CN105096684B - A kind of sludge of sewage treatment plant incinerator training operation platform - Google Patents
A kind of sludge of sewage treatment plant incinerator training operation platform Download PDFInfo
- Publication number
- CN105096684B CN105096684B CN201510495689.4A CN201510495689A CN105096684B CN 105096684 B CN105096684 B CN 105096684B CN 201510495689 A CN201510495689 A CN 201510495689A CN 105096684 B CN105096684 B CN 105096684B
- Authority
- CN
- China
- Prior art keywords
- icon
- machine
- air
- incinerator
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The invention discloses a kind of sludge of sewage treatment plant incinerator training operation platform, there is the controller of Experimental Management software including bottom plate and operation, bottom plate front upper is embedded with touch-screen, layered material pressure difference simulative display table, furnace roof negative pressure simulative display table, air-introduced machine A numerical simulation display tables and the air-introduced machine B numerical simulation display tables being electrically connected with the controller;Bottom plate front bottom is painted with the process chart of incinerator and embedded with digital display meter, operation button, tune rotation button and the simulation pipeline indicator lamp being electrically connected with the controller;The controller is arranged on the bottom plate back side.When student carries out training operation, the operating procedure of student is automatically recorded in software systems, and operation completion click is handed in an examination paper after button, and all operationss step of student can be automatically displayed on touch-screen system interface, and contrasted with answer database, automatically derived real training achievement.This programme is applied to the teaching and examination of sludge incinerator operation.
Description
Technical field
The present invention relates to simulated teaching checking system, more particularly, to a kind of sludge of sewage treatment plant incinerator training operation
Platform.
Background technology
In recent years, with developing rapidly for national economy and stepping up for living standards of the people, the place of sewage treatment plant
Reason degree improves rapidly, and while sewage is purified, the polluter in sewage is separated as sludge, that is,
It is accessory substance caused by sewage treatment plant's purification sewage to say sludge.Sludge of sewage treatment plant complicated component, property more containing organic matter
Matter is unstable, easily degenerates smelly, heavy metal, the content height of hazardous contaminant, containing pathogen and parasitic ovum etc., if arbitrarily
Serious harm will be produced without effectively handling disposal to environment by stacking, and specific resistance to filtration problem is more and more closed
Note.
Sludge incineration is most thoroughly method for sludge treatment, compared with other method for sludge treatment, the advantages of burning
All it is carbonized in the organic matter in it can make sludge, reduces sludge volume to greatest extent, its product is sterile, odorless inorganic
Residue, sterileization of sludge and the purpose of minimizing are realized rapidly.And sludge incineration facility floor space is small, Automated water
Flat height, is influenceed smaller by external environmental condition.
Main sludge incineration facilities and equipment domestic at present is mostly that foreign countries introduce, merely by the training of original sewage treatment plant
Project has not met real Treatment of Sludge requirement.Therefore, a kind of new sludge incinerator training operation platform is researched and developed, at sludge
Science and engineering is targetedly trained, and is had for the development and environmental protection energy-saving and emission-reduction for promoting Treatment of Sludge industry important
Realistic meaning.
The content of the invention
The present invention mainly solves the suitable sludge incinerator simulated teaching checking system of shortage present in prior art
Technical problem, there is provided it is a kind of can be with altitude simulation incinerator execute-in-place, the sewage treatment plant suitable for imparting knowledge to students and examining
Sludge incinerator training operation platform.
The present invention is mainly what is be addressed by following technical proposals for above-mentioned technical problem:A kind of sewage treatment plant
Sludge incinerator training operation platform, including bottom plate and operation have the controller of Experimental Management software, bottom plate front upper setting-in
There are touch-screen, layered material pressure difference simulative display table, furnace roof negative pressure simulative display table, air-introduced machine A numerical simulation display tables and air inducing
Machine B numerical simulations show table;Bottom plate front bottom be painted with the process chart of incinerator and embedded with digital display meter, operation button,
Adjust rotation button and simulation pipeline indicator lamp;The controller is arranged on the bottom plate back side, touch-screen, layered material pressure difference simulative display
Table, furnace roof negative pressure simulative display table, air-introduced machine A numerical simulations show that table, air-introduced machine B numerical simulations show table, digital display meter, operation
Button, adjusting knob and simulation pipeline indicator lamp are all electrically connected with the controller.
Whole training operation platform uses suspension type plate profile structure, and real training is to hang over after plug-in to make on corresponding support
With.Bottom plate uses irony bilayer matt fine groove plastic-spraying structure.The layered material pressure difference of layered material pressure difference simulative display table display simulation,
The furnace roof negative pressure value of furnace roof negative pressure simulative display table display simulation, air-introduced machine A numerical simulations show the air-introduced machine A of table display simulation
Parameter, air-introduced machine B numerical simulations show table display simulation air-introduced machine B parameter.
Preferably, the digital display meter includes furnace roof oxygen amount value simulative display table, fire box temperature value simulative display table, air compartment
Temperature simulation shows that table, primary air flow wind value simulative display table and pressure feeding spiral numerical value show table.
Preferably, process chart include disintegrating machine icon, coal bunker icon, tramp iron separator icon, dewatered sludge feed bin icon,
Incinerator icon, spray column icon, sack cleaner icon, primary air fan icon, air-introduced machine A icons, air-introduced machine B icons, cigarette
Chimney icon and heat-conducting oil system analog module, the disintegrating machine icon connect coal bunker icon, tramp iron separator figure by simulating pipeline
Mark is connected by simulating pipeline connection dewatered sludge feed bin icon, coal bunker icon and dewatered sludge feed bin icon by simulating feed pipeline
Incinerator icon, incinerator icon connect spray column icon by simulating pipeline, and spray column icon connects cloth by simulating pipeline
Bag dust collector icon, sack cleaner icon is by simulating pipeline distribution connection air-introduced machine A icons and air-introduced machine B icons, air inducing
Machine A icons all connect chimney icon with air-introduced machine B icons by simulating pipeline, and heat-conducting oil system analog module is by simulating pipeline
Connect incinerator icon.
Each icon on process chart corresponds with each equipment in actual incinerator system.
Preferably, simulation pipeline indicator lamp is installed, even on the simulation pipeline of connection disintegrating machine icon and coal bunker icon
Connect and simulation pipeline indicator lamp is installed on the simulation pipeline of tramp iron separator icon and dewatered sludge feed bin icon.
Simulating pipeline indicator lamp, to be used for instruction simulation pipeline unobstructed or close.
Preferably, operation button include with primary air fan icon corresponding to primary air fan button, corresponding with coal bunker icon
Coal bunker button, dewatered sludge feed bin button corresponding with dewatered sludge feed bin, disintegrating machine button corresponding with disintegrating machine icon, with removing
Tramp iron separator button corresponding to ironware icon, air-introduced machine A buttons corresponding with air-introduced machine A icons and corresponding with air-introduced machine B icons
Air-introduced machine B buttons;Adjusting knob includes feed adjusting knob, furnace roof oxygen flow regulation knob and primary air fan air quantity adjusting knob.
Operation button is used for the switch for the equipment for controlling corresponding icon to be simulated.
Preferably, heat-conducting oil system analog module includes filling pump icon, conduction oil Lower tank icon, high-order expansion drum
Icon, oil cooler icon, drying machine icon, threeway icon, the first pump machine icon, the second pump machine icon and the 3rd pump machine figure
Mark;By simulating, pipeline connects conduction oil Lower tank icon to filling pump icon and high-order expansion drum, conduction oil Lower tank icon lead to
Cross simulation pipeline and connect high-order expansion drum icon, high-order expansion drum icon connects threeway icon, the first pump machine by simulating pipeline
Icon both ends connect threeway icon and incinerator icon by simulating pipeline respectively, and the second pump machine icon and the 3rd pump machine icon are all
In parallel with the first pump machine icon, drying machine icon connects incinerator icon by simulating pipeline, and oil cooler icon passes through simulation
Pipeline connects drying machine icon and threeway icon, and heat-conducting oil system analog module is also connected in simulation pipeline including several
Switching icons.
Preferably, operation button also include with filling pump icon corresponding to filling pump button, corresponding with drying machine icon
Drying machine button, the first pump machine button corresponding with the first pump machine icon, the second pump machine corresponding with the second pump machine icon press
Button, the 3rd pump machine button corresponding with the 3rd pump machine icon and with the one-to-one shift knob of each switching icons.
There is Experimental Management software cryptoguard, operating time to record automatically, operating process records automatically and operation order
The functions such as answer database.When student carries out training operation, the operating procedure of student is automatically recorded in software systems, behaviour
Work completion click is handed in an examination paper after button, and all operationss step of student can be automatically displayed on touch-screen system interface, and and answer
Database is contrasted, automatically derived real training achievement.
The substantial effect that the present invention is brought is, have high in technological content, good appearance, installation easy maintenance, it is in light weight,
Easy to use, the features such as reliability is high, the real training of a variety of sludge incineration process operations flows can be carried out by the platform
And examination, while altitude simulation execute-in-place condition, avoid at the scene training when may be related to facility is set
The influence of standby normal operation and safety problem.
The exploitation of this training operation platform makes sewage treatment plant operating personnel systematically to learn to arrive by real training education
The knowledge of specific resistance to filtration, practical technique and operative skill, constantly developing development new technology are really grasped, ensures sewage disposal
The stable operation of factory is up to standard.Environmental Protection Cause and sustainable development for China make bigger contribution.
Brief description of the drawings
Fig. 1 is a kind of bottom plate front upper structural representation of the present invention;
Fig. 2 is a kind of bottom plate front substructure schematic diagram of the present invention;
In figure:1st, bottom plate, 2, touch-screen, 3, layered material pressure difference simulative display table, 4, furnace roof negative pressure simulative display table, 5, draw
Blower fan A numerical simulations show table, 6, air-introduced machine B numerical simulations show table, 7, disintegrating machine icon, 8, coal bunker icon, 9, tramp iron separator
Icon, 10, dewatered sludge feed bin icon, 11, incinerator icon, 12, spray column icon, 13, sack cleaner icon, 14, once
Blower fan icon, 15, air-introduced machine A icons, 16, air-introduced machine B icons, 17, chimney icon, 18, filling pump icon, 19, conduction oil it is low
Position groove icon, 20, high-order expansion drum icon, 21, oil cooler icon, 22, drying machine icon, 23, threeway icon, 24, first
Pump machine icon, the 25, second pump machine icon, the 26, the 3rd pump machine icon, 27, furnace roof oxygen amount value simulative display table, 28, fire box temperature
Be worth simulative display table, 29, air compartment temperature simulation show table, 30, primary air flow wind value simulative display table, 31, pressure feeding spiral numerical value
Show table, 32, simulation pipeline indicator lamp, 33, primary air fan button, 34, coal bunker button, 35, dewatered sludge feed bin button, 36 is broken
Machine button, 37, tramp iron separator button, 38, air-introduced machine A buttons, 39, air-introduced machine B buttons, 40, feed adjusting knob, 41, furnace roof oxygen
Measure adjusting knob, 42, primary air fan air quantity adjusting knob, 43, filling pump button, 44, drying machine button, the 45, first pump machine is pressed
Button, the 46, second pump machine button, the 47, the 3rd pump machine button, 48, shift knob, 49, oil strainer.
Embodiment
Below by embodiment, and with reference to accompanying drawing, technical scheme is described in further detail.
Embodiment:A kind of sludge of sewage treatment plant incinerator training operation platform of the present embodiment, including bottom plate 1 and operation
There is the controller of Experimental Management software.As shown in figure 1, bottom plate front upper is embedded with touch-screen 2, layered material pressure difference simulative display
Table 3, furnace roof negative pressure simulative display table 4, air-introduced machine A numerical simulations show that table 5 and air-introduced machine B numerical simulations show table 6.Bottom plate is just
Face top is also equipped with regulation simulation air-introduced machine A and simulates air-introduced machine B adjusting knob.
As shown in Fig. 2 bottom plate front bottom be painted with the process chart of incinerator and embedded with digital display meter, operation button,
Adjust rotation button and simulation pipeline indicator lamp;Controller is arranged on the bottom plate back side, touch-screen, layered material pressure difference simulative display table, stove
Push up negative pressure simulative display table, air-introduced machine A numerical simulations show table, air-introduced machine B numerical simulations show table, digital display meter, operation button,
Adjusting knob and simulation pipeline indicator lamp are all electrically connected with the controller.
Process chart includes disintegrating machine icon 7, coal bunker icon 8, tramp iron separator icon 9, dewatered sludge feed bin icon 10, burning
Stove icon 11, spray column icon 12, sack cleaner icon 13, primary air fan icon 14, air-introduced machine A icons 15, air-introduced machine B figures
Mark 16, chimney icon 17 and heat-conducting oil system analog module, the disintegrating machine icon connect coal bunker icon by simulating pipeline,
Tramp iron separator icon connects dewatered sludge feed bin icon, coal bunker icon and dewatered sludge feed bin icon by simulating feed by simulating pipeline
Pipeline connects incinerator icon, and incinerator icon connects spray column icon by simulating pipeline, and spray column icon is managed by simulating
Road connects sack cleaner icon, and sack cleaner icon is schemed by simulating pipeline distribution connection air-introduced machine A icons and air-introduced machine B
Mark, air-introduced machine A icons all connect chimney icon with air-introduced machine B icons by simulating pipeline, and heat-conducting oil system analog module passes through
Simulate pipeline connection incinerator icon.
Simulation pipeline indicator lamp 32 is installed on the simulation pipeline of connection disintegrating machine icon and coal bunker icon, connects tramp iron separator
Simulation pipeline indicator lamp 32 is installed on the simulation pipeline of icon and dewatered sludge feed bin icon.
Heat-conducting oil system analog module includes filling pump icon 18, conduction oil Lower tank icon 19, high-order expansion drum icon
20th, oil cooler icon 21, drying machine icon 22, threeway icon 23, the first pump machine icon 24, the second pump machine icon 25 and the 3rd
Pump machine icon 26;Filling pump icon connects conduction oil Lower tank icon and high-order expansion drum, conduction oil low level by simulating pipeline
Groove icon connects high-order expansion drum icon by simulating pipeline, and high-order expansion drum icon connects threeway icon by simulating pipeline,
First pump machine icon both ends connect threeway icon and incinerator icon, the second pump machine icon and the 3rd pump by simulating pipeline respectively
Machine icon is all in parallel with the first pump machine icon, and drying machine icon connects incinerator icon, oil cooler icon by simulating pipeline
By simulating, pipeline connects drying machine icon and threeway icon, heat-conducting oil system analog module are also connected on simulation including several
Switching icons in pipeline.
Heat-conducting oil system also includes oil strainer icon 49, and oil strainer icon is connected on filling pump icon and conduction oil is low
Between the groove icon of position.
Digital display meter includes furnace roof oxygen amount value simulative display table 27, fire box temperature value simulative display table 28, air compartment temperature simulation
Show that table 29, primary air flow wind value simulative display table 30 and pressure feeding spiral numerical value show table 31.
Operation button includes primary air fan button 33 corresponding with primary air fan icon, coal bunker corresponding with coal bunker icon is pressed
Button 34, dewatered sludge feed bin button 35 corresponding with dewatered sludge feed bin, disintegrating machine button 36 corresponding with disintegrating machine icon and iron removaling
Tramp iron separator button 37 corresponding to device icon, with air-introduced machine A icons corresponding to air-introduced machine A buttons 38 and corresponding with air-introduced machine B icons
Air-introduced machine B buttons 39;Adjusting knob includes feed adjusting knob 40, furnace roof oxygen flow regulation knob 41 and primary air fan air quantity and adjusted
Save knob 42.
Operation button also includes filling pump button 43 corresponding with filling pump icon, drying machine corresponding with drying machine icon
Button 44, the first pump machine button 45 corresponding with the first pump machine icon, the second pump machine button 46 corresponding with the second pump machine icon,
Corresponding with the 3rd pump machine icon the 3rd pump machine button 47 and shift knob one-to-one with each switching icons 48.
Whole training operation platform uses suspension type plate profile structure, and hanging over during real training can make on corresponding support after plug-in
With, have the characteristics that it is simple in construction, easy to use, be easy to safeguard.Training operation platform floor uses irony bilayer matt fine groove
Plastic-spraying structure, platform upper are embedded with technical grade touch-screen and incinerator bed of material pressure difference simulative display table, incinerator furnace roof negative pressure
Simulative display table, air-introduced machine A numerical simulations show that table, air-introduced machine B numerical simulations show table.Platform lower is furnished with whole incinerator
Process chart, comprising disintegrating machine, drying machine, burn furnace main body, blower fan, oil cooler, heat-conducting oil pipes, air compartment temperature display
The equipment such as instrument, burner hearth, top temperature display instrument, spray column and air-introduced machine.And simulation pipeline instruction is provided with relevant position
Lamp, operation button, adjusting knob and digital displaying meter etc..The platform floor back side is provided with technical grade programmable controller, all to press
Button, indicator lamp and digital displaying meter are all acted and simulated according to actual process flow by programmable controller.In the reality
The project that real training and examination can be carried out on instruction operating platform has sludge incinerator banking fire and opens stove operation, sludge incinerator fuel
On storehouse coal operation, dewatered sludge particle enter incinerator Bunker operation, incinerator fuel Operating condition adjustment operation, Heat-transfer Oil Pump it is daily
Handover operation, sludge incineration furnace igniting throw fuel handling, the operation of sludge incinerator Fuel switching, the oiling of heat-conducting oil system behaviour
Make, switch fan operation in day-to-day operation.
There is Experimental Management software cryptoguard, operating time to record automatically, operating process records automatically and operation order
The functions such as answer database.When student carries out training operation, the operating procedure of student is automatically recorded in software systems, behaviour
Work completion click is handed in an examination paper after button, and all operationss step of student can be automatically displayed on touch-screen system interface, and and answer
Database is contrasted, automatically derived real training achievement.
It can be examined and the operation that learns includes incinerator banking fire and opens stove operation, coal is grasped on incinerator Bunker
Make, dewatered sludge particle enters the operation of incinerator Bunker, the adjustment of incinerator combustion conditions operates, the daily switching of Heat-transfer Oil Pump behaviour
Make, burn and cut in furnace igniting throwing fuel handling, the operation of incinerator Fuel switching, the oil injection operation of heat-conducting oil system and day-to-day operation
Ventilating fan operates.
Specific embodiment described herein is only to spirit explanation for example of the invention.Technology belonging to the present invention is led
The technical staff in domain can be made various modifications or supplement to described specific embodiment or be replaced using similar mode
Generation, but without departing from the spiritual of the present invention or surmount scope defined in appended claims.
Although more having used the terms such as controller, digital display meter herein, the possibility using other terms is not precluded from
Property.It is used for the purpose of more easily describing and explaining the essence of the present invention using these terms;It is construed as any one
Additional limitation is all disagreed with spirit of the present invention.
Claims (6)
1. a kind of sludge of sewage treatment plant incinerator training operation platform, it is characterised in that have real training pipe including bottom plate and operation
The controller of software is managed, bottom plate front upper is embedded with touch-screen, layered material pressure difference simulative display table, furnace roof negative pressure simulative display
Table, air-introduced machine A numerical simulations show that table and air-introduced machine B numerical simulations show table;The technique that bottom plate front bottom is painted with incinerator
Flow chart simultaneously revolves button and simulation pipeline indicator lamp embedded with digital display meter, operation button, tune;The controller is carried on the back installed in bottom plate
Face, touch-screen, layered material pressure difference simulative display table, furnace roof negative pressure simulative display table, air-introduced machine A numerical simulations show table, air inducing
Machine B numerical simulation displays table, digital display meter, operation button, adjusting knob and simulation pipeline indicator lamp are all electrically connected with the controller;
Process chart includes disintegrating machine icon, coal bunker icon, tramp iron separator icon, dewatered sludge feed bin icon, incinerator icon, spray
Drench tower icon, sack cleaner icon, primary air fan icon, air-introduced machine A icons, air-introduced machine B icons, chimney icon and heat conduction
Oil system analog module, the disintegrating machine icon connect coal bunker icon by simulating pipeline, and tramp iron separator icon is by simulating pipeline
Connect dewatered sludge feed bin icon, coal bunker icon and dewatered sludge feed bin icon and connect incinerator icon by simulating feed pipeline, burn
Burning stove icon and connect spray column icon by simulating pipeline, spray column icon connects sack cleaner icon by simulating pipeline,
Sack cleaner icon is by simulating pipeline distribution connection air-introduced machine A icons and air-introduced machine B icons, air-introduced machine A icons and air inducing
Machine B icons all connect chimney icon by simulating pipeline, and heat-conducting oil system analog module connects incinerator figure by simulating pipeline
Mark.
2. a kind of sludge of sewage treatment plant incinerator training operation platform according to claim 1, it is characterised in that described
Digital display meter includes furnace roof oxygen amount value simulative display table, fire box temperature value simulative display table, air compartment temperature simulation and shows table, First air
Measure wind value simulative display table and pressure feeding spiral numerical value shows table.
A kind of 3. sludge of sewage treatment plant incinerator training operation platform according to claim 1, it is characterised in that connection
Simulation pipeline indicator lamp is installed on the simulation pipeline of disintegrating machine icon and coal bunker icon, connects tramp iron separator icon and dewatered sludge material
Simulation pipeline indicator lamp is installed on the simulation pipeline of storehouse icon.
A kind of 4. sludge of sewage treatment plant incinerator training operation platform according to claim 1 or 3, it is characterised in that
Operation button includes primary air fan button corresponding with primary air fan icon, coal bunker button corresponding with coal bunker icon, with doing dirt
Dewatered sludge feed bin button corresponding to pug storehouse, disintegrating machine button corresponding with disintegrating machine icon, corresponding with tramp iron separator icon remove
Ironware button, air-introduced machine A buttons corresponding with air-introduced machine A icons and air-introduced machine B buttons corresponding with air-introduced machine B icons;Regulation
Knob includes feed adjusting knob, furnace roof oxygen flow regulation knob and primary air fan air quantity adjusting knob.
A kind of 5. sludge of sewage treatment plant incinerator training operation platform according to claim 4, it is characterised in that heat conduction
Oil system analog module includes filling pump icon, conduction oil Lower tank icon, high-order expansion drum icon, oil cooler icon, dry
Dry machine icon, threeway icon, the first pump machine icon, the second pump machine icon and the 3rd pump machine icon;Filling pump icon passes through simulation
Pipeline connects conduction oil Lower tank icon and high-order expansion drum, and conduction oil Lower tank icon is by simulating the high-order expansion of pipeline connection
Tank icon, high-order expansion drum icon connect threeway icon by simulating pipeline, and the first pump machine icon both ends are managed by simulating respectively
Road connects threeway icon and incinerator icon, and the second pump machine icon and the 3rd pump machine icon are all in parallel with the first pump machine icon, does
Dry machine icon connects incinerator icon by simulating pipeline, and oil cooler icon connects drying machine icon and three by simulating pipeline
Logical icon, heat-conducting oil system analog module also include several switching icons being connected in simulation pipeline.
A kind of 6. sludge of sewage treatment plant incinerator training operation platform according to claim 5, it is characterised in that operation
Button also includes filling pump button corresponding with filling pump icon, drying machine button corresponding with drying machine icon and the first pump
First pump machine button corresponding to machine icon, with the second pump machine icon corresponding to the second pump machine button, corresponding with the 3rd pump machine icon
The 3rd pump machine button and with the one-to-one shift knob of each switching icons.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510495689.4A CN105096684B (en) | 2015-08-12 | 2015-08-12 | A kind of sludge of sewage treatment plant incinerator training operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510495689.4A CN105096684B (en) | 2015-08-12 | 2015-08-12 | A kind of sludge of sewage treatment plant incinerator training operation platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105096684A CN105096684A (en) | 2015-11-25 |
CN105096684B true CN105096684B (en) | 2017-11-24 |
Family
ID=54576994
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510495689.4A Active CN105096684B (en) | 2015-08-12 | 2015-08-12 | A kind of sludge of sewage treatment plant incinerator training operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105096684B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108877366B (en) * | 2018-05-10 | 2022-07-15 | 上海城投污水处理有限公司 | Sewage treatment detection analysis examination system |
CN108766094B (en) * | 2018-07-13 | 2024-04-05 | 上海城投污水处理有限公司 | Sludge incinerator simulation system |
CN108646590A (en) * | 2018-07-13 | 2018-10-12 | 上海城投污水处理有限公司 | It is fed the simulation system of distributor |
CN108922362B (en) * | 2018-07-13 | 2024-03-01 | 上海城投污水处理有限公司 | Sludge dryer simulation system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101201989A (en) * | 2007-12-18 | 2008-06-18 | 徐州工业职业技术学院 | Multifunctional automatization biological sewage treatment composite experimental device |
CN202838736U (en) * | 2012-07-05 | 2013-03-27 | 浙江天煌科技实业有限公司 | Comprehensive training platform for water environment monitoring and control technology |
CN103256608A (en) * | 2013-05-23 | 2013-08-21 | 杭州国泰环保科技有限公司 | Sludge incineration method |
CN203706485U (en) * | 2014-01-08 | 2014-07-09 | 青岛远洋船员职业学院 | Ship ballast water system operation and troubleshooting simulator |
CN204360618U (en) * | 2014-12-17 | 2015-05-27 | 哈尔滨莱特兄弟科技开发有限公司 | Plane simulation training patterns control panel and plane simulation Training Control system |
CN204423675U (en) * | 2015-01-26 | 2015-06-24 | 哈尔滨莱特兄弟科技开发有限公司 | Simulation Air-Conditioning Control Panel |
-
2015
- 2015-08-12 CN CN201510495689.4A patent/CN105096684B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101201989A (en) * | 2007-12-18 | 2008-06-18 | 徐州工业职业技术学院 | Multifunctional automatization biological sewage treatment composite experimental device |
CN202838736U (en) * | 2012-07-05 | 2013-03-27 | 浙江天煌科技实业有限公司 | Comprehensive training platform for water environment monitoring and control technology |
CN103256608A (en) * | 2013-05-23 | 2013-08-21 | 杭州国泰环保科技有限公司 | Sludge incineration method |
CN203706485U (en) * | 2014-01-08 | 2014-07-09 | 青岛远洋船员职业学院 | Ship ballast water system operation and troubleshooting simulator |
CN204360618U (en) * | 2014-12-17 | 2015-05-27 | 哈尔滨莱特兄弟科技开发有限公司 | Plane simulation training patterns control panel and plane simulation Training Control system |
CN204423675U (en) * | 2015-01-26 | 2015-06-24 | 哈尔滨莱特兄弟科技开发有限公司 | Simulation Air-Conditioning Control Panel |
Also Published As
Publication number | Publication date |
---|---|
CN105096684A (en) | 2015-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105096684B (en) | A kind of sludge of sewage treatment plant incinerator training operation platform | |
CN206924608U (en) | Stench processing system for landfill leachate treatment station | |
CN103713110A (en) | Landfill soil slope unstability centrifugal model testing device based on liquid-gas coupling effect | |
CN205992370U (en) | A kind of boiler plant with Multifunction fluviograph | |
CN200987972Y (en) | Environment protection health type electronic practice work table | |
CN105096676B (en) | A kind of sludge of sewage treatment plant anaerobic digester training operation platform and wire examination method | |
CN206989212U (en) | A kind of industrial waste recycling combustion furnace | |
CN202532492U (en) | Garbage converter | |
CN104633669A (en) | Trash burning chamber structure | |
CN206875441U (en) | A kind of refuse burner | |
CN206556026U (en) | A kind of environment-friendly garbage heating unit | |
CN209028875U (en) | Sludge incinerator simulation system | |
CN204901775U (en) | Msw incineration secondary device that burn -backs | |
CN107543172A (en) | A kind of method of the oxygen-enriched high temperature intelligent control combustion stability of old rubbish | |
CN104402540B (en) | A kind of small towns rubbish solid-liquid separation and fermentation processes pond | |
CN202770816U (en) | Environment-friendly horizontally perpendicular burning test cabinet | |
CN204153782U (en) | Integration garbage classification equipment | |
CN103847380A (en) | Teaching chalk dust collecting system | |
CN206582852U (en) | No-smoke furnace for waste incineration | |
CN205560709U (en) | Biomass fuel furnace equipment | |
CN205551043U (en) | Medicine cabinet | |
CN205216899U (en) | Physics electricity experiment cupboard | |
CN206582856U (en) | Multifunctional furnace arranging device | |
CN108861214A (en) | A kind of smokeless dustbin of cell using the first dirty processing of electric energy | |
CN207214054U (en) | The refuse disposal installation of tipping bucket ash discharge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |