CN105096684B - A kind of sludge of sewage treatment plant incinerator training operation platform - Google Patents

A kind of sludge of sewage treatment plant incinerator training operation platform Download PDF

Info

Publication number
CN105096684B
CN105096684B CN201510495689.4A CN201510495689A CN105096684B CN 105096684 B CN105096684 B CN 105096684B CN 201510495689 A CN201510495689 A CN 201510495689A CN 105096684 B CN105096684 B CN 105096684B
Authority
CN
China
Prior art keywords
icon
machine
air
incinerator
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510495689.4A
Other languages
Chinese (zh)
Other versions
CN105096684A (en
Inventor
裘湛
张剑峰
麦穗海
舒德
宣建岚
庞敏
庞一敏
康海
林邦辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Chengtou Waste Water Treatment Co Ltd
Original Assignee
Shanghai Chengtou Waste Water Treatment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Chengtou Waste Water Treatment Co Ltd filed Critical Shanghai Chengtou Waste Water Treatment Co Ltd
Priority to CN201510495689.4A priority Critical patent/CN105096684B/en
Publication of CN105096684A publication Critical patent/CN105096684A/en
Application granted granted Critical
Publication of CN105096684B publication Critical patent/CN105096684B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of sludge of sewage treatment plant incinerator training operation platform, there is the controller of Experimental Management software including bottom plate and operation, bottom plate front upper is embedded with touch-screen, layered material pressure difference simulative display table, furnace roof negative pressure simulative display table, air-introduced machine A numerical simulation display tables and the air-introduced machine B numerical simulation display tables being electrically connected with the controller;Bottom plate front bottom is painted with the process chart of incinerator and embedded with digital display meter, operation button, tune rotation button and the simulation pipeline indicator lamp being electrically connected with the controller;The controller is arranged on the bottom plate back side.When student carries out training operation, the operating procedure of student is automatically recorded in software systems, and operation completion click is handed in an examination paper after button, and all operationss step of student can be automatically displayed on touch-screen system interface, and contrasted with answer database, automatically derived real training achievement.This programme is applied to the teaching and examination of sludge incinerator operation.

Description

A kind of sludge of sewage treatment plant incinerator training operation platform
Technical field
The present invention relates to simulated teaching checking system, more particularly, to a kind of sludge of sewage treatment plant incinerator training operation Platform.
Background technology
In recent years, with developing rapidly for national economy and stepping up for living standards of the people, the place of sewage treatment plant Reason degree improves rapidly, and while sewage is purified, the polluter in sewage is separated as sludge, that is, It is accessory substance caused by sewage treatment plant's purification sewage to say sludge.Sludge of sewage treatment plant complicated component, property more containing organic matter Matter is unstable, easily degenerates smelly, heavy metal, the content height of hazardous contaminant, containing pathogen and parasitic ovum etc., if arbitrarily Serious harm will be produced without effectively handling disposal to environment by stacking, and specific resistance to filtration problem is more and more closed Note.
Sludge incineration is most thoroughly method for sludge treatment, compared with other method for sludge treatment, the advantages of burning All it is carbonized in the organic matter in it can make sludge, reduces sludge volume to greatest extent, its product is sterile, odorless inorganic Residue, sterileization of sludge and the purpose of minimizing are realized rapidly.And sludge incineration facility floor space is small, Automated water Flat height, is influenceed smaller by external environmental condition.
Main sludge incineration facilities and equipment domestic at present is mostly that foreign countries introduce, merely by the training of original sewage treatment plant Project has not met real Treatment of Sludge requirement.Therefore, a kind of new sludge incinerator training operation platform is researched and developed, at sludge Science and engineering is targetedly trained, and is had for the development and environmental protection energy-saving and emission-reduction for promoting Treatment of Sludge industry important Realistic meaning.
The content of the invention
The present invention mainly solves the suitable sludge incinerator simulated teaching checking system of shortage present in prior art Technical problem, there is provided it is a kind of can be with altitude simulation incinerator execute-in-place, the sewage treatment plant suitable for imparting knowledge to students and examining Sludge incinerator training operation platform.
The present invention is mainly what is be addressed by following technical proposals for above-mentioned technical problem:A kind of sewage treatment plant Sludge incinerator training operation platform, including bottom plate and operation have the controller of Experimental Management software, bottom plate front upper setting-in There are touch-screen, layered material pressure difference simulative display table, furnace roof negative pressure simulative display table, air-introduced machine A numerical simulation display tables and air inducing Machine B numerical simulations show table;Bottom plate front bottom be painted with the process chart of incinerator and embedded with digital display meter, operation button, Adjust rotation button and simulation pipeline indicator lamp;The controller is arranged on the bottom plate back side, touch-screen, layered material pressure difference simulative display Table, furnace roof negative pressure simulative display table, air-introduced machine A numerical simulations show that table, air-introduced machine B numerical simulations show table, digital display meter, operation Button, adjusting knob and simulation pipeline indicator lamp are all electrically connected with the controller.
Whole training operation platform uses suspension type plate profile structure, and real training is to hang over after plug-in to make on corresponding support With.Bottom plate uses irony bilayer matt fine groove plastic-spraying structure.The layered material pressure difference of layered material pressure difference simulative display table display simulation, The furnace roof negative pressure value of furnace roof negative pressure simulative display table display simulation, air-introduced machine A numerical simulations show the air-introduced machine A of table display simulation Parameter, air-introduced machine B numerical simulations show table display simulation air-introduced machine B parameter.
Preferably, the digital display meter includes furnace roof oxygen amount value simulative display table, fire box temperature value simulative display table, air compartment Temperature simulation shows that table, primary air flow wind value simulative display table and pressure feeding spiral numerical value show table.
Preferably, process chart include disintegrating machine icon, coal bunker icon, tramp iron separator icon, dewatered sludge feed bin icon, Incinerator icon, spray column icon, sack cleaner icon, primary air fan icon, air-introduced machine A icons, air-introduced machine B icons, cigarette Chimney icon and heat-conducting oil system analog module, the disintegrating machine icon connect coal bunker icon, tramp iron separator figure by simulating pipeline Mark is connected by simulating pipeline connection dewatered sludge feed bin icon, coal bunker icon and dewatered sludge feed bin icon by simulating feed pipeline Incinerator icon, incinerator icon connect spray column icon by simulating pipeline, and spray column icon connects cloth by simulating pipeline Bag dust collector icon, sack cleaner icon is by simulating pipeline distribution connection air-introduced machine A icons and air-introduced machine B icons, air inducing Machine A icons all connect chimney icon with air-introduced machine B icons by simulating pipeline, and heat-conducting oil system analog module is by simulating pipeline Connect incinerator icon.
Each icon on process chart corresponds with each equipment in actual incinerator system.
Preferably, simulation pipeline indicator lamp is installed, even on the simulation pipeline of connection disintegrating machine icon and coal bunker icon Connect and simulation pipeline indicator lamp is installed on the simulation pipeline of tramp iron separator icon and dewatered sludge feed bin icon.
Simulating pipeline indicator lamp, to be used for instruction simulation pipeline unobstructed or close.
Preferably, operation button include with primary air fan icon corresponding to primary air fan button, corresponding with coal bunker icon Coal bunker button, dewatered sludge feed bin button corresponding with dewatered sludge feed bin, disintegrating machine button corresponding with disintegrating machine icon, with removing Tramp iron separator button corresponding to ironware icon, air-introduced machine A buttons corresponding with air-introduced machine A icons and corresponding with air-introduced machine B icons Air-introduced machine B buttons;Adjusting knob includes feed adjusting knob, furnace roof oxygen flow regulation knob and primary air fan air quantity adjusting knob.
Operation button is used for the switch for the equipment for controlling corresponding icon to be simulated.
Preferably, heat-conducting oil system analog module includes filling pump icon, conduction oil Lower tank icon, high-order expansion drum Icon, oil cooler icon, drying machine icon, threeway icon, the first pump machine icon, the second pump machine icon and the 3rd pump machine figure Mark;By simulating, pipeline connects conduction oil Lower tank icon to filling pump icon and high-order expansion drum, conduction oil Lower tank icon lead to Cross simulation pipeline and connect high-order expansion drum icon, high-order expansion drum icon connects threeway icon, the first pump machine by simulating pipeline Icon both ends connect threeway icon and incinerator icon by simulating pipeline respectively, and the second pump machine icon and the 3rd pump machine icon are all In parallel with the first pump machine icon, drying machine icon connects incinerator icon by simulating pipeline, and oil cooler icon passes through simulation Pipeline connects drying machine icon and threeway icon, and heat-conducting oil system analog module is also connected in simulation pipeline including several Switching icons.
Preferably, operation button also include with filling pump icon corresponding to filling pump button, corresponding with drying machine icon Drying machine button, the first pump machine button corresponding with the first pump machine icon, the second pump machine corresponding with the second pump machine icon press Button, the 3rd pump machine button corresponding with the 3rd pump machine icon and with the one-to-one shift knob of each switching icons.
There is Experimental Management software cryptoguard, operating time to record automatically, operating process records automatically and operation order The functions such as answer database.When student carries out training operation, the operating procedure of student is automatically recorded in software systems, behaviour Work completion click is handed in an examination paper after button, and all operationss step of student can be automatically displayed on touch-screen system interface, and and answer Database is contrasted, automatically derived real training achievement.
The substantial effect that the present invention is brought is, have high in technological content, good appearance, installation easy maintenance, it is in light weight, Easy to use, the features such as reliability is high, the real training of a variety of sludge incineration process operations flows can be carried out by the platform And examination, while altitude simulation execute-in-place condition, avoid at the scene training when may be related to facility is set The influence of standby normal operation and safety problem.
The exploitation of this training operation platform makes sewage treatment plant operating personnel systematically to learn to arrive by real training education The knowledge of specific resistance to filtration, practical technique and operative skill, constantly developing development new technology are really grasped, ensures sewage disposal The stable operation of factory is up to standard.Environmental Protection Cause and sustainable development for China make bigger contribution.
Brief description of the drawings
Fig. 1 is a kind of bottom plate front upper structural representation of the present invention;
Fig. 2 is a kind of bottom plate front substructure schematic diagram of the present invention;
In figure:1st, bottom plate, 2, touch-screen, 3, layered material pressure difference simulative display table, 4, furnace roof negative pressure simulative display table, 5, draw Blower fan A numerical simulations show table, 6, air-introduced machine B numerical simulations show table, 7, disintegrating machine icon, 8, coal bunker icon, 9, tramp iron separator Icon, 10, dewatered sludge feed bin icon, 11, incinerator icon, 12, spray column icon, 13, sack cleaner icon, 14, once Blower fan icon, 15, air-introduced machine A icons, 16, air-introduced machine B icons, 17, chimney icon, 18, filling pump icon, 19, conduction oil it is low Position groove icon, 20, high-order expansion drum icon, 21, oil cooler icon, 22, drying machine icon, 23, threeway icon, 24, first Pump machine icon, the 25, second pump machine icon, the 26, the 3rd pump machine icon, 27, furnace roof oxygen amount value simulative display table, 28, fire box temperature Be worth simulative display table, 29, air compartment temperature simulation show table, 30, primary air flow wind value simulative display table, 31, pressure feeding spiral numerical value Show table, 32, simulation pipeline indicator lamp, 33, primary air fan button, 34, coal bunker button, 35, dewatered sludge feed bin button, 36 is broken Machine button, 37, tramp iron separator button, 38, air-introduced machine A buttons, 39, air-introduced machine B buttons, 40, feed adjusting knob, 41, furnace roof oxygen Measure adjusting knob, 42, primary air fan air quantity adjusting knob, 43, filling pump button, 44, drying machine button, the 45, first pump machine is pressed Button, the 46, second pump machine button, the 47, the 3rd pump machine button, 48, shift knob, 49, oil strainer.
Embodiment
Below by embodiment, and with reference to accompanying drawing, technical scheme is described in further detail.
Embodiment:A kind of sludge of sewage treatment plant incinerator training operation platform of the present embodiment, including bottom plate 1 and operation There is the controller of Experimental Management software.As shown in figure 1, bottom plate front upper is embedded with touch-screen 2, layered material pressure difference simulative display Table 3, furnace roof negative pressure simulative display table 4, air-introduced machine A numerical simulations show that table 5 and air-introduced machine B numerical simulations show table 6.Bottom plate is just Face top is also equipped with regulation simulation air-introduced machine A and simulates air-introduced machine B adjusting knob.
As shown in Fig. 2 bottom plate front bottom be painted with the process chart of incinerator and embedded with digital display meter, operation button, Adjust rotation button and simulation pipeline indicator lamp;Controller is arranged on the bottom plate back side, touch-screen, layered material pressure difference simulative display table, stove Push up negative pressure simulative display table, air-introduced machine A numerical simulations show table, air-introduced machine B numerical simulations show table, digital display meter, operation button, Adjusting knob and simulation pipeline indicator lamp are all electrically connected with the controller.
Process chart includes disintegrating machine icon 7, coal bunker icon 8, tramp iron separator icon 9, dewatered sludge feed bin icon 10, burning Stove icon 11, spray column icon 12, sack cleaner icon 13, primary air fan icon 14, air-introduced machine A icons 15, air-introduced machine B figures Mark 16, chimney icon 17 and heat-conducting oil system analog module, the disintegrating machine icon connect coal bunker icon by simulating pipeline, Tramp iron separator icon connects dewatered sludge feed bin icon, coal bunker icon and dewatered sludge feed bin icon by simulating feed by simulating pipeline Pipeline connects incinerator icon, and incinerator icon connects spray column icon by simulating pipeline, and spray column icon is managed by simulating Road connects sack cleaner icon, and sack cleaner icon is schemed by simulating pipeline distribution connection air-introduced machine A icons and air-introduced machine B Mark, air-introduced machine A icons all connect chimney icon with air-introduced machine B icons by simulating pipeline, and heat-conducting oil system analog module passes through Simulate pipeline connection incinerator icon.
Simulation pipeline indicator lamp 32 is installed on the simulation pipeline of connection disintegrating machine icon and coal bunker icon, connects tramp iron separator Simulation pipeline indicator lamp 32 is installed on the simulation pipeline of icon and dewatered sludge feed bin icon.
Heat-conducting oil system analog module includes filling pump icon 18, conduction oil Lower tank icon 19, high-order expansion drum icon 20th, oil cooler icon 21, drying machine icon 22, threeway icon 23, the first pump machine icon 24, the second pump machine icon 25 and the 3rd Pump machine icon 26;Filling pump icon connects conduction oil Lower tank icon and high-order expansion drum, conduction oil low level by simulating pipeline Groove icon connects high-order expansion drum icon by simulating pipeline, and high-order expansion drum icon connects threeway icon by simulating pipeline, First pump machine icon both ends connect threeway icon and incinerator icon, the second pump machine icon and the 3rd pump by simulating pipeline respectively Machine icon is all in parallel with the first pump machine icon, and drying machine icon connects incinerator icon, oil cooler icon by simulating pipeline By simulating, pipeline connects drying machine icon and threeway icon, heat-conducting oil system analog module are also connected on simulation including several Switching icons in pipeline.
Heat-conducting oil system also includes oil strainer icon 49, and oil strainer icon is connected on filling pump icon and conduction oil is low Between the groove icon of position.
Digital display meter includes furnace roof oxygen amount value simulative display table 27, fire box temperature value simulative display table 28, air compartment temperature simulation Show that table 29, primary air flow wind value simulative display table 30 and pressure feeding spiral numerical value show table 31.
Operation button includes primary air fan button 33 corresponding with primary air fan icon, coal bunker corresponding with coal bunker icon is pressed Button 34, dewatered sludge feed bin button 35 corresponding with dewatered sludge feed bin, disintegrating machine button 36 corresponding with disintegrating machine icon and iron removaling Tramp iron separator button 37 corresponding to device icon, with air-introduced machine A icons corresponding to air-introduced machine A buttons 38 and corresponding with air-introduced machine B icons Air-introduced machine B buttons 39;Adjusting knob includes feed adjusting knob 40, furnace roof oxygen flow regulation knob 41 and primary air fan air quantity and adjusted Save knob 42.
Operation button also includes filling pump button 43 corresponding with filling pump icon, drying machine corresponding with drying machine icon Button 44, the first pump machine button 45 corresponding with the first pump machine icon, the second pump machine button 46 corresponding with the second pump machine icon, Corresponding with the 3rd pump machine icon the 3rd pump machine button 47 and shift knob one-to-one with each switching icons 48.
Whole training operation platform uses suspension type plate profile structure, and hanging over during real training can make on corresponding support after plug-in With, have the characteristics that it is simple in construction, easy to use, be easy to safeguard.Training operation platform floor uses irony bilayer matt fine groove Plastic-spraying structure, platform upper are embedded with technical grade touch-screen and incinerator bed of material pressure difference simulative display table, incinerator furnace roof negative pressure Simulative display table, air-introduced machine A numerical simulations show that table, air-introduced machine B numerical simulations show table.Platform lower is furnished with whole incinerator Process chart, comprising disintegrating machine, drying machine, burn furnace main body, blower fan, oil cooler, heat-conducting oil pipes, air compartment temperature display The equipment such as instrument, burner hearth, top temperature display instrument, spray column and air-introduced machine.And simulation pipeline instruction is provided with relevant position Lamp, operation button, adjusting knob and digital displaying meter etc..The platform floor back side is provided with technical grade programmable controller, all to press Button, indicator lamp and digital displaying meter are all acted and simulated according to actual process flow by programmable controller.In the reality The project that real training and examination can be carried out on instruction operating platform has sludge incinerator banking fire and opens stove operation, sludge incinerator fuel On storehouse coal operation, dewatered sludge particle enter incinerator Bunker operation, incinerator fuel Operating condition adjustment operation, Heat-transfer Oil Pump it is daily Handover operation, sludge incineration furnace igniting throw fuel handling, the operation of sludge incinerator Fuel switching, the oiling of heat-conducting oil system behaviour Make, switch fan operation in day-to-day operation.
There is Experimental Management software cryptoguard, operating time to record automatically, operating process records automatically and operation order The functions such as answer database.When student carries out training operation, the operating procedure of student is automatically recorded in software systems, behaviour Work completion click is handed in an examination paper after button, and all operationss step of student can be automatically displayed on touch-screen system interface, and and answer Database is contrasted, automatically derived real training achievement.
It can be examined and the operation that learns includes incinerator banking fire and opens stove operation, coal is grasped on incinerator Bunker Make, dewatered sludge particle enters the operation of incinerator Bunker, the adjustment of incinerator combustion conditions operates, the daily switching of Heat-transfer Oil Pump behaviour Make, burn and cut in furnace igniting throwing fuel handling, the operation of incinerator Fuel switching, the oil injection operation of heat-conducting oil system and day-to-day operation Ventilating fan operates.
Specific embodiment described herein is only to spirit explanation for example of the invention.Technology belonging to the present invention is led The technical staff in domain can be made various modifications or supplement to described specific embodiment or be replaced using similar mode Generation, but without departing from the spiritual of the present invention or surmount scope defined in appended claims.
Although more having used the terms such as controller, digital display meter herein, the possibility using other terms is not precluded from Property.It is used for the purpose of more easily describing and explaining the essence of the present invention using these terms;It is construed as any one Additional limitation is all disagreed with spirit of the present invention.

Claims (6)

1. a kind of sludge of sewage treatment plant incinerator training operation platform, it is characterised in that have real training pipe including bottom plate and operation The controller of software is managed, bottom plate front upper is embedded with touch-screen, layered material pressure difference simulative display table, furnace roof negative pressure simulative display Table, air-introduced machine A numerical simulations show that table and air-introduced machine B numerical simulations show table;The technique that bottom plate front bottom is painted with incinerator Flow chart simultaneously revolves button and simulation pipeline indicator lamp embedded with digital display meter, operation button, tune;The controller is carried on the back installed in bottom plate Face, touch-screen, layered material pressure difference simulative display table, furnace roof negative pressure simulative display table, air-introduced machine A numerical simulations show table, air inducing Machine B numerical simulation displays table, digital display meter, operation button, adjusting knob and simulation pipeline indicator lamp are all electrically connected with the controller;
Process chart includes disintegrating machine icon, coal bunker icon, tramp iron separator icon, dewatered sludge feed bin icon, incinerator icon, spray Drench tower icon, sack cleaner icon, primary air fan icon, air-introduced machine A icons, air-introduced machine B icons, chimney icon and heat conduction Oil system analog module, the disintegrating machine icon connect coal bunker icon by simulating pipeline, and tramp iron separator icon is by simulating pipeline Connect dewatered sludge feed bin icon, coal bunker icon and dewatered sludge feed bin icon and connect incinerator icon by simulating feed pipeline, burn Burning stove icon and connect spray column icon by simulating pipeline, spray column icon connects sack cleaner icon by simulating pipeline, Sack cleaner icon is by simulating pipeline distribution connection air-introduced machine A icons and air-introduced machine B icons, air-introduced machine A icons and air inducing Machine B icons all connect chimney icon by simulating pipeline, and heat-conducting oil system analog module connects incinerator figure by simulating pipeline Mark.
2. a kind of sludge of sewage treatment plant incinerator training operation platform according to claim 1, it is characterised in that described Digital display meter includes furnace roof oxygen amount value simulative display table, fire box temperature value simulative display table, air compartment temperature simulation and shows table, First air Measure wind value simulative display table and pressure feeding spiral numerical value shows table.
A kind of 3. sludge of sewage treatment plant incinerator training operation platform according to claim 1, it is characterised in that connection Simulation pipeline indicator lamp is installed on the simulation pipeline of disintegrating machine icon and coal bunker icon, connects tramp iron separator icon and dewatered sludge material Simulation pipeline indicator lamp is installed on the simulation pipeline of storehouse icon.
A kind of 4. sludge of sewage treatment plant incinerator training operation platform according to claim 1 or 3, it is characterised in that Operation button includes primary air fan button corresponding with primary air fan icon, coal bunker button corresponding with coal bunker icon, with doing dirt Dewatered sludge feed bin button corresponding to pug storehouse, disintegrating machine button corresponding with disintegrating machine icon, corresponding with tramp iron separator icon remove Ironware button, air-introduced machine A buttons corresponding with air-introduced machine A icons and air-introduced machine B buttons corresponding with air-introduced machine B icons;Regulation Knob includes feed adjusting knob, furnace roof oxygen flow regulation knob and primary air fan air quantity adjusting knob.
A kind of 5. sludge of sewage treatment plant incinerator training operation platform according to claim 4, it is characterised in that heat conduction Oil system analog module includes filling pump icon, conduction oil Lower tank icon, high-order expansion drum icon, oil cooler icon, dry Dry machine icon, threeway icon, the first pump machine icon, the second pump machine icon and the 3rd pump machine icon;Filling pump icon passes through simulation Pipeline connects conduction oil Lower tank icon and high-order expansion drum, and conduction oil Lower tank icon is by simulating the high-order expansion of pipeline connection Tank icon, high-order expansion drum icon connect threeway icon by simulating pipeline, and the first pump machine icon both ends are managed by simulating respectively Road connects threeway icon and incinerator icon, and the second pump machine icon and the 3rd pump machine icon are all in parallel with the first pump machine icon, does Dry machine icon connects incinerator icon by simulating pipeline, and oil cooler icon connects drying machine icon and three by simulating pipeline Logical icon, heat-conducting oil system analog module also include several switching icons being connected in simulation pipeline.
A kind of 6. sludge of sewage treatment plant incinerator training operation platform according to claim 5, it is characterised in that operation Button also includes filling pump button corresponding with filling pump icon, drying machine button corresponding with drying machine icon and the first pump First pump machine button corresponding to machine icon, with the second pump machine icon corresponding to the second pump machine button, corresponding with the 3rd pump machine icon The 3rd pump machine button and with the one-to-one shift knob of each switching icons.
CN201510495689.4A 2015-08-12 2015-08-12 A kind of sludge of sewage treatment plant incinerator training operation platform Active CN105096684B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510495689.4A CN105096684B (en) 2015-08-12 2015-08-12 A kind of sludge of sewage treatment plant incinerator training operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510495689.4A CN105096684B (en) 2015-08-12 2015-08-12 A kind of sludge of sewage treatment plant incinerator training operation platform

Publications (2)

Publication Number Publication Date
CN105096684A CN105096684A (en) 2015-11-25
CN105096684B true CN105096684B (en) 2017-11-24

Family

ID=54576994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510495689.4A Active CN105096684B (en) 2015-08-12 2015-08-12 A kind of sludge of sewage treatment plant incinerator training operation platform

Country Status (1)

Country Link
CN (1) CN105096684B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108877366B (en) * 2018-05-10 2022-07-15 上海城投污水处理有限公司 Sewage treatment detection analysis examination system
CN108766094B (en) * 2018-07-13 2024-04-05 上海城投污水处理有限公司 Sludge incinerator simulation system
CN108646590A (en) * 2018-07-13 2018-10-12 上海城投污水处理有限公司 It is fed the simulation system of distributor
CN108922362B (en) * 2018-07-13 2024-03-01 上海城投污水处理有限公司 Sludge dryer simulation system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101201989A (en) * 2007-12-18 2008-06-18 徐州工业职业技术学院 Multifunctional automatization biological sewage treatment composite experimental device
CN202838736U (en) * 2012-07-05 2013-03-27 浙江天煌科技实业有限公司 Comprehensive training platform for water environment monitoring and control technology
CN103256608A (en) * 2013-05-23 2013-08-21 杭州国泰环保科技有限公司 Sludge incineration method
CN203706485U (en) * 2014-01-08 2014-07-09 青岛远洋船员职业学院 Ship ballast water system operation and troubleshooting simulator
CN204360618U (en) * 2014-12-17 2015-05-27 哈尔滨莱特兄弟科技开发有限公司 Plane simulation training patterns control panel and plane simulation Training Control system
CN204423675U (en) * 2015-01-26 2015-06-24 哈尔滨莱特兄弟科技开发有限公司 Simulation Air-Conditioning Control Panel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101201989A (en) * 2007-12-18 2008-06-18 徐州工业职业技术学院 Multifunctional automatization biological sewage treatment composite experimental device
CN202838736U (en) * 2012-07-05 2013-03-27 浙江天煌科技实业有限公司 Comprehensive training platform for water environment monitoring and control technology
CN103256608A (en) * 2013-05-23 2013-08-21 杭州国泰环保科技有限公司 Sludge incineration method
CN203706485U (en) * 2014-01-08 2014-07-09 青岛远洋船员职业学院 Ship ballast water system operation and troubleshooting simulator
CN204360618U (en) * 2014-12-17 2015-05-27 哈尔滨莱特兄弟科技开发有限公司 Plane simulation training patterns control panel and plane simulation Training Control system
CN204423675U (en) * 2015-01-26 2015-06-24 哈尔滨莱特兄弟科技开发有限公司 Simulation Air-Conditioning Control Panel

Also Published As

Publication number Publication date
CN105096684A (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN105096684B (en) A kind of sludge of sewage treatment plant incinerator training operation platform
CN206924608U (en) Stench processing system for landfill leachate treatment station
CN103713110A (en) Landfill soil slope unstability centrifugal model testing device based on liquid-gas coupling effect
CN205992370U (en) A kind of boiler plant with Multifunction fluviograph
CN200987972Y (en) Environment protection health type electronic practice work table
CN105096676B (en) A kind of sludge of sewage treatment plant anaerobic digester training operation platform and wire examination method
CN206989212U (en) A kind of industrial waste recycling combustion furnace
CN202532492U (en) Garbage converter
CN104633669A (en) Trash burning chamber structure
CN206875441U (en) A kind of refuse burner
CN206556026U (en) A kind of environment-friendly garbage heating unit
CN209028875U (en) Sludge incinerator simulation system
CN204901775U (en) Msw incineration secondary device that burn -backs
CN107543172A (en) A kind of method of the oxygen-enriched high temperature intelligent control combustion stability of old rubbish
CN104402540B (en) A kind of small towns rubbish solid-liquid separation and fermentation processes pond
CN202770816U (en) Environment-friendly horizontally perpendicular burning test cabinet
CN204153782U (en) Integration garbage classification equipment
CN103847380A (en) Teaching chalk dust collecting system
CN206582852U (en) No-smoke furnace for waste incineration
CN205560709U (en) Biomass fuel furnace equipment
CN205551043U (en) Medicine cabinet
CN205216899U (en) Physics electricity experiment cupboard
CN206582856U (en) Multifunctional furnace arranging device
CN108861214A (en) A kind of smokeless dustbin of cell using the first dirty processing of electric energy
CN207214054U (en) The refuse disposal installation of tipping bucket ash discharge

Legal Events

Date Code Title Description