CN105117526A - Measuring method for risk of physical protection system - Google Patents
Measuring method for risk of physical protection system Download PDFInfo
- Publication number
- CN105117526A CN105117526A CN201510466515.5A CN201510466515A CN105117526A CN 105117526 A CN105117526 A CN 105117526A CN 201510466515 A CN201510466515 A CN 201510466515A CN 105117526 A CN105117526 A CN 105117526A
- Authority
- CN
- China
- Prior art keywords
- function part
- physical protection
- protection system
- power plant
- nuclear power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
The present invention relates to the technical field of nuclear power safety, and particularly to a measuring method for risk of a physical protection system. The method comprises the following steps of: dividing functions of the physical protection system, defining basis threat to a nuclear power plant, establishing a simulation model for the nuclear power plant and the physical protection system, and calculating a risk value of the physical protection system according to the formula R = PA x [1- (PI x PN)] x C. The method related to the invention can determine a reliability of the physical protection system used by the nuclear power plant, and update and modify the physical protection system according to the weakest portion of the system to meet the requirements for physical protection of nuclear material and nuclear facility; and meanwhile, centralized management and control of the whole physical protection system can be achieved by establishing the simulation model.
Description
Technical field
The present invention relates to technical field of nuclear power safety, especially a kind of risk Measure of physical protection system.
Background technology
Physical protection system (PPS) is a kind of integrated system integrating personnel, program and equipment, to take precautions against nuclear material stolen, illegally shifted and the people of nuclear facilities played an important role for the aspect such as sabotaging.And along with the development of the technology such as computer network, communication, information fusion, robotization, building structure; the improvement that it may be necessary method, to improve functional, the Stability and dependability of physical protection system, makes it play more effective effect at protection nuclear material and nuclear facilities secure context.
Summary of the invention
For above-mentioned the deficiencies in the prior art, the object of the present invention is to provide the risk Measure of the physical protection system that a kind of step is simple, reliability is high.
To achieve these goals, the present invention adopts following technical scheme:
A risk Measure for physical protection system, it comprises the following steps:
S1, according to the attribute of the subsystem in physical protection system or equipment, physical protection system is divided into detecting function part, delay function part and response function part;
Attribute and the feature of the event body of S2, the inside of attempting to implement to destroy or steal to nuclear facilities or nuclear material according to potential, outside or collusion from both within and without carry out definition datum threat;
S3, according to the inside of nuclear power plant and external environment condition feature, nuclear power plant and physical protection system are carried out to 3D modeling and form realistic model;
S4, measure the risk of physical protection system according to realistic model: in realistic model, implant formula R=P
a× [1-(P
i× P
n)] × C, meanwhile, probability of happening also counts in formula by the probability of happening that assessment detecting function part, delay function part, response function part and benchmark threaten;
In formula: R is the value-at-risk of physical protection system, P
ifor the outage probability value of detecting function part, delay function part or response function part, P
nfor the failure probability value of detecting function part, delay function part or response function part, C is the assessed value of nuclear power plant's loss of assets.
Preferably, the detecting function part in step S1 comprises detecting and warning system and video monitoring system, delay function part comprise each domain entities barrier device of gateway control system and nuclear power plant, response function part comprises security communication system and online patrol system.
Owing to have employed such scheme, the present invention is led to and can be determined that the reliability of the physical protection system that whole nuclear power plant uses is strong and weak according to final obtained value-at-risk, and according to link the weakest in system, upgrading is carried out to physical protection system, the physical protection requirement of nuclear facilities and materials can be met; Meanwhile, the realistic model by setting up then can realize centralized management to whole physical protection system and control.
Embodiment
Below embodiments of the invention are described in detail, but the multitude of different ways that the present invention can be defined by the claims and cover is implemented.
The risk Measure of a kind of physical protection system that the present embodiment provides, it comprises the following steps:
S1, according to the attribute of the subsystem in physical protection system or equipment, physical protection system is divided into detecting function part, delay function part and response function part;
Attribute and the feature of the event body of S2, the inside of attempting to implement to destroy or steal to nuclear facilities or nuclear material according to potential, outside or collusion from both within and without carry out definition datum threat, and this step needs the geographical environment residing for syncaryon power plant and national conditions to determine;
S3, according to the inside of nuclear power plant and external environment condition feature, nuclear power plant and physical protection system are carried out to 3D modeling and form realistic model;
S4, measure the risk of physical protection system according to realistic model, that is: in realistic model, implant formula R=P
a× [1-(P
i× P
n)] × C, meanwhile, probability of happening also counts in formula by the probability of happening that assessment detecting function part, delay function part, response function part and benchmark threaten;
In formula: R is the value-at-risk of physical protection system, P
ifor the outage probability value of detecting function part, delay function part or response function part, P
nfor the failure probability value of detecting function part, delay function part or response function part, C is the assessed value of nuclear power plant's loss of assets; Suppose that outage probability and failure probability all belong to response function part, then outage probability value to refer to from path to certain some position the detection probability that adds up, and this was determined by the time leaving response for.
So, can determine that the reliability of the physical protection system that whole nuclear power plant uses is strong and weak according to final obtained value-at-risk, and according to link the weakest in system, upgrading is carried out to physical protection system, the physical protection requirement of nuclear facilities and materials can be met; Meanwhile, the realistic model by setting up then can realize centralized management to whole physical protection system and control.
Further, the detecting and warning system in the physical protection system of nuclear power plant and video monitoring system etc. can be divided into detecting function part, each domain entities barrier device of gateway control system and nuclear power plant etc. be divided into delay function part, security communication system and online patrol system etc. are divided into response function part.
The foregoing is only the preferred embodiments of the present invention; not thereby the scope of the claims of the present invention is limited; every utilize description of the present invention to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present invention.
Claims (2)
1. a risk Measure for physical protection system, is characterized in that: it comprises the following steps:
S1, according to the attribute of the subsystem in physical protection system or equipment, physical protection system is divided into detecting function part, delay function part and response function part;
Attribute and the feature of the event body of S2, the inside of attempting to implement to destroy or steal to nuclear facilities or nuclear material according to potential, outside or collusion from both within and without carry out definition datum threat;
S3, according to the inside of nuclear power plant and external environment condition feature, nuclear power plant and physical protection system are carried out to 3D modeling and form realistic model;
S4, measure the risk of physical protection system according to realistic model: in realistic model, implant formula R=P
a× [1-(P
i× P
n)] × C, meanwhile, probability of happening also counts in formula by the probability of happening that assessment detecting function part, delay function part, response function part and benchmark threaten;
In formula: R is the value-at-risk of physical protection system, P
ifor the outage probability value of detecting function part, delay function part or response function part, P
nfor the failure probability value of detecting function part, delay function part or response function part, C is the assessed value of nuclear power plant's loss of assets.
2. the risk Measure of a kind of physical protection system as claimed in claim 1, is characterized in that: the detecting function part in step S1 comprises detecting and warning system and video monitoring system, delay function part comprise each domain entities barrier device of gateway control system and nuclear power plant, response function part comprises security communication system and online patrol system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510466515.5A CN105117526A (en) | 2015-07-31 | 2015-07-31 | Measuring method for risk of physical protection system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510466515.5A CN105117526A (en) | 2015-07-31 | 2015-07-31 | Measuring method for risk of physical protection system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105117526A true CN105117526A (en) | 2015-12-02 |
Family
ID=54665514
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510466515.5A Pending CN105117526A (en) | 2015-07-31 | 2015-07-31 | Measuring method for risk of physical protection system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105117526A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105825344A (en) * | 2016-03-23 | 2016-08-03 | 深圳市欣横纵数码科技有限公司 | Nuclear power object protection effectiveness quantifying and evaluating method and device |
CN108520346A (en) * | 2018-03-29 | 2018-09-11 | 深圳市欣横纵技术股份有限公司 | A kind of physical protection efficiency evaluation system |
CN109190932A (en) * | 2018-08-15 | 2019-01-11 | 华南理工大学 | A kind of critical infrastructures physical protection system risk monitoring and control method |
CN111178684A (en) * | 2019-12-10 | 2020-05-19 | 中国人民解放军96901部队23分队 | Weak path determination method for nuclear facility physical protection system |
CN111553569A (en) * | 2020-04-16 | 2020-08-18 | 国家核安保技术中心 | Method, device and equipment for evaluating nuclear facility physical protection effectiveness and storage medium |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104463455A (en) * | 2014-12-02 | 2015-03-25 | 中广核工程有限公司 | Nuclear power physical protection effectiveness analysis method, device and system |
-
2015
- 2015-07-31 CN CN201510466515.5A patent/CN105117526A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104463455A (en) * | 2014-12-02 | 2015-03-25 | 中广核工程有限公司 | Nuclear power physical protection effectiveness analysis method, device and system |
Non-Patent Citations (2)
Title |
---|
VINTR Z 等: "Evaluation of physical protection system effectiveness", 《SECURITY TECHNOLOGY(ICCST), 2012 IEEE INTERNATIONAL CARNAHAN CONFERENCE ON. IEEE》 * |
马亮 等: "核设施实物保护技术探究", 《核安全》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105825344A (en) * | 2016-03-23 | 2016-08-03 | 深圳市欣横纵数码科技有限公司 | Nuclear power object protection effectiveness quantifying and evaluating method and device |
CN108520346A (en) * | 2018-03-29 | 2018-09-11 | 深圳市欣横纵技术股份有限公司 | A kind of physical protection efficiency evaluation system |
CN109190932A (en) * | 2018-08-15 | 2019-01-11 | 华南理工大学 | A kind of critical infrastructures physical protection system risk monitoring and control method |
CN109190932B (en) * | 2018-08-15 | 2021-08-10 | 华南理工大学 | Risk monitoring method for key infrastructure physical protection system |
CN111178684A (en) * | 2019-12-10 | 2020-05-19 | 中国人民解放军96901部队23分队 | Weak path determination method for nuclear facility physical protection system |
CN111553569A (en) * | 2020-04-16 | 2020-08-18 | 国家核安保技术中心 | Method, device and equipment for evaluating nuclear facility physical protection effectiveness and storage medium |
CN111553569B (en) * | 2020-04-16 | 2024-02-02 | 国家核安保技术中心 | Method, device, equipment and storage medium for evaluating physical protection effectiveness of nuclear facility |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105117526A (en) | Measuring method for risk of physical protection system | |
CN102546638B (en) | Scene-based hybrid invasion detection method and system | |
CN106021970B (en) | Pass through the method and system of rainfall forecast predicted city ponding | |
CN103150687B (en) | Electric network structure vulnerability real-time evaluation system | |
CN105825009B (en) | A kind of bridge vertical deformation performance method for early warning based on Building Information Model | |
CN104331072B (en) | Information security risk assessment method oriented to typical metallurgy process control system | |
CN106410792B (en) | A kind of power grid lightening arresting method and system | |
CN107659554A (en) | Method and system for detection of false Data Injection Attacks | |
CN104486141A (en) | Misdeclaration self-adapting network safety situation predication method | |
CN106792523B (en) | A kind of anomaly detection method based on extensive WiFi activity trajectory | |
CN104283889A (en) | Electric power system interior APT attack detection and pre-warning system based on network architecture | |
CN109344708A (en) | A kind of water supply network booster abnormal signal analysis method | |
CN103634296A (en) | Intelligent electricity network attack detection method based on physical system and information network abnormal data merging | |
CN105868629B (en) | Security threat situation assessment method suitable for electric power information physical system | |
CN107196895A (en) | Network attack is traced to the source implementation method and device | |
CN205537756U (en) | Monitoring system based on big dipper | |
CN109871764A (en) | A kind of abnormal behaviour recognition methods, device and storage medium | |
Cai et al. | Review of cyber-attacks and defense research on cyber physical power system | |
CN103905440A (en) | Network security situation awareness analysis method based on log and SNMP information fusion | |
CN108111463A (en) | The self study of various dimensions baseline and abnormal behaviour analysis based on average value and standard deviation | |
CN105867347A (en) | Trans-space cascade fault detection method based on machine learning technology | |
CN108183897A (en) | A kind of information physical emerging system safety risk estimating method | |
Andersson et al. | Cyber-security of SCADA systems | |
Taormina et al. | Assessing the effect of cyber-physical attacks on water distribution systems | |
CN116432989A (en) | Intelligent construction-based construction site safety control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151202 |