CN105113428B CN201510621147.7A CN201510621147A CN105113428B CN 105113428 B CN105113428 B CN 105113428B CN 201510621147 A CN201510621147 A CN 201510621147A CN 105113428 B CN105113428 B CN 105113428B
Authority
CN
China
Prior art keywords
tower
pontic
king
elevation
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510621147.7A
Other languages
Chinese (zh)
Other versions
CN105113428A (en
Inventor
李晓静
高乐秀
陈伯礼
邱世柱
肖胜开
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhaobo Construction Co., Ltd
Original Assignee
Wenzhou Shenbang Municipal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Shenbang Municipal Engineering Co Ltd filed Critical Wenzhou Shenbang Municipal Engineering Co Ltd
Priority to CN201510621147.7A priority Critical patent/CN105113428B/en
Publication of CN105113428A publication Critical patent/CN105113428A/en
Application granted granted Critical
Publication of CN105113428B publication Critical patent/CN105113428B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of high-altitude constructing device construction method of installation after bridge rotating, its device includes pontic king-tower, it is characterized in that, the most uniform on described pontic king-tower it is symmetrically installed with multiple adsorbent equipment, multiple short beams are connected between the adsorbent equipment being symmetrically installed form suction base, track along the radian of pontic king-tower from top to bottom by being arranged on short beam;Described track one or both sides are provided with teeth groove, and elevation and subsidence mechanical is rotated by the gear controlling to be meshed with described teeth groove and realizes lower motion in orbit, and described elevation and subsidence mechanical is arranged above operation platform.The invention has the beneficial effects as follows: by utilizing strong magnets to hold pontic, at attachment rail, make construction operation platform the up and down motion of bridge tower body upper can meet various construction demand again, it is achieved that good treatment effect, fill up domestic technological gap simultaneously.

Description

A kind of high-altitude constructing device construction method of installation after bridge rotating
The application is Application No. 2014105182434, October 2 2014 applying date, entitled a kind of bridge High-altitude constructing device after turning and the divisional application of installation and application thereof.
Technical field
The present invention relates to a kind of bridge construction apparatus for work, particularly relating to is the high-altitude after a kind of bridge rotating Constructing device construction method of installation.
Background technology
At present, the vertical turn construction method of bridge pontic is applied in bridge construction, as authorized The open a kind of mutual pull-type vertical turn of cable-stayed bridge head tower of the Chinese invention patent of notification number CN102635070B is executed Work method:
(1) on existing left side Main Pier of Bridges and right side Main Pier of Bridges, left side head tower tower seat and right side steel it are respectively mounted Tower tower seat, using the girder steel bridge floor that completes as welding procedure platform, is respectively welded left side on girder steel bridge floor both sides Head tower and right side head tower, then arrange left side pull bar and left side depression bar, left side head tower, left side on the head tower of left side Tripod on the left of pull bar and left side depression bar composition, accordingly, arranges right side pull bar and right side pressure on the head tower of right side Bar, tripod on the right side of right side head tower, right side pull bar and right side depression bar composition, flexible load-bearing steel strand wires two ends are respectively Tripod and the summit of right side tripod top triangular on the left of connection, and flexible load-bearing steel strand wires penetrate oil of turning Cylinder.
(2) placing head tower counterweight on the head tower of right side, the rotator construction for left side head tower is ready.Utilize meter Calculation machine controls hydraulic synchronizing lifting system, by oil cylinder of turning by flexibility load-bearing steel strand wires tensioning, steps up a left side Side head tower, makes left side head tower turn certain angle, continues tensioning flexibility load-bearing steel strand wires, complete left side head tower Rotator construction so that left side head tower 3 completes to close up, the then flexible load-bearing steel strand wires load of unloading, at left side steel Stretch-draw back steel strand wires on tower.
(3) the head tower counterweight on head tower on the right side of removal, ready for turning of right side head tower, by turning Oil cylinder, by flexibility load-bearing steel strand wires tensioning, steps up right side head tower, makes right side head tower turn certain angle, continues Continuous tensioning flexibility load-bearing steel strand wires, complete the rotator construction of right side head tower so that right side head tower completes to close up, so The flexible load-bearing steel strand wires load of rear unloading, the back steel strand wires on head tower on the left of dismounting, pull bar and a left side on the left of dismounting Side pressure bar, right side pull bar and right side depression bar, and flexible load-bearing steel strand wires.Complete turning of cable-stayed bridge head tower Construction.
After this construction method completes bridge rotating, bridge main tower also needs to cleaning, installs test point, wears The work high above the ground such as cable wire, owing to the height of bridge main tower is the highest, so carry out operation danger very big, cloth simultaneously Put monitoring point to be likely at any one of bridge main tower, and existing construction hanging basket has been difficult to the above Highly difficult, dangerous big construction operation.For this work high above the ground, can accomplish the bridge tower main body turned Whole body carries out construction operation, and the most domestic such device also do not occur.
Summary of the invention
It is an object of the invention to overcome above-mentioned the deficiencies in the prior art, it is provided that after a kind of bridge rotating High-altitude constructing device and installation and application thereof, the present invention is designed by rational structure, by utilizing strong magnetic Iron holds pontic, at attachment rail, makes construction operation platform can move up and down at bridge tower body upper and meets Various construction demands, it is achieved that good construction effect.
For realizing the purpose of the present invention, the technical solution used in the present invention is:
High-altitude constructing device after a kind of bridge rotating, including pontic king-tower, it is characterised in that on described pontic king-tower The most uniform be symmetrically installed with multiple adsorbent equipment, multiple short beams be connected to the adsorbent equipment that is symmetrically installed it Between formed suction base, track is arranged on short beam from top to bottom along the radian of pontic king-tower;Described track side or two Side is provided with teeth groove, and elevation and subsidence mechanical is rotated by the gear controlling to be meshed with described teeth groove under realizing in orbit Motion, described elevation and subsidence mechanical is arranged above operation platform.
Preferentially, described adsorbent equipment includes housing, demagnetization material protection shell pass through articulate Being arranged on housing back edge, strong magnets is fixed in demagnetization material protection shell by securing member, connects sheet and sets Inside demagnetization material protection shell.
Preferentially, also include that keying dish, described keying dish are half elliptic, its upper side edge edge and demagnetization material Connecting by connecting pin is fixing bottom the another side of material containment vessel, regulation spanner is arranged on above keying dish for revolving Turn demagnetization material protection shell.
For a modification of the present invention, be additionally provided with below operation platform can the operation platform two of left and right, rail Pinned hole also it is laid with above road.
Based on said structure, present invention also offers the high-altitude constructing device installation after a kind of bridge rotating and execute Work method, it is characterised in that comprise the following steps:
1) before bridge rotating on pontic king-tower the most uniform installation adsorbent equipment, short beam, and by track installation On short beam;
2) at pontic king-tower top and corner cambered maximum, fixed pulley is installed, and is wound with cable wire respectively above;
3) rise after perpendicular pontic king-tower turns successfully, elevation and subsidence mechanical, operation platform and operation platform two are installed in orbit;
4) electronic reel is installed in pontic king-tower bottom, and is connected to construction by being wound on the cable wire one end above fixed pulley Above platform or operation platform two, the other end connects electronic reel;
5) startup elevation and subsidence mechanical starts face up and down motion in orbit and carries out construction operation, when elevation and subsidence mechanical is elevated to turn Utilize electronic reel to make elevation and subsidence mechanical be tightened up by fixed pulley rotation cable wire during the radian maximum of angle fixing, treat Elevation and subsidence mechanical continuation rising smoothly passes to be loosened cable wire at corner cambered again;
6), after having constructed, sequentially dismantle elevation and subsidence mechanical, operation platform and operation platform two, and utilize crane to remove Fixed pulley and short beam;
7) cocked by manually spanner will be regulated again with crane, make the strong magnets above adsorbent equipment and pontic King-tower separates removes adsorbent equipment, completes the construction of entirety.
The invention has the beneficial effects as follows: by utilizing strong magnets to hold pontic, at attachment rail, make to execute Work job platform the up and down motion of bridge tower body upper can meet various construction demand, dismounting aspect again, it is achieved Good construction effect, has filled up domestic technological gap simultaneously.
Accompanying drawing explanation
With reference to the accompanying drawings the present invention is further described in more detail, preferred tool shown in the drawings Body embodiment.
Construction drawing when Fig. 1 is the high-altitude constructing device use after bridge rotating of the present invention;
Fig. 2 is the structural representation of the high-altitude constructing device after bridge rotating of the present invention;
Fig. 3 is the structural representation of adsorbent equipment of the present invention.
In figure: 2, teeth groove, 3, bolt, 4, gear, 5, pinned hole, 6, elevation and subsidence mechanical, 7, execute Work platform, 8, operation platform two, 9, demagnetization material protection shell, 10, housing, 11, hinge, 12, open and close Dish, 13, strong magnets, 14, track, 15, securing member, 16, connecting pin, 17, regulation spanner, 19, Electronic reel, 20, pontic king-tower, 21, fixed pulley one, 22, fixed pulley two, 23, short beam, 24, absorption Device, 25, connect sheet.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in detail.Following example will assist in ability The technical staff in territory is further appreciated by the present invention, but limits the present invention the most in any form.It should be pointed out that, To those skilled in the art, without departing from the inventive concept of the premise, it is also possible to make some Deformation and improvement.These broadly fall into protection scope of the present invention.
Embodiment 1
As it is shown in figure 1, the high-altitude constructing device after a kind of bridge rotating, including pontic king-tower 20, pontic king-tower 20 On the most uniform be symmetrically installed with multiple adsorbent equipment 24, multiple short beams 23 are connected to the suction being symmetrically installed Forming suction base between adsorption device 24, track 14 is arranged on short beam 23 from top to bottom along the radian of pontic king-tower 20 On;The side of described track 14 is provided with teeth groove 2, and track 14 is also laid with pinned hole 5, above when executing Work platform need to rest on certain position long-time time, backing pin can be inserted operation platform is positioned by pinned hole 5 again Live.
Elevation and subsidence mechanical 6 is rotated by the gear 4 controlling to be meshed with described teeth groove 2 and realizes on track 14 Lower motion, described elevation and subsidence mechanical 6 is arranged above operation platform 7, and being additionally provided with below operation platform 7 can left and right The operation platform 28 of regulation, operation platform 28 left and right activity can meet different construction requirements.
It is respectively mounted fixed pulley 2 22 at the top of pontic king-tower 20 and angle of turn maximum and has determined sliding Taking turns 1, install electronic reel 19 in pontic king-tower 20 bottom, two cable wires walk around fixed pulley 2 22 respectively With fixed pulley 1, its one end is connected to above operation platform 7, and the other end connects electronic reel 19.
As shown in Figures 2 and 3, adsorbent equipment 24 includes housing 10, the one of two demagnetization material protection shells 9 Limit is movably arranged on housing 10 back edge by hinge 11, strong magnets 13 is fixed by securing member 15 In demagnetization material protection shell 9, connect sheet 25 and be located at inside containment vessel 9.It addition, also include keying dish 12, Described keying dish 12 is half elliptic, and its upper side edge is along passing through bottom the another side of demagnetization material protection shell 9 Connecting pin 16 is fixing to be connected, and regulation spanner 17 is arranged on keying dish 12 above for rotating demagnetization material protection 9。
Based on said apparatus, the construction method of installation of the present invention, comprise the following steps:
1) before bridge rotating on pontic king-tower 20 the most uniform installation adsorbent equipment 24, short beam 23, and will Track 14 is arranged on above short beam 23, during installation adsorbs the strong magnets 13 above adsorbent equipment 24 at bridge Above body king-tower 20, short beam 23 both sides are fixing inserted the hole connecting sheet 25 by bolt 3 in, such short beam 23 are installed between adsorbent equipment 24.
2) at pontic king-tower 20 top and corner cambered maximum, fixed pulley 2 22 and fixed pulley 1 are installed, And cable wire it is wound with respectively above;
3) rise after perpendicular pontic king-tower 20 turns successfully, track 14 is installed elevation and subsidence mechanical 6, operation platform 7 and Operation platform 28;
4) electronic reel 19 is installed in pontic king-tower 20 bottom, and fixed pulley 2 22 and fixed pulley 1 will be wound on Cable wire one end above is connected to above operation platform 7, and the other end connects electronic reel 19;
5) start elevation and subsidence mechanical 6 to start to move up and down on track 14 to carry out construction operation, can be to pontic king-tower 20 any one installation monitoring points, weld and transport the construction operations such as construction material.Meanwhile, when elevation and subsidence mechanical 6 In order to ensure safety when being elevated to corner cambered maximum, cable wire is passed through fixed pulley by available electronic reel 19 2 22 and fixed pulley 1 rotate that to make elevation and subsidence mechanical 6 be tightened up fixing, treat that elevation and subsidence mechanical 6 continues to rise steadily By being loosened by cable wire at corner cambered, safety coefficient is so made to be greatly improved again;
6) after having constructed, sequentially dismounting elevation and subsidence mechanical 6, operation platform 7 and operation platform 28, and utilize crane Remove fixed pulley and short beam 23;
7) again with crane by manually by cocked for regulation spanner 17, making adsorbent equipment 24 strong magnets above 13 separate dismounting adsorbent equipment 24 with pontic king-tower 20, complete the construction of entirety.

Claims (1)

1. the high-altitude constructing device construction method of installation after a bridge rotating, it is characterised in that comprise the following steps:
1) at pontic king-tower (20) the most uniform installation adsorbent equipment (24), short beam (23) before bridge rotating, And track (14) is arranged on short beam (23) above;
2) at pontic king-tower (20) top and corner cambered maximum, fixed pulley is installed, and is wound with steel respectively above Rope;
3) rise after perpendicular pontic king-tower (20) turns successfully, track (14) is installed elevation and subsidence mechanical (6), construction Platform (7) and operation platform two (8);
4) electronic reel (19) is installed in pontic king-tower (20) bottom, and the cable wire one end above fixed pulley will be wound on Being connected to operation platform (7) or operation platform two (8) above, the other end connects electronic reel (19);
5) start elevation and subsidence mechanical (6) to start to move up and down above at track (14) to carry out construction operation, work as lift Tool (6) is elevated to during corner cambered maximum utilize electronic reel (19) to be rotated by fixed pulley by cable wire to be made Elevation and subsidence mechanical (6) is tightened up fixing, treats that elevation and subsidence mechanical (6) continuation rising smoothly passes and will at corner cambered again Cable wire loosens;
6), after having constructed, elevation and subsidence mechanical (6), operation platform (7) and operation platform two (8) are sequentially dismantled, and Crane is utilized to remove fixed pulley and short beam (23);
7) again with crane by manually by cocked for regulation spanner (17), adsorbent equipment (24) above strong is made Power magnet (13) separates dismounting adsorbent equipment (24) with pontic king-tower (20), completes the construction of entirety.
CN201510621147.7A 2014-10-02 2014-10-02 A kind of high-altitude constructing device construction method of installation after bridge rotating Active CN105113428B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510621147.7A CN105113428B (en) 2014-10-02 2014-10-02 A kind of high-altitude constructing device construction method of installation after bridge rotating

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510621147.7A CN105113428B (en) 2014-10-02 2014-10-02 A kind of high-altitude constructing device construction method of installation after bridge rotating
CN201410518243.4A CN104213513B (en) 2014-10-02 2014-10-02 High-altitude construction equipment after a kind of bridge rotating

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410518243.4A Division CN104213513B (en) 2014-10-02 2014-10-02 High-altitude construction equipment after a kind of bridge rotating

Publications (2)

Publication Number Publication Date
CN105113428A CN105113428A (en) 2015-12-02
CN105113428B true CN105113428B (en) 2016-08-24

Family

ID=52095396

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201410518243.4A Expired - Fee Related CN104213513B (en) 2014-10-02 2014-10-02 High-altitude construction equipment after a kind of bridge rotating
CN201510621147.7A Active CN105113428B (en) 2014-10-02 2014-10-02 A kind of high-altitude constructing device construction method of installation after bridge rotating

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201410518243.4A Expired - Fee Related CN104213513B (en) 2014-10-02 2014-10-02 High-altitude construction equipment after a kind of bridge rotating

Country Status (1)

Country Link
CN (2) CN104213513B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109014685B (en) * 2018-09-27 2023-09-12 上海永乾机电有限公司 Flexible assembly operation island for car body
CN110761193A (en) * 2019-10-30 2020-02-07 中交路桥华南工程有限公司 Cable tower construction equipment
CN112627038A (en) * 2020-12-17 2021-04-09 江苏恒睿杰钢结构工程有限公司 Installation and construction method of steel box girder of steel structure bridge

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6832459B2 (en) * 2002-01-18 2004-12-21 Matthew Russell Methods and apparatus for forming and placing generally horizontal structures
CN101824904A (en) * 2009-03-05 2010-09-08 卢兴明 Integral-scaffold supporting elevation method and double-track double-anti-dropping hydraulic lifting integral scaffold thereof
CN202164546U (en) * 2011-07-28 2012-03-14 中铁一局集团有限公司 High pier bridge construction platform
CN102635070B (en) * 2012-04-09 2014-03-05 同济大学 Mutual-pulling type vertical turning construction method for steel towers of cable-stayed bridge
CN202688879U (en) * 2012-06-28 2013-01-23 中交二公局第二工程有限公司 Arch steel tower coating platform running with arch
CN103194981B (en) * 2013-04-02 2015-06-10 中铁大桥局集团有限公司 System and method for bridge steel tower maritime vertical rotation construction
CN204151694U (en) * 2014-10-02 2015-02-11 杜东升 High-altitude construction equipment after a kind of bridge rotating

Also Published As

Publication number Publication date
CN104213513A (en) 2014-12-17
CN104213513B (en) 2015-12-02
CN105113428A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN104088449B (en) Safe and fast double-track construction platform of super high-rise curtain wall
CN105113428B (en) A kind of high-altitude constructing device construction method of installation after bridge rotating
CN104993422A (en) Line inspection robot on-line and off-line device and line inspection robot on-line and off-line system provided with same
CN104143782B (en) The electrification replacing tool of one ± 800kV line tension insulator chain and method
CN103342318A (en) Lifting device for steel truss inspection trolley working platform and installation method thereof
CN106758882A (en) For the hood type automatic leveling anchor and its method for suspender replacement of CFST Arch Bridge suspender replacement
CN206971689U (en) Support operating platform that is detachable and recycling
CN204703534U (en) A kind of large-scale unit plates of curtain wall two-rail hanging apparatus
CN204151694U (en) High-altitude construction equipment after a kind of bridge rotating
CN101725114B (en) Method for hoisting hawser of long-span cable-stayed bridge and equipment thereof
CN106185618B (en) One kind is used for Generator Stator hoisting structure and its hanging method
CN204001751U (en) Super high steel structure construction overhanging unloading platform
CN104878966B (en) Prefabricated channel-section steel multilayer assembled monitoring, which is parked, to stop
RU2409513C1 (en) Method of replacement of ropes of mine winding plant with friction pulley, and device for its implementation
CN206667032U (en) Facility suspension bridge waterborne
CN205312753U (en) Cable laying pay -off suitable for any cable drum
CN109378767A (en) A kind of lifting engineering method of hoist engine to skyscraper electricity well inner cable
CN208327105U (en) A kind of boom hoisting for steel
CN205170234U (en) Cantilever crane
TW201604118A (en) Fixing method for portal crane, and fixing structure for portal crane
CN108035530A (en) A kind of inner wall of oil tank construction hanging basket
CN207812982U (en) A kind of inner wall of oil tank construction hanging basket
CN102583149B (en) Removing method of lifting cover for hoisting
CN208716718U (en) A kind of Novel spider plant rotary device
CN207738303U (en) A kind of generator unit stator lifting steering

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No.123 Wenju Middle Road, Guoxi Town, Ouhai, Wenzhou, Zhejiang 325000 (2nd floor)

Patentee after: Zhejiang Zhaobo Construction Co., Ltd

Address before: No.123 Wenju Middle Road, Guoxi Town, Ouhai, Wenzhou, Zhejiang 325000 (2nd floor)

Patentee before: WENZHOU SHENBANG MUNICIPAL ENGINEERING Co.,Ltd.