Prior art keywords
well
road surface
concrete
inspection shaft
well lid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510550285.0A
Other languages
Chinese (zh)
Other versions
CN105133655A (en
Inventor
罗斯
吴晓丹
穆大宁
孙龙
王如恒
邢奇志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Construction (Group) Co Ltd
Original Assignee
Shenzhen Construction (Group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Construction (Group) Co Ltd filed Critical Shenzhen Construction (Group) Co Ltd
Priority to CN201510550285.0A priority Critical patent/CN105133655B/en
Publication of CN105133655A publication Critical patent/CN105133655A/en
Application granted granted Critical
Publication of CN105133655B publication Critical patent/CN105133655B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a construction method of a well lid of a road surface inspection well. The construction method overcomes the defects that in the prior art, time for installation work of a well lid base is long, and the consistency of construction quality cannot be guaranteed. The construction method of the well lid of the road surface inspection well comprises the following steps that A, a concrete well ring and a well lid base are integrally prefabricated; B, a well ring foundation pit is dug; C, a well mouth supporting inner formwork is mounted in the well mouth of the inspection well; D, the space between the well mouth supporting inner formwork and the well ring foundation pit is filled with concrete; E, the concrete well ring and the well lid base are hoisted integrally; F, the well ring foundation pit and the prefabricated concrete well ring are filled with concrete, and the concrete is compacted; G, the well mouth supporting inner formwork and a hoisting and leveling device are taken out; and H, an asphalt concrete pavement layer between the well ring and the road surface is laid. The invention further provides an auxiliary installation device. The auxiliary installation device comprises the well mouth supporting inner formwork and the hoisting and leveling device. According to the construction method of the well lid of the road surface inspection well and the auxiliary installation device, construction is simple, work time is short, the dimensional precision of well lid installation is high, and the construction method and the auxiliary installation device are suitable for well lid installation.

Description

A kind of well lid construction method of road surface inspection shaft and auxiliary installation device
Technical field
The present invention relates to the construction of municipal inspection shaft, the more particularly, to a kind of well lid construction method of road surface inspection shaft and auxiliary Erecting device.
Background technology
For many years, the inspection shaft well lid of various pipelines is installed is all the weak link of municipal road construction, and town road is examined The construction quality looking into well well lid directly influences the flatness on road surface, road-ability, safety, aesthetics and road longevity Life.Traditional construction technology, cover seat of manhole directly can pass to inspection shaft well head end face the pressure perpendicular coming from above, with heavy type It is increasing that vehicle travels, and after the impact being constantly under pressure, easily causes well lid fragmentation, sinking, destroys road surface knot Structure, decreases the service life of road.Meanwhile, traditional construction technology is that absolute altitude lateral stay with reference to curb determines well mostly The absolute altitude of lid, this method is simple, but have ignored the head fall of road, causes actual elevation and designed elevation to have Enter, the situation of pavement roughness easily occurs.Patent No. zl200910230438.8, patent name are road inspection well coagulation The patent of invention of native monolithic casting construction method and construction harness is improved to traditional construction technology, using fixed support Suspention harness adjustment well lid elevation, pours into a mould, to walling crib foundation ditch, the globality that concrete improves structure, but still suffers from following aspect Deficiency, such as: need in an installation to suspend harness adjustment well lid elevation in midair by fixed support, the process of adjustment not only needs to spend greatly The time of amount, and it cannot be guaranteed that the concordance of construction quality.Meanwhile, need to pour substantial amounts of concrete at the scene, construction is made Industry time length is it is impossible to timely complete installing and follow-up maintenance of well lid, the occupancy road surface time is long, affects traffic.
Content of the invention
The first object of the present invention is to overcome cover seat of manhole installation exercise time length of the prior art it is impossible to ensure construction A kind of shortcoming of quality conformance, there is provided the well lid construction method of road surface inspection shaft.
The second object of the present invention is to overcome cover seat of manhole installation exercise time length of the prior art it is impossible to ensure construction A kind of shortcoming of quality conformance, there is provided the auxiliary installation device of the well lid construction of road surface inspection shaft.
The present invention realizes the well lid construction method that the first goal of the invention the technical scheme is that a kind of road surface inspection shaft, Specifically include following steps:
A, carry out the integral prefabricated of concrete walling crib and cover seat of manhole, cover seat of manhole is arranged in concrete walling crib and is fixedly connected Integral;
B, dig walling crib foundation ditch, walling crib foundation ditch is with diameter greater than inspection shaft external diameter and concrete well loop diameter;
C, the well head support internal mould of reducing is installed in inspection shaft well head, well head support internal mould outer rim is close to inspection shaft well Mouth inwall, well head support internal mould one end is arranged in inspection shaft well head, the other end upwardly extends;
D, the well head support internal mould described in step c and between walling crib foundation ditch filling design consumption concrete;
E, lifting levelling device will be mixed in walling crib foundation ditch to the concrete walling crib described in step a and cover seat of manhole integral hoisting On solidifying soil, the axis of cover seat of manhole and the dead in line of inspection shaft, cover seat of manhole is levelling with road surface positioning;
F, into walling crib foundation ditch and precast concrete walling crib filling and compacted concrete, by the overfall of well head support internal mould Observation panel observes the occupied state of concrete, makes concrete walling crib and inspection shaft upper surface viscous and integral, and by concrete well The space filling being formed between circle and walling crib foundation ditch is full;
After g, concrete initial set to be filled, reduce well head support internal mould diameter, take out well head support internal mould and lifting is adjusted Leveling device;
H, lay asphalt concrete pavement between walling crib and road surface.
Also include step i, according to train-passing through conditions needs, setting on road surface is more than the cover sheet of walling crib foundation ditch diameter, After the completion for the treatment of asphalt concrete pavement maintenance, remove cover sheet, complete the construction of road surface inspection shaft entirety well lid.
Well head support internal mould upper end described in step c differs the height of asphalt concrete pavement with road surface.
In described step e, cover seat of manhole and road surface positioning are levelling, and concrete mode is that cover seat of manhole is arranged on lifting leveling dress Put, the datum clamp face of lifting levelling device is fitted with the upper surface of cover seat of manhole, by the datum clamp face of lifting levelling device It is placed on levelling on road surface.
In four head end of described lifting levelling device, cushion block is installed in advance, for well lid datum level and road surface it Between settle pre- allowance.
Described concrete is fast rigid concrete.
The present invention realizes the auxiliary that the second goal of the invention the technical scheme is that a kind of well lid construction of road surface inspection shaft Erecting device, auxiliary installation device includes well head support internal mould and lifting levelling device, and described well head support internal mould is cylinder Shape, cylinder side wall is provided with the opening of insertion in the axial direction, and opening both sides form the structure of juxtaposition, the intersection weight of opening Folded place is formed at diametrically opposite under external force effect or move toward one another structure, and lifting levelling device includes leveling die and lifting Connector, hoisting connecting piece is respectively arranged at two ends with suspension hook and suspension ring, and the lower surface of leveling die is to connect with road surface during lifting well lid Tactile datum clamp face, leveling die is detachably coupled with hoisting connecting piece.
The invention has the beneficial effects as follows: mix with the integral prefabricated of cover seat of manhole with using rigid soon due to carrying out concrete walling crib Solidifying soil, pours too many concrete without in walling crib foundation ditch during in-site installation, decreases the time of pouring.Only need during actual installation The datum clamp face of lifting levelling device is placed on road surface, the hoisting structure of the present invention ensure that the upper surface of cover seat of manhole Fit with datum clamp face, so in installation process, the upper surface of cover seat of manhole remains fair with road surface, even if eliminating The step of adjustment well lid elevation, still can ensure that the smooth of overall road surface after installation, improves the installation dimension precision of well lid. Well head support internal mould can strut or retract for different construction procedures, beneficial to construction and dismounting.Using standardized components and hanging Debug leveling device and carry out do mechanization operation, improve efficiency of construction it is ensured that the concordance of construction quality, can be high-quality and efficient Complete installation and the maintenance construction of asphalt concrete pavement well lid.Have that construction is simple, the activity duration is short, well lid installation dimension essence The advantages of spend high.
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
Brief description
Fig. 1 is the flow chart of the construction method of the present invention.
Fig. 2 is the assembling schematic diagram of the auxiliary installation device of the present invention.
Fig. 3 is lifting levelling device and cover seat of manhole, the assembling schematic diagram of concrete walling crib of the present invention.
Fig. 4 is the structural representation of the well head support internal mould of the present invention.
Fig. 5 is the a-a sectional view of Fig. 4.
Fig. 6 is the partial enlarged drawing of Fig. 5.
Fig. 7 is the structural representation of the cover sheet of the present invention.
Fig. 8 is the c direction view of Fig. 7.
In accompanying drawing, 1 is inspection shaft, 2 is well head support internal mould, 2-1 is controllable telescoping rod, 2-2 is anti-fall limited block, 2-3 For side wall, 2-4 be opening, 2-5 be overfall observation panel, 3 be road surface, 4 be cushion block, 5 be leveling die, 5-1 be datum clamp face, 5-2 is long beam, 5-3 is short beam, 6 is concrete walling crib, 6-1 is return pipe, 7 is cover seat of manhole, 8 is hoisting connecting piece, 8-1 is to hang Ring, 8-2 are suspension hook, 9 is walling crib foundation ditch, 10 is asphalt concrete pavement, 11 is cover sheet, 11-1 is damping and slide-prevention offset plate.
Specific embodiment
As shown in Figure 1, the well lid construction method of a kind of road surface inspection shaft of the present embodiment, specifically includes following steps:
A, carry out the integral prefabricated of concrete walling crib and cover seat of manhole, pre-buried return pipe in concrete walling crib, by cover seat of manhole It is arranged on and is fixedly connected integral in concrete walling crib, expand the area of cover seat of manhole by concrete walling crib, by car after installing Wheel is transmitted to the roadbed around inspection shaft top to the impulsive force of well lid by concrete walling crib;
B, dig walling crib foundation ditch centered on inspection shaft well head, walling crib foundation ditch is with diameter greater than inspection shaft external diameter and concrete well Loop diameter;
C, in inspection shaft well head install reducing well head support internal mould, radially strut well head support internal mould, well head Support internal mould outer rim is close to inspection shaft well head inwall, well head support internal mould one end is arranged in inspection shaft well head, the other end upwards Extend, the present embodiment preferred well head support internal mould upper end is differed the height of asphalt concrete pavement, fills up well head and prop up with road surface The gap being formed after support internal model is softened, and in well head support internal mould outer rim smearing release agent;
D, the well head support internal mould described in step c and between walling crib foundation ditch filling design consumption concrete;
E, lifting levelling device will be mixed in walling crib foundation ditch to the concrete walling crib described in step a and cover seat of manhole integral hoisting On solidifying soil, the axis of cover seat of manhole and the dead in line of inspection shaft, cover seat of manhole is levelling with road surface positioning, and the present embodiment preferably has Body mode is that cover seat of manhole is arranged on lifting levelling device, lifts the datum clamp face of levelling device and the upper table of cover seat of manhole Fit in face, by the datum clamp face of lifting levelling device be placed on road surface levelling it is contemplated that the problem of concrete settlement, this reality Apply example and preferably in four head end of lifting levelling device, cushion block is installed in advance, for heavy between well lid datum level and road surface Pre- allowance drops, during installation, cover seat of manhole can be slightly above road surface, after concrete settlement, cover seat of manhole is consistent with pavement-height;
F, into walling crib foundation ditch and precast concrete walling crib filling and compacted concrete, by the overfall of concrete walling crib Pipe, the overfall observation panel of well head support internal mould observe the occupied state of concrete, so that concrete walling crib is glued with inspection shaft upper surface With integral, and the space filling that will be formed between concrete walling crib and walling crib foundation ditch is full;
After g, concrete initial set to be filled, reduce well head support internal mould diameter, take out well head support internal mould and lifting is adjusted Leveling device;
H, lay asphalt concrete pavement between walling crib and road surface.
For the situation repairing well lid, in order to reduce urban transportation blocking, traffic control department often requires that 12 points of constructions of midnight 6 points of open to traffic of morning, if not making proper treatment, not up to design strength to concrete and being open to traffic by force, are bound to cause Inspection shaft periphery sinks, and the present embodiment preferably also includes step i, and according to train-passing through conditions needs, setting on road surface is more than well Cycle basis cheats the cover sheet of diameter, after the completion for the treatment of asphalt concrete pavement maintenance, removes cover sheet, completes road surface inspection shaft whole The construction of body well lid.
Connect concrete strength to improve concrete walling crib and inspection shaft, shorten setting time, the present embodiment is preferred Concrete is fast rigid concrete.
As shown in accompanying drawing 2-6, a kind of auxiliary installation device of the well lid construction of road surface inspection shaft of the present embodiment, auxiliary peace Assembling device includes well head support internal mould 2 and lifting levelling device.Described well head support internal mould 2 is cylindrical shape.Cylinder side wall 2-3 It is provided with the opening 2-4 of insertion in the axial direction.Opening 2-4 both sides form the structure of juxtaposition.The juxtaposition of opening 2-4 Place is formed at diametrically opposite under external force effect or move toward one another structure.The both sides of the present embodiment preferred opening 2-4 with can Control expansion link 2-1 two ends hinge-coupled, controllable telescoping rod 2-1 passes through at the flexible juxtaposition driving opening 2-4 radially phase To or move toward one another, control well head support internal mould 2 diameter change.Observe whether concrete is filled for convenience, the present embodiment The cylinder side wall 2-3 of preferably well head support internal mould 2 is provided with overfall observation panel 2-5 vertically.In order to preferably well head be supported Internal model 2 is fixed in inspection shaft 1 well head, and the outer rim of the present embodiment preferred well head support internal mould 2 is provided with anti-fall limited block 2- 2.Lifting levelling device includes leveling die 5 and hoisting connecting piece 8.Hoisting connecting piece 8 is respectively arranged at two ends with suspension hook 8-2 and suspension ring 8-1.The lower surface of leveling die 5 is the datum clamp face 5-1 contacting with road surface 3 during lifting cover seat of manhole 7, and the present embodiment is preferred Leveling die 5 is to combine, by two long beam 5-2 and short beam 5-3, the framework being formed.Leveling die 5 is detachable with hoisting connecting piece 8 Connection.The preferred leveling die of the present embodiment 5 and hoisting connecting piece 8 are fixedly connected by nut.For the situation repairing well lid, In order to reduce urban transportation blocking, traffic control department often requires that 12 points of construction 6 points of open to traffic of morning of midnight, if to concrete Do not make proper treatment, not up to design strength and be open to traffic by force, be bound to cause inspection shaft periphery to sink, the present embodiment is preferred Also include cover sheet 11, the diameter with diameter greater than walling crib foundation ditch 9 of cover sheet 11, the lower surface of cover sheet 11 is provided with one Circle damping and slide-prevention offset plate 11-1.After the completion for the treatment of asphalt concrete pavement 10 maintenance, remove cover sheet 11, complete road surface inspection shaft The construction of overall well lid.Cover sheet 11 improves new clothes well lid maintenance security reliability, usually can be used as site operation material Mix backing plate, it is ensured that asphalt concrete pavement sanitation and hygiene, improves civilized construction grade.
Pour the time in order to reduce on-site concrete, carry out the integral prefabricated of concrete walling crib 6 and cover seat of manhole 7, by well Cage 7 is arranged on and is fixedly connected integral in concrete walling crib 6, and concrete walling crib 6 is provided with pre-buried return pipe 6-1.Lifting During levelling device clamping cover seat of manhole 7, the suspension hook 8-2 clamping cover seat of manhole 7 of lifting levelling device, suspension hook 8-2, well are adjusted by nut Cage 7 and the relative distance of datum clamp face 5-1, make the upper surface of cover seat of manhole 7 and the datum clamp face 5-1 patch of leveling die 5 Close.At the construction field (site), well head support internal mould 2 one end is arranged in inspection shaft 1 well head, anti-fall limited block 2-2 is placed on inspection On well 1 well head.Well head support internal mould 2 is strutted by controllable telescoping rod 2-1, makes well head support internal mould 2 outer rim be close to inspection shaft 1 well head Inwall, fills up the softened rear gap being formed of well head support internal mould 2, and in well head support internal mould 2 outer rim smearing release agent.In well The concrete of filling design consumption between mouth support internal mould 2 and the walling crib foundation ditch 9 having digged.Lifting levelling device is by concrete Walling crib 6 and cover seat of manhole 7 integral hoisting on the concrete in walling crib foundation ditch 9, the axis of the axis of cover seat of manhole 7 and inspection shaft 1 Overlap.The datum clamp face 5-1 of lifting levelling device is placed on road surface 3 it is contemplated that the problem of concrete settlement, adjusts in lifting Four head end of leveling device install cushion block 4 in advance, for settling pre- allowance between well lid datum level and road surface, well during installation Cage 7 can be slightly above road surface 3, and after concrete settlement, cover seat of manhole 7 is highly consistent with road surface 3.To walling crib foundation ditch 9 and prefabricated mixed Filling compacted concrete in solidifying soil walling crib 6, by returning of the pre-buried return pipe 6-1 of concrete walling crib 6 and well head support internal mould 2 Slurry observation panel 2-5 observes whether concrete is filled.After concrete setting, concrete by concrete walling crib 6 and walling crib foundation ditch 9 it Between the space filling that formed full, concrete walling crib 6 is viscous and integral with inspection shaft 1 upper surface, improves the intensity of well lid.Due to In installation process the upper surface on road surface 3, datum clamp face 5-1 and cover seat of manhole 7 all the time in one plane it is ensured that install after Overall road surface smooth, improve the installation dimension precision of well lid.After the concrete initial set of filling, take out lifting levelling device, Controllable telescoping rod 2-1 reduces well head support internal mould 2 diameter, and well head support internal mould 2 is taken out from inspection shaft 1 well head.Lay well Asphalt concrete pavement 10 between circle and road surface 3.Carry out mechanization due to employing standardized components and lifting levelling device Operation, improves efficiency of construction it is ensured that the concordance of construction quality.

Claims (11)

1. a kind of well lid construction method of road surface inspection shaft is it is characterised in that specifically include following steps:
A, carry out the integral prefabricated of concrete walling crib and cover seat of manhole, cover seat of manhole is arranged in concrete walling crib and is fixedly connected into one Body;
B, dig walling crib foundation ditch, walling crib foundation ditch is with diameter greater than inspection shaft external diameter and concrete well loop diameter;
C, the well head support internal mould of reducing is installed in inspection shaft well head, well head support internal mould outer rim is close in inspection shaft well head Wall, well head support internal mould one end is arranged in inspection shaft well head, the other end upwardly extends;
D, the well head support internal mould described in step c and between walling crib foundation ditch filling design consumption concrete;
E, the lifting levelling device concrete in walling crib foundation ditch by the concrete walling crib and cover seat of manhole integral hoisting described in step a On, the axis of cover seat of manhole and the dead in line of inspection shaft, cover seat of manhole is levelling with road surface positioning;
F, into walling crib foundation ditch and precast concrete walling crib filling compacted concrete, observed by the overfall of well head support internal mould Mouthful observe the occupied state of concrete, so that concrete walling crib and inspection shaft upper surface is glued and integral, and by concrete walling crib and The space filling being formed between walling crib foundation ditch is full;
After g, concrete initial set to be filled, reduce well head support internal mould diameter, take out well head support internal mould and lifting leveling dress Put;
H, lay asphalt concrete pavement between walling crib and road surface.
2. a kind of well lid construction method of road surface according to claim 1 inspection shaft is it is characterised in that also include step i, According to train-passing through conditions needs, setting on road surface, more than the cover sheet of walling crib foundation ditch diameter, treats asphalt concrete pavement maintenance After the completion of, remove cover sheet, complete the construction of road surface inspection shaft entirety well lid.
3. a kind of well lid construction method of road surface according to claim 1 inspection shaft is it is characterised in that described in step c Well head support internal mould upper end differs the height of asphalt concrete pavement with road surface.
4. a kind of well lid construction method of road surface according to claim 1 inspection shaft is it is characterised in that described step e Middle cover seat of manhole and road surface positioning are levelling, and concrete mode is that cover seat of manhole is arranged on lifting levelling device, lifting levelling device Datum clamp face is fitted with the upper surface of cover seat of manhole, the datum clamp face of lifting levelling device is placed on levelling on road surface.
5. a kind of well lid construction method of road surface according to claim 4 inspection shaft is it is characterised in that in described lifting Four head end of levelling device install cushion block in advance, for settling pre- allowance between well lid datum level and road surface.
6. a kind of well lid construction method of road surface according to claim 1 inspection shaft is it is characterised in that described concrete For fast rigid concrete.
7. a kind of auxiliary installation device of the well lid construction of road surface inspection shaft is it is characterised in that auxiliary installation device includes well head Support internal mould (2) and lifting levelling device, described well head support internal mould (2) is cylindrical shape, and cylinder side wall (2-3) is along axis side To the opening (2-4) being provided with insertion, opening (2-4) both sides form the structure of juxtaposition, at the juxtaposition of opening (2-4) It is formed at diametrically opposite under external force effect or move toward one another structure, lifting levelling device includes leveling die (5) and lifting Connector (8), hoisting connecting piece is respectively arranged at two ends with suspension hook (8-2) and suspension ring (8-1), and the lower surface of leveling die (5) is to hang The datum clamp face (5-1) contacting with road surface (3) during dress well lid, leveling die (5) is detachably coupled with hoisting connecting piece (8).
8. a kind of auxiliary installation device of the well lid construction of road surface according to claim 7 inspection shaft is it is characterised in that institute The both sides of opening (2-4) stated and controllable telescoping rod (2-1) two ends hinge-coupled.
9. a kind of auxiliary installation device of the well lid construction of road surface according to claim 7 inspection shaft is it is characterised in that institute The cylinder side wall (2-3) of the well head support internal mould (2) stated is provided with overfall observation panel (2-5) vertically, well head support internal mould (2) Outer rim is provided with anti-fall limited block (2-2).
10. a kind of road surface according to claim 7 inspection shaft well lid construction auxiliary installation device it is characterised in that Described leveling die (5) is the framework being formed by two long beams (5-2) and short beam (5-3) combination.
A kind of 11. road surface according to claim 7 inspection shafts well lid construction auxiliary installation device it is characterised in that Also include cover sheet (11), the lower surface of described cover sheet (11) is provided with circle damping and slide-prevention offset plate (11-1).
CN201510550285.0A 2015-09-01 2015-09-01 Construction method of well lid of road surface inspection well and auxiliary installation device Active CN105133655B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510550285.0A CN105133655B (en) 2015-09-01 2015-09-01 Construction method of well lid of road surface inspection well and auxiliary installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510550285.0A CN105133655B (en) 2015-09-01 2015-09-01 Construction method of well lid of road surface inspection well and auxiliary installation device

Publications (2)

Publication Number Publication Date
CN105133655A CN105133655A (en) 2015-12-09
CN105133655B true CN105133655B (en) 2017-01-18

Family

ID=54719202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510550285.0A Active CN105133655B (en) 2015-09-01 2015-09-01 Construction method of well lid of road surface inspection well and auxiliary installation device

Country Status (1)

Country Link
CN (1) CN105133655B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948377B (en) * 2017-04-07 2023-03-17 中泰国际高新技术有限公司 Prefabricated road bed inspection shaft of assembled
CN107227753A (en) * 2017-07-04 2017-10-03 北京城建远东建设投资集团有限公司 Municipal administration is mated formation bright dress inspection shaft and mat formation engineering attachment structure and method in engineering
CN108487323B (en) * 2018-03-21 2020-09-15 天津炬实科技发展股份有限公司 Construction process of manhole cover device of inspection well on road
CN108560684B (en) * 2018-04-30 2023-06-27 安徽省公路桥梁工程有限公司 Heavy-load traffic road inspection well ring and construction method thereof
CN110820808A (en) * 2018-08-10 2020-02-21 山东中宏路桥建设有限公司 Method for installing rain sewage well cover on asphalt pavement
CN110512651A (en) * 2019-08-28 2019-11-29 安徽普瑞明精密机械有限公司 A kind of noiseproof ductile cast iron manhole cover production technology
BE1027314B1 (en) * 2019-12-31 2020-12-21 Viabuild Nv USE OF A REUSABLE INSTALLATION DEVICE WHEN INSTALLING A SEWER FRAME
CN111733887A (en) * 2020-06-15 2020-10-02 中国一冶集团有限公司 Construction method of asphalt concrete road inspection well first-rising structure
CN112095668B (en) * 2020-09-22 2022-04-08 齐力建设集团有限公司 Municipal road anti-settlement manhole cover and rapid construction method thereof
CN112376619B (en) * 2020-11-30 2022-02-01 北京城建五建设集团有限公司 Construction method of integrated structure of prefabricated well ring and well cover of asphalt concrete pavement
CN117428918B (en) * 2023-10-24 2024-04-19 江苏瀚能电气有限公司 Prefabricated UHPC rainwater well integrated construction method and device

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9127430B2 (en) * 2009-01-13 2015-09-08 Andrew C. Mitchell Method and apparatus for raising manhole castings
CN101545268B (en) * 2009-04-29 2010-09-01 陈良保 Method for mounting well tools of inspection well on asphalt concrete pavement
CN101718101B (en) * 2009-11-19 2011-04-06 济南城建工程公司 Concrete integral pouring construction method and device for road inspection well
KR20130067976A (en) * 2011-12-15 2013-06-25 한국주철산업주식회사 Device for fixing of manhole cover
CN104018523A (en) * 2014-05-13 2014-09-03 武汉悍路威科技发展有限公司 Well lid constructing method
CN205062844U (en) * 2015-09-01 2016-03-02 深圳市建设(集团)有限公司 Supplementary installation device of well lid construction of road surface inspection shaft

Also Published As

Publication number Publication date
CN105133655A (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN105133655B (en) Construction method of well lid of road surface inspection well and auxiliary installation device
CN105484157B (en) Positioning device and construction method of capping beam of prefabricated bridge
CN106223360A (en) Use the open cut cast in place and precast construction subway station construction method of stake supporting system
CN109837831A (en) A kind of centrifugation prefabricated assembled concrete bridge pier and construction method
CN106930194B (en) Inter-tie and pier stud global formation construction method and template used holder
CN103255717A (en) Method for constructing hit-preventing wall
CN201762666U (en) Bent cap construction support
CN107090908B (en) A kind of vertical prefabricated components joint connecting method
CN108487630A (en) Coagulation earth steps platform prefabrication and assembly construction construction method
CN102535353A (en) Construction method for box beam swinging body striding on expressways and railways in rail transit
CN110468725A (en) Installation engineering method after swivel bridges abutment pier support
CN109162204A (en) A kind of construction method of the quick spelling of bridge substructure transverse direction piecemeal
CN113863166B (en) Reverse order construction method for swivel-first and mounting support
CN109138457A (en) For installing the support system and its construction method of assembled architecture
CN109594467A (en) Precast pier and cushion cap connection structure, construction method, precast pier, cushion cap
CN201520942U (en) Moving die carrier spreader for resolving problems of cast-in-site beam concrete construction
CN205062844U (en) Supplementary installation device of well lid construction of road surface inspection shaft
CN108360570A (en) Bituminous paving inspection shaft gug construction method
CN106381810B (en) With the cast-in-place outstanding method for filling beam of beam-column type bracket
CN205171381U (en) Prefabricated assembly bridge bent cap positioner
CN107059574A (en) A kind of method of concrete structure and its prefabricated assembled cement concrete pavement of leveling
CN214992983U (en) Fully-assembled bridge based on UHPC (ultra high performance polycarbonate) slab wall embedded pile foundation
CN107460793B (en) Hang empty iron assembly interval structure system and its construction method
CN214656383U (en) Line is alternately low headroom and is pieced together wide cast-in-place case roof beam support
CN206052565U (en) A kind of beam-column type bracket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant