CN105064359A - 一种无粘结预应力施工锚杆 - Google Patents

一种无粘结预应力施工锚杆 Download PDF

Info

Publication number
CN105064359A
CN105064359A CN201510421814.7A CN201510421814A CN105064359A CN 105064359 A CN105064359 A CN 105064359A CN 201510421814 A CN201510421814 A CN 201510421814A CN 105064359 A CN105064359 A CN 105064359A
Authority
CN
China
Prior art keywords
anchor rod
anchor pole
construction
main body
rod body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510421814.7A
Other languages
English (en)
Inventor
高路恒
徐卫星
徐琳
周悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510421814.7A priority Critical patent/CN105064359A/zh
Publication of CN105064359A publication Critical patent/CN105064359A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种无粘结预应力施工锚杆,属于土木工程施工技术领域。一种无粘结预应力施工锚杆,包括引导头、锚杆外钢管、主体锚杆、锚垫、锚件等五个部分组成,其特征是:所述的主体锚杆采用预应力钢棒、钢筋、钢索等材料,锚杆外钢管与引导头活性连接,且置于主体锚杆外侧。本发明的有益效果是主体锚杆可选择预应力钢棒、钢筋、钢索等材料,在施工过程中可不断调整主体锚杆的应力,可实现过程控制;锚杆外钢管与引导头活性连接,且置于主体锚杆外侧,用于基坑工程维护,后期回填土可分层、分段实现回收再利用等特点。本发明构造简单,实施方便。

Description

一种无粘结预应力施工锚杆
技术领域
一种无粘结预应力施工锚杆,属于土木工程施工技术领域。
背景技术
锚杆边坡维护技术在建筑工程、桥梁公路等领域应用十分广泛,技术成熟度也很高。但传统锚杆施工性价比不高,施工过程中由于土层变化、锚杆变形等因素常导致锚杆边坡部分失效,甚至全部失效,造成安全事故发生的工程案例很多。
发明内容
本发明的目的是为了实现施工的过程控制。无粘结预应力施工锚杆可根据不同的工程环境选择适合的锚杆材料,在施工过程中可不断调整主体锚杆的应力,可实现过程控制,当发现局部边坡变形过大,也可实现施工过程控制的动态灵活性。
本发明的目的可通过以下方式来实现:一种无粘结预应力施工锚杆,包括引导头、锚杆外钢管、主体锚杆、锚垫、锚件等五个部分组成,其特征是:所述的主体锚杆采用预应力钢棒、钢筋、钢索等材料,锚杆外钢管与引导头活性连接,且置于主体锚杆外侧。
本发明与现有现有技术相比有如下优点:构造简单,实施方便,在施工过程中可不断调整主体锚杆的应力,可实现过程控制;锚杆外钢管与引导头活性连接,且置于主体锚杆外侧,后期回填土可分层、分段实现回收再利用等特点,性价比高。
附图说明
附图1是本发明结构示意图。
图中:1、引导头,2、锚杆外钢管,3、主体锚杆,4、锚垫,5、锚件,6、边坡喷射混凝土或维护桩,7、塑料套管。
具体实施方式
参照附图1如下:一种无粘结预应力施工锚杆,包括引导头1、锚杆外钢管2、主体锚杆3、锚垫4、锚件5,其特征是:所述的主体锚杆采用预应力钢棒、钢筋、钢索等材料,锚杆外钢管与引导头活性连接,且置于主体锚杆外侧。本发明的有益效果是主体锚杆可选择预应力钢棒、钢筋、钢索等材料,在施工过程中可不断调整主体锚杆的应力,可实现过程控制;锚杆外钢管与引导头活性连接,且置于主体锚杆外侧,用于基坑工程维护。
边坡锚杆施工过程中,将引导头1、主体锚杆3与锚杆外钢管2一起打入边坡土层中,完成锚杆施工的第一步;由于在施工前,事先在主体锚杆的外侧套上了塑料套管7,后期边坡混凝土喷射4、预应力张拉、锚固等,可方便施工操作。

Claims (3)

1.一种无粘结预应力施工锚杆,包括引导头、锚杆外钢管、主体锚杆、锚垫、锚件等五个部分组成。
2.主体锚杆采用预应力钢棒、钢筋、钢索等材料,在施工过程中可不断调整主体锚杆的应力,可实现过程控制。
3.锚杆外钢管与引导头活性连接,且置于主体锚杆外侧。
CN201510421814.7A 2015-07-18 2015-07-18 一种无粘结预应力施工锚杆 Pending CN105064359A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510421814.7A CN105064359A (zh) 2015-07-18 2015-07-18 一种无粘结预应力施工锚杆

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510421814.7A CN105064359A (zh) 2015-07-18 2015-07-18 一种无粘结预应力施工锚杆

Publications (1)

Publication Number Publication Date
CN105064359A true CN105064359A (zh) 2015-11-18

Family

ID=54493846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510421814.7A Pending CN105064359A (zh) 2015-07-18 2015-07-18 一种无粘结预应力施工锚杆

Country Status (1)

Country Link
CN (1) CN105064359A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107514272A (zh) * 2016-06-16 2017-12-26 中国矿业大学 一种用于支护交错层理发育围岩的锚杆套索

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL7508278A (nl) * 1974-07-10 1976-01-13 Mueller Ludwig Inrichting voor het verbinden van een paal in de vorm van een breedflensbalk met een damwand.
CN200961263Y (zh) * 2006-08-29 2007-10-17 湖北中南岩土工程有限公司 定阈锁固式可回收锚杆
DE102009016893B4 (de) * 2009-04-08 2011-12-08 Nordex Energy Gmbh Verankerungsbauteil für einen Windenergieanlagenturm
CN102477740A (zh) * 2011-08-24 2012-05-30 柳州欧维姆机械股份有限公司 电隔离防护锚索及其制作安装方法
CN203307803U (zh) * 2013-06-04 2013-11-27 中铁建设集团有限公司 带螺旋箍筋的预应力压力型抗浮锚杆
CN203701092U (zh) * 2014-01-22 2014-07-09 北京现代金宇工程建设有限公司 挤压锁头应力分散型高吨位锚索

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL7508278A (nl) * 1974-07-10 1976-01-13 Mueller Ludwig Inrichting voor het verbinden van een paal in de vorm van een breedflensbalk met een damwand.
CN200961263Y (zh) * 2006-08-29 2007-10-17 湖北中南岩土工程有限公司 定阈锁固式可回收锚杆
DE102009016893B4 (de) * 2009-04-08 2011-12-08 Nordex Energy Gmbh Verankerungsbauteil für einen Windenergieanlagenturm
CN102477740A (zh) * 2011-08-24 2012-05-30 柳州欧维姆机械股份有限公司 电隔离防护锚索及其制作安装方法
CN203307803U (zh) * 2013-06-04 2013-11-27 中铁建设集团有限公司 带螺旋箍筋的预应力压力型抗浮锚杆
CN203701092U (zh) * 2014-01-22 2014-07-09 北京现代金宇工程建设有限公司 挤压锁头应力分散型高吨位锚索

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107514272A (zh) * 2016-06-16 2017-12-26 中国矿业大学 一种用于支护交错层理发育围岩的锚杆套索

Similar Documents

Publication Publication Date Title
CN103195069B (zh) 预应力式双排桩强约束深基坑支护方法
CN104790424A (zh) 风力发电塔基础环基础的加固***及其加固方法
CN103114585A (zh) 预应力预制桩尖结构
CN203222809U (zh) 一种输电线路杆塔预应力混凝土管桩基础
CN103806451B (zh) 一种锚碇型基坑加固结构及其施工方法
CN105401571B (zh) 预制后注浆异型树根桩及其施工方法
CN204780979U (zh) 一种快速安装铁塔的抗水平力的钢管桩基础
CN103790168A (zh) 一种土钉墙在深基坑支护中的应用方法
CN105064359A (zh) 一种无粘结预应力施工锚杆
CN204174627U (zh) 一种边坡支护结构
CN205776194U (zh) 一种防漏浆尖桩
CN206646521U (zh) 一种排桩复合全粘结锚杆支护结构
CN102561315B (zh) 一种连锁预制桩地下连续墙
CN202989911U (zh) 一种预制混凝土后注浆桩
CN205242385U (zh) 预制后注浆异型树根桩
CN204728356U (zh) 风力发电塔基础环基础的加固***
CN106836324A (zh) 一种增设斜向抗拉钢筋的风机基础加固方法
CN209741864U (zh) 一种装配式后张法全预应力混凝土x型梁反力结构
CN106638733A (zh) 一种增设水平钢筋的风机基础加固方法
CN102155015A (zh) 一种带刺的植入式钢管锚杆
CN203034790U (zh) 地下室用基础预制砼模板
CN206070558U (zh) 一种风电基础减震耗能装置
CN103669901A (zh) 一种将地下空间中的桩改造为柱的方法
CN206873684U (zh) 预制窗墙的竖向连接结构
CN205259175U (zh) 一种下部扩大直径段复合基桩

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151118