CN105044534B - Go out the test method and device of line transformer by oil jacket tube transitions plug cable termination - Google Patents

Go out the test method and device of line transformer by oil jacket tube transitions plug cable termination Download PDF

Info

Publication number
CN105044534B
CN105044534B CN201510585871.9A CN201510585871A CN105044534B CN 105044534 B CN105044534 B CN 105044534B CN 201510585871 A CN201510585871 A CN 201510585871A CN 105044534 B CN105044534 B CN 105044534B
Authority
CN
China
Prior art keywords
experiment
oil
transformer
sleeve pipe
rise
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510585871.9A
Other languages
Chinese (zh)
Other versions
CN105044534A (en
Inventor
李静
张国运
赵徐
常鑫
张立明
汤鹏
孙国刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoding Tianwei Group Tebian Electric Co Ltd
Original Assignee
Baoding Tianwei Group Tebian Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoding Tianwei Group Tebian Electric Co Ltd filed Critical Baoding Tianwei Group Tebian Electric Co Ltd
Priority to CN201510585871.9A priority Critical patent/CN105044534B/en
Publication of CN105044534A publication Critical patent/CN105044534A/en
Application granted granted Critical
Publication of CN105044534B publication Critical patent/CN105044534B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The present invention relates to a kind of test method and device for going out line transformer by oil jacket tube transitions plug cable termination, belong to transformer test technical field.Technical scheme is:Experiment is externally provided with oil extraction capsule with rise seat(4)And butterfly valve(5), oil extraction capsule is connected with butterfly valve;Three experiments rise seat(2)Between use connecting leg(3)It is connected, connecting leg is connected with three experiments with rise seat respectively, and is connected with butterfly valve, and the both ends of butterfly valve connect connecting leg and oil extraction capsule respectively(4);Experiment sleeve pipe(1)It is oil-gas casing, three experiments are separately mounted on experiment rise seat with sleeve pipe;Transformer oil tubing and casing(7)One end be connected with transformer coil lead, the other end is by raising seat(6)With experiment rise seat, experiment is provided with air relief cock with sleeve pipe(8), overtesting completes the Insulation Test of transformer and temperature rise test with sleeve pipe.The positive effect of the present invention:Ancillary test device is easy to operation, has versatility, practical.

Description

By oil-oil jacket tube transitions plug cable termination go out line transformer test method and Device
Technical field
The present invention relates to a kind of test method and dress for going out line transformer by oil-oil jacket tube transitions plug cable termination Put, belong to transformer test technical field.
Background technology
, it is necessary to carry out corresponding experiment to verify transformer performance after the completion of transformer manufacturing.But for using oil-oil The transformer of tube transitions plug cable termination outlet is covered, because reasons in structure can not directly be tried by plugging cable termination Test, how to complete to test by auxiliary experiment device, be this area technical problem urgently to be resolved hurrily.
The content of the invention
It is an object of the present invention to provide a kind of test method for going out line transformer by oil-oil jacket tube transitions plug cable termination And device, by ancillary test device, solve oil-oil jacket tube transitions plug cable termination and go out line transformer and be not easy to do insulation examination Test and the problem of temperature rise test, ancillary test device is easy to operation, has versatility, solves the problems, such as that background technology is present.
The technical scheme is that:Go out the experimental rig of line transformer by oil-oil jacket tube transitions plug cable termination, Include experiment sleeve pipe, experiment rise seat, connecting leg, oil extraction capsule and butterfly valve, three experiments rise seats and transformer oil-oil Rise seat where sleeve pipe connects respectively, because experimental rig is in high point, it is necessary to which oil extraction, experiment are externally provided with oil extraction with rise seat Capsule and butterfly valve, oil extraction capsule are connected with butterfly valve;Three experiments are connected with connecting leg between seat with raising, connecting leg respectively with three Experiment is connected with rise seat, and is connected with butterfly valve, and the both ends of butterfly valve connect connecting leg and oil extraction capsule respectively;Experiment is with sleeve pipe Oil-gas sleeve pipe, three experiments are separately mounted on experiment rise seat with sleeve pipe;One end of transformer oil-tubing and casing and transformation Device coil lead is connected, and the other end raises seat by raising seat and experiment, is drawn with temporary lead wire by testing with sleeve pipe, tests Air relief cock is provided with sleeve pipe, the Insulation Test of transformer and temperature rise test are completed with sleeve pipe by experiment.
The connecting leg is arranged on the top of experiment rise seat, is connected respectively with three experiments with peak at the top of rise seat It is logical.
Go out the test method of line transformer by oil-oil jacket tube transitions plug cable termination, include following processing step:
Three experiments are connected respectively with rise seat with the rise seat where transformer oil-tubing and casing, due to experimental rig In high point, it is necessary to which oil extraction, experiment are externally provided with oil extraction capsule and butterfly valve with rise seat, oil extraction capsule is connected with butterfly valve;Three examinations Test and be connected between rise seat with connecting leg, connecting leg is connected with three experiments with rise seat respectively, and is connected with butterfly valve, butterfly valve Both ends connect connecting leg and oil extraction capsule respectively;Experiment is oil-gas sleeve pipe with sleeve pipe, and three experiments are separately mounted to test with sleeve pipe With on rise seat;One end of transformer oil-tubing and casing is connected with transformer coil lead, and the other end is used by raising seat and experiment Seat is raised, is drawn with temporary lead wire by testing with sleeve pipe, experiment is provided with air relief cock with sleeve pipe;
The Insulation Test of transformer and temperature rise test are completed with sleeve pipe by experiment, carry out oiling first, during oiling Butterfly valve is closed, and the air relief cock of experiment sleeve pipe is opened, and carries out vacuum oil by the fuel feeding valve of transformer, oiling to air relief cock emits Untill fuel-displaced, stop oiling and close air relief cock;During oiling, internal gas is deflated by air relief cock;
After oiling, it is quiet put 48 hours after, proceed by Insulation Test and the temperature rise test of transformer, during experiment, The butterfly valve being connected with oil extraction capsule is switched on, and Insulation Test and temperature rise test are conventionally completed.
The positive effect of the present invention:By ancillary test device, solves oil-oil jacket tube transitions plug cable termination outlet The problem of transformer is not easy to do Insulation Test and temperature rise test, ancillary test device is easy to operation, has versatility, practicality By force.
Brief description of the drawings
Figure l is the structural representation of the present invention;
Fig. 2 is schematic side view of the present invention;
In figure:Experiment sleeve pipe 1, experiment rise seat 2, connecting leg 3, oil extraction capsule 4, butterfly valve 5, rise seat 6, oil-oil jacket Pipe 7, air relief cock 8, connect-disconnect plug 9.
Embodiment
Below in conjunction with accompanying drawing, by embodiment, the invention will be further described.
Go out the experimental rig of line transformer by oil-oil jacket tube transitions plug cable termination, include experiment sleeve pipe 1, examination Test with seat 2, connecting leg 3, oil extraction capsule 4 and butterfly valve 5 is raised, three experiments, which are used, raises seat 2 and the place of transformer oil-tubing and casing 7 Rise seat 6 connects respectively, because experimental rig is in high point, it is necessary to which oil extraction, experiment rise seat 2 are externally provided with the He of oil extraction capsule 4 Butterfly valve 5, oil extraction capsule 4 are connected with butterfly valve 5;Be connected between three experiments rise seats 2 with connecting leg 3, connecting leg 3 respectively with three Experiment rise seat 2 connects, and is connected with butterfly valve 5, and the both ends of butterfly valve 5 connect connecting leg 3 and oil extraction capsule 4 respectively;Experiment covers Pipe 1 is oil-gas sleeve pipe, and three experiment sleeve pipes 1 are separately mounted on experiment rise seat 2;The one of transformer oil-tubing and casing 7 End is connected with transformer coil lead, and the other end raises seat 2 by raising seat 6 and experiment, is covered with temporary lead wire by experiment Pipe 1 is drawn, and experiment is provided with air relief cock 8 with sleeve pipe 1, is tried by experiment with sleeve pipe 1 to complete the Insulation Test of transformer and temperature rise Test.
The connecting leg 3 is arranged on the top of experiment rise seat 2, is used with three experiments raise the top peak of seat 2 respectively Connection.
The bottom of rise seat 6 of the transformer is provided with connect-disconnect plug 9.
Go out the test method of line transformer by oil-oil jacket tube transitions plug cable termination, include following processing step:
Three experiments are connected respectively with rise seat 2 with the rise seat 6 where transformer oil-tubing and casing 7, because experiment fills Put in high point, it is necessary to which oil extraction, experiment are externally provided with oil extraction capsule 4 and butterfly valve 5 with rise seat, oil extraction capsule 4 is connected with butterfly valve 5; Be connected between three experiments rise seats 2 with connecting leg 3, connecting leg 3 raises seats 2 with three experiments respectively and connected, and with butterfly valve 5 Connection, the both ends of butterfly valve 5 connect connecting leg 3 and oil extraction capsule 4 respectively;Experiment sleeve pipe 1 is oil-gas sleeve pipe, and three experiments cover Pipe 1 is separately mounted on experiment rise seat 2;One end of transformer oil-tubing and casing 7 is connected with transformer coil lead, another End raises seat 2 by raising seat 6 and experiment, is drawn with temporary lead wire by experiment sleeve pipe 1, and experiment is provided with sleeve pipe 1 and deflated Plug 8;
The Insulation Test of transformer and temperature rise test are completed with sleeve pipe 1 by experiment, carry out oiling first, during oiling Butterfly valve 5 is closed, and the air relief cock 8 of experiment sleeve pipe 1 is opened, and vacuum oil, oiling to deflation are carried out by the fuel feeding valve of transformer Plug 8 emit it is fuel-displaced untill, stop oiling and simultaneously close air relief cock 8;During oiling, internal gas is deflated by air relief cock 8;
After oiling, it is quiet put 48 hours after, proceed by Insulation Test and the temperature rise test of transformer, during experiment, The butterfly valve 5 being connected with oil extraction capsule 4 is switched on, and Insulation Test and temperature rise test are conventionally completed.

Claims (3)

  1. A kind of 1. experimental rig for going out line transformer by oil-oil jacket tube transitions plug cable termination, it is characterised in that:Include examination Test and use sleeve pipe(1), experiment with rise seat(2), connecting leg(3), oil extraction capsule(4)And butterfly valve(5), three experiments rise seat(2) With transformer oil-tubing and casing(7)The rise seat at place(6)Connect respectively, experiment rise seat(2)It is externally provided with oil extraction capsule(4) And butterfly valve(5), oil extraction capsule(4)With butterfly valve(5)Connection;Three experiments rise seat(2)Between use connecting leg(3)It is connected, even Pipe(3)Used respectively with three experiments and raise seat(2)Connection, and and butterfly valve(5)Connection, butterfly valve(5)Both ends connect connecting leg respectively (3)With oil extraction capsule(4);Experiment sleeve pipe(1)It is oil-gas sleeve pipe, three experiment sleeve pipes(1)Experiment is separately mounted to rise Dais(2)On;Transformer oil-tubing and casing(7)One end be connected with transformer coil lead, the other end is by raising seat(6)With Experiment rise seat(2), sleeve pipe is used by testing with temporary lead wire(1)Draw, experiment sleeve pipe(1)Provided with air relief cock(8), pass through Experiment sleeve pipe(1)To complete the Insulation Test of transformer and temperature rise test.
  2. 2. the experimental rig according to claim 1 for going out line transformer by oil-oil jacket tube transitions plug cable termination, its It is characterised by:The connecting leg(3)It is arranged on experiment rise seat(2)Top, respectively with three experiment with rise seats(2)Top Peak connects.
  3. A kind of 3. test method for going out line transformer by oil-oil jacket tube transitions plug cable termination, it is characterised in that:Comprising such as Lower processing step:
    Three experiments rise seat(2)With transformer oil-tubing and casing(7)The rise seat at place(6)Connect respectively, experiment rises Dais is externally provided with oil extraction capsule(4)And butterfly valve(5), oil extraction capsule(4)With butterfly valve(5)Connection;Three experiments rise seat(2)It Between use connecting leg(3)It is connected, connecting leg(3)Connected respectively with three experiments with rise seat, and and butterfly valve(5)Connection, the two of butterfly valve End connects connecting leg respectively(3)With oil extraction capsule(4);Experiment sleeve pipe(1)It is oil-gas sleeve pipe, three experiment sleeve pipes(1)Respectively Installed in experiment rise seat(2)On;Transformer oil-tubing and casing(7)One end be connected with transformer coil lead, the other end leads to Cross rise seat(6)With experiment rise seat(2), drawn with temporary lead wire by testing with sleeve pipe, experiment sleeve pipe(1)Provided with deflation Plug(8);
    Pass through experiment sleeve pipe(1)To complete the Insulation Test of transformer and temperature rise test, oiling is carried out first, butterfly during oiling Valve(5)Close, experiment sleeve pipe(1)Air relief cock(8)Open, vacuum oil is carried out by the fuel feeding valve of transformer, oiling is extremely Air relief cock(8)Emit it is fuel-displaced untill, stop oiling and simultaneously close air relief cock(8);During oiling, internal gas passes through air relief cock(8)Carry out Deflate;
    After oiling, it is quiet put 48 hours after, Insulation Test and the temperature rise test of transformer are proceeded by, during experiment, with row Oil capsule(4)The butterfly valve of connection(5)It is switched on, Insulation Test and temperature rise test are conventionally completed.
CN201510585871.9A 2015-09-16 2015-09-16 Go out the test method and device of line transformer by oil jacket tube transitions plug cable termination Active CN105044534B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510585871.9A CN105044534B (en) 2015-09-16 2015-09-16 Go out the test method and device of line transformer by oil jacket tube transitions plug cable termination

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510585871.9A CN105044534B (en) 2015-09-16 2015-09-16 Go out the test method and device of line transformer by oil jacket tube transitions plug cable termination

Publications (2)

Publication Number Publication Date
CN105044534A CN105044534A (en) 2015-11-11
CN105044534B true CN105044534B (en) 2018-01-16

Family

ID=54451220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510585871.9A Active CN105044534B (en) 2015-09-16 2015-09-16 Go out the test method and device of line transformer by oil jacket tube transitions plug cable termination

Country Status (1)

Country Link
CN (1) CN105044534B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105428008A (en) * 2015-12-28 2016-03-23 保定天威保变电气股份有限公司 S-shaped ascending flanged base connection structure for transformer
CN106504859A (en) * 2016-12-01 2017-03-15 保定天威保变电气股份有限公司 A kind of transformer device structure for high earthquake intensity area fast changeable sleeve pipe
CN114464419A (en) * 2020-11-09 2022-05-10 吴江变压器有限公司 Transformer with economical gas insulation outgoing line structure
CN112595997B (en) * 2020-11-30 2022-11-22 保定天威集团特变电气有限公司 Device and method for measuring temperature rise of outlet structure of transformer oil tank

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1719267A (en) * 2004-07-06 2006-01-11 特变电工沈阳变压器集团有限公司 Transformer cannula test device and its test method
CN201311830Y (en) * 2008-12-15 2009-09-16 锦州变压器股份有限公司 Cable incoming device of transformer high-voltage side
EP2348307A1 (en) * 2010-01-22 2011-07-27 Josef Altmann On-line diagnostics and control process of dielectric behavior of power transformers and device to implement the process
CN201975245U (en) * 2010-12-29 2011-09-14 天威云南变压器股份有限公司 Pluggable cable transformer
CN202119845U (en) * 2011-05-09 2012-01-18 国网电力科学研究院 Multifunctional extra-high voltage sleeve pipe testing fuel tank
CN203312757U (en) * 2013-06-21 2013-11-27 中国西电电气股份有限公司 Oil-oil casing installation device
CN203616435U (en) * 2013-12-25 2014-05-28 保定天威保变电气股份有限公司 On-site 220V SF6 gas test device
CN204065275U (en) * 2014-08-11 2014-12-31 中国西电电气股份有限公司 A kind of employing oil-SF 6the 220kV transformer test device of sleeve pipe outlet

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1719267A (en) * 2004-07-06 2006-01-11 特变电工沈阳变压器集团有限公司 Transformer cannula test device and its test method
CN201311830Y (en) * 2008-12-15 2009-09-16 锦州变压器股份有限公司 Cable incoming device of transformer high-voltage side
EP2348307A1 (en) * 2010-01-22 2011-07-27 Josef Altmann On-line diagnostics and control process of dielectric behavior of power transformers and device to implement the process
CN201975245U (en) * 2010-12-29 2011-09-14 天威云南变压器股份有限公司 Pluggable cable transformer
CN202119845U (en) * 2011-05-09 2012-01-18 国网电力科学研究院 Multifunctional extra-high voltage sleeve pipe testing fuel tank
CN203312757U (en) * 2013-06-21 2013-11-27 中国西电电气股份有限公司 Oil-oil casing installation device
CN203616435U (en) * 2013-12-25 2014-05-28 保定天威保变电气股份有限公司 On-site 220V SF6 gas test device
CN204065275U (en) * 2014-08-11 2014-12-31 中国西电电气股份有限公司 A kind of employing oil-SF 6the 220kV transformer test device of sleeve pipe outlet

Also Published As

Publication number Publication date
CN105044534A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN105044534B (en) Go out the test method and device of line transformer by oil jacket tube transitions plug cable termination
CN203202305U (en) Integrated control valve block
CN106481326A (en) The no chock pressure difference fracturing strings of self controllable supercharging
CN104334868B (en) Pressure control valve
CN205449896U (en) Rotatory ultrasonic probe's signal transmission device
CN105449419B (en) A kind of connection method and structure tested envelope pipe nipple and pipe nipple is adjusted with surveying
CN202149310U (en) Safe and quick connector
CN205785905U (en) Portable standard oil sample storage device
CN204064557U (en) A kind of wellhead traversing device pick-up unit
CN204902257U (en) Coiled pipe heat exchanger business turn over mouth connecting device
CN205159693U (en) Test connection structure who seals nipple joint and measure and regulate nipple joint
CN104075915B (en) A kind of vacuum line system for gas sampling and method
CN209085841U (en) Suppress platform tap device
CN205532456U (en) Setting device and packing device
CN106089112B (en) Underground cable coiling and butting device and installation method and application thereof
CN203584368U (en) Paraffin removing and consistence reducing device for marine electric pump well
CN203734956U (en) Waterproof heat-dissipation insulating base of electrical product
CN204344015U (en) A kind of air filling type gripping tongs buoyancy body lifting gear
CN105048319B (en) Discrete vacuumizes transformer oil transfer system
CN206038114U (en) Fuel gage
CN205743782U (en) Pipe fitting quick inserting joint in succession
CN206234391U (en) Three-chip type manual ball valve
CN202810828U (en) Oil well bridging plug testing apparatus
CN207488434U (en) 110kV high-tension cable local discharge test water terminal installations
CN104792536B (en) Performance test methods before the installation of aircraft air cycle machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant