CN105064140A - Construction method of tramcar overall-type roadbed - Google Patents

Construction method of tramcar overall-type roadbed Download PDF

Info

Publication number
CN105064140A
CN105064140A CN201510275444.0A CN201510275444A CN105064140A CN 105064140 A CN105064140 A CN 105064140A CN 201510275444 A CN201510275444 A CN 201510275444A CN 105064140 A CN105064140 A CN 105064140A
Authority
CN
China
Prior art keywords
iron piece
track
cover plate
rail
upper cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510275444.0A
Other languages
Chinese (zh)
Inventor
邵佐
廖秋林
张礼舜
王海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Group Co Ltd
Beijing Urban Construction Design and Development Group Co Ltd
Original Assignee
Beijing Urban Construction Group Co Ltd
Beijing Urban Construction Design and Development Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Group Co Ltd, Beijing Urban Construction Design and Development Group Co Ltd filed Critical Beijing Urban Construction Group Co Ltd
Priority to CN201510275444.0A priority Critical patent/CN105064140A/en
Publication of CN105064140A publication Critical patent/CN105064140A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The present invention discloses a construction method of a tramcar overall-type roadbed. A track skeleton rail-erection type construction method is adopted. Short sleepers are manufactured in factories, short sleepers and 25 mm imporous steel rails are transported to a rail laying construction site by automobiles, track skeletons are erected by through steel rail supports, working procedure construction such as track rough adjustment, reinforcing steel bar tying and framework erecting are simultaneously carried out, and after all the working procedure construction achieves requirements for design technical specifications, roadbed concrete pouring is carried out. The construction method is reasonable in construction design, excellent in construction quality and fast in construction, the construction progress is fastened and the production cost is lowered.

Description

A kind of construction method of tram monolithic railway roadbed
Technical field
The present invention relates to a kind of construction method of monolithic railway roadbed of construction method, particularly tram of monolithic railway roadbed.
Background technology
Railway roadbed is layed on the substructures such as roadbed, bridge or tunnel, the rubble under rail, sleeper or rest pad, boulder bed or layer of concrete, as the basis of rail or track-frame.Railway roadbed is divided into common ballast track bed, asphalt cemented ballast bed and concrete integral channel bed.Solid concrete roabed is often monolithic reinforced concrete structure, is usually used in on-deformable tunnel or on bridge, and because city track traffic engineering major part is on subterranean tunnel or viaduct, therefore concrete integral channel bed is comparatively conventional.Owing to designing in the delayed track laying process of relative site operation, various ballast bed structure reservation member and other professional Installation unit interfaces more, the construction cooperation of period, construction coordination are more, bring very large pressure to daily construction coordination and scheduling.Concrete integral channel bed can keep the kilter of track for a long time, safer reliable, smooth-going, reduces later period maintenance expense simultaneously greatlyr.Solid concrete roabed primary concreting method is adopted to construct, eliminate the operation of beating buttress, improve work efficiency, the buttress quality difficulty control simultaneously avoiding railway roadbed concrete two-step pouring to bring, buttress and railway roadbed concrete exist in conjunction with drawbacks such as problems, improve the durability of solid concrete roabed.
Summary of the invention
A construction method for monolithic railway roadbed, is characterized in that, comprises the following steps:
First step: the assembled section of track, specifically comprises:
1. be first well placed sleeper, then rubber mat plate under iron chair is installed on its corresponding precalculated position, then on described lower rubber mat plate, iron chair is installed, connecting bolt installed by described iron chair and/or sleeper and spring washer is reinforced them;
2. the iron chair secondly after reinforcing and sleeper arrange on-sleeper rubber tie plate and/or rubber tie plate under rail, and rail is put in the precalculated position then on above-mentioned rubber mat plate;
3. secondly upright described sleeper make described sleeper vertical with the axis of required circuit;
4. installing tache rail spring, makes to become section of track building block;
Second step: the substrate of solid concrete roabed is cleared up, and implements construction drainage, and lay railway roadbed base plate;
Third step is that steel mesh reinforcement is laid: be dispersed on the base plate of railway roadbed by many reinforcing bar vertical and horizontal, colligation is fixed, and the mesh spacing of adjustment reinforcing bar vertical and horizontal, chooses 2 longitudinal reinforcements and weld with transverse reinforcement, be used as drainage bar; 1 transverse reinforcement is selected to weld with all longitudinal reinforcements intersected every about 5m; A galvanized flat steel is welded with all longitudinal reinforcements, and draws to the outside of described steel mesh reinforcement, and the hole of φ 12mm is set at described galvanized flat steel exit; Described galvanized flat steel is 50mm × 8mm type; Each welding above-mentioned is double welding;
4th step is that frame founds the section of track and adjusts:
1. in railway roadbed precalculated position, assembled good described section of track building block is laid;
2. tentatively adjust orbital position, with rail bearing support, section of track building block is erected during adjustment, with right angle track forces and universal rail gage, and be aided with the range estimation adjustment absolute altitude of rail, gauge, level and direction;
3., after preliminary adjustment, multiple described section of track building block is welded to each other fixing by end;
5th step is track accurate adjustment: use track fine-tuning machine, detect the parameter values of the tread elevation at every sleepers place, track centre position, distance between centers of tracks, rail smooth degree, and by being that each numerical value uses instrument to carry out accurate adjustment;
6th step is install solid concrete roabed template: in the template of precalculated position fixed road bed, described template is wooden model for building;
7th step is placing railway roadbed concrete:
1. bottom first moistening railway roadbed;
2. continuous print fluid concrete;
3. tamping is carried out to the concrete of sleeper bottom periphery, railway roadbed is combined with sleeper well;
4., during railway roadbed concrete initial set, carry out smooth to its surface;
8th step is process of being completed:
1. the concrete be sprinkled upon on rail is cleaned with water;
2. the defect part on railway roadbed surface fills closely knit with 1: 1 cement mortar repairing.
Further, in step 2, flexible member is set under railway roadbed floor.
Further, this flexible member, comprises upper cover plate, upper iron piece, rubber parts, lower iron piece and lower seat board, and iron core, caging bolt and locking plug screw; Upper cover plate, upper iron piece, rubber parts, lower iron piece are connected with lower seat board order, and wherein, upper cover plate is removably connected with upper iron piece, and upper iron piece and lower iron piece and rubber parts are sulfided into integrally, and lower seat board is removably connected with lower iron piece; Iron core to be arranged in rubber parts and to be sulfided into one with rubber parts, and caging bolt successively through upper cover plate, upper iron piece, rubber parts and lower iron piece, and is threaded with upper cover plate, and locking plug screw is threaded with upper cover plate, and abuts the end face of caging bolt.
Further, three projected claws that upper cover plate comprises upper cover plate body and extended radially outward by the edge of upper cover plate body, upper cover plate body in the form of annular discs, this upper cover plate body and upper iron piece are located by seam; The centre of upper cover plate body is provided with tapped through hole, and caging bolt and locking plug screw are all threaded with this tapped through hole; Upper iron piece is the cylindrical structure part of hollow, and cylindrical cavity is formed at the top of upper iron piece, and conical cavity is formed at the bottom of upper iron piece; In the form of a truncated cone, this conical butt rubber parts has the bottom surface of level to rubber parts, and the lateral surface of conical butt rubber parts is connected with the sidewall sulfuration of the conical cavity of upper iron piece; Iron core has the truncated conical configuration similar to rubber parts, and rubber parts is divided into thickness equal inside and outside two-layer; Lower iron piece comprises the lower iron piece body of hollow and the lower end flatly outward extending annular join from lower iron piece body; Lower iron piece body in the form of a truncated cone, lower iron piece body comprises a top board, and top board has a central through hole passed for caging bolt, and bottom surface and the lower seat board of annular join are located by seam; The lateral surface of lower iron piece body and the upper surface at least partially of annular join with rubber parts sulfuration be connected; Lower seat board is discoid, is provided with positive stop lug boss protruding upward, the caging bolt that this positive stop lug boss is just right, is provided with the locating hole under shed below positive stop lug boss in the middle of the upper surface of lower seat board; The top of caging bolt is provided with thread segment, and bottom is provided with sulfuration section; Be provided with the hexagon ring matched with inner hexagon spanner in the middle of the end face of thread segment, the sulfuration of sulfuration section has one deck rubber layer; Upper cover plate is removably connected by bolt with upper iron piece, and lower seat board is removably connected by bolt with lower iron piece.
Accompanying drawing explanation
Fig. 1 construction method schematic diagram;
Fig. 2-4 is damping part schematic diagram.
Detailed description of the invention
A construction method for monolithic railway roadbed, it rests the head on solid concrete roabed by short rail, and adopts the method that " section of track frame rail method " constructs.Its short-and-medium sleeper adopts factory of manufactory system, main construction method is: by short pillow and 25m atresia rail Automobile Transportation to job site of laying a railway track, and utilize lower support type rail bracing frame frame to found the section of track, carry out the operation constructions such as track coarse adjustment, reinforcing bar binding, formwork erection simultaneously, after each operation construction all reaches designing technique code requirement, carrying out building railway roadbed concrete, shown in accompanying drawing 1, is detailed method.
Roughly method is specially:
Step (1) the assembled section of track
Utilize at the construction field (site) on existing supporting layer and pad the thick lumps of wood of 100mm as section of track platform for lining.The section of track is assembled on assembly jig, assembles time assembled by the rail length listed by rail joint table, gauge, sleeper pitch, fastener type, joint dislocation amount and short sleeper position, finally adopts rail distance rod to carry out connecting and composing track-frame.Its working procedure is: first arrange platform for lining, then carries out putting sleeper, then puts rail, then adjust sleeper pitch, afterwards installing tache rail spring, finally installs rail bearing support.Be specially:
1. sleeper is put:
A. at section of track assembly jig hyte dress sleeper.Order of its assembling is: put rubber mat plate → installation iron chair under sleeper → installations iron chair → go up connecting bolt → mounting spring packing ring → band nut and tighten.
B. according to the spaced lines coarse adjustment sleeper pitch that assembly or fitting table position marks.
2. rail is put
A. on-sleeper rubber tie plate, rubber tie plate under rail is put.
B. rail is put in section of track assembly jig position.
3. sleeper pitch is adjusted
A. with white oil paint, inside steel rail web, (curve is inside silent partners steel rail web) marks sleeper position.
B. tie respacing make sleeper should be vertical with circuit axis.
4. installing tache rail spring, finally pacifies rail bearing support.
Then carry out step (2), solid concrete roabed substrate cleaning and construction drainage, and implement construction drainage, and lay railway roadbed base plate.And in order to improve damping effect, rubber elastic element can be set under railway roadbed floor.
Then carry out step (3), solid concrete roabed steel mesh reinforcement is laid.Solid concrete roabed steel mesh reinforcement is taked in tracklaying base blanking, processing, the operating type of on-the-spot colligation welding fabrication, and longitudinal reinforcement is by two adjacent shrinkage joint length batchings.Reinforcing bar is transported to job site by automobile, after dispersed placement, manually lifts fortune reinforcing bar and is dispersed on railway roadbed base plate.Artificial colligation is fixed, adjustment steel grid spacing.
Choose 2 longitudinal reinforcements in track structure substructure reinforcing bar immediately below every root traveling to weld with track structure bottom transverse reinforcement, as drainage bar; 1 transverse reinforcement is selected to weld with all longitudinal reinforcements intersected every about 5m in railway roadbed block; Smooth and easy for ensureing stray current drainage, railway roadbed is drawn, as connector after adopting 50mm × 8mm galvanized flat steel to weld with all longitudinal reinforcements in every railway roadbed block two ends.The longitudinal electrical communication of all longitudinal reinforcements, if any overlap joint, answer overlap welding, weld length is not less than 6 times of bar diameter, and weld bead height is not less than 6mm, and all overlap weldings are double welding, forbids rosin joint.Galvanized flat steel each side draws 150mm at roadbed, and beats φ 12 hole in its end.In the position of the railway roadbed block central authorities of every 6.25m, all welded with intersected all longitudinal reinforcements by bottom transverse reinforcement, connector utilizes round steel to connect, and brushes after installation by the part that connector to be exposed railway roadbed by asphalt varnish.
Then carry out step (4), be transported to by the section of track and lay place, frame is vertical to be laid the section of track and adjusts.Deck type rail bearing support must be adopted.Bracing frame configuration quantity: 50kg/m-25m rail, 1600/km track configurations 11 is overlapped.Be specially:
1. the section of track is laid
During erection rail bearing support:
A. the substrate at rail bearing support column place is made to be smooth hard.
B. for avoiding depressed joint, joint bearing support spacing should suitably be encrypted.
C. rail bearing support is as time contradictory with reserved pipe trench, adjustment bracing frame position.
2. tentatively orbital position is adjusted
A. use right angle track forces and universal rail gage, and be aided with the range estimation adjustment absolute altitude of rail, gauge, level and direction.
B. sleeper position is adjusted:
A. when sleeper position and track cross equipment conflict time, adjust adjacent a few sleepers spacing and dodge.
B. sleeper rail support groove edge is not less than 50mm far from structural joint, as sleeper can not arrange by design attitude time, can adjust between adjacent three sleepers.
After the section of track being erected with rail bearing support, with disjunction mark stake of laying a railway track for foundation, by road, right angle late and universal rail gage (track forces should correct before use, its precision allowable error is 0.5mm), Rotary cloumn adjusts the height of rail, and borrow rail clip bolt to adjust rail direction, successively carry out adjustment operation, until reach requirement standard.
Then step (5) is carried out, track accurate adjustment.Track accurate adjustment is a crucial procedure, and can it play decisive role to meet the requirements of last turn position.
Track detection car (track fine-tuning machine) is used to detect the geometric type position such as tread elevation, track centre position, distance between centers of tracks, rail smooth degree at every sleepers place one by one.According to the data of track detection car display, adjust screw adjusters with spanner.By rotating screw bolt adjuster, come the height of accurate adjustment track, direction, level, superelevation.Accurate adjustment orbital position is a very elaboration, each screw adjusters all will adjust one by one, and the adjustment of a screw adjusters often has impact to the adjustment of contiguous screw adjusters, needs repeated multiple times, successively approaching, just can reach the required precision of construction.
Then carry out step (6), solid concrete roabed template is installed.Solid concrete roabed concrete side adopts building wood pattern.Railway roadbed absolute altitude to be checked before installation form and whether orbit centre line position meets designing requirement, check built-in fitting and whether reserving hole is omitted, whether position is accurate, guarantee that model sheetinstallat is correct.
The medial surface of template requires smooth, and seam is tight, must not spillage, in concreting process, want running check, as the phenomenon such as find distortion, loosen, will repair reinforcing in time.
Then step (7) is carried out, placing railway roadbed concrete.In concrete perfusion process, for strictly preventing filling concrete and making in operation the section of track colliding and mixed up firm by ramming, and polyphony to be carried out at any time.Therefore supervision and the experienced linemen's of polyphony job placement serve as.In order to make the acceptance criteria of the track coincidence circuit after filling concrete, consider the factors such as the possible error of concrete contraction and fastener size, therefore, the Adjustment precision of rail is more high simultaneously.Operation is: again check and adjust (the test specimen sampling) → vibrated concrete → supervision of track → concrete perfusion and adjustment track → concrete curing → form removal → completion arrangement.
Concrete:
1.. first check whether line midline, location of rail, direction, level, absolute altitude, gauge meet the requirements; Whether inspection template, anti-fan flow steel mesh reinforcement, built-in fitting and pipe trench and stablize firmly; Check whether anti-fan stream steel mesh reinforcement specification, size, installation site, welding quality, conduction requirement etc. meet design code.
2.. perfusion and vibrated concrete:
A, concrete answer layering, level, point step perfusion, and cast layer thickness is 1.25 times of poker vibrator agency part length, and fluid concrete should carry out continuously, and its interval time should comply with relevant regulations.
When B, fluid concrete, should note preventing concrete laminated segregation, concrete by draw off in hopper, funnel pour into a mould time, its degree of falling that freely inclines is generally no more than 2m.Should be monitored by special messenger, check.When finding that rail level size (gauge, level, just, direction) transfinites, template, bearing support, anti-fan flow reinforced mesh, built-in fitting, built-in pipe, ditch, hole, hole have during distortion displacement and should stop cast immediately, and should repair intact before the concrete coagulation poured into a mould.
C, filling concrete interrupt establishing vertical baffle for some reason, and perfusion next time needs at 24 hours later, and the double time of making firm by ramming should not exceed the concrete initial setting time.
D, constuction joint place continue fluid concrete time, the concrete crushing strength poured into a mould should not be less than 2.5Mpa, should be removed rubbish cement film simultaneously before the concrete surface fluid concrete hardened, loosen sandstone and weak layer of concrete on the surface, also answer dabbing, to rinse well with water and fully moistening, generally should not be less than 24h.The ponding remaining in concrete surface should be removed.When continuing fluid concrete from constuction joint place, note being directly adjacent to tape edge blanking.Should advance gradually to constuction joint place before machinery vibrates, and vibrate apart from the stopping of 80-100cm place, but should strengthen, to the tamping work of constuction joint seam, making it combine closely.
E, should strengthen bottom sleeper and the tamping of surrounding concrete, railway roadbed is combined well with sleeper.
Before F, railway roadbed concrete initial set, surface need be wiped one's face smooth, and drainage grade meets designing requirement, and ditch longitudinal gradient is consistent with line slope and smooth-going.
G, planeness of wiping one's face allowable error are ± 2mm, absolute altitude allowable error+5mm ,-10mm.The mortar on the surfaces such as rail, sleeper, fastener is cleared up in time when wiping one's face.
Then carry out step (8), be completed and arrange.Concrete:
1. rail is cleaned with water: clean the concrete be sprinkled upon on rail with water with spades or steel brush.
2. railway roadbed surface is rebuild: railway roadbed surface touches off part 1: 1 cement mortar repairing and fills closely knit.
3. fastener oiling: will cover fastener overburden and remove, cleans the mortar adhered in fastener surface and rail support groove with water, then by fastener oiling.
4. after railway roadbed dress work completes, railway roadbed is thoroughly cleaned, and with water cleaning, reach beautiful and clean.
5. after railway roadbed concrete construction completes, track condition is measured, perform record, and Survey control disjunction mark is intactly protected, as completion information and acceptance survey foundation.
In addition, the flexible member in step (2), can be the flexible member of band rubber, is fixed on railway roadbed floor, shown in accompanying drawing 2-4:
Rubber elastic element, comprises upper cover plate 1, upper iron piece 2, rubber parts 3, lower iron piece 4 and lower seat board 5, and iron core 6, caging bolt 7 and locking plug screw 8; Upper cover plate, upper iron piece, rubber parts, lower iron piece are connected with lower seat board order, and wherein, upper cover plate is removably connected with upper iron piece, and upper iron piece and lower iron piece and rubber parts are sulfided into integrally, and lower seat board is removably connected with lower iron piece; Iron core to be arranged in rubber parts and to be sulfided into one with rubber parts, and caging bolt successively through upper cover plate, upper iron piece, rubber parts and lower iron piece, and is threaded with upper cover plate, and locking plug screw is threaded with upper cover plate, and abuts the end face of caging bolt.Three projected claws 11 that upper cover plate 1 comprises upper cover plate body 12 and extended radially outward by the edge of upper cover plate body, upper cover plate body in the form of annular discs, this upper cover plate body and upper iron piece are located by seam; The centre of upper cover plate body is provided with tapped through hole, and caging bolt and locking plug screw are all threaded with this tapped through hole.Upper iron piece is the cylindrical structure part of 2 hollows, and cylindrical cavity 21 is formed at the top of upper iron piece, and conical cavity 22 is formed at the bottom of upper iron piece.In the form of a truncated cone, this conical butt rubber parts has the bottom surface of level to rubber parts 3, and the lateral surface of conical butt rubber parts is connected with the sidewall sulfuration of the conical cavity of upper iron piece; Iron core has the truncated conical configuration similar to rubber parts, and rubber parts is divided into thickness equal inside and outside two-layer.Lower iron piece 4 comprises the lower iron piece body of hollow and the lower end flatly outward extending annular join from lower iron piece body; In the form of a truncated cone, lower iron piece body comprises a top board to lower iron piece body, and top board has a central through hole passed for caging bolt, and bottom surface and the lower seat board of annular join are located by seam; The lateral surface of lower iron piece body and the upper surface at least partially of annular join with rubber parts sulfuration be connected.Lower seat board 5 is discoid, is provided with positive stop lug boss protruding upward, the caging bolt that this positive stop lug boss is just right, is provided with the locating hole under shed below positive stop lug boss in the middle of the upper surface of lower seat board.The top of caging bolt 7 is provided with thread segment, and bottom is provided with sulfuration section; Be provided with the hexagon ring matched with inner hexagon spanner in the middle of the end face of thread segment, the sulfuration of sulfuration section has one deck rubber layer.Upper cover plate 1 is removably connected by bolt with upper iron piece 2, and lower seat board is removably connected by bolt with lower iron piece.
Although be below described the preferred embodiments of the present invention by reference to the accompanying drawings; but the invention is not restricted to above-mentioned detailed description of the invention; above-mentioned detailed description of the invention is only schematic instead of determinate; those of ordinary skill in the art is under enlightenment of the present invention; under the prerequisite without prejudice to present inventive concept and claim; multiple similar enlightenment and accommodation can be drawn, and make corresponding simple change and amendment, be similar to such conversion and all fall within protection scope of the present invention.

Claims (4)

1. a construction method for tram monolithic railway roadbed, is characterized in that, comprises the following steps:
First step: the assembled section of track, specifically comprises:
1. be first well placed sleeper, then rubber mat plate under iron chair is installed on its corresponding precalculated position, then on described lower rubber mat plate, iron chair is installed, connecting bolt installed by described iron chair and/or sleeper and spring washer is reinforced them;
2. the iron chair secondly after reinforcing and sleeper arrange on-sleeper rubber tie plate and/or rubber tie plate under rail, and rail is put in the precalculated position then on above-mentioned rubber mat plate;
3. secondly upright described sleeper make described sleeper vertical with the axis of required circuit;
4. installing tache rail spring, makes to become section of track building block;
Second step: the substrate of solid concrete roabed is cleared up, and implements construction drainage, and lay railway roadbed base plate;
Third step is that steel mesh reinforcement is laid: be dispersed on the base plate of railway roadbed by many reinforcing bar vertical and horizontal, colligation is fixed, and the mesh spacing of adjustment reinforcing bar vertical and horizontal, chooses 2 longitudinal reinforcements and weld with transverse reinforcement, be used as drainage bar; 1 transverse reinforcement is selected to weld with all longitudinal reinforcements intersected every about 5m; A galvanized flat steel is welded with all longitudinal reinforcements, and draws to the outside of described steel mesh reinforcement, and the hole of φ 12mm is set at described galvanized flat steel exit; Described galvanized flat steel is 50mm × 8mm type; Each welding above-mentioned is double welding;
4th step is that frame founds the section of track and adjusts:
1. in railway roadbed precalculated position, assembled good described section of track building block is laid;
2. tentatively adjust orbital position, with rail bearing support, section of track building block is erected during adjustment, with right angle track forces and universal rail gage, and be aided with the range estimation adjustment absolute altitude of rail, gauge, level and direction;
3., after preliminary adjustment, multiple described section of track building block is welded to each other fixing by end;
5th step is track accurate adjustment: use track fine-tuning machine, detect the parameter values of the tread elevation at every sleepers place, track centre position, distance between centers of tracks, rail smooth degree, and by being that each numerical value uses instrument to carry out accurate adjustment;
6th step is install solid concrete roabed template: in the template of precalculated position fixed road bed, described template is wooden model for building;
7th step is placing railway roadbed concrete:
1. bottom first moistening railway roadbed;
2. continuous print fluid concrete;
3. tamping is carried out to the concrete of sleeper bottom periphery, railway roadbed is combined with sleeper well;
4., during railway roadbed concrete initial set, carry out smooth to its surface;
8th step is process of being completed:
1. the concrete be sprinkled upon on rail is cleaned with water;
2. the defect part 1:1 cement mortar repairing on railway roadbed surface fills closely knit.
2. construction method according to claim 1, is characterized in that, in step 2, under railway roadbed floor, arranges flexible member.
3. construction method according to claim 2, is characterized in that, this flexible member, comprises upper cover plate, upper iron piece, rubber parts, lower iron piece and lower seat board, and iron core, caging bolt and locking plug screw; Upper cover plate, upper iron piece, rubber parts, lower iron piece are connected with lower seat board order, and wherein, upper cover plate is removably connected with upper iron piece, and upper iron piece and lower iron piece and rubber parts are sulfided into integrally, and lower seat board is removably connected with lower iron piece; Iron core to be arranged in rubber parts and to be sulfided into one with rubber parts, and caging bolt successively through upper cover plate, upper iron piece, rubber parts and lower iron piece, and is threaded with upper cover plate, and locking plug screw is threaded with upper cover plate, and abuts the end face of caging bolt.
4. flexible member according to claim 3, it is characterized in that, three projected claws that upper cover plate comprises upper cover plate body and extended radially outward by the edge of upper cover plate body, upper cover plate body in the form of annular discs, this upper cover plate body and upper iron piece are located by seam; The centre of upper cover plate body is provided with tapped through hole, and caging bolt and locking plug screw are all threaded with this tapped through hole; Upper iron piece is the cylindrical structure part of hollow, and cylindrical cavity is formed at the top of upper iron piece, and conical cavity is formed at the bottom of upper iron piece; In the form of a truncated cone, this conical butt rubber parts has the bottom surface of level to rubber parts, and the lateral surface of conical butt rubber parts is connected with the sidewall sulfuration of the conical cavity of upper iron piece; Iron core has the truncated conical configuration similar to rubber parts, and rubber parts is divided into thickness equal inside and outside two-layer; Lower iron piece comprises the lower iron piece body of hollow and the lower end flatly outward extending annular join from lower iron piece body; Lower iron piece body in the form of a truncated cone, lower iron piece body comprises a top board, and top board has a central through hole passed for caging bolt, and bottom surface and the lower seat board of annular join are located by seam; The lateral surface of lower iron piece body and the upper surface at least partially of annular join with rubber parts sulfuration be connected; Lower seat board is discoid, is provided with positive stop lug boss protruding upward, the caging bolt that this positive stop lug boss is just right, is provided with the locating hole under shed below positive stop lug boss in the middle of the upper surface of lower seat board; The top of caging bolt is provided with thread segment, and bottom is provided with sulfuration section; Be provided with the hexagon ring matched with inner hexagon spanner in the middle of the end face of thread segment, the sulfuration of sulfuration section has one deck rubber layer; Upper cover plate is removably connected by bolt with upper iron piece, and lower seat board is removably connected by bolt with lower iron piece.
CN201510275444.0A 2015-05-20 2015-05-20 Construction method of tramcar overall-type roadbed Pending CN105064140A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510275444.0A CN105064140A (en) 2015-05-20 2015-05-20 Construction method of tramcar overall-type roadbed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510275444.0A CN105064140A (en) 2015-05-20 2015-05-20 Construction method of tramcar overall-type roadbed

Publications (1)

Publication Number Publication Date
CN105064140A true CN105064140A (en) 2015-11-18

Family

ID=54493628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510275444.0A Pending CN105064140A (en) 2015-05-20 2015-05-20 Construction method of tramcar overall-type roadbed

Country Status (1)

Country Link
CN (1) CN105064140A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107675564A (en) * 2017-11-16 2018-02-09 广西三维铁路轨道制造有限公司 A kind of fragment-free track slab framework of steel reinforcement insulation system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090129848A (en) * 2008-06-13 2009-12-17 한국철도기술연구원 Vibration proof apparatus of floating track
CN103321111A (en) * 2013-07-01 2013-09-25 中冶交通(沈阳)建设工程有限公司 Tramcar track continuous-laying construction method
CN203546517U (en) * 2013-09-17 2014-04-16 中铁二院工程集团有限责任公司 Green ballast bed for modern trams
CN104863025A (en) * 2015-03-30 2015-08-26 北京城建设计发展集团股份有限公司 Construction method of virescence-section monolithic track-bed for tramcars
CN105274912A (en) * 2015-03-30 2016-01-27 北京城建设计发展集团股份有限公司 Construction method for monolithic track bed of tramcar on hardened section

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090129848A (en) * 2008-06-13 2009-12-17 한국철도기술연구원 Vibration proof apparatus of floating track
CN103321111A (en) * 2013-07-01 2013-09-25 中冶交通(沈阳)建设工程有限公司 Tramcar track continuous-laying construction method
CN203546517U (en) * 2013-09-17 2014-04-16 中铁二院工程集团有限责任公司 Green ballast bed for modern trams
CN104863025A (en) * 2015-03-30 2015-08-26 北京城建设计发展集团股份有限公司 Construction method of virescence-section monolithic track-bed for tramcars
CN105274912A (en) * 2015-03-30 2016-01-27 北京城建设计发展集团股份有限公司 Construction method for monolithic track bed of tramcar on hardened section

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107675564A (en) * 2017-11-16 2018-02-09 广西三维铁路轨道制造有限公司 A kind of fragment-free track slab framework of steel reinforcement insulation system

Similar Documents

Publication Publication Date Title
CN106868959B (en) A kind of method that high ferro non-fragment orbit circuit is quickly repaired
CN101503870B (en) Construction method for two-block unballasted track bed board
CN101063289B (en) City-rail steel spring floating slab rail bed railroad switch construction method
CN104264543B (en) The construction method of sharp radius curve non-fragment orbit
CN202954282U (en) Steel-structure pedestrian bridge
CN107542017A (en) A kind of assembled road construction method
CN103321111B (en) Streetcar track connects the construction method of paving
CN106245467B (en) A kind of paving frame method for assembling board-like track structure
CN105421170A (en) Ballastless track construction method based on high-integration track panel frame
CN105755915A (en) Construction method for CRTS III plate type ballastless track bed plate
MX2010007687A (en) Apparatus and method for replacing a bridge using pre-cast construction techniques.
CN105274912A (en) Construction method for monolithic track bed of tramcar on hardened section
CN105735063A (en) Construction method for laying inspection pit rail through gluing method and rail hanging method based on rail erecting tool
CN106120479A (en) The board-like track structure of a kind of assembling
CN105926376A (en) Construction method of rubber springs of point support type track structure
CN104775340A (en) Intra-tunnel elastic support block type ballastless track dual-line construction process
CN104863025A (en) Construction method of virescence-section monolithic track-bed for tramcars
CN117758549A (en) Construction process of ballastless track of urban railway
CN117738032A (en) Ballastless track temporary supporting structure and ballastless track deformation renovation method
CN205501739U (en) Hole track construction is laid with frame rail frock to hanger rail method
CN105064140A (en) Construction method of tramcar overall-type roadbed
CN108130825B (en) Subgrade of metro concrete replacement technique in special limiting condition
WO2017187461A1 (en) Slab track, arranged in an overlapping manner on a slab foundation
CN111472283B (en) Construction method and structural system for ensuring installation accuracy of steel box girder of cable-stayed bridge
CN101191324A (en) Exchanging of plate-type rubber supporting on highway bridge abutment by using template positioning method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151118

WD01 Invention patent application deemed withdrawn after publication