相连,悬挂三相导线中相的绝缘子1-7下端还与第二斜向绝缘子1-10上端相连;第一斜向绝缘子1-9下端固接于下曲臂1-16左侧和上曲臂1-15左侧的交接点处;第二斜向绝缘子1-10下端固接于下曲臂1-16右侧和上曲臂1-15右侧的交接点处。
所述塔身2从上至下坡度不变。塔身2由角钢构成。
所述塔头1由角钢和复合材料构成。塔头的地线支架1-13、导线横担1-14、上曲臂1-15和下曲臂1-15由角钢构成。第一横担1-11和第二横担1-12由复合材料构成,具体可采用江苏神马电力股份有限公司生产的增强纤维环氧树脂玻璃钢横担(市售)。
使用时,三相导线呈水平排列,三相导线的左相导线置于悬挂三相导线左相的绝缘子1-6下端(如图1中A处所示),左相导线由悬挂三相导线左相的绝缘子1-6、水平第一横担1-11固定,以防止左相导线风偏摆动。三相导线的右相导线置于悬挂三相导线右相的绝缘子1-8下端(如图1中C处所示),右相导线由悬挂三相导线右相的绝缘子1-8、水平第二横担1-12固定,以防止右相导线风偏摆动。三相导线的中相导线置于悬挂三相导线中相的绝缘子1-7下端(如图1中B处所示),中相导线由悬挂三相导线中相的绝缘子1-7、第一斜向绝缘子1-9和第二斜向绝缘子1-10固定,以防止中相导线风偏摆动。地线置于第一地线挂点1-1和第二地线挂点1-2处。
Claims (4)
1.一种山区抗上拔直线塔,包括塔体,塔体由塔头和塔身组成,塔头顶部设有地线支架,塔头中部设有导线横担,塔头下部设有上曲臂和下曲臂;地线支架上设有用于挂设地线的第一地线挂点和第二地线挂点;其特征在于,导线横担的最左端设有导线横担左挂点,导线横担的中部设有导线横担中挂点,导线横担的最右端设有导线横担右挂点;导线横担左挂点处挂有悬挂三相导线左相的绝缘子,导线横担中挂点处挂有悬挂三相导线中相的绝缘子,导线横担右挂点处挂有悬挂三相导线右相的绝缘子;悬挂三相导线左相的绝缘子下端与水平第一横担一端相连;悬挂三相导线右相的绝缘子下端与水平第二横担一端相连;悬挂三相导线中相的绝缘子下端与第一斜向绝缘子上端相连,悬挂三相导线中相的绝缘子下端还与第二斜向绝缘子上端相连。
2.根据权利要求1所述的山区抗上拔直线塔,其特征在于,所述水平第一横担另一端固接于上曲臂的左侧、下曲臂的左侧或曲臂左侧与下曲臂左侧的交接点处;水平第二横担另一端固接于上曲臂的右侧、下曲臂的右侧或上曲臂右侧与下曲臂右侧的交接点处;第一斜向绝缘子下端固接于下曲臂左侧和上曲臂左侧的交接点处;第二斜向绝缘子下端固接于下曲臂右侧和上曲臂右侧的交接点处。
3.根据权利要求1或2所述的山区抗上拔直线塔,其特征在于,所述塔体呈酒杯型。
4.根据权利要求1或2所述的山区抗上拔直线塔,其特征在于,所述塔身从上至下坡度不变。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510627874.4A CN105133909A (zh) | 2015-09-29 | 2015-09-29 | 一种山区抗上拔直线塔 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510627874.4A CN105133909A (zh) | 2015-09-29 | 2015-09-29 | 一种山区抗上拔直线塔 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105133909A true CN105133909A (zh) | 2015-12-09 |
Family
ID=54719453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510627874.4A Pending CN105133909A (zh) | 2015-09-29 | 2015-09-29 | 一种山区抗上拔直线塔 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105133909A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106567603A (zh) * | 2016-10-27 | 2017-04-19 | 中国电力工程顾问集团西北电力设计院有限公司 | 一种750kV酒杯复合横担塔 |
CN108374593A (zh) * | 2018-02-13 | 2018-08-07 | 浙江华云电力工程设计咨询有限公司 | 一种钢复组合受力式横担杆塔结构 |
CN113047682A (zh) * | 2021-03-30 | 2021-06-29 | 国网河南省电力公司西峡县供电公司 | 一种低塔身双回路钻越塔 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4430761A1 (de) * | 1994-08-30 | 1996-03-14 | Abb Patent Gmbh | Verfahren und Vorrichtung zum Auswechseln eines Mastkopfes eines Tragmastes einer Hochspannungsfreileitung |
CN201771242U (zh) * | 2010-07-16 | 2011-03-23 | 潍坊长安铁塔股份有限公司 | 电力钢管杆塔 |
CN102296864A (zh) * | 2011-05-31 | 2011-12-28 | 国网电力科学研究院 | 一种用于特高压同塔双回紧凑型输电的新型塔型 |
CN202706628U (zh) * | 2012-07-19 | 2013-01-30 | 安徽华电工程咨询设计有限公司 | 一种采用“i-j-i”串型的新型输电线路杆塔 |
CN202945851U (zh) * | 2012-08-20 | 2013-05-22 | 宜昌电力勘测设计院有限公司 | 中、重冰区110kv输电线路单回路直线塔 |
CN204941012U (zh) * | 2015-09-29 | 2016-01-06 | 中国能源建设集团湖南省电力设计院有限公司 | 山区抗上拔直线塔 |
-
2015
- 2015-09-29 CN CN201510627874.4A patent/CN105133909A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4430761A1 (de) * | 1994-08-30 | 1996-03-14 | Abb Patent Gmbh | Verfahren und Vorrichtung zum Auswechseln eines Mastkopfes eines Tragmastes einer Hochspannungsfreileitung |
CN201771242U (zh) * | 2010-07-16 | 2011-03-23 | 潍坊长安铁塔股份有限公司 | 电力钢管杆塔 |
CN102296864A (zh) * | 2011-05-31 | 2011-12-28 | 国网电力科学研究院 | 一种用于特高压同塔双回紧凑型输电的新型塔型 |
CN202706628U (zh) * | 2012-07-19 | 2013-01-30 | 安徽华电工程咨询设计有限公司 | 一种采用“i-j-i”串型的新型输电线路杆塔 |
CN202945851U (zh) * | 2012-08-20 | 2013-05-22 | 宜昌电力勘测设计院有限公司 | 中、重冰区110kv输电线路单回路直线塔 |
CN204941012U (zh) * | 2015-09-29 | 2016-01-06 | 中国能源建设集团湖南省电力设计院有限公司 | 山区抗上拔直线塔 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106567603A (zh) * | 2016-10-27 | 2017-04-19 | 中国电力工程顾问集团西北电力设计院有限公司 | 一种750kV酒杯复合横担塔 |
CN108374593A (zh) * | 2018-02-13 | 2018-08-07 | 浙江华云电力工程设计咨询有限公司 | 一种钢复组合受力式横担杆塔结构 |
CN108374593B (zh) * | 2018-02-13 | 2023-09-12 | 浙江华云电力工程设计咨询有限公司 | 一种钢复组合受力式横担杆塔结构 |
CN113047682A (zh) * | 2021-03-30 | 2021-06-29 | 国网河南省电力公司西峡县供电公司 | 一种低塔身双回路钻越塔 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203352100U (zh) | 输电线路防风拉线横担装置 | |
CN105133909A (zh) | 一种山区抗上拔直线塔 | |
CN102296864B (zh) | 一种用于特高压同塔双回紧凑型输电的新型塔型 | |
CN204941012U (zh) | 山区抗上拔直线塔 | |
CN205025179U (zh) | 单回路耐张塔 | |
CN203412346U (zh) | 一种新型单回路开断杆塔 | |
CN205565511U (zh) | 同塔双回钢管杆更换绝缘子作业用横担卡具 | |
CN103915807A (zh) | 一种用于输电线路的防风偏柔性控制装置 | |
CN104037658B (zh) | 悬垂玻璃绝缘子串提升*** | |
CN102916372B (zh) | 10kV同杆多回线路中间相导线提线工具 | |
CN104295147A (zh) | 一种适用于变电站出线的构架 | |
CN204089044U (zh) | 便携式架空导线移位装置 | |
CN201843382U (zh) | 采用绝缘材料横担上弦杆降低塔高的输电杆塔塔头结构 | |
CN201574616U (zh) | 35千伏四回路钢管杆 | |
CN204252614U (zh) | 高压铁塔内支撑伸缩式抱杆 | |
CN202227755U (zh) | 电网输电线斜拉塔 | |
CN202157569U (zh) | 一种用于特高压同塔双回紧凑型输电的新型塔型 | |
CN203617651U (zh) | 一种稳固可靠的算盘街码 | |
CN105155916A (zh) | 一种单回路正逆相序变换角钢塔 | |
CN206242955U (zh) | 一种绝缘复合式接触网支持装置 | |
CN104505795A (zh) | 一种线缆分支架装置 | |
CN204258228U (zh) | 用于线路终端及引线的固定金具 | |
CN106049959B (zh) | 一种横担及耐张塔 | |
CN106555499A (zh) | 既有单回路耐张铁塔电缆引下杆 | |
CN204703578U (zh) | 门型构架式电缆登杆 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151209 |