CN105059575B - Emulsion bull ladle is installed - Google Patents

Emulsion bull ladle is installed Download PDF

Info

Publication number
CN105059575B
CN105059575B CN201510488568.7A CN201510488568A CN105059575B CN 105059575 B CN105059575 B CN 105059575B CN 201510488568 A CN201510488568 A CN 201510488568A CN 105059575 B CN105059575 B CN 105059575B
Authority
CN
China
Prior art keywords
diaphragm
emulsion
rotating disk
working chamber
drive mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510488568.7A
Other languages
Chinese (zh)
Other versions
CN105059575A (en
Inventor
敬亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anshun Jiulian Civil Explosion Co ltd
Original Assignee
HUNAN JINNENG AUTOMATIC EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN JINNENG AUTOMATIC EQUIPMENT CO Ltd filed Critical HUNAN JINNENG AUTOMATIC EQUIPMENT CO Ltd
Priority to CN201510488568.7A priority Critical patent/CN105059575B/en
Publication of CN105059575A publication Critical patent/CN105059575A/en
Application granted granted Critical
Publication of CN105059575B publication Critical patent/CN105059575B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B1/00Packaging fluent solid material, e.g. powders, granular or loose fibrous material, loose masses of small articles, in individual containers or receptacles, e.g. bags, sacks, boxes, cartons, cans, or jars
    • B65B1/04Methods of, or means for, filling the material into the containers or receptacles
    • B65B1/10Methods of, or means for, filling the material into the containers or receptacles by rotary feeders
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B1/00Packaging fluent solid material, e.g. powders, granular or loose fibrous material, loose masses of small articles, in individual containers or receptacles, e.g. bags, sacks, boxes, cartons, cans, or jars
    • B65B1/30Devices or methods for controlling or determining the quantity or quality or the material fed or filled
    • B65B1/36Devices or methods for controlling or determining the quantity or quality or the material fed or filled by volumetric devices or methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Quality & Reliability (AREA)
  • Air Transport Of Granular Materials (AREA)
  • Reciprocating Pumps (AREA)

Abstract

A kind of emulsion bull ladle installation, including the metering device being sequentially connected, delivery pipeline system, powder stick shaped device and the sealing device for sealing powder stick, metering device includes hopper and rotating disc type diaphragm pump, rotating disc type diaphragm pump includes rotating disk, the rotary drive mechanism that driving rotating disk is rotated and the end cap with the cooperation of rotating disk upper surface dynamic sealing, end cap is provided with charging aperture and discharging opening, rotating disk is provided with multiple diaphragm working chambers connected with charging aperture and discharging opening with rotating disk rotation period, the sealed bottom of each diaphragm working chamber is connected with diaphragm, rotating disc type diaphragm pump also includes driving each diaphragm back and forth to be agitated and sucking explosive when diaphragm working chamber connects charging aperture, the drive mechanism of explosive is discharged when diaphragm working chamber connects discharging opening.The emulsion conveying and packaging machine has the advantages that simple in construction, globality and integration are good, assembling and convenient operating maintenance, security are good, operating efficiency is high, service life is long.

Description

Emulsion bull ladle is installed
Technical field
The present invention relates to industrial emulsion explosive conveying and packaging technical field, and in particular to a kind of emulsion conveying and packaging Machine.
Background technology
Emulsion is a kind of new commercial explosive, with special physical arrangement, special chemical property, in emulsification In the conveying and packaging production process of explosive, do not destroying the physical arrangement of emulsion, do not influenceing emulsion commercial performance Under the premise of, it there is great potential safety hazard., it is necessary to which bulk cargo explosive is packed by specification after the completion of commercial explosive pharmacy, In order to manage, store, transport and sell.Screw pump, vane pump, impeller pump or post are generally used on current packaging production line Pump conveying emulsion is filled in, wherein, screw pump is eccentric driven pump, and friction is strong, and friction point is more, and elastomer stator easily assembles heat energy, exists Potential safety hazard;Blade, impeller, the cavity of vane pump are all metal material, there is intermetallic rigidity in the course of the work and rub Wipe, there is the pyrophoric hidden danger of production;Impeller pump be two cams to edging pressure, it is more sensitive to particulate matter, have necessarily to explosive property Influence, safeguards that cleaning is very inconvenient;The piston of plunger pump and plunger cavity have a friction at work, and between seal rapid wear It is bad, it is difficult to find, intermetallic rigidity friction is there may exist after damage, there is potential safety hazard.Therefore it provides a kind of safety, Stable, efficient powder charge packing machine turns into this area urgent problem.
The content of the invention
The technical problem to be solved in the present invention be overcome the shortcomings of prior art exist there is provided one kind it is simple in construction, be laid out Optimization is rationally, globality and integration are good, assembling and convenient operating maintenance, the security of equipment are good, operating efficiency is high, use the longevity The long emulsion bull ladle installation of life.
In order to solve the above technical problems, the present invention uses following technical scheme:
A kind of emulsion bull ladle installation, including metering device, the transfer pipeline of delivering explosion being sequentially connected System, powder stick shaped device and the sealing device for sealing powder stick, the metering device include hopper and rotating disc type diaphragm Pump, the rotating disc type diaphragm pump includes rotating disk, the rotary drive mechanism of driving rotating disk rotation and matched somebody with somebody with rotating disk upper surface dynamic sealing The end cap of conjunction, discharging opening of the end cap provided with the charging aperture connected with hopper outlet and with delivery pipeline system inlet communication, The rotating disk is evenly arranged and connecting with charging aperture and discharging opening with rotating disk rotation period provided with multiple around pivot center Diaphragm working chamber, the sealed bottom of each diaphragm working chamber is connected with diaphragm, the rotating disc type diaphragm pump also include driving it is each every Diaphragm is back and forth agitated and explosive is sucked when diaphragm working chamber connects charging aperture, discharges and fry when diaphragm working chamber connects discharging opening The drive mechanism of medicine.
Above-mentioned emulsion bull ladle installation, it is preferred that the drive mechanism includes the upper cylindrical cam being fixedly mounted With lower cylindrical cam, each diaphragm of correspondence is respectively equipped with a slide bar being slidably installed, one end of the slide bar on the rotating disk Be connected with diaphragm, the other end be provided with fixing axle, the fixing axle be equiped with two respectively with upper cylindrical cam and lower circle The bearing that the cam curved surface of post cam is engaged.
Above-mentioned emulsion bull ladle installation, it is preferred that blanking servicing unit is provided with the hopper, the blanking is auxiliary Device is helped to include the rotating shaft drive mechanism for the rotating shaft and driving axis of rotation being vertically arranged in hopper inner chamber, described turn The upper end of axle is connected with rotating shaft drive mechanism, and the lower end of the rotating shaft is provided with screw thread is promoted, and the outlet of the hopper is provided with one section Cylindrical cavity, the propulsion screw thread is located in the cylindrical cavity.
Above-mentioned emulsion bull ladle installation, it is preferred that the rotating shaft drive mechanism includes being installed at the top of hopper Decelerator and motor, the output shaft of the motor are connected with the input of decelerator, output end and the rotating shaft phase of the decelerator Even.
Above-mentioned emulsion bull ladle installation, it is preferred that the end cap is hingedly mounted on a column, and the column is consolidated In the frame for being connected to the installation of emulsion bull ladle, the hopper is fixedly connected with the end cap, is also equipped with the frame The cylinder opened and closed for Driving terminal around hinge axes.
Above-mentioned emulsion bull ladle installation, it is preferred that the rotating disk is provided with 4 ~ 20 diaphragm working chambers.
Above-mentioned emulsion bull ladle installation, it is preferred that the surrounding edge at the top of the rotating disk is provided with the bulge loop of evagination Portion, the diaphragm working chamber is located on projecting ring section and up/down perforation projecting ring section, and the inwall of the diaphragm working chamber is close to bottom position Put place and be provided with annular boss, the surrounding edge of the diaphragm is tightly connected with the annular boss.
Above-mentioned emulsion bull ladle installation, it is preferred that the surrounding of the rotating disk is covered with transparent shroud.
Above-mentioned emulsion bull ladle installation, it is preferred that the delivery pipeline system includes Pneumatic three-way valve and quick change Connector hose;Quick-release connector flexible pipe one end connects Pneumatic three-way valve, other end connection powder stick shaped device.
Above-mentioned emulsion bull ladle installation, it is preferred that the rotary drive mechanism is constant-speed drive mechanism.
Compared with prior art, the advantage of the invention is that:The emulsion bull ladle installation of the present invention uses rotating disc type Explosive is entered delivery pipeline system by diaphragm pump with constant flow, in the course of conveying of emulsion, diaphragm and diaphragm Without dynamic friction between working chamber, good airproof performance, explosive will not enter closed rotating mechanism, also there will be no heat energy aggregation, from And ensure that the security reliability of emulsion pumping;Meanwhile, rotating disk be provided with multiple diaphragm working chambers, can continuously, height The delivering explosion of effect, beneficial to the production efficiency for improving bull ladle installation.Emulsion bull ladle installation is simple in construction, it is excellent to be laid out Chemical combination is managed, globality and integration are good, assembling and convenient operating maintenance, the security of equipment are good, operating efficiency is high, service life It is long.
Brief description of the drawings
Fig. 1 is the main structure diagram that emulsion bull ladle of the present invention is installed.
Fig. 2 is the overlooking the structure diagram that emulsion bull ladle of the present invention is installed.
Fig. 3 is the overlooking the structure diagram of metering device during emulsion bull ladle of the present invention is installed.
Fig. 4 is front view structure signal of the metering device when end cap is closed during emulsion bull ladle of the present invention is installed Figure.
Fig. 5 is front view structure signal of the metering device when end cap is opened during emulsion bull ladle of the present invention is installed Figure.
Fig. 6 is the cross section structure diagram of emulsion bull ladle of the present invention installation turntable formula diaphragm pump.
Marginal data:
1st, metering device;2nd, delivery pipeline system;21st, Pneumatic three-way valve;22nd, quick-release connector flexible pipe;3rd, powder stick into Type device;4th, sealing device;5th, hopper;51st, cylindrical cavity;6th, rotating disc type diaphragm pump;61st, rotating disk;611st, diaphragm working chamber;612、 Projecting ring section;613rd, annular boss;62nd, end cap;63rd, rotary drive mechanism;64th, charging aperture;65th, discharging opening;66th, diaphragm;67、 Upper cylindrical cam;68th, lower cylindrical cam;69th, slide bar;610th, fixing axle;620th, bearing;7th, blanking servicing unit;71st, rotating shaft; 72nd, screw thread is promoted;73rd, decelerator;74th, motor;8th, column;9th, cylinder;10th, transparent shroud;100th, frame.
Embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.
As shown in Figures 1 to 6, emulsion bull ladle of the invention installation, including the metering device being sequentially connected 1st, the delivery pipeline system 2 of delivering explosion, powder stick shaped device 3 and the sealing device 4 for sealing powder stick, wherein, transfer pipeline System 2, powder stick shaped device 3 and sealing device 4 can use prior art, and powder stick shaped device 3 makes sheet plastic film form circle Post is simultaneously glued by connecting sewing longitudinal direction, explosive is filled into column plastic film, U-shaped aluminium buckle is connected on powder stick by sealing device 4, And cutting is sealed to powder stick.Metering device 1 includes hopper 5 and the rotating disc type diaphragm pump 6 positioned at the lower section of hopper 5, rotating disc type What diaphragm pump 6 coordinated including rotating disk 61, the rotary drive mechanism 63 of the rotation of driving rotating disk 61 and with the upper surface dynamic sealing of rotating disk 61 End cap 62, end cap 62 is provided with the discharging opening with the charging aperture 64 of the outlet of hopper 5 and with the inlet communication of delivery pipeline system 2 65, rotating disk 61 is evenly arranged 611,11 diaphragm working chambers 611 of diaphragm working chamber with 61 turns of rotating disk provided with 11 around pivot center It is dynamic to be periodically directed at connection with charging aperture 64 and discharging opening 65, rotating disk 61 often rotate one week each diaphragm working chamber 611 successively with Charging aperture 64 is connected successively with discharging opening 65, and the sealed bottom of each diaphragm working chamber 611 is connected with diaphragm 66, rotating disc type diaphragm Pump 6 also includes driving the drive mechanism that each diaphragm 66 is back and forth agitated, and diaphragm working chamber 611 can be changed by being agitated by diaphragm 66 Size, and then suck or discharge explosive, and drive mechanism suction when diaphragm working chamber 611 connects charging aperture 64 is fried Medicine, diaphragm working chamber 611 connect discharging opening 65 when discharge explosive.
The rotating disk 61 of the present embodiment is altogether provided with 11 diaphragm working chambers 611, in other embodiments, diaphragm working chamber 611 It can also be the other quantity between 4 ~ 20.Multiple diaphragm working chambers 611 are set to improve the transfer efficiency of explosive.
In the present embodiment, as shown in fig. 6, drive mechanism includes the upper cylindrical cam 67 and lower cylindrical cam being fixedly mounted 68, each diaphragm 66 of correspondence is respectively equipped with a slide bar being slidably installed 69, one end and the diaphragm 66 of slide bar 69 on rotating disk 61 Removable seal connect, the other end be provided with fixing axle 610, fixing axle 610 be equiped with two respectively with upper cylindrical cam 67 The bearing 620 being engaged with the cam curved surface of lower cylindrical cam 68.Upper cylindrical cam 67 and lower cylindrical cam 68 and two axles Hold 620 mating reaction to control slide bar 69 to slide up and down, for each revolution, slide bar 69 is slided up and down once rotating disk 61, works as film When piece working chamber 611 is aligned with charging aperture 64, the cam curved surface of upper cylindrical cam 67 just force bearing 620 with slide bar 69 to Lower slider, slide bar 69 pulls diaphragm 66 to agitate the volume that makes diaphragm working chamber 611 to increase downwards, and then explosive is sucked into diaphragm In working chamber 611;When diaphragm working chamber 611 is aligned with discharging opening 65, the cam curved surface of lower cylindrical cam 68 just forces axle 620 are held with the upward sliding of slide bar 69, slide bar 69 pulls diaphragm 66 to agitate the volume for making diaphragm working chamber 611 to reduce upwards, And then release explosive outside diaphragm working chamber 611.The curve form of above-mentioned upper cylindrical cam 67 and lower cylindrical cam 68 can root According to reasonable setting is actually needed, it refers to existing mature technology.In other embodiments, it would however also be possible to employ cam path and bearing 620 cooperation controls the slide bar 69 to slide up and down.
In the present embodiment, blanking servicing unit 7 is provided with hopper 5, blanking servicing unit 7 includes being vertically arranged to hopper 5 The rotating shaft drive mechanism that rotating shaft 71 and drive shaft 71 in inner chamber are rotated, upper end and the rotating shaft drive mechanism phase of rotating shaft 71 Even, the lower end of rotating shaft 71 is provided with screw thread 72 is promoted, and the outlet of hopper 5 promotes screw thread 72 to be located at cylinder provided with one section of cylindrical cavity 51 In chamber 51.
Above-mentioned rotating shaft drive mechanism includes being installed on the decelerator 73 and motor 74 at the top of hopper 5, the output shaft of motor 74 It is connected with the input of decelerator 73, the output end of decelerator 73 is connected with rotating shaft 71.
In the present embodiment, as shown in Figures 3 to 5, end cap 62 is hingedly mounted on a column 8, and it is fried that column 8 is fixed in emulsification In the frame 100 of medicine bull ladle installation, hopper 5 is fixedly connected with end cap 62, is also equipped with being used for Driving terminal 62 in frame 100 The cylinder 9 opened and closed around hinge axes.Cylinder 9 is hingedly mounted in frame 100, and its telescoping cylinder is hinged with hopper 5, is passed through The stretching motion of cylinder 9, can be close to end cap 62 and the upper surface of rotating disk 61, it is ensured that the reliability of dynamic sealing, while can also drive Hopper 5 and end cap 62 is set to be opened around hinge axes, easy access, maintenance.
In the present embodiment, the surrounding edge at the top of rotating disk 61 is provided with the projecting ring section 612 of evagination, and each diaphragm working chamber 611 is set In on projecting ring section 612 and up/down perforation projecting ring section 612, the inwall of diaphragm working chamber 611 is provided with convex annular at bottom position Platform 613, surrounding edge and the annular boss 613 of diaphragm 66 are tightly connected.This kind of structure causes diaphragm 66 and slide bar 69 It is point exposed to be easy to check the service condition of diaphragm 66 outside, if there is breakage to find easily, and safeguarded in time more Change, if there is material to ooze out, fallen out under the action of the centrifugal force from exposed position as rotating disk 61 rotates, without entering closed turn Dynamic center.
In the present embodiment, rotary drive mechanism 63 is constant-speed drive mechanism, and its constant revolution of driving rotating disk 61, the rotation is driven Motivation structure 63 can use diversified forms of the prior art, will not be repeated here.
In the present embodiment, as shown in fig. 6, the surrounding of rotating disk 61 is covered with transparent shroud 10, to rotating disk 61 and associated components Security protection is carried out, while also allowing for observation.As depicted in figs. 1 and 2, delivery pipeline system 2 includes Pneumatic three-way valve 21 and fast Change connector hose 22;The one end of quick-release connector flexible pipe 22 connects Pneumatic three-way valve 21, other end connection powder stick shaped device 3.It is pneumatic Triple valve 21 is easy to the normal conveying or emptying of emulsion, the easy disassembly of quick-release connector flexible pipe 22 cleaning maintaining.
During the emulsion bull ladle installation work of the present embodiment, emulsion enters rotating disc type diaphragm pump 6 by hopper 5 Charging aperture 64, rotating disk 61 rotation driving and diaphragm 66 elastic deformation motion under, with rotating disk 61 rotation successively Emulsion in diaphragm working chamber 611 is escaped and enter into delivery pipeline system 2 by discharging opening 65, and the flow of explosive is permanent It is fixed.Emulsion passes through the delivery pipeline system 2 being made up of Pneumatic three-way valve 21, quick-release connector flexible pipe 22 and enters powder stick shaping dress Put 3;Powder stick shaped device 3 first makes sheet plastic film formation cylinder and connecting sewing longitudinal direction is glued, and explosive then is filled into column In plastic film;The plastic film volume of the full emulsion of filling is drawn to sealing device 4, and U-shaped aluminium buckle is connected to powder stick by sealing device 4 On, and powder stick is sealed and cut, so far complete the conveying to explosive, pack.
Described above is only the preferred embodiment of the present invention, and protection scope of the present invention is not limited merely to above-mentioned implementation Example.To those of ordinary skill in the art, the improvement and change resulting in the case where not departing from the technology of the present invention concept thereof Change and also should be regarded as protection scope of the present invention.

Claims (9)

1. a kind of emulsion bull ladle installation, including the metering device being sequentially connected(1), delivering explosion transfer pipeline System(2), powder stick shaped device(3)With the sealing device for sealing powder stick(4), it is characterised in that:The metering device (1)Including hopper(5)With rotating disc type diaphragm pump(6), the rotating disc type diaphragm pump(6)Including rotating disk(61), driving rotating disk(61) The rotary drive mechanism of rotation(63)With with rotating disk(61)The end cap that upper surface dynamic sealing coordinates(62), the end cap(62)It is provided with With hopper(5)The charging aperture of outlet(64)With with delivery pipeline system(2)The discharging opening of inlet communication(65), the rotating disk (61)It is evenly arranged provided with multiple around pivot center and with rotating disk(61)Rotation period and charging aperture(64)And discharging opening (65)The diaphragm working chamber of connection(611), each diaphragm working chamber(611)Sealed bottom be connected with diaphragm(66), described turn Disc type diaphragm pump(6)Also include driving each diaphragm(66)Back and forth agitate and in diaphragm working chamber(611)Connect charging aperture(64) When suction explosive, in diaphragm working chamber(611)Connect discharging opening(65)When discharge explosive drive mechanism;
The rotating disk(61)The surrounding edge at top is provided with the projecting ring section of evagination(612), the diaphragm working chamber(611)Located at convex Ring portion(612)Upper and up/down perforation projecting ring section(612), the diaphragm working chamber(611)Inwall be provided with bottom position Annular boss(613), the diaphragm(66)Surrounding edge and the annular boss(613)It is tightly connected.
2. emulsion bull ladle installation according to claim 1, it is characterised in that:The drive mechanism includes fixed pacify The upper cylindrical cam of dress(67)With lower cylindrical cam(68), the rotating disk(61)Upper each diaphragm of correspondence(66)It is respectively equipped with one The slide bar being slidably installed(69), the slide bar(69)One end and diaphragm(66)It is connected, the other end is provided with fixing axle (610), the fixing axle(610)On be equiped with two respectively with upper cylindrical cam(67)With lower cylindrical cam(68)Cam it is bent The bearing that face is engaged(620).
3. emulsion bull ladle installation according to claim 1, it is characterised in that:The hopper(5)In be provided with blanking Servicing unit(7), the blanking servicing unit(7)Including being vertically arranged to hopper(5)Rotating shaft in inner chamber(71)And driving The rotating shaft(71)The rotating shaft drive mechanism of rotation, the rotating shaft(71)Upper end be connected with rotating shaft drive mechanism, the rotating shaft (71)Lower end provided with promote screw thread(72), the hopper(5)Outlet provided with one section of cylindrical cavity(51), the propulsion screw thread (72)Positioned at the cylindrical cavity(51)In.
4. emulsion bull ladle installation according to claim 3, it is characterised in that:The rotating shaft drive mechanism includes peace Loaded on hopper(5)The decelerator at top(73)And motor(74), the motor(74)Output shaft and decelerator(73)Input End is connected, the decelerator(73)Output end and rotating shaft(71)It is connected.
5. emulsion bull ladle installation according to claim 1, it is characterised in that:The end cap(62)It is hingedly mounted on One column(8)On, the column(8)It is fixed in the frame of emulsion bull ladle installation(100)On, the hopper(5)With institute State end cap(62)It is fixedly connected, the frame(100)On be also equipped be used for Driving terminal(62)On and off is beaten around hinge axes The cylinder closed(9).
6. emulsion bull ladle installation according to claim 1, it is characterised in that:The rotating disk(61)Provided with 4 ~ 20 Diaphragm working chamber(611).
7. emulsion bull ladle installation according to claim 1, it is characterised in that:The rotating disk(61)Surrounding cover set There is transparent shroud(10).
8. emulsion bull ladle installation according to claim 1, it is characterised in that:The delivery pipeline system(2)Bag Include Pneumatic three-way valve(21)With quick-release connector flexible pipe(22);Quick-release connector flexible pipe(22)One end connects Pneumatic three-way valve(21), separately One end connects powder stick shaped device(3).
9. emulsion bull ladle installation according to claim 1, it is characterised in that:The rotary drive mechanism(63)For Constant-speed drive mechanism.
CN201510488568.7A 2015-08-11 2015-08-11 Emulsion bull ladle is installed Active CN105059575B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510488568.7A CN105059575B (en) 2015-08-11 2015-08-11 Emulsion bull ladle is installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510488568.7A CN105059575B (en) 2015-08-11 2015-08-11 Emulsion bull ladle is installed

Publications (2)

Publication Number Publication Date
CN105059575A CN105059575A (en) 2015-11-18
CN105059575B true CN105059575B (en) 2017-10-03

Family

ID=54489174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510488568.7A Active CN105059575B (en) 2015-08-11 2015-08-11 Emulsion bull ladle is installed

Country Status (1)

Country Link
CN (1) CN105059575B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106428662A (en) * 2016-08-25 2017-02-22 石家庄成功机电有限公司 Charging machine for packaging powdery explosives through plastic film
CN112552131A (en) * 2020-11-13 2021-03-26 宏大***工程集团有限责任公司 High-integration emulsion explosive mobile ground station

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2055873U (en) * 1989-02-21 1990-04-11 黄涛 Diaphragm pump
KR100210224B1 (en) * 1996-07-03 1999-07-15 김성철 Diaphragm pump
CN2321956Y (en) * 1998-04-21 1999-06-02 杭州华黎泵厂 Machanic driving type membrane measuring pump
CN2743350Y (en) * 2004-11-24 2005-11-30 北京燕麓通科技开发有限公司 Explosive loading attachment
CN202765626U (en) * 2012-05-03 2013-03-06 薛世忠 Emulsion explosive matrix storing and shipping equipment
CN103964979B (en) * 2014-05-06 2017-01-11 河北晓进机械制造股份有限公司 Emulsion explosive charging machine and charging method thereof
CN204473176U (en) * 2015-01-28 2015-07-15 长沙琦清机械设备有限公司 Emulsion bull ladle based on rotating disc type plunger pump is installed
CN204956959U (en) * 2015-08-11 2016-01-13 长沙琦清机械设备有限公司 Emulsion explosive carries packagine machine

Also Published As

Publication number Publication date
CN105059575A (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN105059575B (en) Emulsion bull ladle is installed
CN106014971B (en) A kind of eccentric revolution grouting pump of big flow and its application method
CN206954539U (en) A kind of edible mushroom materials auto-feeder for bag
CN210116925U (en) Material sealing type spiral conveying device
CN106040379B (en) A kind of continuous vacuum pulverizer and its application method
CN117028336B (en) Anti-blocking standby slurry pump conveying device
CN201817422U (en) Automatic packaging unit for emulsion explosive cartridge
CN204473176U (en) Emulsion bull ladle based on rotating disc type plunger pump is installed
CN201400311Y (en) Multifunctional energy-saving powder packaging machine
CN105604959B (en) Powershift combined agricultural water pump
CN204956959U (en) Emulsion explosive carries packagine machine
CN208632076U (en) Integral type lotion racking machine
CN203921406U (en) A kind of environment-friendly type bag discharge machine for bagged cement
CN110185594A (en) A kind of pressure water well device
CN205550197U (en) Real empty can is carried in configuration of large -scale medicament goods
CN101935261A (en) Automatic packaging machine for emulsion explosive cartridge
CN206458644U (en) Guide vane structure with floating choma
CN209441789U (en) Tablet tablet counter
CN2774939Y (en) Valve bag screw filler for quantitative funnel scale
CN101913970A (en) Explosive cartridge end heat sealing method for emulsion explosive packaged by plastic film
CN209076549U (en) A kind of efficient material-compound tank of pharmaceutical purpose
CN218877643U (en) Wax powder filling equipment
CN206582118U (en) A kind of self-priming centrifugal multistage pump multiple centrifugal pump
CN106567988A (en) Butter filler capable of automatically fixing quantity
CN204323713U (en) A kind of emulsion bull ladle installation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170428

Address after: 410000 Changsha high tech Development Zone, Lu Feng Road, No. 69, Jin Rui science and Technology Industrial Park, diamond workshop auxiliary room

Applicant after: HUNAN KENON AUTOMATIC EQUIPMENT Co.,Ltd.

Address before: 410000 Hunan city high tech Development Zone Changsha Changsha Luhu Road No. 39, block A building block 15 Jin Rongyang Valley

Applicant before: CHANGSHA QIQING MACHINERY EQUIPMENT Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240607

Address after: 561007 daxiqiao Town, Xixiu District, Anshun City, Guizhou Province

Patentee after: Anshun Jiulian civil explosion Co.,Ltd.

Country or region after: China

Address before: 410000 Auxiliary Building for Diamond Products Workshop in Jinrui Technology Industrial Park, No. 69 Lufeng Road, Changsha High tech Development Zone, Hunan Province

Patentee before: HUNAN KENON AUTOMATIC EQUIPMENT Co.,Ltd.

Country or region before: China