CN105089146A - Plant integrated green building system and construction method thereof - Google Patents
Plant integrated green building system and construction method thereof Download PDFInfo
- Publication number
- CN105089146A CN105089146A CN201510512643.9A CN201510512643A CN105089146A CN 105089146 A CN105089146 A CN 105089146A CN 201510512643 A CN201510512643 A CN 201510512643A CN 105089146 A CN105089146 A CN 105089146A
- Authority
- CN
- China
- Prior art keywords
- steel structure
- structure frame
- enhancing non
- building system
- built
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Building Environments (AREA)
Abstract
The invention provides a plant integrated green building system and a construction method thereof. The plant integrated green building system comprises a steel structure frame, inorganic reinforcement detachment-free formworks and foaming concrete. Grouting openings are formed in the bottom face and the top layer of the steel structure frame respectively. The upper and lower (inner and outer) surfaces of the steel structure frame are covered with the two inorganic reinforcement detachment-free formworks. The foaming concrete is poured in the portion, between the two inorganic reinforcement detachment-free formworks, of the steel structure frame. A plurality of exhaust holes are formed in the inorganic reinforcement detachment-free formworks. By means of the exhaust holes, exhausting during pouring is facilitated, and the pouring situation can be conveniently observed. The whole building system is excellent in fireproof performance, the fire-resistant soft spot of the steel structure can be increased to 1500 DEG C from 700 DEG C, the gas tightness is high, the steel structure can be wrapped in the vacuum state, no oxidation damage is caused, no mould or worm damage is caused especially in tropics, and the plant integrated green building system and the construction method have the advantages of being low in manufacturing cost, quick in construction, free of pollution and low in energy consumption.
Description
Technical field
The present invention relates to technical field of building construction, be specifically related to a kind of factory integration Green Architecture System and construction method thereof.
Background technology
Integration green building, refers to the new builing structure system integrating building heat preservation heat insulating function and body of wall Support Function, body of wall and do not need to take Insulation can meet Current Building ' energy conservation standard separately and require.Factory's integration green building is based on steel work, and floor, top board and side fascia use calcium silicate board; Inner-outer wall and top board cavity are built by cement foamed, make steel work be in protection state, make building disposable one-body molded, not only can reduce body of wall area occupied, reduce building costs, shorten construction period, effects of energy saving and emission reduction and building sound insulation value can also be improved.
Light steel wall is the structural skeleton setting up integrated green building, the structural element such as the light steel quarter bend of general employing, C-type steel or light steel truss structure composition pillar, body of wall, beam, the whole skeleton of building structure of further formation, again at the both sides laying structure surface layer of wall skeleton, and then do architectural surface, the whole house of final formation.There is a lot of problems in existing light steel wall, steel work contacts with air, easily there is oxidation damage, be especially easy to occur phenomenon of damaging by worms of going mouldy in torrid areas, cause shorten application life, in addition working procedure is various, speed of application is slow, and can not embody the feature of lightweight steel construction fast construction, mechanical strength and the crack resistance of existing light steel wall panel are undesirable, its bearing capacity can not provide the effect of structural slab by greatly reducing, significantly limit the application of inside/outside decorative material.
Summary of the invention
The invention provides a kind of factory integration Green Architecture System and construction method thereof, to solve that the steel work oxidation that prior art exists is impaired, working procedure is various, speed of application is slow and the mechanical strength of panel and the undesirable problem of crack resistance.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of factory integration Green Architecture System, comprise steel structure frame, inorganic enhancing non-dismantling formwork and foamed concrete, steel structure frame bottom surface and top layer arrange grouting port respectively, two inorganic enhancing non-dismantling formworks are coated on steel structure frame (inside and outside) surface up and down, the steel structure frame that foamed concrete is built in the middle of two inorganic enhancing non-dismantling formworks is inner, and inorganic enhancing non-dismantling formwork arranges some exhausts and observe the steam vent of situation of building when being convenient to build.
The construction method of above-mentioned factory integration Green Architecture System, concrete grammar step is as follows:
(1) assemble: with structural silicone adhesive, inorganic enhancing non-dismantling formwork is bonded on steel structure frame, and fixes with screw special;
(2) build: use foamed concrete placing installation to be built the steel structure frame inside in the middle of inorganic enhancing non-dismantling formwork by the grouting port of steel structure frame bottom surface and top layer according to the size of the area of the requirement of design drawing and monolithic operation template, body of wall four sides is by building highly in batches;
(3) maintenance: after having built, warning mark should be set up outside casting area, forbid people or thing to reach again advancing into of execution conditions at MS combined wall, and body of wall should be covered having built in rear 12h, with moisture-keeping maintaining, the time of maintenance must not be less than 14 days.
Building system entirety of the present invention is set fire function admirable, the fire-resistant soft spots of steel work can be brought up to 1500 degree from 700 degree, tightness is good, steel work is coated on vacuum state, non-oxidation is destroyed, especially in the torrid zone without going mouldy, free from insect pests, have that cost is low, the advantage of fast and pollution-free low power consuming of constructing.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is the structural representation of building system of the present invention.
1 steel structure frame, 2 grouting ports, 3 steam vents, 4 foamed concretes, 5 inorganic enhancing non-dismantling formworks in figure.
Detailed description of the invention
As shown in the figure: a kind of factory integration Green Architecture System, comprise steel structure frame 1, inorganic enhancing non-dismantling formwork 5 and foamed concrete 4, steel structure frame 1 bottom surface and top layer arrange grouting port 2 respectively, two inorganic enhancing non-dismantling formworks 5 are coated on steel structure frame 1 upper and lower surface, the steel structure frame 1 that foamed concrete 4 is built in the middle of two inorganic enhancing non-dismantling formworks 5 is inner, and inorganic enhancing non-dismantling formwork 5 arranges some exhausts and observe the steam vent 3 of situation of building when being convenient to build.
The construction method of above-mentioned factory integration Green Architecture System, concrete grammar step is as follows:
(1) assemble: with structural silicone adhesive, inorganic enhancing non-dismantling formwork is bonded on steel structure frame, and fixing with special-purpose metal nail;
(2) build: use foamed concrete placing installation to be built the steel structure frame inside in the middle of inorganic enhancing non-dismantling formwork by the grouting port of steel structure frame bottom surface and top layer according to the size of the area of the requirement of design drawing and monolithic operation template, body of wall four sides is by building highly in batches;
(3) maintenance: after having built, warning mark should be set up outside casting area, forbid people or thing to reach again advancing into of execution conditions at MS combined wall, and body of wall should be covered having built in rear 12h, with moisture-keeping maintaining, the time of maintenance must not be less than 14 days.
Claims (2)
1. factory's integration Green Architecture System, it is characterized in that comprising steel structure frame, inorganic enhancing non-dismantling formwork and foamed concrete, steel structure frame bottom surface and top layer arrange grouting port respectively, two inorganic enhancing non-dismantling formworks are coated on steel structure frame (inside and outside) surface up and down, the steel structure frame that foamed concrete is built in the middle of two inorganic enhancing non-dismantling formworks is inner, and inorganic enhancing non-dismantling formwork arranges some exhausts and observe the steam vent of situation of building when being convenient to build.
2. the construction method of factory according to claim 1 integration Green Architecture System, is characterized in that concrete grammar step is as follows:
(1) assemble: with structural silicone adhesive, inorganic enhancing non-dismantling formwork is bonded on steel structure frame, and fixing with special-purpose metal nail;
(2) build: use foamed concrete placing installation to be built the steel structure frame inside in the middle of inorganic enhancing non-dismantling formwork by the grouting port of steel structure frame bottom surface and top layer according to the size of the area of the requirement of design drawing and monolithic operation template, body of wall four sides is by building highly in batches;
(3) maintenance: after having built, warning mark should be set up outside casting area, forbid people or thing to reach again advancing into of execution conditions at MS combined wall, and body of wall should be covered having built in rear 12h, with moisture-keeping maintaining, the time of maintenance must not be less than 14 days.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510512643.9A CN105089146A (en) | 2015-08-17 | 2015-08-17 | Plant integrated green building system and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510512643.9A CN105089146A (en) | 2015-08-17 | 2015-08-17 | Plant integrated green building system and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105089146A true CN105089146A (en) | 2015-11-25 |
Family
ID=54570402
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510512643.9A Pending CN105089146A (en) | 2015-08-17 | 2015-08-17 | Plant integrated green building system and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105089146A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088452A (en) * | 2016-07-01 | 2016-11-09 | 缙云县石城文化研究中心 | Exempt to fit up wallboard and preparation method thereof |
CN106522406A (en) * | 2016-11-18 | 2017-03-22 | 哈尔滨鸿盛房屋节能体系研发中心 | Assembly type cast-in-place concrete exterior thermal insulation wall steel skeleton framework system and connecting piece |
CN108035439A (en) * | 2017-12-18 | 2018-05-15 | 湘潭大学 | A kind of rapid coagulation soil assembling type node and its construction method |
CN109505366A (en) * | 2016-07-25 | 2019-03-22 | 崔日盛 | Double measure heat-insulation and heat-preservation brick-less wall |
CN109518839A (en) * | 2019-01-12 | 2019-03-26 | 王宗平 | Foamed cement wall exempts from demoulding integration perfusion technique |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2457716A1 (en) * | 2004-02-16 | 2005-08-16 | Michelange Panzini | System and method for erecting buildings, and buildings thereof |
CN101560797A (en) * | 2009-06-02 | 2009-10-21 | 筑巢(北京)科技有限公司 | Wall body of light steel structure and construction method thereof |
CN201588316U (en) * | 2009-09-11 | 2010-09-22 | 闫振甲 | Fire-proof and self-heat insulating structure of cast-in-place foam concrete of wall with steel structure and concrete frame structure |
CN102425265A (en) * | 2011-09-10 | 2012-04-25 | 威海建设集团股份有限公司 | High-performance composite wallboard, manufacturing method thereof, and installation method thereof |
CN204531076U (en) * | 2015-03-30 | 2015-08-05 | 山东美森环保科技有限公司 | Light steel latticework cast-in-place foamed concrete combined wall |
-
2015
- 2015-08-17 CN CN201510512643.9A patent/CN105089146A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2457716A1 (en) * | 2004-02-16 | 2005-08-16 | Michelange Panzini | System and method for erecting buildings, and buildings thereof |
CN101560797A (en) * | 2009-06-02 | 2009-10-21 | 筑巢(北京)科技有限公司 | Wall body of light steel structure and construction method thereof |
CN201588316U (en) * | 2009-09-11 | 2010-09-22 | 闫振甲 | Fire-proof and self-heat insulating structure of cast-in-place foam concrete of wall with steel structure and concrete frame structure |
CN102425265A (en) * | 2011-09-10 | 2012-04-25 | 威海建设集团股份有限公司 | High-performance composite wallboard, manufacturing method thereof, and installation method thereof |
CN204531076U (en) * | 2015-03-30 | 2015-08-05 | 山东美森环保科技有限公司 | Light steel latticework cast-in-place foamed concrete combined wall |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088452A (en) * | 2016-07-01 | 2016-11-09 | 缙云县石城文化研究中心 | Exempt to fit up wallboard and preparation method thereof |
CN109505366A (en) * | 2016-07-25 | 2019-03-22 | 崔日盛 | Double measure heat-insulation and heat-preservation brick-less wall |
CN106522406A (en) * | 2016-11-18 | 2017-03-22 | 哈尔滨鸿盛房屋节能体系研发中心 | Assembly type cast-in-place concrete exterior thermal insulation wall steel skeleton framework system and connecting piece |
CN108035439A (en) * | 2017-12-18 | 2018-05-15 | 湘潭大学 | A kind of rapid coagulation soil assembling type node and its construction method |
CN109518839A (en) * | 2019-01-12 | 2019-03-26 | 王宗平 | Foamed cement wall exempts from demoulding integration perfusion technique |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7913469B2 (en) | Concrete load-bearing wall with compound heat-insulating layer | |
CN105089146A (en) | Plant integrated green building system and construction method thereof | |
ATE300641T1 (en) | PREFABRICATED CONCRETE Slab FOR PRODUCING CEILINGS IN CIVIL OR INDUSTRIAL CONSTRUCTION | |
CN204531076U (en) | Light steel latticework cast-in-place foamed concrete combined wall | |
CN103255860A (en) | On-site concrete shear wall structure with permanent heat insulation formwork and construction process of on-site concrete shear wall structure | |
CN103132633A (en) | Permanent shuttering cast-in-place extra light concrete self-insulation composite wall body and construction technology | |
CN106836526A (en) | Prefabricated reinforced concrete composite thermal-insulation external wall panel and its making and installation method | |
CN103669707A (en) | Light composite prefabricated wallboard for house and preparation method thereof | |
CN106759994A (en) | A kind of warming plate with arrangement of reinforcement and its thermal insulation structure construction method in exterior wall concrete section position | |
CN209854976U (en) | Assembled heat preservation brickwork wall | |
CN101392588A (en) | Frame special for thermal insulation decorative integration plate | |
CN2898156Y (en) | Precast prestressed concrete hollow decorative wall board with thermal-insulating function | |
CN106638978B (en) | The node structure of the prefabricated load-bearing wall panel combination light weight steel frames of assembled PC | |
CN114086686A (en) | Welded light steel frame foamed concrete self-insulation shear wall system and construction method | |
CN203640072U (en) | Composite thermal insulation board | |
CN202899343U (en) | Composite wall body formed by foam concrete self-insulation modules with built-in cores | |
CN202298989U (en) | Poured lattice self-heat-insulating wall formwork | |
CN207794429U (en) | Assembled integral composite interior wallboard | |
CN201190348Y (en) | Peripheral revetment suitable for energy-conserving building | |
CN104251026A (en) | Inorganic fireproof self-heat-insulation system with fully externally enclosed and built cast-in-situ walls | |
CN104295116A (en) | Heat-preservation and energy-saving house building method | |
CN211200990U (en) | Decoration system integrated with construction of outer wall structure | |
CN210342318U (en) | Energy-saving refractory wall | |
CN108589980A (en) | Integrated prefabricated Side fascia of PSC light thermal-insulating decorating structures and preparation method thereof | |
CN104100110A (en) | Construction method of large production plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151125 |