CN105048483A - Energy-storage capacity configuration method and system for PV-containing power distribution network - Google Patents

Energy-storage capacity configuration method and system for PV-containing power distribution network Download PDF

Info

Publication number
CN105048483A
CN105048483A CN201510276154.8A CN201510276154A CN105048483A CN 105048483 A CN105048483 A CN 105048483A CN 201510276154 A CN201510276154 A CN 201510276154A CN 105048483 A CN105048483 A CN 105048483A
Authority
CN
China
Prior art keywords
grid
energy storage
power
connected point
point voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510276154.8A
Other languages
Chinese (zh)
Other versions
CN105048483B (en
Inventor
刘涛
朱志芳
翟世涛
刘泽槐
张勇军
黄健昂
朱革兰
刘文泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
South China University of Technology SCUT
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT, Guangzhou Power Supply Bureau Co Ltd filed Critical South China University of Technology SCUT
Priority to CN201510276154.8A priority Critical patent/CN105048483B/en
Publication of CN105048483A publication Critical patent/CN105048483A/en
Application granted granted Critical
Publication of CN105048483B publication Critical patent/CN105048483B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Photovoltaic Devices (AREA)

Abstract

The invention provides an energy-storage capacity configuration method and system for a PV-containing power distribution network, and the method comprises the steps: collecting network frame parameters, a daily load in a maximum operation mode in a last time period, and a daily active power output of a photovoltaic power station; obtaining the daily operation voltage data of a photovoltaic grid-connected point at each moment through load flow calculation; setting the upper and lower limits of voltage constraint of the photovoltaic grid-connected point; obtaining an energy-storage power output array of each sampling point through employing a grid-connected point equal-step-length power injection method according to an operation voltage of the photovoltaic grid-connected point; and obtaining the energy-storage configuration capacity according to the integration of time step lengths. The whole process is simple and visual, and the voltage constraint on the energy-storage capacity configuration is considered. The energy-storage capacity configuration is carried out from an angle of preventing the voltage of the photovoltaic grid-connected point from being exceeds the limits. A configuration index is visual, is easy to measure, is effective and can be used for the determining of the energy-storage capacity and the optimization of the energy-storage capacity configuration under the condition of giving consideration to the voltage constraint.

Description

Containing energy accumulation capacity configuration and the system of photovoltaic power distribution network
Technical field
The present invention relates to electric power network technical field, particularly relate to the energy accumulation capacity configuration containing photovoltaic power distribution network and system.
Background technology
Along with the fast development of economy, continuing to increase of electricity needs, the deterioration increasingly of the day by day deficient and environment of traditional energy, photovoltaic generation large-scale grid connection has become development trend.
But photovoltaic is subject to Natural resources condition and weather influence obviously, has fluctuation and intermittent feature, causes disturbance and impact to a certain extent, even cause voltage out-of-limit, affect the safe and reliable stable operation of electrical network the power distribution network of access.In order to utilize illumination resource to greatest extent, photovoltaic generation runs with unity power factor usually, and energy storage is in the meritorious advantage having its uniqueness that exports of balance, therefore, can effectively regulate grid-connected point voltage in grid-connected configuration energy storage, the stored energy capacitance configuration therefore how carrying out photovoltaic power distribution network is also known as in order to a difficult problem in the urgent need to address.
In recent years, have both at home and abroad much about the collocation method of stored energy capacitance, but there is the shortcoming of energy storage distribu-tion index inadequate problem and complicated operation intuitively in conventional method.
Summary of the invention
Based on this, be necessary to there is the directly perceived not and problem of complexity of energy storage distribu-tion index for the collocation method of the general stored energy capacitance containing photovoltaic power distribution network, provide a kind of energy storage distribu-tion index directly perceived and the simple energy accumulation capacity configuration containing photovoltaic power distribution network and system.
Containing an energy accumulation capacity configuration for photovoltaic power distribution network, comprise step:
Gather Net Frame of Electric Network parameter, maximum operational mode daily load and photovoltaic plant day gained merit and exert oneself in the upper time period;
According to Net Frame of Electric Network parameter, maximum operational mode daily load and photovoltaic plant day gained merit and exert oneself in the upper time period, adopt distribution power system load flow calculation, obtain grid-connected some day operation voltage data;
According to electric power netting safe running requirement, set higher limit and the lower limit of grid-connected point voltage constraint;
The higher limit retrain grid-connected some day operation voltage data with grid-connected point voltage respectively and lower limit compare, and adopt also site unique step Power-injected method to obtain energy storage power output;
By energy storage power output temporally step-length integration obtain the energy storage configuration capacity containing photovoltaic power distribution network.
Containing a stored energy capacitance configuration-system for photovoltaic power distribution network, comprising:
Acquisition module, for gathering Net Frame of Electric Network parameter, in the upper time period, maximum operational mode daily load and photovoltaic plant day gain merit and exert oneself;
Voltage data acquisition module, for according to Net Frame of Electric Network parameter, meritoriously to exert oneself maximum operational mode daily load and photovoltaic plant day in the upper time period, adopts distribution power system load flow calculation, obtains grid-connected some day operation voltage data;
Upper lower limit value setting module, for according to electric power netting safe running requirement, sets higher limit and the lower limit of grid-connected point voltage constraint;
Energy storage power output calculates module, compares for the higher limit that retrained with grid-connected point voltage respectively by grid-connected some day operation voltage data and lower limit, and adopts and site unique step Power-injected method obtains energy storage power output;
Energy storage configuration capacity acquisition module, for by energy storage power output temporally step-length integration obtain the energy storage configuration capacity containing photovoltaic power distribution network.
The present invention contains energy accumulation capacity configuration and the system of photovoltaic power distribution network, gather parameter of double--layer grids, maximum operational mode daily load and photovoltaic plant day gained merit and exert oneself in the upper time period, Load flow calculation obtains each sampling instant grid-connected some day operation voltage data, set the bound of grid-connected point voltage constraint, according to the working voltage of grid-connected point, adopt also site unique step Power-injected method to obtain the energy storage power stage array of each sampled point, and temporally step-length integration obtain energy storage configuration capacity.Whole process is simple, and consider the stored energy capacitance configuration of voltage constraint, carry out energy storage configuration from the angle avoiding grid-connected point voltage out-of-limit, distribu-tion index is intuitively easily surveyed effectively, can be used for the determination of stored energy capacitance and optimizes the stored energy capacitance configuration considering voltage constraint.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet that the present invention contains energy accumulation capacity configuration first embodiment of photovoltaic power distribution network;
Fig. 2 is the schematic flow sheet that the present invention contains energy accumulation capacity configuration second embodiment of photovoltaic power distribution network.
Fig. 3 is the simplified model schematic diagram that the present invention contains photovoltaic plant access 10kV power distribution network in one of them application example of energy accumulation capacity configuration of photovoltaic power distribution network;
Fig. 4 is power output and the load power curve chart that the present invention contains photovoltaic plant in one of them application example of energy accumulation capacity configuration of photovoltaic power distribution network;
Fig. 5 is that the present invention contains the day operation voltage curve not configuring each node of energy storage in one of them application example of energy accumulation capacity configuration of photovoltaic power distribution network;
Fig. 6 is the output curve diagram that the present invention contains each moment energy storage power in one of them application example of energy accumulation capacity configuration of photovoltaic power distribution network;
Fig. 7 is by the voltage curve of the present invention containing each node after the energy accumulation capacity configuration configuration energy storage of photovoltaic power distribution network;
Fig. 8 is the structural representation that the present invention contains stored energy capacitance configuration-system first embodiment of photovoltaic power distribution network;
Fig. 9 is the structural representation that the present invention contains stored energy capacitance configuration-system second embodiment of photovoltaic power distribution network.
Embodiment
As shown in Figure 1, a kind of energy accumulation capacity configuration containing photovoltaic power distribution network, comprises step:
S100: gather Net Frame of Electric Network parameter, maximum operational mode daily load and photovoltaic plant day gained merit and exert oneself in the upper time period.
Net Frame of Electric Network parameter, in the upper time period, meritorious these data of exerting oneself can obtain based on electrical network historical data maximum operational mode daily load and photovoltaic plant day.A upper time period is specifically as follows one month, a season or 1 year equal time section.
As shown in Figure 2, wherein in an embodiment, step 100 comprises step:
S120: the sampling time interval △ t determining Dan Tian.
Determine the sampling time interval △ t of a day, then within one day, be total to n sampled point.
S140: gathered Net Frame of Electric Network parameter, the load data of each load point of each sampling instant of maximum operational mode day i and meritorious the exerting oneself of photovoltaic plant on the same day each sampling instant i in a day in the upper time period.
Gather Net Frame of Electric Network line impedance, the load data of each load point of each sampling instant of maximum operational mode day i and the meritorious P that exerts oneself of photovoltaic plant on the same day each sampling instant i in a day in the upper time period vi.
S200: according to Net Frame of Electric Network parameter, maximum operational mode daily load and photovoltaic plant day gained merit and exert oneself in the upper time period, adopt distribution power system load flow calculation, obtain grid-connected some day operation voltage data.
Net Frame of Electric Network parameter mainly comprises Net Frame of Electric Network line impedance, calls distribution power system load flow calculation program solution each moment grid-connected point voltage U i, (i=1,2 ... n), one group of day operation voltage array U=(U is obtained 1, U 2..., U n).To exert oneself P according to photovoltaic plant vand load data P l, Q l, parameter of double--layer grids situation, calls distribution power system load flow calculation program solution and goes out grid-connected point voltage U of each moment i.
S300: according to electric power netting safe running requirement, sets higher limit and the lower limit of the constraint of grid-connected point voltage.
Electric power netting safe running requires to know based on the relevant industries criterion of power industry, safe operation in different power distribution network requires not identical, such as, in 10kV power distribution network, allows the voltage range deviation run to be ± 7%, from perunit value, working voltage scope is 0.93kV ~ 1.07kV.
S400: the higher limit retrain grid-connected some day operation voltage data with grid-connected point voltage respectively and lower limit compare, and adopt also site unique step Power-injected method to obtain energy storage power output.
By each element U in grid-connected some day operation voltage data U i(i=1,2 ..., upper limit n) retrained with voltage respectively and lower limit urelatively, and adopt also site unique step Power-injected method to obtain energy storage power output, the energy storage power output of i-th sampled point is p si; The energy storage power output of each sampled point is deposited in an array, claims this array to be p s.And site unique step Power-injected method refer to photovoltaic and site unique step inject energy storage power, until the method for voltage in restriction range of grid-connected point.
Specifically, wherein in an embodiment, the energy storage power output p of i-th sampled point siobtain by the following method:
Initialization energy storage power output p si=0, setting energy storage injecting power step-length △ P s; If U i< u, be △ P at grid-connected point with step-length sprogressively inject energy storage power, often inject a power and carry out primary distribution Load flow calculation, solve grid-connected point voltage U i, until grid-connected point voltage is greater than U, p is set sifor the injecting power of now energy storage; If be-△ P at grid-connected point with step-length sprogressively inject energy storage power, often inject a power and carry out primary distribution Load flow calculation, solve grid-connected point voltage, until grid-connected point voltage is less than p is set sifor the injecting power of now energy storage; If p is set sibe 0.
S500: by energy storage power output temporally step-length integration obtain the energy storage configuration capacity containing photovoltaic power distribution network.
Wherein in an embodiment, step S500 specifically comprises step:
Judge the positive and negative of energy storage output power value;
Be the positive cumulative summation of numerical value by energy storage output power value, record summed result is sum pos, by energy storage output power value be the negative cumulative summation of numerical value and negate, record summation negate result is sum neg;
Relatively summed result sum poswith summation negate result sum negsize, work as sum pos>sum negtime, arranging energy storage configuration capacity is sum pos* △ t, works as sum pos≤ sum negtime, arranging energy storage configuration capacity is sum neg* △ t.
The present invention is containing the energy accumulation capacity configuration of photovoltaic power distribution network, gather parameter of double--layer grids, maximum operational mode daily load and photovoltaic plant day gained merit and exert oneself in the upper time period, Load flow calculation obtains each sampling instant grid-connected some day operation voltage data, set the bound of grid-connected point voltage constraint, according to the working voltage of grid-connected point, adopt also site unique step Power-injected method to obtain the energy storage power stage array of each sampled point, and temporally step-length integration obtain energy storage configuration capacity.Whole process simple, intuitive, consider the stored energy capacitance configuration of voltage constraint, carry out energy storage configuration from the angle avoiding grid-connected point voltage out-of-limit, distribu-tion index is intuitively easily surveyed effectively, can be used for the determination of stored energy capacitance and optimizes the stored energy capacitance configuration considering voltage constraint.
Wherein in an embodiment, the described higher limit that retrained with grid-connected point voltage respectively by grid-connected some day operation voltage data and lower limit compare, and adopt and site unique step Power-injected method obtains energy storage power output specifically comprises step:
Initialization energy storage power output p s0=0, setting energy storage injecting power step-length △ P s;
By grid-connected some day operation voltage U ithe higher limit retrained with grid-connected point voltage respectively and lower limit urelatively;
When grid-connected some day operation voltage U ibe less than the lower limit of grid-connected point voltage constraint utime, be △ P at grid-connected point with step-length sprogressively inject energy storage power, often inject a power and carry out primary distribution Load flow calculation, solve grid-connected point voltage, until grid-connected point voltage is greater than the lower limit of grid-connected point voltage constraint u, energy storage power output p is set sifor the injecting power of now energy storage;
When grid-connected some day operation voltage U ibe greater than the higher limit of grid-connected point voltage constraint time, be-△ P at grid-connected point with step-length sprogressively inject energy storage power, often inject a power and carry out primary distribution Load flow calculation, solve grid-connected point voltage, until grid-connected point voltage is less than the higher limit of grid-connected point voltage constraint energy storage power output p is set sifor the injecting power of now energy storage;
When grid-connected some day operation voltage U ibe less than or equal to the higher limit of grid-connected point voltage constraint and be more than or equal to the lower limit of grid-connected point voltage constraint utime, energy storage power output p is set sibe zero.
Below by employing instantiation, and composition graphs 3, Fig. 4, Fig. 5 further explain explanation to the present invention containing the energy accumulation capacity configuration of photovoltaic power distribution network.
Fig. 3 is the simplified model of middle photovoltaic plant access 10kV power distribution network in this specific embodiment, and in figure, 1,2,3,4 represent node serial number respectively.
Step one: the sampling time interval △ t=15min determining a day, be then total to n=96 sampled point in one day;
Step 2: collection Net Frame of Electric Network line impedance, the load data of each load point of each sampling instant of maximum operational mode day i and the meritorious P that exerts oneself of photovoltaic plant on the same day each sampling instant i in a day in the upper time period vi;
Line impedance Z between node 1 to node 2 12, line impedance Z between node 2 to node 3 23, system equivalent reactance X 0, because susceptance is very little over the ground in 10kV power distribution network, therefore ignore line-to-ground susceptance.Above parameter is respectively:
Z 12=(0.63+j1.2)Ω,Z 23=(1.26+j2.4)Ω,X 0=j0.6Ω
Infinite bus system node voltage perunit value is: V 4=1.05
The load data of each load point of each sampling instant of maximum operational mode day i and the meritorious P that exerts oneself of photovoltaic plant on the same day each sampling instant i in a day in the upper time period vias shown in Figure 4, photovoltaic plant runs with unit power, i.e. Q v=0, Fig. 4 shows the P that exerts oneself of the photovoltaic plant that each sampling instant is formed vand load is gained merit P lidle Q lcurve.
Step 3: call distribution power system load flow calculation program solution each moment grid-connected point voltage U i(i=1,2 ... n), one group of day operation voltage array U=(U is obtained 1, U 2..., U n); To exert oneself P according to photovoltaic plant vand load data P l, Q l, parameter of double--layer grids situation, calls distribution power system load flow calculation program solution and goes out grid-connected point voltage U of each moment i, for more getting information about the voltage condition of different node in example, Fig. 5 gives the voltage curve that the day operation voltage array that each moment is formed is linked to be of each node in example.
Step 4: the bound requiring the grid-connected point voltage constraint of setting according to safe operation: u;
In 10kV power distribution network, allow the voltage range deviation run to be ± 7%, from perunit value, working voltage scope is 0.93kV ~ 1.07kV.Consider certain nargin, setting u=0.95, namely grid-connected point voltage is constrained between 0.95kV ~ 1.06kV.
Step 5: by and site day operation voltage array U in each element U i(i=1,2 ... n) upper limit retrained with voltage respectively and lower limit urelatively, and adopt also site unique step Power-injected method to obtain energy storage power output, the energy storage power output of i-th sampled point is p si; The energy storage power output of each sampled point is deposited in an array, claims this array to be p s.
The energy storage power output p of i-th sampled point siobtain by the following method:
Initialization energy storage power output p s0=0, setting energy storage injecting power step-length △ P s; If U i< u, be △ P at grid-connected point with step-length sprogressively inject energy storage power, often inject a power and carry out primary distribution Load flow calculation, solve grid-connected point voltage U i, until grid-connected point voltage is greater than U, p is set sifor the injecting power of now energy storage; If be-△ P at grid-connected point with step-length sprogressively inject energy storage power, often inject a power and carry out primary distribution Load flow calculation, solve grid-connected point voltage, until grid-connected point voltage is less than p is set sifor the injecting power of now energy storage; If p is set sibe 0.In this specific embodiment, there is the more upper limit and more lower limit situation in grid-connected point voltage, finds the moment that grid-connected some U get over the upper limit to be: this time period of 11:00 ~ 14:45, more the moment of lower limit is: this time period of 18:00 ~ 23:00.From day operation voltage array U, be 44th ~ 59 elements and occurred the more upper limit, there is more lower limit in 72nd ~ 92 elements, the upper limit is got in totally 16 sampling instants, and lower limit is got in 21 sampling instants, setting △ P s=0.05MW; If Ui<U, be △ P at grid-connected point with step-length sprogressively inject energy storage power, often inject a power and carry out primary distribution Load flow calculation, solve grid-connected point voltage U i, until grid-connected point voltage is greater than U, the injecting power that Psi is now energy storage is set; If at grid-connected point with step-length for-Δ Ps progressively injects energy storage power, often inject a power and carry out primary distribution Load flow calculation, solve grid-connected point voltage, until grid-connected point voltage is less than p is set sifor the injecting power of now energy storage; If p is set sibe 0; Fig. 6 shows the curve of output of each moment energy storage power, p si>0 represents that energy storage is in discharge condition, p si<0 represents that energy storage is in charged state.
Step 6: to p sielement carries out suing for peace, integration obtains energy storage configuration capacity.
To p selement carries out suing for peace, integration obtains energy storage configuration capacity, energy storage configuration capacity is determined by the following method: judge the positive and negative of energy storage output power value, and be the positive cumulative summation of numerical value by energy storage output power value, record summed result is sum pos, by energy storage output power value be the negative cumulative summation of numerical value and negate, record summation negate result is sum neg, compare summed result sum poswith summation negate result sum negsize, work as sum pos>sum negtime, arranging energy storage configuration capacity is sum pos* △ t, works as sum pos≤ sum negtime, arranging energy storage configuration capacity is sum neg* △ t.
In this specific embodiment, p sin all elements totally 21 being greater than 0, p sin all elements totally 16 being less than 0; To p sin all be greater than 0 element summation, summed result sum posrepresent; Then: sum pos=33; To p sin all be less than 0 element summation and negate, summation, negate result sum negrepresent; Then: sum neg=41.05;
Because sum neg<sum neg, △ t=15min=0.25h, then the stored energy capacitance configured is:
C=sum neg*△t=41.05MW*0.25h=10.2625MWgh
Therefore, in this specific embodiment, the configuration capacity C=10.2625MWgh of energy storage.
For visual test adopts the present invention to contain the effect after the energy accumulation capacity configuration of photovoltaic power distribution network, Fig. 7 gives and adopts the present invention containing after the energy accumulation capacity configuration configuration energy storage of photovoltaic power distribution network, the day operation voltage curve of each node.
As shown in Figure 7, the voltage of node 1, namely the voltage of grid-connected point is constrained between 0.96kV ~ 1.06kV accurately, and this proves accuracy and the validity of the energy storage power output that the method is calculated.In Figure 5, the node 1 at grid-connected some place, node 2 voltage at load place have occurred all having occurred more bound, and after adopting the present invention to contain the energy accumulation capacity configuration configuration energy storage of photovoltaic power distribution network, node 1,
Node 2 all there will not be out-of-limit.Visible, adopt the present invention to configure containing the energy accumulation capacity configuration of photovoltaic power distribution network the problem that energy storage effectively can solve the local nodes voltage out-of-limit caused after photovoltaic accesses.
Wherein in an embodiment, described by energy storage power output temporally step-length integration after obtaining containing photovoltaic power distribution network energy storage configuration capacity also in steps:
Energy storage configuration capacity data containing photovoltaic power distribution network are stored.
Storing calculating the energy storage configuration capacity data containing photovoltaic power distribution network obtained, avoiding fortuitous event to cause loss of data on the one hand, also convenient operation personnel are follow-up again on the other hand checks.
As shown in Figure 8, a kind of stored energy capacitance configuration-system containing photovoltaic power distribution network, comprising:
Acquisition module 100, for gathering Net Frame of Electric Network parameter, in the upper time period, maximum operational mode daily load and photovoltaic plant day gain merit and exert oneself;
Voltage data acquisition module 200, for according to Net Frame of Electric Network parameter, meritoriously to exert oneself maximum operational mode daily load and photovoltaic plant day in the upper time period, adopts distribution power system load flow calculation, obtains grid-connected some day operation voltage data;
Upper lower limit value setting module 300, for according to electric power netting safe running requirement, sets higher limit and the lower limit of grid-connected point voltage constraint;
Energy storage power output calculates module 400, compares for the higher limit that retrained with grid-connected point voltage respectively by grid-connected some day operation voltage data and lower limit, and adopts and site unique step Power-injected method obtains energy storage power output;
Energy storage configuration capacity acquisition module 500, for by energy storage power output temporally step-length integration obtain the energy storage configuration capacity containing photovoltaic power distribution network.
The present invention is containing the stored energy capacitance configuration-system of photovoltaic power distribution network, acquisition module 100 gathers parameter of double--layer grids, in the upper time period, maximum operational mode daily load and photovoltaic plant day gain merit and exert oneself, voltage data acquisition module 200 Load flow calculation obtains each sampling instant grid-connected some day operation voltage data, upper lower limit value setting module 300 sets the bound of grid-connected point voltage constraint, energy storage power output calculates module 400 according to the working voltage of grid-connected point, also site unique step Power-injected method is adopted to obtain the energy storage power stage array of each sampled point, energy storage configuration capacity acquisition module 500 temporally step-length integration obtains energy storage configuration capacity.Whole process simple, intuitive, consider the stored energy capacitance configuration of voltage constraint, carry out energy storage configuration from the angle avoiding grid-connected point voltage out-of-limit, distribu-tion index is intuitively easily surveyed effectively, can be used for the determination of stored energy capacitance and optimizes the stored energy capacitance configuration considering voltage constraint.
As shown in Figure 9, wherein in an embodiment, described acquisition module 100 specifically comprises:
Sampling interval determining unit 120, for determining the sampling time interval △ t of Dan Tian;
Collecting unit 140, the load data of each load point of each sampling instant of maximum operational mode day i and meritorious the exerting oneself of photovoltaic plant on the same day each sampling instant i in a day for gathering Net Frame of Electric Network parameter, in the upper time period.
Wherein in an embodiment, described energy storage power output calculates module 400 and specifically comprises:
Initial cell, for initialization energy storage power output p s0=0, setting energy storage injecting power step-length △ P s;
Comparing unit, for by grid-connected some day operation voltage U ithe higher limit retrained with grid-connected point voltage respectively and lower limit urelatively;
First processing unit, for working as grid-connected some day operation voltage U ibe less than the lower limit of grid-connected point voltage constraint utime, be △ P at grid-connected point with step-length sprogressively inject energy storage power, often inject a power and carry out primary distribution Load flow calculation, solve grid-connected point voltage, until grid-connected point voltage is greater than the lower limit of grid-connected point voltage constraint u, energy storage power output p is set sifor the injecting power of now energy storage;
Second processing unit, for working as grid-connected some day operation voltage U ibe greater than the higher limit of grid-connected point voltage constraint time, be-△ P at grid-connected point with step-length sprogressively inject energy storage power, often inject a power and carry out primary distribution Load flow calculation, solve grid-connected point voltage, until grid-connected point voltage is less than the higher limit of grid-connected point voltage constraint energy storage power output p is set sifor the injecting power of now energy storage;
3rd processing unit, for working as grid-connected some day operation voltage U ibe less than or equal to the higher limit of grid-connected point voltage constraint and be more than or equal to the lower limit of grid-connected point voltage constraint utime, energy storage power output p is set sibe zero.
Wherein in an embodiment, described energy storage configuration capacity acquisition module 500 specifically comprises:
Judging unit, for judging the positive and negative of energy storage output power value;
Energy storage configuration capacity computing unit, for being the positive cumulative summation of numerical value by energy storage output power value, record summed result is sum pos, by energy storage output power value be the negative cumulative summation of numerical value and negate, record summation negate result is sum neg;
Energy storage configuration capacity acquiring unit, for comparing summed result sum poswith summation negate result sum negsize, work as sum pos>sum negtime, arranging energy storage configuration capacity is sum pos* △ t, works as sum pos≤ sum negtime, arranging energy storage configuration capacity is sum neg* △ t.
Wherein in an embodiment, the described stored energy capacitance configuration-system containing photovoltaic power distribution network also comprises:
Memory module, for storing the energy storage configuration capacity data containing photovoltaic power distribution network.
The above embodiment only have expressed several execution mode of the present invention, and it describes comparatively concrete and detailed, but can not therefore be construed as limiting the scope of the patent.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection range of patent of the present invention should be as the criterion with claims.

Claims (10)

1., containing an energy accumulation capacity configuration for photovoltaic power distribution network, it is characterized in that, comprise step:
Gather Net Frame of Electric Network parameter, maximum operational mode daily load and photovoltaic plant day gained merit and exert oneself in the upper time period;
According to Net Frame of Electric Network parameter, maximum operational mode daily load and photovoltaic plant day gained merit and exert oneself in the upper time period, adopt distribution power system load flow calculation, obtain grid-connected some day operation voltage data;
According to electric power netting safe running requirement, set higher limit and the lower limit of grid-connected point voltage constraint;
The higher limit retrain grid-connected some day operation voltage data with grid-connected point voltage respectively and lower limit compare, and adopt also site unique step Power-injected method to obtain energy storage power output;
By energy storage power output temporally step-length integration obtain the energy storage configuration capacity containing photovoltaic power distribution network.
2. the energy accumulation capacity configuration containing photovoltaic power distribution network according to claim 1, is characterized in that, described collection Net Frame of Electric Network parameter, maximum operational mode daily load and photovoltaic plant day gains merit to exert oneself and specifically comprises step in the upper time period:
Determine the sampling time interval △ t of Dan Tian;
Gathered Net Frame of Electric Network parameter, the load data of each load point of each sampling instant of maximum operational mode day i and meritorious the exerting oneself of photovoltaic plant on the same day each sampling instant i in a day in the upper time period.
3. the energy accumulation capacity configuration containing photovoltaic power distribution network according to claim 1 and 2, it is characterized in that, the described higher limit that retrained with grid-connected point voltage respectively by grid-connected some day operation voltage data and lower limit compare, and adopt and site unique step Power-injected method obtains energy storage power output specifically comprises step:
Initialization energy storage power output p s0=0, setting energy storage injecting power step-length △ P s;
By grid-connected some day operation voltage U ithe higher limit retrained with grid-connected point voltage respectively and lower limit urelatively;
When grid-connected some day operation voltage U ibe less than the lower limit of grid-connected point voltage constraint utime, be △ P at grid-connected point with step-length sprogressively inject energy storage power, often inject a power and carry out primary distribution Load flow calculation, solve grid-connected point voltage, until grid-connected point voltage is greater than the lower limit of grid-connected point voltage constraint u, energy storage power output p is set sifor the injecting power of now energy storage;
When grid-connected some day operation voltage U ibe greater than the higher limit of grid-connected point voltage constraint time, be-△ P at grid-connected point with step-length sprogressively inject energy storage power, often inject a power and carry out primary distribution Load flow calculation, solve grid-connected point voltage, until grid-connected point voltage is less than the higher limit of grid-connected point voltage constraint energy storage power output p is set sifor the injecting power of now energy storage;
When grid-connected some day operation voltage U ibe less than or equal to the higher limit of grid-connected point voltage constraint and be more than or equal to the lower limit of grid-connected point voltage constraint utime, energy storage power output p is set sibe zero.
4. the energy accumulation capacity configuration containing photovoltaic power distribution network according to claim 2, is characterized in that, described by energy storage power output temporally step-length integration obtain specifically comprising step containing the energy storage configuration capacity of photovoltaic power distribution network:
Judge the positive and negative of energy storage output power value;
Be the positive cumulative summation of numerical value by energy storage output power value, record summed result is sum pos, by energy storage output power value be the negative cumulative summation of numerical value and negate, record summation negate result is sum neg;
Relatively summed result sum poswith summation negate result sum negsize, work as sum pos>sum negtime, arranging energy storage configuration capacity is sum pos* △ t, works as sum pos≤ sum negtime, arranging energy storage configuration capacity is sum neg* △ t.
5. the energy accumulation capacity configuration containing photovoltaic power distribution network according to claim 1 and 2, is characterized in that, described by energy storage power output temporally step-length integration after obtaining containing photovoltaic power distribution network energy storage configuration capacity also in steps:
Energy storage configuration capacity data containing photovoltaic power distribution network are stored.
6., containing a stored energy capacitance configuration-system for photovoltaic power distribution network, it is characterized in that, comprising:
Acquisition module, for gathering Net Frame of Electric Network parameter, in the upper time period, maximum operational mode daily load and photovoltaic plant day gain merit and exert oneself;
Voltage data acquisition module, for according to Net Frame of Electric Network parameter, meritoriously to exert oneself maximum operational mode daily load and photovoltaic plant day in the upper time period, adopts distribution power system load flow calculation, obtains grid-connected some day operation voltage data;
Upper lower limit value setting module, for according to electric power netting safe running requirement, sets higher limit and the lower limit of grid-connected point voltage constraint;
Energy storage power output calculates module, compares for the higher limit that retrained with grid-connected point voltage respectively by grid-connected some day operation voltage data and lower limit, and adopts and site unique step Power-injected method obtains energy storage power output;
Energy storage configuration capacity acquisition module, for by energy storage power output temporally step-length integration obtain the energy storage configuration capacity containing photovoltaic power distribution network.
7. the stored energy capacitance configuration-system containing photovoltaic power distribution network according to claim 6, it is characterized in that, described acquisition module specifically comprises:
Sampling interval determining unit, for determining the sampling time interval △ t of Dan Tian;
Collecting unit, the load data of each load point of each sampling instant of maximum operational mode day i and meritorious the exerting oneself of photovoltaic plant on the same day each sampling instant i in a day for gathering Net Frame of Electric Network parameter, in the upper time period.
8. the stored energy capacitance configuration-system containing photovoltaic power distribution network according to claim 6 or 7, is characterized in that, described energy storage power output calculates module and specifically comprises:
Initial cell, for initialization energy storage power output p s0=0, setting energy storage injecting power step-length △ P s;
Comparing unit, for by grid-connected some day operation voltage U ithe higher limit retrained with grid-connected point voltage respectively and lower limit urelatively;
First processing unit, for working as grid-connected some day operation voltage U iwhen being less than the lower limit U of grid-connected point voltage constraint, be △ P at grid-connected point with step-length sprogressively inject energy storage power, often inject a power and carry out primary distribution Load flow calculation, solve grid-connected point voltage, until grid-connected point voltage is greater than the lower limit of grid-connected point voltage constraint u, energy storage power output p is set sifor the injecting power of now energy storage;
Second processing unit, for working as grid-connected some day operation voltage U ibe greater than the higher limit of grid-connected point voltage constraint time, be-△ P at grid-connected point with step-length sprogressively inject energy storage power, often inject a power and carry out primary distribution Load flow calculation, solve grid-connected point voltage, until grid-connected point voltage is less than the higher limit of grid-connected point voltage constraint energy storage power output p is set sifor the injecting power of now energy storage;
3rd processing unit, for working as grid-connected some day operation voltage U ibe less than or equal to the higher limit of grid-connected point voltage constraint and be more than or equal to the lower limit of grid-connected point voltage constraint utime, energy storage power output p is set sibe zero.
9. the stored energy capacitance configuration-system containing photovoltaic power distribution network according to claim 7, it is characterized in that, described energy storage configuration capacity acquisition module specifically comprises:
Judging unit, for judging the positive and negative of energy storage output power value;
Energy storage configuration capacity computing unit, for being the positive cumulative summation of numerical value by energy storage output power value, record summed result is sum pos, by energy storage output power value be the negative cumulative summation of numerical value and negate, record summation negate result is sum neg;
Energy storage configuration capacity acquiring unit, for comparing summed result sum poswith summation negate result sum negsize, work as sum pos>sum negtime, arranging energy storage configuration capacity is sum pos* △ t, works as sum pos≤ sum negtime, arranging energy storage configuration capacity is sum neg* △ t.
10. the stored energy capacitance configuration-system containing photovoltaic power distribution network according to claim 1 and 2, is characterized in that, also comprise:
Memory module, for storing the energy storage configuration capacity data containing photovoltaic power distribution network.
CN201510276154.8A 2015-05-26 2015-05-26 The energy accumulation capacity configuration and system of the power distribution network containing photovoltaic Active CN105048483B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510276154.8A CN105048483B (en) 2015-05-26 2015-05-26 The energy accumulation capacity configuration and system of the power distribution network containing photovoltaic

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510276154.8A CN105048483B (en) 2015-05-26 2015-05-26 The energy accumulation capacity configuration and system of the power distribution network containing photovoltaic

Publications (2)

Publication Number Publication Date
CN105048483A true CN105048483A (en) 2015-11-11
CN105048483B CN105048483B (en) 2018-04-17

Family

ID=54454806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510276154.8A Active CN105048483B (en) 2015-05-26 2015-05-26 The energy accumulation capacity configuration and system of the power distribution network containing photovoltaic

Country Status (1)

Country Link
CN (1) CN105048483B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106410831A (en) * 2016-11-15 2017-02-15 广东电网有限责任公司茂名供电局 Method and system for active distribution network energy storage configuration
CN107634528A (en) * 2016-07-19 2018-01-26 锐电科技有限公司 A kind of wind farm energy storage capacity collocation method
CN107959301A (en) * 2017-12-06 2018-04-24 华南理工大学 Low-voltage network distributed energy storage containing photovoltaic is distributed rationally and operation method
CN108110791A (en) * 2017-12-29 2018-06-01 西交利物浦大学 Reduce the photovoltaic output power smooth control method and system of energy storage system capacity
CN108448612A (en) * 2018-03-20 2018-08-24 国网江西省电力有限公司电力科学研究院 A kind of echelon for energy storage utilizes lithium-ion-power cell capacity collocation method
CN109462255A (en) * 2018-11-20 2019-03-12 国网浙江省电力有限公司绍兴供电公司 A kind of power distribution network photovoltaic power generation capacity optimization method and system based on energy-storage system
CN110518606A (en) * 2019-09-18 2019-11-29 合肥阳光新能源科技有限公司 A kind of energy storage device method for parameter configuration and device
CN110556857A (en) * 2019-06-10 2019-12-10 国网甘肃省电力公司定西供电公司 distributed photovoltaic grid-connected point voltage calculation method based on current collection network model
CN111092447A (en) * 2019-12-05 2020-05-01 国网河南省电力公司电力科学研究院 Optimal energy storage grid connection point configuration method and device under system small interference stability boundary
CN113964869A (en) * 2021-11-05 2022-01-21 内蒙古民族大学 Distributed photovoltaic power generation grid-connected power control system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103346563A (en) * 2013-07-15 2013-10-09 国家电网公司 Method for evaluating maximum permeability of distributed generation based on time scene access analysis

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103346563A (en) * 2013-07-15 2013-10-09 国家电网公司 Method for evaluating maximum permeability of distributed generation based on time scene access analysis

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107634528A (en) * 2016-07-19 2018-01-26 锐电科技有限公司 A kind of wind farm energy storage capacity collocation method
CN106410831A (en) * 2016-11-15 2017-02-15 广东电网有限责任公司茂名供电局 Method and system for active distribution network energy storage configuration
CN107959301A (en) * 2017-12-06 2018-04-24 华南理工大学 Low-voltage network distributed energy storage containing photovoltaic is distributed rationally and operation method
CN107959301B (en) * 2017-12-06 2020-11-03 华南理工大学 Distributed energy storage optimal configuration and operation method for low-voltage distribution network containing photovoltaic
CN108110791A (en) * 2017-12-29 2018-06-01 西交利物浦大学 Reduce the photovoltaic output power smooth control method and system of energy storage system capacity
CN108448612A (en) * 2018-03-20 2018-08-24 国网江西省电力有限公司电力科学研究院 A kind of echelon for energy storage utilizes lithium-ion-power cell capacity collocation method
CN109462255A (en) * 2018-11-20 2019-03-12 国网浙江省电力有限公司绍兴供电公司 A kind of power distribution network photovoltaic power generation capacity optimization method and system based on energy-storage system
CN110556857A (en) * 2019-06-10 2019-12-10 国网甘肃省电力公司定西供电公司 distributed photovoltaic grid-connected point voltage calculation method based on current collection network model
CN110518606A (en) * 2019-09-18 2019-11-29 合肥阳光新能源科技有限公司 A kind of energy storage device method for parameter configuration and device
CN111092447A (en) * 2019-12-05 2020-05-01 国网河南省电力公司电力科学研究院 Optimal energy storage grid connection point configuration method and device under system small interference stability boundary
CN111092447B (en) * 2019-12-05 2022-04-22 国网河南省电力公司电力科学研究院 Optimal energy storage grid connection point configuration method and device under system small interference stability boundary
CN113964869A (en) * 2021-11-05 2022-01-21 内蒙古民族大学 Distributed photovoltaic power generation grid-connected power control system

Also Published As

Publication number Publication date
CN105048483B (en) 2018-04-17

Similar Documents

Publication Publication Date Title
CN105048483A (en) Energy-storage capacity configuration method and system for PV-containing power distribution network
Trillo-Montero et al. Development of a software application to evaluate the performance and energy losses of grid-connected photovoltaic systems
CN103544378A (en) Method for calculating harmonic wave impedance of alternating current system for direct current transmission
CN103219748A (en) Determination method and system of power grid wind electricity digestion capability
CN104077664B (en) Confidence capacity assessment method of energy storage and generation system of wind power
CN106651660B (en) Comprehensive evaluation method for searching static weak points of power grid based on G1-entropy weight method
CN104111691A (en) Photovoltaic inverter MPPT control method based on three-point comparison method
JP2022550212A (en) Methods and apparatus for modeling photovoltaic power curves, and computer devices and storage media thereof
CN110247397A (en) A kind of energy storage configuration method, system, device and readable storage medium storing program for executing
CN111327075B (en) Two-stage type photovoltaic grid-connected system low voltage ride through dynamic evaluation method and system
CN105262146A (en) Electrical power system standby capacity calculating method containing wind power and system thereof
CN103489137B (en) A kind of action sequence determination method for reactive power compensation device of wind power system
CN112072692A (en) Impedance equivalence method and device for new energy power generation station
CN117473384A (en) Power grid line safety constraint identification method, device, equipment and storage medium
CN106849154B (en) Photovoltaic power station node harmonic voltage and harmonic source sensitivity relation analysis method
Hou et al. Measurement-based load modeling at distribution level with complete model structure
Yang The optimal capacity determination method of energy storage system with different applications in wind farm
CN106685083A (en) Intelligent power distribution terminal and method capable of implementing power utilization behavior analysis of charging pile
CN105529740A (en) Method and system for evaluating flickering of wind power plant and wind power plant grid-connected part
CN103178519B (en) The method of power oscillation of power system disturbing source is located in real time based on SCADA data
CN103178521B (en) Based on the method for SCADA historical data searching analysis power oscillation of power system disturbing source
CN112993984B (en) Large-disturbance polymerization method for distributed photovoltaic power station under condition of electrical connection
CN115660314A (en) Shadow shielding diagnosis method and device, electronic equipment and storage medium
CN107994586A (en) A kind of high and low pressure network voltage dynamic response decoupling method
CN111817359B (en) Micro-grid solvable boundary analysis method based on equivalent circuit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231215

Address after: 510620, No. two, No. 2, Tianhe South Road, Guangzhou, Guangdong, Tianhe District

Patentee after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.

Patentee after: SOUTH CHINA University OF TECHNOLOGY

Address before: 510620, No. two, No. 2, Tianhe South Road, Guangzhou, Guangdong, Tianhe District

Patentee before: GUANGZHOU POWER SUPPLY Co.,Ltd.

Patentee before: SOUTH CHINA University OF TECHNOLOGY