CN105133781A - Novel building load-bearing floor - Google Patents

Novel building load-bearing floor Download PDF

Info

Publication number
CN105133781A
CN105133781A CN201510597555.3A CN201510597555A CN105133781A CN 105133781 A CN105133781 A CN 105133781A CN 201510597555 A CN201510597555 A CN 201510597555A CN 105133781 A CN105133781 A CN 105133781A
Authority
CN
China
Prior art keywords
floor
tension wire
preload tension
water
new type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510597555.3A
Other languages
Chinese (zh)
Other versions
CN105133781B (en
Inventor
向红先
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huzhou You Yan Intellectual Property Service Co.,Ltd.
Original Assignee
Chengdu Yuya Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Yuya Science and Technology Co Ltd filed Critical Chengdu Yuya Science and Technology Co Ltd
Priority to CN201510597555.3A priority Critical patent/CN105133781B/en
Publication of CN105133781A publication Critical patent/CN105133781A/en
Application granted granted Critical
Publication of CN105133781B publication Critical patent/CN105133781B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Floor Finish (AREA)

Abstract

The invention discloses a novel building load-bearing floor. The floor includes a floor body, wherein a self-repairing tensioning structure and a fracture waterproof structure are arranged in the floor body; the self-repairing tensioning structure includes a plurality of prestressed wires arranged inside the floor body; connecting structures used for connecting two adjacent floor bodies are arranged at the two ends of the prestressed wires; the fracture waterproof structure includes a plurality of capsule bodies and a cement powder layer which are arranged inside the floor body; a plurality of parallelly-arranged water-swellable rubber strips are arranged inside the floor body; the water-swellable rubber strips are not parallel to the edge of the floor body. The novel building load-bearing floor provided by the invention overcomes the deficiencies of existing floors, can repair by self after fracture occurs, and realizes water resistance and water-seepage resistance of the fractured floor.

Description

A kind of novel building load-bearing floor
Technical field
The present invention relates to a kind of novel building load-bearing floor, belong to building field.
Background technology
Floor is a kind of separation supporting member.Floor is the supporting part in floor, and house vertical direction is divided into some layers by it, and the vertical load such as people and furniture and floor deadweight are passed to basis by body of wall, beam or post.Several form such as floor of wood floor, brick arch floor, reinforced concrete floor and steel liner plate load-bearing can be divided into by its material used.Reinforced concrete floor adopts concrete and rebar jointly to make.This floor is firm, durable, and rigidity is large, and intensity is high, and fireproof performance is good, and current application is commonplace.In-situ reinforced concrete slab and the large class of assembled steel bar concrete floor two can be divided into by construction method.In-situ reinforced concrete slab is generally solid slab, and cast-in-situ floor is also frequent builds together with Cast-in-situ Beam, forms cast-in-situ beam slab.The common type of cast-in-situ beam slab has ribbed floor, nine-squares beam floor and girderless floor etc.Assembled steel bar concrete floor, except only a few is solid slab, the overwhelming majority adopts circular hole slab and trough slab (being divided into positive flute profile and anti-flute profile two kinds).Assembled steel bar concrete floor is generally all stretched at plate end reinforcing bar, uses the concrete cementation of fissures, to strengthen globality after on-site consolidation.In modern room design, waterproof is the most important thing, generally, can carry out waterproofing work in places such as kitchens, lavatory.But, waterproofing course owing to showing shallow air circulation, very easily ageing failure.And in fitment process, due to ground surface finishing, very easily waterproofing course is destroyed to cause and leak.Address this problem so be badly in need of now a kind of New Floor Slab.
Summary of the invention
For the deficiency that prior art exists, technical problem to be solved by this invention is, provides a kind of novel building load-bearing floor, solves the weak point of existing floor, can self-regeneration after there is crackle, achieves the waterproof, seepage control of fracture floor.
For solving the problems of the technologies described above, the technical scheme that the present invention takes is, a kind of novel building load-bearing floor, comprises floor body, is provided with selfreparing tightening structure and fracture waterproof construction in described floor body; Described selfreparing tightening structure comprises some some preload tension wire be arranged in floor body, and the two ends of preload tension wire are provided with the syndeton for connecting adjacent two floor bodies; Described fracture waterproof construction comprises and is somely arranged at capsule body in floor body and cement bisque; Also be provided with some hydro-expansive rubber bars be arranged in parallel in described floor body, hydro-expansive rubber bar is not parallel to the edge of floor body.
Optimize, above-mentioned New type weight loading floor, described preload tension wire comprises 8 basic preload tension wire arranged along floor diagonal, also comprises some become 20-45 degree angle reinforcement preload tension wire with basic preload tension wire; The pretightning force of described basic preload tension wire is 1/2 of floor fracture shearing, and the pretightning force strengthening preload tension wire is 1/3.5 of floor fracture shearing.
Optimize, above-mentioned New type weight loading floor, is filled with hydrogel in described capsule body; The length of described capsule body is 1/30 to 1/40 of the long edge lengths of floor, and width is 1/25 to 1/35 of floor bond length; Described capsule body is evenly arranged in two parallel planes in floor, and the axis of capsule body and the long limit of floor are 30 degree of angles.
Optimize, above-mentioned New type weight loading floor, the longitudinal section of described water-swellable adhesive tape is square, and the longitudinal section length of side is 1/10 of floor bond length; Spacing between described water-swellable adhesive tape is 1/18 of floor minor face and is 30 degree of angles with the long limit of floor.
Optimize, above-mentioned New type weight loading floor, the quantity of described reinforcement preload tension wire is less than or equal to 20; The angle of described reinforcement preload tension wire and basic preload tension wire is 32 degree.
Optimize, above-mentioned New type weight loading floor, described preload tension wire is provided with some stress metal grabs, stress metal grab is I-shaped and is fixedly connected with preload tension wire.
Optimize, above-mentioned New type weight loading floor, the stress metal grab quantity in described same preload tension wire is 5 and evenly arranges.
Optimize, above-mentioned New type weight loading floor, described capsule body and water-swellable adhesive tape are not present in same vertical plane.
Optimize, above-mentioned New type weight loading floor, described capsule body is wrapped up by glass cement softgel shell, and cement bisque is wrapped in glass plate; The thickness of described cement bisque is 1/10 of slab thickness.
The invention has the advantages that:
(1) when fracture occurs floor, 8 pile foundation preload tension wire provide a pulling force merged to breaking part from floor two ends, cracks on floor slab are merged as possible, reduce the width of cracks on floor slab; Because basic preload tension wire is 8 and 8 diagonal along floor are arranged, its pulling force provided is not apply from single direction to crack, and such is arranged so that pulling force is more even, improves the effect of basic preload tension wire.
(2) setting strengthening preload tension wire adds pulling force effect.In theory, the quantity strengthening preload tension wire is more, its effect is stronger, but due to the reason of cost, the symbolic animal of the birth year strengthening preload tension wire is restricted, so reinforcement preload tension wire and basic preload tension wire can only be arranged according to angle, like this when ensureing pulling force effect, good economic benefit can also be reached.In this application, draw through a large amount of experiments, both are when becoming 20-45 degree angle, good pulling force effect can be reached, be less than or equal to 20 in the quantity strengthening preload tension wire, and when angle is 32 degree, economic benefit and actual effect reach a balance preferably.
(3) draw through a large amount of floor tensile tests: when ensure that (1) and (2), the pretightning force of basis preload tension wire is 1/2 of floor fracture shearing, and the pretightning force strengthening preload tension wire is that 1/3.5 of floor fracture shearing can ensure that its pulling force reaches effect better.
(4) effect of capsule body is: owing to adding the dried powder of hydrogel in capsule body, and after crack appears in floor and water infiltrates in crack, hydrogel capsule breaks, and hydrogel forms gelinite after oozing out and meeting water.Gelinite can the gap in filled floor crack effectively, and anti-sealing oozes out floor.Vitreum is selected to be because fragile material just can break when running into less shearing as capsule shell, fragile material has a lot, comprise pottery, brick, watt, stone, concrete etc., but other fragile materials are due to poor in processability, processing cost is higher, is not suitable for the technical scheme of the application.Although concrete price is low, can process, because concrete is not suitable for being made as small processing part, so the application selects glass as the housing of capsule.
(5) water-swellable adhesive tape is the performance of existing a kind of waterproofing materials, its existing general rubber product, can meet again the performance of water self-expansion, is that a kind of waterproof material, sealing, waterproof effect are more more reliable than ordinary rubber.But existing water-swellable adhesive tape mainly occurring that clear and definite crack is that it is laterally filled in crack place, prevents infiltration.In this application, the crack place do not determined, so water-swellable adhesive tape can not be horizontally set in floor.Draw through fracture experiment, cracks on floor slab is minimum along the probability of the arrangement being parallel to floor edge, arranges so water-swellable adhesive tape is 30 degree of angles along the long limit of floor.
(6) the stress metal grab quantity in same preload tension wire is 5 and evenly arranges.Although applied stress metal grab can not reach by the frictional force on aramid line surface the effect providing pulling force yet, add stress metal grab and can better ensure pulling force effect.
(7) although capsule body is identical with the angle at floor edge with water-swellable adhesive tape, but it is not present in same vertical plane in solid space, such capsule body and water-swellable adhesive tape are staggered in solid space, like this by the reciprocation of capsule body and water-swellable adhesive tape, have water leakage when can prevent floor from occurring crack better.
(8) cement bisque is wrapped in glass plate, and like this after cracks on floor slab, glass breakage, cement flour exposes, and after water enters floor gap, water condensation met by cement, serves better percolation-proof effect.
In the technical scheme of the application, cement bisque, preload tension wire, capsule body and water-swellable adhesive tape form a firmly percolation-proof system, when there is crack in floor, hydrogel powders in capsule body and cement bisque and cement expose, after water enters gap, hydrogel powders first becomes gel, water-swellable adhesive tape water-swellable simultaneously, water met by cement.Hydrogel and water-swellable adhesive tape alternating action, filled floor crack.Under the effect of preload tension wire, because hydrogel and water-swellable adhesive tape are elastic material, when crack pulling force inwardly merges, hydrogel and water-swellable adhesive tape receive the extruding of sides of fracture, fill in crack, the gap of crack and their place plane intersections both this, can be filled like this.But because hydrogel and water-swellable adhesive tape are easily aging material, so they need the synergy of cement.The time that the time theed cement solidifies meets water change gel compared with hydrogel powders will be grown, so little in the effect of preload tension wire, first cement met water and become the mud with mobility, after hydrogel and water-swellable adhesive tape fill the gap of crack and their place plane intersections, cement slurry also slowly enter in crack, fill crack, when crack is filled completely by cement, cement slowly solidifies, gap is filled, when after water-swellable adhesive tape and hydrogel ageing failure, cement still can play the effect of antiseepage, side's infiltration effect that the technical scheme of such the application is brought can be more lasting.Through crack, filling test draws, when cement bisque, preload tension wire, capsule body and water-swellable adhesive tape lack any one of it, the post-rift waterproof, seepage control effect of floor is all had a greatly reduced quality.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the A-A sectional structure schematic diagram of Fig. 1;
Fig. 3 is the B-B sectional structure schematic diagram of Fig. 1;
Fig. 4 is the C-C sectional structure schematic diagram of Fig. 1.
Detailed description of the invention
Technical characterstic of the present invention is set forth further below in conjunction with accompanying drawing and specific embodiment.
Detailed description of the invention
embodiment 1
The present invention is a kind of novel building load-bearing floor, comprises floor body, is provided with selfreparing tightening structure and fracture waterproof construction in described floor body; Described selfreparing tightening structure comprises some some preload tension wire be arranged in floor body, and the two ends of preload tension wire are provided with the syndeton for connecting adjacent two floor bodies; Described fracture waterproof construction comprises and is somely arranged at capsule body in floor body and cement bisque; Also be provided with some hydro-expansive rubber bars be arranged in parallel in described floor body, hydro-expansive rubber bar is not parallel to the edge of floor body.
Described preload tension wire comprises 8 basic preload tension wire arranged along floor diagonal, also comprises some become 20 degree of angles reinforcement preload tension wire with basic preload tension wire; The pretightning force of described basic preload tension wire is 1/2 of floor fracture shearing, and the pretightning force strengthening preload tension wire is 1/3.5 of floor fracture shearing.
Hydrogel is filled with in described capsule body; The length of described capsule body is 1/30 to 1/40 of the long edge lengths of floor, and width is 1/25 to 1/35 of floor bond length; Described capsule body is evenly arranged in two parallel planes in floor, and the axis of capsule body and the long limit of floor are 30 degree of angles.
The longitudinal section of described water-swellable adhesive tape is square, and the longitudinal section length of side is 1/10 of floor bond length; Spacing between described water-swellable adhesive tape is 1/18 of floor minor face and is 30 degree of angles with the long limit of floor.
The quantity of described reinforcement preload tension wire is less than or equal to 20; The angle of described reinforcement preload tension wire and basic preload tension wire is 32 degree.
Described preload tension wire is provided with some stress metal grabs, stress metal grab is I-shaped and is fixedly connected with preload tension wire.
Stress metal grab quantity in described same preload tension wire is 5 and evenly arranges.
Described capsule body and water-swellable adhesive tape are not present in same vertical plane.
Described capsule body is wrapped up by glass cement softgel shell, and cement bisque is wrapped in glass plate; The thickness of described cement bisque is 1/10 of slab thickness.
The invention has the advantages that:
(1) when fracture occurs floor, 8 pile foundation preload tension wire provide a pulling force merged to breaking part from floor two ends, cracks on floor slab are merged as possible, reduce the width of cracks on floor slab; Because basic preload tension wire is 8 and 8 diagonal along floor are arranged, its pulling force provided is not apply from single direction to crack, and such is arranged so that pulling force is more even, improves the effect of basic preload tension wire.
(2) setting strengthening preload tension wire adds pulling force effect.In theory, the quantity strengthening preload tension wire is more, its effect is stronger, but due to the reason of cost, the symbolic animal of the birth year strengthening preload tension wire is restricted, so reinforcement preload tension wire and basic preload tension wire can only be arranged according to angle, like this when ensureing pulling force effect, good economic benefit can also be reached.In this application, draw through a large amount of experiments, both are when becoming 20-45 degree angle, good pulling force effect can be reached, be less than or equal to 20 in the quantity strengthening preload tension wire, and when angle is 32 degree, economic benefit and actual effect reach a balance preferably.
(3) draw through a large amount of floor tensile tests: when ensure that (1) and (2), the pretightning force of basis preload tension wire is 1/2 of floor fracture shearing, and the pretightning force strengthening preload tension wire is that 1/3.5 of floor fracture shearing can ensure that its pulling force reaches effect better.
(4) effect of capsule body is: owing to adding the dried powder of hydrogel in capsule body, and after crack appears in floor and water infiltrates in crack, hydrogel capsule breaks, and hydrogel forms gelinite after oozing out and meeting water.Gelinite can the gap in filled floor crack effectively, and anti-sealing oozes out floor.Vitreum is selected to be because fragile material just can break when running into less shearing as capsule shell, fragile material has a lot, comprise pottery, brick, watt, stone, concrete etc., but other fragile materials are due to poor in processability, processing cost is higher, is not suitable for the technical scheme of the application.Although concrete price is low, can process, because concrete is not suitable for being made as small processing part, so the application selects glass as the housing of capsule.
(5) water-swellable adhesive tape is the performance of existing a kind of waterproofing materials, its existing general rubber product, can meet again the performance of water self-expansion, is that a kind of waterproof material, sealing, waterproof effect are more more reliable than ordinary rubber.But existing water-swellable adhesive tape mainly occurring that clear and definite crack is that it is laterally filled in crack place, prevents infiltration.In this application, the crack place do not determined, so water-swellable adhesive tape can not be horizontally set in floor.Draw through fracture experiment, cracks on floor slab is minimum along the probability of the arrangement being parallel to floor edge, arranges so water-swellable adhesive tape is 30 degree of angles along the long limit of floor.
(6) the stress metal grab quantity in same preload tension wire is 5 and evenly arranges.Although applied stress metal grab can not reach by the frictional force on aramid line surface the effect providing pulling force yet, add stress metal grab and can better ensure pulling force effect.
(7) although capsule body is identical with the angle at floor edge with water-swellable adhesive tape, but it is not present in same vertical plane in solid space, such capsule body and water-swellable adhesive tape are staggered in solid space, like this by the reciprocation of capsule body and water-swellable adhesive tape, have water leakage when can prevent floor from occurring crack better.
(8) cement bisque is wrapped in glass plate, and like this after cracks on floor slab, glass breakage, cement flour exposes, and after water enters floor gap, water condensation met by cement, serves better percolation-proof effect.
In the technical scheme of the application, cement bisque, preload tension wire, capsule body and water-swellable adhesive tape form a firmly percolation-proof system, when there is crack in floor, hydrogel powders in capsule body and cement bisque and cement expose, after water enters gap, hydrogel powders first becomes gel, water-swellable adhesive tape water-swellable simultaneously, water met by cement.Hydrogel and water-swellable adhesive tape alternating action, filled floor crack.Under the effect of preload tension wire, because hydrogel and water-swellable adhesive tape are elastic material, when crack pulling force inwardly merges, hydrogel and water-swellable adhesive tape receive the extruding of sides of fracture, fill in crack, the gap of crack and their place plane intersections both this, can be filled like this.But because hydrogel and water-swellable adhesive tape are easily aging material, so they need the synergy of cement.The time that the time theed cement solidifies meets water change gel compared with hydrogel powders will be grown, so little in the effect of preload tension wire, first cement met water and become the mud with mobility, after hydrogel and water-swellable adhesive tape fill the gap of crack and their place plane intersections, cement slurry also slowly enter in crack, fill crack, when crack is filled completely by cement, cement slowly solidifies, gap is filled, when after water-swellable adhesive tape and hydrogel ageing failure, cement still can play the effect of antiseepage, side's infiltration effect that the technical scheme of such the application is brought can be more lasting.Through crack, filling test draws, when cement bisque, preload tension wire, capsule body and water-swellable adhesive tape lack any one of it, the post-rift waterproof, seepage control effect of floor is all had a greatly reduced quality.
embodiment 2
The difference of the present embodiment and embodiment 1 is: basic preload tension wire and reinforcement preload tension wire are in angle of 45 degrees.
embodiment 3
The present embodiment is with the difference of the first two: basic preload tension wire becomes 32 degree of angles with reinforcement preload tension wire.
Certainly, above-mentioned explanation is not limitation of the present invention, and the present invention is also not limited to above-mentioned citing; those skilled in the art; in essential scope of the present invention, the change made, remodeling, interpolation or replacement, all should belong to protection scope of the present invention.

Claims (9)

1. a novel building load-bearing floor, is characterized in that: comprise floor body, is provided with selfreparing tightening structure and fracture waterproof construction in described floor body; Described selfreparing tightening structure comprises some some preload tension wire be arranged in floor body, and the two ends of preload tension wire are provided with the syndeton for connecting adjacent two floor bodies; Described fracture waterproof construction comprises and is somely arranged at capsule body in floor body and cement bisque; Also be provided with some hydro-expansive rubber bars be arranged in parallel in described floor body, hydro-expansive rubber bar is not parallel to the edge of floor body.
2. New type weight loading floor according to claim 1, is characterized in that: described preload tension wire comprises 8 basic preload tension wire arranged along floor diagonal, also comprises some become 20-45 degree angle reinforcement preload tension wire with basic preload tension wire; The pretightning force of described basic preload tension wire is 1/2 of floor fracture shearing, and the pretightning force strengthening preload tension wire is 1/3.5 of floor fracture shearing.
3. New type weight loading floor according to claim 2, is characterized in that: be filled with hydrogel in described capsule body; The length of described capsule body is 1/30 to 1/40 of the long edge lengths of floor, and width is 1/25 to 1/35 of floor bond length; Described capsule body is evenly arranged in two parallel planes in floor, and the axis of capsule body and the long limit of floor are 30 degree of angles.
4. New type weight loading floor according to claim 3, is characterized in that: the longitudinal section of described water-swellable adhesive tape is square, and the longitudinal section length of side is 1/10 of floor bond length; Spacing between described water-swellable adhesive tape is 1/18 of floor minor face and is 30 degree of angles with the long limit of floor.
5. New type weight loading floor according to claim 4, is characterized in that: the quantity of described reinforcement preload tension wire is less than or equal to 20; The angle of described reinforcement preload tension wire and basic preload tension wire is 32 degree.
6. New type weight loading floor according to claim 5, is characterized in that: described preload tension wire is provided with some stress metal grabs, stress metal grab is I-shaped and is fixedly connected with preload tension wire.
7. New type weight loading floor according to claim 6, is characterized in that: the stress metal grab quantity in described same preload tension wire is 5 and evenly arranges.
8. New type weight loading floor according to claim 7, is characterized in that: described capsule body and water-swellable adhesive tape are not present in same vertical plane.
9. New type weight loading floor according to claim 8, it is characterized in that: described capsule body is wrapped up by glass cement softgel shell, cement bisque is wrapped in glass plate; The thickness of described cement bisque is 1/10 of slab thickness.
CN201510597555.3A 2015-09-20 2015-09-20 Building load-bearing floor Active CN105133781B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510597555.3A CN105133781B (en) 2015-09-20 2015-09-20 Building load-bearing floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510597555.3A CN105133781B (en) 2015-09-20 2015-09-20 Building load-bearing floor

Publications (2)

Publication Number Publication Date
CN105133781A true CN105133781A (en) 2015-12-09
CN105133781B CN105133781B (en) 2017-05-10

Family

ID=54719327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510597555.3A Active CN105133781B (en) 2015-09-20 2015-09-20 Building load-bearing floor

Country Status (1)

Country Link
CN (1) CN105133781B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115627845A (en) * 2022-10-28 2023-01-20 中国一冶集团有限公司 Cast-in-place concrete deformation joint waterproof structure and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1349027A (en) * 2001-12-10 2002-05-15 邱则有 Hollow and steel bar reinforced concrete building member
CN101289300A (en) * 2008-05-20 2008-10-22 深圳大学 Self-repair concrete using polyurethane high molecule microcapsule and method of manufacture
CN102808372A (en) * 2012-08-20 2012-12-05 杨众 Simply supported prefabricated integrally-cast superposed bridge and construction method thereof
CN103224343A (en) * 2013-04-17 2013-07-31 重庆交通大学 Manufacturing method of microcapsule for concrete crack self-repairing
CN105155868A (en) * 2015-09-16 2015-12-16 项剑锋 Method for pulling pillar through prestress using non-binding steel strands
CN205189231U (en) * 2015-09-20 2016-04-27 成都育芽科技有限公司 Novel bearing floor

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1349027A (en) * 2001-12-10 2002-05-15 邱则有 Hollow and steel bar reinforced concrete building member
CN101289300A (en) * 2008-05-20 2008-10-22 深圳大学 Self-repair concrete using polyurethane high molecule microcapsule and method of manufacture
CN102808372A (en) * 2012-08-20 2012-12-05 杨众 Simply supported prefabricated integrally-cast superposed bridge and construction method thereof
CN103224343A (en) * 2013-04-17 2013-07-31 重庆交通大学 Manufacturing method of microcapsule for concrete crack self-repairing
CN105155868A (en) * 2015-09-16 2015-12-16 项剑锋 Method for pulling pillar through prestress using non-binding steel strands
CN205189231U (en) * 2015-09-20 2016-04-27 成都育芽科技有限公司 Novel bearing floor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115627845A (en) * 2022-10-28 2023-01-20 中国一冶集团有限公司 Cast-in-place concrete deformation joint waterproof structure and construction method

Also Published As

Publication number Publication date
CN105133781B (en) 2017-05-10

Similar Documents

Publication Publication Date Title
US10865557B2 (en) Prestressed assembled concrete frame-joint connecting structure and constructing method thereof
Inácio et al. Strengthening of flat slabs with transverse reinforcement by introduction of steel bolts using different anchorage approaches
CN203429831U (en) Split-free composite heat insulation template for pouring concrete
CN104452984A (en) Double-layer steel wire gauze insulating mortar outer wall outer insulating structure and construction method thereof
CN104153495B (en) A kind of attachment structure of Multi-function light concrete curtain wall
CN204326299U (en) The antidetonation adobe wall that a kind of steel concrete sleeper and dark beam are strengthened
CN201554235U (en) Polymer modified cement mortar reinforcement mesh surface layer reinforcing structure
CN205857794U (en) Non-reinforced masonry building supporting reinforcing structure
CN205189231U (en) Novel bearing floor
CN104389358B (en) A kind of fire hydrant box back side body of wall and construction method thereof
CN201714104U (en) Anti-cracking wedge for filled wall shrinkage compensation
CN105133781B (en) Building load-bearing floor
CN202945816U (en) Brickwork wall between windows and reinforced by high-ductility fiber concrete
CN104631658A (en) Construction method of adobe wall suitable for seismic fortification high-seismic-intensity area and adobes
CN206693469U (en) A kind of precast floor slab connecting node
CN107246106A (en) A kind of surface cuts shaping haydite concrete prefabricated panel
CN203856096U (en) Novel free stone masonry building structure
RU2561414C2 (en) Device for reinforcement of ferroconcrete hollow panels within flooring
RU108059U1 (en) FIXED FORMWORK KIT FOR BUILDING WALLS
CN202689233U (en) Shock insulation structure used for low-rise reinforced concrete and brick construction
CN104790810A (en) Window installation structure in aerated concrete block wall and construction method
CN103590521A (en) Prefabricated reinforcement stone floor slab and manufacturing method thereof
RU2668888C1 (en) Method of reconstruction of the stone building
CN202945815U (en) Brick masonry wall capable of increasing high-ductility fiber concrete ring beam
CN113863539B (en) Low-intervention brick masonry wall anti-seismic reinforcing device and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Hu Lichun

Inventor before: Xiang Hongxian

TA01 Transfer of patent application right

Effective date of registration: 20170322

Address after: 510665 Guangdong city of Guangzhou province Tianhe District Software Park Building No. 59 Middle East block, Grand Building Room 501

Applicant after: Hu Lichun

Address before: The middle Tianfu Avenue in Chengdu city Sichuan province 610041 No. 1388 1 8 storey building No. 866

Applicant before: CHENGDU YUYA SCIENCE & TECHNOLOGY CO., LTD.

TA01 Transfer of patent application right
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Yu Jianliang

Inventor before: Hu Lichun

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170411

Address after: Suzhou Changshou City City, Jiangsu province 215500 Dong Bang Ye Hua Road

Applicant after: Jiangsu SF Construction Co., Ltd.

Address before: 510665 Guangdong city of Guangzhou province Tianhe District Software Park Building No. 59 Middle East block, Grand Building Room 501

Applicant before: Hu Lichun

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200415

Address after: Room 1,020, Nanxun Science and Technology Pioneering Park, No. 666 Chaoyang Road, Nanxun District, Huzhou City, Zhejiang Province, 313000

Patentee after: Huzhou You Yan Intellectual Property Service Co.,Ltd.

Address before: Suzhou Changshou City City, Jiangsu province 215500 Dong Bang Ye Hua Road

Patentee before: JIANGSU SHUNFENG CONSTRUCTION Co.,Ltd.

TR01 Transfer of patent right