CN105081281A - Metal mold low-pressure casting process for cast-aluminum gearbox body of high-speed train - Google Patents
Metal mold low-pressure casting process for cast-aluminum gearbox body of high-speed train Download PDFInfo
- Publication number
- CN105081281A CN105081281A CN201510534648.1A CN201510534648A CN105081281A CN 105081281 A CN105081281 A CN 105081281A CN 201510534648 A CN201510534648 A CN 201510534648A CN 105081281 A CN105081281 A CN 105081281A
- Authority
- CN
- China
- Prior art keywords
- casting
- core
- mold
- pressure
- mould
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Molds, Cores, And Manufacturing Methods Thereof (AREA)
Abstract
The invention provides a metal mold low-pressure casting process for a cast-aluminum gearbox body of a high-speed train. The process comprises the following steps of S1, three-dimensional modeling; S2, determining of casting process parameters; S3, drawing of a cast blank three-dimensional drawing and determining of a final casting process scheme; S4, design of the modeling of a casting mold; S5, manufacturing of a metal mold low-pressure mold and an inner-cavity resin sand hot box mold; S6, pressing of inner-cavity sand cores, maze sand cores, oil return groove sand cores and oil baffle sand cores of a resin sand gearbox; S7, preheating of the whole molds; S8, adding of smelted casting alloy material into a low-pressure casting machine maintaining furnace; S9, mounting of the inner-cavity sand cores, the maze sand cores, the oil return groove sand cores and the oil baffle sand cores manufactured in S6 on a low-pressure casting machine; S10, product pouring according to the casting process parameters obtained through S2; and S11, obtaining of a final product after T6 thermal treatment on a product obtained in S10. The casting cast through the process is compact in structure, clear in contour, smooth in inner and outer surface, stable in mechanical property and good in size stability and uniformity.
Description
Technical field
The present invention relates to cast aluminium gear-box casting technology field, particularly relate to a kind of bullet train cast aluminium gear case body metal-mold low-pressure casting technique.
Background technology
Along with the high speed development of World Economics, the continuous deterioration of global energy, environmental problem, in the face of day by day serious traffic congestion, bullet train is fast with speed, carrying capacity large, low energy consumption, low emission, the trip vehicles that are popular, safety and comfort environmental protection obtain develop rapidly.China's high ferro all reaches advanced international standard in bullet train manufacture, the construction of high speed railway foundation facility and high-speed railway operation management etc.But as bullet train core component gear box height dependence on import, the Zoomlion such as German, Japanese is just firmly in occupation of Chinese market.According to relevant report, German old brand gear-box Fu Yite supplies the gear case body of Chinese high ferro EMUs vehicle, occurs a lot of faults such as crackle, oil impregnate, hot box continuously, and Chinese Railway parent company has required that vehicle manufacturers is suspended and used Fu Yite gear-box.The embarrassment that gear-box of stopping using will be replaced without suitable spare and accessory parts in time to Chinese bullet train EMUs Design and manufacture, bullet train generation and operation, existing train, so the production domesticization of Chinese gear box of high-speed train is extremely urgent.
Gear case body is the critical component ensureing bullet train continuous service, be high ferro machine driving core component, required precision be high, manufacture difficulty is large, bearing load is large, work under bad environment and train high-speed cruising time bear very complicated alternate stress.Alleviating light weight object to reach in recent years, successfully being adopted by gear case body the aluminium alloy of high strength to replace cast-iron alloy both at home and abroad.Domestic and international cast aluminium gear case body is all adopt core casting, and the shortcoming due to core casting technique mode itself governs the lifting of cast aluminium gear case body performance always.Particularly important and urgent in order to produce a kind of new aluminum alloy casting technique method of performance better cast aluminium gear case body research.
Summary of the invention
In order to solve the technical problem existed in background technology, the present invention proposes a kind of bullet train cast aluminium gear case body metal-mold low-pressure casting technique, casting cast structure densification out, clear-cut, surfaces externally and internally are bright and clean, stable mechanical performance, inner chamber oil-recovery tank, lubrication groove, labyrinth, oil baffle be shaped more clear, dimensionally stable uniformity is good, and the lightweight allowance of blank is few, and casting yield rate is high.
A kind of bullet train cast aluminium gear case body metal-mold low-pressure casting technique that the present invention proposes, comprises the steps:
S1, according to the three-dimensional modeling of S1 and in conjunction with metal-mold low-pressure casting technique determination casting technological parameter;
S3, the casting technological parameter drafting spray three-dimensional determined according to S2, the casting technological parameter according to spray three-dimensional and in conjunction with the determination of S2 carries out mold flow analysis, determines final casting process scheme and final casting blank three-dimensional;
S4, three-dimensional and in conjunction with metal-mold low-pressure casting die feature and device parameter according to the final casting process scheme of S3, final casting blank, the moulding of design casting mould;
S5, the casting mould moulding designed according to S4 manufacture metal mold low pressure mould and inner chamber resin sand hot core box mould;
S6, the hot box core mold compacting resin sand gear-box inner chamber core manufactured with S5, labyrinth core, oil-recovery tank core, oil baffle core, then fireproof coating in core surface brush;
S7, the metal mold low pressure mould completed by S5 carry out blasting treatment, are installed on low pressure casting board, then to whole mould and die preheating, and to mould molding position spray paint;
S8, according to metal-mold low-pressure casting technique, the cast alloy materials after melting is added in low pressure casting machine holding furnace;
S9, the inner chamber core produced by S6, labyrinth core, oil-recovery tank core, oil baffle core are arranged on air injection machine;
S10, according to the casting technological parameter of S2 cast product;
S11, according to the characteristic of cast alloy materials, T6 heat treatment is carried out to the product of S10 and obtain final products.
Preferably, in S2, technological parameter comprises alloy material chemical composition, running gate system, allowance and die joint.
Preferably, in S7, according to metal-mold low-pressure casting technique subregion to metal-mold low-pressure casting mould and die preheating, make mould from top to bottom temperature decline gradually, ensure that casting mould inlet temperature is 380 DEG C-400 DEG C, Die head temperatures is 300 DEG C-320 DEG C; Even spraying wanted by coating, makes paint thickness and heat insulating ability according to order from top to bottom from thick to thin, from strong to weak, the thickness of coating is 0.2-0.5mm.
Preferably, in S8, the absolute density adding the cast alloy materials in low pressure casting machine holding furnace is 2.63-2.67g/cm
2.
Preferably, further comprising the steps of:
S12, according to casting techniques require to the final products in S11 carry out dimension control, surface fluorescence flaw detection, significant points x-ray inspection.
Preferably, further comprising the steps of:
S13, deburring process and shotblasting are carried out to the product be up to the standards in S12.
Preferably, in S10, the temperature of product cast is at 720 DEG C-740 DEG C, and mold filling pressure is 0.025MP-0.035MP, and filling time is 15-20s, and dwell pressure is 0.05MP-0.07MP, dwell time 10-12min.
In the present invention, bullet train cast aluminium gear case body metal-mold low-pressure casting technique, passes through three-dimensional modeling, casting process scheme designs, mold flow analysis, mould three dimensional design, metal mold low pressure Making mold, manufacture core, manufacture metal and think low pressure mould, alloy melting is with reinforced, core is installed, low-pressure casting, the multiple working procedures such as heat treating castings, and design is optimized to each procedure technology parameter, adopt metal-mold low-pressure casting, cast liquation when making full use of low pressure casting and continue feeding from bottom to up in pressure effect, foundry goods is be all crystallization under stress from top to bottom in whole casting process, particularly casting mould is Metal mould casting is have resistance to shrink in process of setting, so the cast structure that metal-mold low-pressure casting is cast out is fine and close, clear-cut, surfaces externally and internally is bright and clean, stable mechanical performance, inner chamber oil-recovery tank, lubrication groove, labyrinth, it is more clear that oil baffle is shaped, and dimensionally stable uniformity is good, and the lightweight allowance of blank is few, and casting yield rate is high, and labour intensity is low, and working condition is good, and the consumption economize energy decreasing core decreases environmental pollution, particularly x-ray inspection, fluorescent penetrating inspection, air-tightness and finished surface pinhole rate grade are cast high than core.
Accompanying drawing explanation
Fig. 1 is the flow chart of a kind of bullet train cast aluminium gear case body metal-mold low-pressure casting technique that the present invention proposes.
Detailed description of the invention
With reference to Fig. 1, the present invention proposes a kind of bullet train cast aluminium gear case body metal-mold low-pressure casting technique, comprises the steps:
S1, utilize three-dimensional software to need casting gear box of high-speed train casing carry out three-dimensional modeling by technical requirement;
S2, according to the three-dimensional modeling of S1 and in conjunction with metal-mold low-pressure casting technique determination casting technological parameter: alloy material chemical composition, running gate system, allowance, die joint;
S3, to draw spray according to the casting technological parameter of the determination of S2 three-dimensional, use according to spray three-dimensional and in conjunction with the casting technological parameter of the determination of S2 mould stream software to carry out mold flow analysis, continue to optimize and determine final casting process scheme and final casting blank three-dimensional;
S4, three-dimensional and in conjunction with metal-mold low-pressure casting die feature and device parameter according to the final casting process scheme of S3, final casting blank, design casting mould graphics and Mould Machining X-Y scheme;
S5, the casting mould graphics designed according to S4 and X-Y scheme manufacture metal mold low pressure mould and inner chamber resin sand hot core box mould, metal mold low pressure mould in conjunction with foundry method features, must make the temperature field wall thickness being applicable to gradually changing according to the shape at shaping position;
S6, the hot box core mold compacting resin sand gear-box inner chamber core, labyrinth core, oil-recovery tank core, the oil baffle core that manufacture with S5, then all brush fireproof coating on inner chamber core, labyrinth core, oil-recovery tank core, oil baffle core surface, inner chamber core, labyrinth core, oil-recovery tank core, oil baffle core all must be come out of the stove use before IR oven 100 degree of bakings 1 hour cast;
S7, the metal mold low pressure mould completed by S5 carry out blasting treatment, be installed on low pressure casting board, according to metal-mold low-pressure casting technique subregion to metal-mold low-pressure casting mould and die preheating, make mould from top to bottom temperature decline gradually, ensure that casting mould inlet temperature is 380 DEG C-400 DEG C, Die head temperatures is 300 DEG C-320 DEG C; To mould molding position spray paint, even spraying wanted by coating, makes paint thickness and heat insulating ability according to order from top to bottom from thick to thin, from strong to weak, the thickness of coating is 0.2-0.5mm;
S8, according to metal-mold low-pressure casting technique, cast alloy materials qualified for melting is added low pressure casting machine holding furnace; During cast alloy materials melting, must carry out melting according to alloy material smelting technology used, after melting completes, spectrum analysis meets DINEN1706 standard regulation ENAC42200 chemical composition, and the absolute density of cast alloy materials is 2.63-2.67g/cm
2;
S9, the inner chamber core produced by S6, labyrinth core, oil-recovery tank core, oil baffle core are arranged on air injection machine;
S10, according to the casting technological parameter of S2 cast product, the temperature of product cast is at 720 DEG C DEG C-740 DEG C, mold filling pressure is 0.025MP-0.035MP, filling time is 15-20s, dwell pressure is 0.05MP-0.07MP, dwell time 10-12min, in actual production process, the parameter of mold filling pressure, dwell pressure, cool time need carry out designing and adjusting according to gear box of high-speed train box casting infrastructure product weight;
S11, according to the characteristic of cast alloy materials, T6 heat treatment is carried out to the product of S10 and obtain final products;
S12, according to casting techniques require to the final products in S11 carry out dimension control, surface fluorescence flaw detection, significant points x-ray inspection;
S13, deburring process and shotblasting are carried out to the product be up to the standards in S12.
Embodiment 1
The present embodiment proposes a kind of bullet train cast aluminium gear case body metal-mold low-pressure casting technique, comprises the steps:
S1, utilize three-dimensional software to need casting gear box of high-speed train casing carry out three-dimensional modeling by technical requirement;
S2, according to the three-dimensional modeling of S1 and in conjunction with metal-mold low-pressure casting technique determination casting technological parameter: alloy material chemical composition, running gate system, allowance, die joint;
S3, to draw spray according to the casting technological parameter of the determination of S2 three-dimensional, use according to spray three-dimensional and in conjunction with the casting technological parameter of the determination of S2 mould stream software to carry out mold flow analysis, continue to optimize and determine final casting process scheme and final casting blank three-dimensional;
S4, three-dimensional and in conjunction with metal-mold low-pressure casting die feature and device parameter according to the final casting process scheme of S3, final casting blank, design casting mould graphics and Mould Machining X-Y scheme;
S5, the casting mould graphics designed according to S4 and X-Y scheme manufacture metal mold low pressure mould and inner chamber resin sand hot core box mould, metal mold low pressure mould in conjunction with foundry method features, must make the temperature field wall thickness being applicable to gradually changing according to the shape at shaping position;
S6, the hot box core mold compacting resin sand gear-box inner chamber core, labyrinth core, oil-recovery tank core, the oil baffle core that manufacture with S5, then all brush fireproof coating on inner chamber core, labyrinth core, oil-recovery tank core, oil baffle core surface, inner chamber core, labyrinth core, oil-recovery tank core, oil baffle core all must be come out of the stove use before IR oven 100 degree of bakings 1 hour cast;
S7, the metal mold low pressure mould completed by S6 carry out blasting treatment, be installed on low pressure casting board, according to metal-mold low-pressure casting technique subregion to metal-mold low-pressure casting mould and die preheating, make mould from top to bottom temperature decline gradually, ensure that casting mould inlet temperature is 390 DEG C, Die head temperatures is 310 DEG C; To mould molding position spray paint, even spraying wanted by coating, makes paint thickness and heat insulating ability according to order from top to bottom from thick to thin, from strong to weak, the thickness of coating is 0.4mm;
S8, according to metal-mold low-pressure casting technique, cast alloy materials qualified for melting is added low pressure casting machine holding furnace; During cast alloy materials melting, must carry out melting according to alloy material smelting technology used, after melting completes, spectrum analysis meets DINEN1706 standard regulation ENAC42200 chemical composition, and the absolute density of cast alloy materials is 2.65g/cm
2;
S9, the inner chamber core produced by S6, labyrinth core, oil-recovery tank core, oil baffle core are arranged on air injection machine;
S10, according to the casting technological parameter of S2 cast product, the temperature of product cast is at 730 DEG C, mold filling pressure is 0.03MP, filling time is 18s, dwell pressure is 0.06MP, dwell time 11min, in actual production process, the parameter of mold filling pressure, dwell pressure, cool time need carry out designing and adjusting according to gear box of high-speed train box casting infrastructure product weight;
S11, according to the characteristic of cast alloy materials, T6 heat treatment is carried out to the product of S10 and obtain final products;
S12, according to casting techniques require to the final products in S11 carry out dimension control, surface fluorescence flaw detection, significant points x-ray inspection;
S13, deburring process and shotblasting are carried out to the product be up to the standards in S12.
Embodiment 2
The present embodiment proposes a kind of bullet train cast aluminium gear case body metal-mold low-pressure casting technique, comprises the steps:
S1, utilize three-dimensional software to need casting gear box of high-speed train casing carry out three-dimensional modeling by technical requirement;
S2, according to the three-dimensional modeling of S1 and in conjunction with metal-mold low-pressure casting technique determination casting technological parameter: alloy material chemical composition, running gate system, allowance, die joint;
S3, to draw spray according to the casting technological parameter of the determination of S2 three-dimensional, use according to spray three-dimensional and in conjunction with the casting technological parameter of the determination of S2 mould stream software to carry out mold flow analysis, continue to optimize and determine final casting process scheme and final casting blank three-dimensional;
S4, three-dimensional and in conjunction with metal-mold low-pressure casting die feature and device parameter according to the final casting process scheme of S3, final casting blank, design casting mould graphics and Mould Machining X-Y scheme;
S5, the casting mould graphics designed according to S4 and X-Y scheme manufacture metal mold low pressure mould and inner chamber resin sand hot core box mould, metal mold low pressure mould in conjunction with foundry method features, must make the temperature field wall thickness being applicable to gradually changing according to the shape at shaping position;
S6, the hot box core mold compacting resin sand gear-box inner chamber core, labyrinth core, oil-recovery tank core, the oil baffle core that manufacture with S5, then all brush fireproof coating on inner chamber core, labyrinth core, oil-recovery tank core, oil baffle core surface, inner chamber core, labyrinth core, oil-recovery tank core, oil baffle core all must be come out of the stove use before IR oven 100 degree of bakings 1 hour cast;
S7, the metal mold low pressure mould completed by S6 carry out blasting treatment, be installed on low pressure casting board, according to metal-mold low-pressure casting technique subregion to metal-mold low-pressure casting mould and die preheating, make mould from top to bottom temperature decline gradually, ensure that casting mould inlet temperature is 380 DEG C, Die head temperatures is 300 DEG C; To mould molding position spray paint, even spraying wanted by coating, makes paint thickness and heat insulating ability according to order from top to bottom from thick to thin, from strong to weak, the thickness of coating is 0.2mm;
S8, according to metal-mold low-pressure casting technique, cast alloy materials qualified for melting is added low pressure casting machine holding furnace; During cast alloy materials melting, must carry out melting according to alloy material smelting technology used, after melting completes, spectrum analysis meets DINEN1706 standard regulation ENAC42200 chemical composition, and the absolute density of cast alloy materials is 2.63g/cm
2;
S9, the inner chamber core produced by S6, labyrinth core, oil-recovery tank core, oil baffle core are arranged on air injection machine;
S10, according to the casting technological parameter of S2 cast product, the temperature of product cast is at 720 DEG C °, mold filling pressure is 0.025MP, filling time is 15s, dwell pressure is 0.05MP, dwell time 10min, in actual production process, the parameter of mold filling pressure, dwell pressure, cool time need carry out designing and adjusting according to gear box of high-speed train box casting infrastructure product weight;
S11, according to the characteristic of cast alloy materials, T6 heat treatment is carried out to the product of S10 and obtain final products;
S12, according to casting techniques require to the final products in S11 carry out dimension control, surface fluorescence flaw detection, significant points x-ray inspection;
S13, deburring process and shotblasting are carried out to the product be up to the standards in S12.
Embodiment 3
The present embodiment proposes a kind of bullet train cast aluminium gear case body metal-mold low-pressure casting technique, comprises the steps:
S1, utilize three-dimensional software to need casting gear box of high-speed train casing carry out three-dimensional modeling by technical requirement;
S2, according to the three-dimensional modeling of S1 and in conjunction with metal-mold low-pressure casting technique determination casting technological parameter: alloy material chemical composition, running gate system, allowance, die joint;
S3, to draw spray according to the casting technological parameter of the determination of S2 three-dimensional, use according to spray three-dimensional and in conjunction with the casting technological parameter of the determination of S2 mould stream software to carry out mold flow analysis, continue to optimize and determine final casting process scheme and final casting blank three-dimensional;
S4, three-dimensional and in conjunction with metal-mold low-pressure casting die feature and device parameter according to the final casting process scheme of S3, final casting blank, design casting mould graphics and Mould Machining X-Y scheme;
S5, the casting mould graphics designed according to S4 and X-Y scheme manufacture metal mold low pressure mould and inner chamber resin sand hot core box mould, metal mold low pressure mould in conjunction with foundry method features, must make the temperature field wall thickness being applicable to gradually changing according to the shape at shaping position;
S6, the hot box core mold compacting resin sand gear-box inner chamber core, labyrinth core, oil-recovery tank core, the oil baffle core that manufacture with S5, then all brush fireproof coating on inner chamber core, labyrinth core, oil-recovery tank core, oil baffle core surface, inner chamber core, labyrinth core, oil-recovery tank core, oil baffle core all must be come out of the stove use before IR oven 100 degree of bakings 1 hour cast;
S7, the metal mold low pressure mould completed by S6 carry out blasting treatment, be installed on low pressure casting board, according to metal-mold low-pressure casting technique subregion to metal-mold low-pressure casting mould and die preheating, make mould from top to bottom temperature decline gradually, ensure that casting mould inlet temperature is 400 DEG C, Die head temperatures is 320 DEG C; To mould molding position spray paint, even spraying wanted by coating, makes paint thickness and heat insulating ability according to order from top to bottom from thick to thin, from strong to weak, the thickness of coating is 0.5mm;
S8, according to metal-mold low-pressure casting technique, cast alloy materials qualified for melting is added low pressure casting machine holding furnace; During cast alloy materials melting, must carry out melting according to alloy material smelting technology used, after melting completes, spectrum analysis meets DINEN1706 standard regulation ENAC42200 chemical composition, and the absolute density of cast alloy materials is 2.67g/cm
2;
S9, the inner chamber core produced by S6, labyrinth core, oil-recovery tank core, oil baffle core are arranged on air injection machine;
S10, according to the casting technological parameter of S2 cast product, the temperature of product cast is at 740 DEG C, mold filling pressure is 0.035MP, filling time is 20s, dwell pressure is 0.07MP, dwell time 12min, in actual production process, the parameter of mold filling pressure, dwell pressure, cool time need carry out designing and adjusting according to gear box of high-speed train box casting infrastructure product weight;
S11, according to the characteristic of cast alloy materials, T6 heat treatment is carried out to the product of S10 and obtain final products;
S12, according to casting techniques require to the final products in S11 carry out dimension control, surface fluorescence flaw detection, significant points x-ray inspection;
S13, deburring process and shotblasting are carried out to the final products be up to the standards in S12.
A kind of bullet train cast aluminium gear case body metal-mold low-pressure casting technique that the present invention proposes, passes through three-dimensional modeling, casting process scheme designs, mold flow analysis, mould three dimensional design, metal mold low pressure Making mold, manufacture core, manufacture metal and think low pressure mould, alloy melting is with reinforced, core is installed, low-pressure casting, the multiple working procedures such as heat treating castings, and design is optimized to each procedure technology parameter, adopt metal-mold low-pressure casting, cast liquation when making full use of low pressure casting and continue feeding from bottom to up in pressure effect, foundry goods is be all crystallization under stress from top to bottom in whole casting process, particularly casting mould is Metal mould casting is have resistance to shrink in process of setting, so the cast structure that metal-mold low-pressure casting is cast out is fine and close, clear-cut, surfaces externally and internally is bright and clean, stable mechanical performance, inner chamber oil-recovery tank, lubrication groove, labyrinth, it is more clear that oil baffle is shaped, and dimensionally stable uniformity is good, and the lightweight allowance of blank is few, and casting yield rate is high, and labour intensity is low, and working condition is good, and the consumption economize energy decreasing core decreases environmental pollution, particularly x-ray inspection, fluorescent penetrating inspection, air-tightness and finished surface pinhole rate grade are cast high than core.
The above; be only the present invention's preferably detailed description of the invention; but protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to according to technical scheme of the present invention and inventive concept thereof and replace or change, all should be encompassed within protection scope of the present invention.
Claims (7)
1. a bullet train cast aluminium gear case body metal-mold low-pressure casting technique, is characterized in that, comprise the steps:
S1, to need casting gear case body carry out three-dimensional modeling;
S2, according to the three-dimensional modeling of S1 and in conjunction with metal-mold low-pressure casting technique determination casting technological parameter;
S3, the casting technological parameter drafting spray three-dimensional determined according to S2, the casting technological parameter according to spray three-dimensional and in conjunction with the determination of S2 carries out mold flow analysis, determines final casting process scheme and final casting blank three-dimensional;
S4, three-dimensional and in conjunction with metal-mold low-pressure casting die feature and device parameter according to the final casting process scheme of S3, final casting blank, the moulding of design casting mould;
S5, the casting mould moulding designed according to S4 manufacture metal mold low pressure mould and inner chamber resin sand hot core box mould;
S6, the hot box core mold compacting resin sand gear-box inner chamber core manufactured with S5, labyrinth core, oil-recovery tank core, oil baffle core, then fireproof coating in core surface brush, baking;
S7, the metal mold low pressure mould completed by S5 carry out blasting treatment, are installed on low pressure casting board, then to whole mould and die preheating, and to mould molding position spray paint;
S8, according to metal-mold low-pressure casting technique, the cast alloy materials after melting is added in low pressure casting machine holding furnace;
S9, the inner chamber core produced by S6, labyrinth core, oil-recovery tank core, oil baffle core are arranged on air injection machine;
S10, according to the casting technological parameter of S2 cast product;
S11, according to the characteristic of cast alloy materials, T6 heat treatment is carried out to the product of S10 and obtain final products.
2. bullet train cast aluminium gear case body metal-mold low-pressure casting technique according to claim 1, it is characterized in that, in S2, technological parameter comprises alloy material chemical composition, running gate system, allowance and die joint.
3. bullet train cast aluminium gear case body metal-mold low-pressure casting technique according to claim 1, it is characterized in that, in S7, according to metal-mold low-pressure casting technique subregion to metal-mold low-pressure casting mould and die preheating, make mould from top to bottom temperature decline gradually, ensure that casting mould inlet temperature is 380 DEG C-400 DEG C, Die head temperatures is 300 DEG C-320 DEG C; Even spraying wanted by coating, makes paint thickness and heat insulating ability according to order from top to bottom from thick to thin, from strong to weak, the thickness of coating is 0.2-0.5mm.
4. bullet train cast aluminium gear case body metal-mold low-pressure casting technique according to claim 1, is characterized in that, in S8, the absolute density adding the cast alloy materials in low pressure casting machine holding furnace is 2.63-2.67g/cm
2.
5. the bullet train cast aluminium gear case body metal-mold low-pressure casting technique according to any one of claim 1-4, is characterized in that, further comprising the steps of:
S12, according to casting techniques require to the final products in S11 carry out dimension control, surface fluorescence flaw detection, significant points x-ray inspection.
6. bullet train cast aluminium gear case body metal-mold low-pressure casting technique according to claim 5, is characterized in that, further comprising the steps of:
S13, deburring process and shotblasting are carried out to the final products be up to the standards in S12.
7. the bullet train cast aluminium gear case body metal-mold low-pressure casting technique according to any one of claim 1-4, it is characterized in that, in S10, the temperature of product cast is at 720 DEG C DEG C-740 DEG C, mold filling pressure is 0.025MP-0.035MP, filling time is 15-20s, and dwell pressure is 0.05MP-0.07MP, dwell time 10-12min.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510534648.1A CN105081281A (en) | 2015-08-25 | 2015-08-25 | Metal mold low-pressure casting process for cast-aluminum gearbox body of high-speed train |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510534648.1A CN105081281A (en) | 2015-08-25 | 2015-08-25 | Metal mold low-pressure casting process for cast-aluminum gearbox body of high-speed train |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105081281A true CN105081281A (en) | 2015-11-25 |
Family
ID=54563124
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510534648.1A Pending CN105081281A (en) | 2015-08-25 | 2015-08-25 | Metal mold low-pressure casting process for cast-aluminum gearbox body of high-speed train |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105081281A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106694853A (en) * | 2016-12-19 | 2017-05-24 | 重庆市合川区银窝铸造厂 | Method for casting motorcycle parts by use of low-pressure casting process |
CN106925757A (en) * | 2017-04-26 | 2017-07-07 | 宁夏维尔铸造有限责任公司 | Aluminum alloy gear casing casting casting system and casting method |
CN109079122A (en) * | 2018-10-18 | 2018-12-25 | 四川省犍为恒益铝业有限公司 | A kind of casting technique of improved vehicle cabinet |
CN109622920A (en) * | 2018-11-30 | 2019-04-16 | 江苏文灿压铸有限公司 | The pouring technology of low-pressure casting gas fuel valve remote controllers gear housing |
CN110732655A (en) * | 2019-11-15 | 2020-01-31 | 西安西电开关电气有限公司 | Aluminum alloy casting forming die and forming process |
CN112893782A (en) * | 2021-01-20 | 2021-06-04 | 湖北长鑫源汽车实业有限公司 | Flywheel housing processing technology |
CN112906187A (en) * | 2021-01-16 | 2021-06-04 | 大连环友屏蔽泵有限公司 | Casting process of double-suction pump body |
CN113857460A (en) * | 2021-09-28 | 2021-12-31 | 济南方德利模具有限公司 | Large oil pan low-pressure casting die, device and process |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101269414A (en) * | 2008-04-01 | 2008-09-24 | 西安电力机械制造公司 | Casting method for large-scale overpressure resistant aluminum housing |
CN101497121A (en) * | 2008-01-31 | 2009-08-05 | 上海爱仕达汽车零部件有限公司 | Diesel motor aluminium alloy cylinder metal mould low-pressure casting method |
CN101602102A (en) * | 2009-06-17 | 2009-12-16 | 北京航空航天大学 | The solidification process control method of using small external temperature gradient to eliminate shrinkage cavities and porosity in casting |
CN102284696A (en) * | 2011-05-30 | 2011-12-21 | 佛山市南海奔达模具有限公司 | Temperature control method of no-riser aluminium-alloy casting mold |
CN102366827A (en) * | 2011-10-10 | 2012-03-07 | 陈伟军 | Extrusion casting method of cylinder cover cap of magnesium alloy automobile engine |
CN103706779A (en) * | 2013-12-27 | 2014-04-09 | 广东鸿特精密技术股份有限公司 | Method and device for controlling temperature of mould heated by fuel gas in sectionalized mode in aluminium alloy gravity casting |
CN104139169A (en) * | 2013-10-31 | 2014-11-12 | 国家电网公司 | Casting and forging method and casting and forging device |
CN104741577A (en) * | 2013-12-25 | 2015-07-01 | 青岛玉光精铸厂 | Technology for producing aluminum copper alloy castings through metal-mould low pressure casting |
CN104741579A (en) * | 2013-12-26 | 2015-07-01 | 青岛玉光精铸厂 | Low-pressure casting process of cylinder |
-
2015
- 2015-08-25 CN CN201510534648.1A patent/CN105081281A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101497121A (en) * | 2008-01-31 | 2009-08-05 | 上海爱仕达汽车零部件有限公司 | Diesel motor aluminium alloy cylinder metal mould low-pressure casting method |
CN101269414A (en) * | 2008-04-01 | 2008-09-24 | 西安电力机械制造公司 | Casting method for large-scale overpressure resistant aluminum housing |
CN101602102A (en) * | 2009-06-17 | 2009-12-16 | 北京航空航天大学 | The solidification process control method of using small external temperature gradient to eliminate shrinkage cavities and porosity in casting |
CN102284696A (en) * | 2011-05-30 | 2011-12-21 | 佛山市南海奔达模具有限公司 | Temperature control method of no-riser aluminium-alloy casting mold |
CN102366827A (en) * | 2011-10-10 | 2012-03-07 | 陈伟军 | Extrusion casting method of cylinder cover cap of magnesium alloy automobile engine |
CN104139169A (en) * | 2013-10-31 | 2014-11-12 | 国家电网公司 | Casting and forging method and casting and forging device |
CN104741577A (en) * | 2013-12-25 | 2015-07-01 | 青岛玉光精铸厂 | Technology for producing aluminum copper alloy castings through metal-mould low pressure casting |
CN104741579A (en) * | 2013-12-26 | 2015-07-01 | 青岛玉光精铸厂 | Low-pressure casting process of cylinder |
CN103706779A (en) * | 2013-12-27 | 2014-04-09 | 广东鸿特精密技术股份有限公司 | Method and device for controlling temperature of mould heated by fuel gas in sectionalized mode in aluminium alloy gravity casting |
Non-Patent Citations (3)
Title |
---|
杨文庆等: "Pro/E在鼠标外壳三维造型及模具设计中的应用", 《模具制造》 * |
郑端阳: "三维设计在缸体铸造模具制造中的应用", 《铸造》 * |
黄引平等: "缸体缸盖铸件工艺优化流程及规范", 《现代铸铁》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106694853A (en) * | 2016-12-19 | 2017-05-24 | 重庆市合川区银窝铸造厂 | Method for casting motorcycle parts by use of low-pressure casting process |
CN106925757A (en) * | 2017-04-26 | 2017-07-07 | 宁夏维尔铸造有限责任公司 | Aluminum alloy gear casing casting casting system and casting method |
CN106925757B (en) * | 2017-04-26 | 2019-06-28 | 宁夏维尔铸造有限责任公司 | Aluminum alloy gear cabinet casting casting system and casting method |
CN109079122A (en) * | 2018-10-18 | 2018-12-25 | 四川省犍为恒益铝业有限公司 | A kind of casting technique of improved vehicle cabinet |
CN109079122B (en) * | 2018-10-18 | 2020-07-10 | 四川省犍为恒益铝业有限公司 | Casting process of improved vehicle box body |
CN109622920A (en) * | 2018-11-30 | 2019-04-16 | 江苏文灿压铸有限公司 | The pouring technology of low-pressure casting gas fuel valve remote controllers gear housing |
CN110732655A (en) * | 2019-11-15 | 2020-01-31 | 西安西电开关电气有限公司 | Aluminum alloy casting forming die and forming process |
CN112906187A (en) * | 2021-01-16 | 2021-06-04 | 大连环友屏蔽泵有限公司 | Casting process of double-suction pump body |
CN112906187B (en) * | 2021-01-16 | 2024-02-23 | 大连环友屏蔽泵有限公司 | Casting process of pump body of double suction pump |
CN112893782A (en) * | 2021-01-20 | 2021-06-04 | 湖北长鑫源汽车实业有限公司 | Flywheel housing processing technology |
CN113857460A (en) * | 2021-09-28 | 2021-12-31 | 济南方德利模具有限公司 | Large oil pan low-pressure casting die, device and process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105081281A (en) | Metal mold low-pressure casting process for cast-aluminum gearbox body of high-speed train | |
CN102554125B (en) | Precision casting method of aluminum gearbox | |
CN102717030B (en) | Precision casting method for thick-wall base aluminium alloy casting | |
CN103920849B (en) | The casting method of Diesel Engine Cylinder Block Castings | |
CN108672655B (en) | Composite casting method with controllable casting mold temperature | |
CN103521705B (en) | Manufacture the method for metal type dies | |
CN204770594U (en) | Motor casing low pressure casting is with spiral water channel psammitolite of taking protective layer | |
CN203484866U (en) | Non-pre-buried type special-shaped bent water channel hot-working die | |
CN101992272A (en) | Self-adaptive casting mould manufacture method for casting | |
CN103522026A (en) | Non-pre-buried type abnormal-shaped bent water channel hot-work die and manufacturing method of non-pre-buried type abnormal-shaped bent water channel hot-work die | |
CN103121081B (en) | Method for integrally casting heavy-duty high-horsepower diesel locomotive bogie | |
CN102699280B (en) | Sand mould of precoated sand for casting single piston ring and manufacturing method of sand mould | |
CN103949584B (en) | The sand mould casting method of the 22nd grade of stator blade is pressed in H level combination circulation steam turbine | |
CN103521698A (en) | Thermal insulation coating and preparation method thereof, metal mold and metal mold casting equipment | |
CN105127399A (en) | Low-pressure casting technology for mounting tube socket of motor train unit brake system | |
CN108927493A (en) | A kind of aluminium alloy electric automobile inner-cooled machine shell cast shaping process | |
CN107052242A (en) | The combined type casting method that a kind of diecasting and model casting are combined | |
CN104550740A (en) | Method for casting large thin-wall rotation body high strength aluminum alloy casting | |
CN103433466A (en) | Aluminum alloy liquid forging mould and combined forming method of starter outer shell | |
CN102861871A (en) | Vacuum evaporative mold casting process of dry-type cylinder block | |
CN103553621B (en) | The preparation method of silicon carbide hydrogen collector | |
CN1911563B (en) | Method for casting large thin wall rotating body high strength aluminium alloy casting | |
CN108273964B (en) | A kind of production method for the cylinder jacket improving surface quality | |
CN105964920A (en) | White die casting process for ductile iron casting | |
CN109967690B (en) | Precoated sand for gravity casting of thin-wall aluminum alloy casting and using method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151125 |
|