CN105118363B - Test method and model for simulating impervious curtain between concrete and bedrock - Google Patents

Test method and model for simulating impervious curtain between concrete and bedrock Download PDF

Info

Publication number
CN105118363B
CN105118363B CN201510384055.1A CN201510384055A CN105118363B CN 105118363 B CN105118363 B CN 105118363B CN 201510384055 A CN201510384055 A CN 201510384055A CN 105118363 B CN105118363 B CN 105118363B
Authority
CN
China
Prior art keywords
curtain
basement rock
water pipe
pressure
pressure water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510384055.1A
Other languages
Chinese (zh)
Other versions
CN105118363A (en
Inventor
饶承彪
张细和
郑克勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201510384055.1A priority Critical patent/CN105118363B/en
Publication of CN105118363A publication Critical patent/CN105118363A/en
Application granted granted Critical
Publication of CN105118363B publication Critical patent/CN105118363B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a test method and a model for simulating an impervious curtain between concrete and bedrock, wherein a more square bedrock is found in advance, one side of the bedrock is roughened, a high-pressure water pipe with a plastic plug is placed in the middle of the roughened surface of the bedrock, then a mixed concrete layer is poured on the roughened bedrock, the high-pressure water pipe is completely covered, and when the normal concrete is not condensed, a slender steel bar is extended into the high-pressure water pipe to puncture the plastic plug at the other end of the high-pressure water pipe to form a post-puncture hole, so that water can enter the contact surface of the bedrock and the concrete layer from the post-puncture hole; after the normal concrete is condensed, the high-pressure water pipe is connected with the high-pressure water pump, and the required water pressure is adjusted by observing data on the water pressure meter, so that the seepage value of water flow in the curtain when the curtain in the impervious curtain is contacted with the bedrock can be obtained in a simulation test mode, and the seepage quantity and the seepage pressure change characteristic of the curtain and the damage relation of the seepage quantity and the seepage pressure change characteristic of the curtain and the curtain can be obtained.

Description

The test method and model of seepage proof curtain between a kind of simulation concrete and basement rock
Technical field
The present invention relates to the test method and model of seepage proof curtain between a kind of simulation concrete and basement rock, belong to dam and prevent Ooze curtain technique field.
Background technology
The most large medium-size station of China and reservoir have run more than 20 years, and also more projects are successively in recent years Go into operation and be completed.Seepage proof curtain is the crucial component of reservoir dam impervious leakage-stopping, and seepage proof curtain is chronically at high-pressure osmosis In the presence of current, hydro-geochemical environment is complicated, and seepage proof curtain will continue to suffer from corroding and aging decays.To non-karst region Area, seepage of dam is based on fissurity seepage;To karst area, seepage field is increasingly complex, has karst concurrently and fissurity oozes Leakage feature.
Grout curtain acts on the process in retrofilling karst or crack its essence is cement grout in high pressure.Actual Geologic body is huge, and material composition and textural anomaly are complicated.Because actual geologic body is huge, only theoretical point at present Analysis and practical application, also without the formation about seepage proof curtain and change procedure analogue data, influence the essence to seepage proof curtain Analyze foundation.
The content of the invention
It is an object of the present invention to provide between a kind of simulation concrete and basement rock seepage proof curtain test method and mould Type, between laboratory simulation concrete and basement rock the formation and change of seepage proof curtain provides close to real data foundation, So as to overcome the deficiencies in the prior art.
The technical proposal of the invention is realized in this way:
The test method of seepage proof curtain is that this method is to antiseepage curtain between a kind of simulation concrete and basement rock of the present invention During the whole process progress simulated test that curtain contact with basement rock in curtain, the basement rock of one piece of more Founder is looked in advance, will wherein one Face dabbing, the position in the middle of basement rock roughened surface is placed on by the high-pressure water pipe with Plastic cap, then by the concrete layer of mix It is cast on the basement rock of dabbing, and high-pressure water pipe is completely covered, formation can be so simulated between concrete layer and basement rock Seepage proof curtain;When normal concrete is non-condensing, stretched into the modeling of high-pressure water pipe other end with elongated reinforcing bar in high-pressure water pipe Material plug is broken, and hole is pricked after forming one, enables water to enter from rear bundle hole the contact surface of basement rock and concrete layer;It is mixed etc. normality After solidifying soil condenses, high-pressure water pipe is connected the data on high-pressure hydraulic pump, observation water pressure gauge to adjust required hydraulic pressure, so i.e. When can show that curtain is contacted with basement rock in seepage proof curtain by way of the simulated test in curtain current osmotic value, Yi Jike To draw injuring relation of the seepage discharge of curtain with osmotic pressure variation characteristic and its with curtain.
The test model of seepage proof curtain between a kind of simulation concrete of the invention and basement rock that are built according to the above method For the test model includes basement rock, and basement rock one side is provided with concrete layer, high pressure is embedded with the contact surface of basement rock and concrete layer Water pipe, high-pressure water pipe is provided with water pressure gauge.
In aforesaid experimental model, described high-pressure water pipe one end is provided with Plastic cap, and high-pressure water pipe is provided with the one of Plastic cap End is located at the center of basement rock and concrete layer contact surface, and Plastic cap pricks hole after being provided with.
In aforesaid experimental model, the basement rock is contacted with concrete layer contact surface for hair side.
By adopting the above-described technical solution, the present invention is compared with prior art, the present invention can be simulated in laboratory Can be with the seepage proof curtain model of geological structure body between the concrete and basement rock of practical operation.The seepage flow of curtain can be drawn by experiment Amount and osmotic pressure variation characteristic and its injuring relation with curtain, can also be by the current that are oozed out in test model, analysis Water quality, draws the content and pH value of SO42-, HCO3-, Ca2+, Mg2+ plasma, electrical conductivity, temperature field in seepage proof curtain body Etc. data, formation and change for seepage proof curtain provide the data foundation close to reality.For in laboratory simulation concrete and base The formation and change of seepage proof curtain provide the data foundation close to reality between rock.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
Mark in accompanying drawing:1- concrete layers;2- basement rock;3- high-pressure water pipes;4- water pressure gauges;5- Plastic caps;6- basement rock With the contact surface of concrete layer;Hole is pricked after 7-.
Embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples, but not as to any of the present invention Limitation.
The test method of seepage proof curtain is between a kind of simulation concrete and basement rock of the present invention, as shown in figure 1, this method It is, when whole process that curtain in seepage proof curtain is contacted with basement rock carries out simulated test, one piece of more upright base to be looked in advance Rock 2, will wherein one side dabbing, the high-pressure water pipe 3 with Plastic cap 5 is placed on the position in the middle of basement rock roughened surface, then will The concrete layer 1 of mix is cast on the basement rock 2 of dabbing, and high-pressure water pipe 3 is completely covered, so can be in concrete layer 1 Simulation forms seepage proof curtain between basement rock 2;When normal concrete is non-condensing, stretched into elongated reinforcing bar in high-pressure water pipe 3 The Plastic cap 5 of the other end of high-pressure water pipe 3 is broken, formed one after prick hole 7, enable water to from rear bundle hole 7 enter basement rock with The contact surface 6 of concrete layer;After being condensed Deng normal concrete, high-pressure water pipe 3 is connected on high-pressure hydraulic pump, observation water pressure gauge 4 Data can so show that curtain connects with basement rock in seepage proof curtain come the hydraulic pressure required for adjusting by way of the simulated test When touching in curtain current osmotic value, and can draw the seepage discharge of curtain with osmotic pressure variation characteristic and its with curtain Injuring relation.
The test model of seepage proof curtain between a kind of simulation concrete of the invention and basement rock that are built according to the above method, As shown in figure 1, the test model includes basement rock 2, basement rock one side is provided with concrete layer 1, in the contact surface 6 of basement rock and concrete layer High-pressure water pipe 3 is embedded with, high-pressure water pipe is provided with water pressure gauge 4.The one end of high-pressure water pipe 3 is provided with Plastic cap 5, and high-pressure water pipe is provided with One end of Plastic cap is located at the center of basement rock 2 and the contact surface of concrete layer 1, and Plastic cap pricks hole 7 after being provided with.Basement rock is with mixing Solidifying soil layer contact surface 6 is that hair side is contacted.
Embodiment
This example is as shown in figure 1, the whole process that curtain is contacted with basement rock in seepage proof curtain can be simulated.Look for one piece it is more square Positive basement rock 2, will wherein one side dabbing, the high-pressure water pipe 3 with Plastic cap 5 is placed on the position in the middle of basement rock roughened surface, Then the concrete layer 1 of mix is cast on the basement rock 2 of dabbing, and high-pressure water pipe is completely covered, in normal concrete not During condensation, stretched into elongated reinforcing bar in high-pressure water pipe 3 and to break the Plastic cap 5 of the other end of high-pressure water pipe 3, formed after one Hole 7 is pricked, enables water to enter from rear bundle hole the contact surface 6 of basement rock and concrete layer.The effect of Plastic cap 5 be prevent from pouring it is mixed During solidifying soil, concrete blocks the mouth of pipe into high-pressure water pipe, only pours after finishing again by pricking a hole after elongated reinforcing bar.Deng After normal concrete condenses, after maintenance a period of time, high-pressure water pipe 3 is connected into the data on high-pressure hydraulic pump, observation water pressure gauge 4 and come Hydraulic pressure required for regulation, so as to draw the osmotic value of current in curtain.The water of outflow can carry out physics and chemical analysis, draw The primary evaluation factor such as SO42-, HCO3-, Ca2+, Mg2+ content and pH value, electrical conductivity, temperature field.

Claims (4)

1. the test method of seepage proof curtain between a kind of simulation concrete and basement rock, it is characterised in that:The curtain in seepage proof curtain Curtain contact with basement rock whole process progress simulated test when, look in advance one piece more Founder basement rock(2), wherein will simultaneously dig Hair, will carry Plastic cap(5)High-pressure water pipe(3)The position in the middle of basement rock roughened surface is placed on, then by the concrete of mix Layer(1)It is cast in the basement rock of dabbing(2)On, and high-pressure water pipe is completely covered, so can be in concrete layer(1)With basement rock (2)Between simulation form seepage proof curtain;When normal concrete is non-condensing, high-pressure water pipe is stretched into elongated reinforcing bar(3)It is middle to incite somebody to action High-pressure water pipe(3)The Plastic cap of other end(5)Break, hole is pricked after forming one(7), enable water to from rear bundle hole(7)Into The contact surface of basement rock and concrete layer(6);After being condensed Deng normal concrete, by high-pressure water pipe(3)High-pressure hydraulic pump is connected, water is observed Press table(4)On data adjust required hydraulic pressure, can so be drawn by way of the simulated test in seepage proof curtain When curtain is contacted with basement rock in curtain current osmotic value, and the seepage discharge of curtain and osmotic pressure variation characteristic can be drawn And its injuring relation with curtain.
2. method according to claim 1, it is characterised in that:Test model includes basement rock(2), basement rock one side is provided with concrete Layer(1), in basement rock and the contact surface of concrete layer(6)It is embedded with high-pressure water pipe(3), high-pressure water pipe is provided with water pressure gauge(4).
3. method according to claim 2, it is characterised in that:The high-pressure water pipe(3)One end is provided with Plastic cap(5), it is high The one end of pressure pipe provided with Plastic cap is located at basement rock(2)With concrete layer(1)The center of contact surface, after Plastic cap is provided with Prick hole(7).
4. method according to claim 2, it is characterised in that:The basement rock and concrete layer contact surface(6)Contacted for hair side.
CN201510384055.1A 2015-07-03 2015-07-03 Test method and model for simulating impervious curtain between concrete and bedrock Active CN105118363B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510384055.1A CN105118363B (en) 2015-07-03 2015-07-03 Test method and model for simulating impervious curtain between concrete and bedrock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510384055.1A CN105118363B (en) 2015-07-03 2015-07-03 Test method and model for simulating impervious curtain between concrete and bedrock

Publications (2)

Publication Number Publication Date
CN105118363A CN105118363A (en) 2015-12-02
CN105118363B true CN105118363B (en) 2017-09-26

Family

ID=54666327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510384055.1A Active CN105118363B (en) 2015-07-03 2015-07-03 Test method and model for simulating impervious curtain between concrete and bedrock

Country Status (1)

Country Link
CN (1) CN105118363B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105466836A (en) * 2015-12-31 2016-04-06 中国电建集团贵阳勘测设计研究院有限公司 Method for simulating impervious curtain of reservoir dam and test structure model adopted by method
CN105464041A (en) * 2015-12-31 2016-04-06 中国电建集团贵阳勘测设计研究院有限公司 Method and model for simulating impervious curtain of reservoir dam
CN106092855A (en) * 2016-07-07 2016-11-09 中国电建集团贵阳勘测设计研究院有限公司 Device and method for simulation test of impervious curtain
CN112504938B (en) * 2020-12-13 2022-09-20 中国科学院武汉岩土力学研究所 Seepage simulation device, real triaxial rock permeability real-time measuring system and method
CN112834403B (en) * 2021-01-06 2023-01-03 中国建筑股份有限公司 Penetration test method
CN112782055B (en) * 2021-01-06 2023-01-03 中国建筑股份有限公司 Penetration test device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4552011A (en) * 1982-09-28 1985-11-12 Phillips Petroleum Company Establishing a differential pressure across a core sample or calibrating a differential pressure transducer
CN101561378A (en) * 2009-05-22 2009-10-21 清华大学 Tester for testing seepage and scour characteristics of contact surface of soil body and structure
CN102839628A (en) * 2012-09-06 2012-12-26 中国水利水电科学研究院 Large-scale high-pressure cylinder permeation simulation device and method
CN103091214A (en) * 2011-10-29 2013-05-08 成都理工大学 Under-dam seepage flow experiment apparatus
CN204759883U (en) * 2015-07-03 2015-11-11 中国电建集团贵阳勘测设计研究院有限公司 Test model for simulating impervious curtain between concrete and bedrock

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4552011A (en) * 1982-09-28 1985-11-12 Phillips Petroleum Company Establishing a differential pressure across a core sample or calibrating a differential pressure transducer
CN101561378A (en) * 2009-05-22 2009-10-21 清华大学 Tester for testing seepage and scour characteristics of contact surface of soil body and structure
CN103091214A (en) * 2011-10-29 2013-05-08 成都理工大学 Under-dam seepage flow experiment apparatus
CN102839628A (en) * 2012-09-06 2012-12-26 中国水利水电科学研究院 Large-scale high-pressure cylinder permeation simulation device and method
CN204759883U (en) * 2015-07-03 2015-11-11 中国电建集团贵阳勘测设计研究院有限公司 Test model for simulating impervious curtain between concrete and bedrock

Also Published As

Publication number Publication date
CN105118363A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN105118363B (en) Test method and model for simulating impervious curtain between concrete and bedrock
CN109356557B (en) Preparation method of three-dimensional oil reservoir water-drive simulation model and dynamic monitoring visualization device
CN204759883U (en) Test model for simulating impervious curtain between concrete and bedrock
CN104314514B (en) A kind of fractured reservoir Weak Gels profile control performance evaluation visual experimental apparatus and method
CN105096718B (en) Test method and model for simulating impervious curtain of reservoir dam
CN104878739B (en) Drainage material assembly capable of being transversely connected with plastic drainage boards and method for constructing drainage material assembly
CN102608011B (en) Method for determining and building bound water for crack-pore (hole) type reservoir core
CN204990969U (en) Test model for simulating impervious curtain of reservoir dam
CN204253024U (en) A kind of three-dimensional visualization physics displacement model detachably recycled
CN104060637B (en) A kind of centrifuge model test method that gravel pile reinforcing is soft soil roadbed
CN104865371B (en) Reinforcing soft foundation experimental provision and experimental method under a kind of vacuum action
CN104833618B (en) To heterogeneous reservoir simulate the method and apparatus of profile control in laboratory
CN109632510A (en) A method of prediction aquation damages shale intensity
CN204827402U (en) Experimental model for researching deep profile control and flooding oil displacement mechanism of water flooding sandstone reservoir
CN106198890A (en) A kind of indoor grouting simulation test device and using method thereof
CN106932555A (en) In-situ ionic rare earth soaks the computational methods of the ore deposit single hole fluid injection radius of influence
CN105319113A (en) Concrete test piece and device for testing and evaluating self-curing capacity for water seepage of crack, and test and evaluation method
CN103091471B (en) A kind of model accelerating rinse fill consolidation and test method thereof
CN111735933A (en) Ecological restoration tailing dam slope stability simulation test device and application thereof
CN203824878U (en) Test device for simulating seepage prevention of embankment foundation engineering soil
CN106092855A (en) Device and method for simulation test of impervious curtain
CN205242462U (en) Research anti -floating pile resists test device that foundation ditch suddenly gushes failure mechanisms
CN110658332A (en) Concrete lining pre-pressure measurement test device and test method thereof
CN103308393A (en) Formation fracturing resistance testing device and method
CN105466836A (en) Method for simulating impervious curtain of reservoir dam and test structure model adopted by method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant