CN105019667B - 一种三角形体系倾斜钢柱测量定位安装方法 - Google Patents

一种三角形体系倾斜钢柱测量定位安装方法 Download PDF

Info

Publication number
CN105019667B
CN105019667B CN201410172499.4A CN201410172499A CN105019667B CN 105019667 B CN105019667 B CN 105019667B CN 201410172499 A CN201410172499 A CN 201410172499A CN 105019667 B CN105019667 B CN 105019667B
Authority
CN
China
Prior art keywords
steel
casting
column
triangular system
inclines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410172499.4A
Other languages
English (en)
Other versions
CN105019667A (zh
Inventor
苏中海
甘国军
王振坤
陆优民
毕波
刘俊威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huning Steel Mechanism Co Ltd
Original Assignee
Jiangsu Huning Steel Mechanism Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huning Steel Mechanism Co Ltd filed Critical Jiangsu Huning Steel Mechanism Co Ltd
Priority to CN201410172499.4A priority Critical patent/CN105019667B/zh
Publication of CN105019667A publication Critical patent/CN105019667A/zh
Application granted granted Critical
Publication of CN105019667B publication Critical patent/CN105019667B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种三角形体系倾斜钢柱测量定位安装方法,所述三角形体系倾斜钢柱包括:第一铸钢件、第二铸钢件、第三铸钢件、外框柱和箱型钢梁;安装方法的具体步骤如下:先安装第二铸钢件、第三铸钢件;再吊装箱型钢梁;然后安装外框柱;最后将第一铸钢件吊装上外框柱的顶部定位焊接,完成安装。本发明实现了三角形体系倾斜钢柱现场的快速安装,使建筑大楼主体造型能够实现。

Description

一种三角形体系倾斜钢柱测量定位安装方法
技术领域
本发明涉及一种钢柱的安装方法,具体是一种超大三角形体系倾斜钢柱测量定位安装方法。
背景技术
中信银行杭州分行新大楼工程位于浙江省杭州市钱江新城A-08-6地块,它由世界著名的FOSTER设计,总建筑面积5.9万平方米,建筑高度99.9米。本工程地下共三层,地上为二十层,大楼主体为外筒内框巨型支撑钢结构体系,采用极具想象力的多面切角,通过玻璃幕墙折射出光影变化,酷似一颗金色钻石。大楼主体于七层处收腰变化呈多面切角,大楼正立面在七层以下为等腰三角结构体系,体系顶部节点高达30米,并呈40°倾斜,要实现上述造型的三角形体系,需要设计出适应结构的三角形体系倾斜钢柱,并完成安装。
发明内容
发明目的:本发明提供了一种三角形体系倾斜钢柱结构实现大楼主体造型,并完成该三角形体系倾斜钢柱的测量定位安装。
技术方案:一种三角形体系倾斜钢柱测量定位安装方法,所述三角形体系倾斜钢柱包括:第一铸钢件、第二铸钢件、第三铸钢件、外框柱和箱型钢梁;
所述三角形体系倾斜钢柱为等腰三角形;所述第一铸钢件、第二铸钢件、第三铸钢件位于等腰三角形的顶点,所述外框柱为等腰三角形的腰;所述箱型钢梁为等腰三角形的底边;所述三角形体系倾斜钢柱与垂直方向成40°倾斜;
所述三角形体系倾斜钢柱测量定位安装方法的具体步骤如下:
(A)通过“吊装+滑移”的方式安装第二铸钢件、第三铸钢件;
(B)吊装箱型钢梁;预先对箱型钢梁进行起拱;将此箱型钢梁合理的划分为6个分段,每个分段重量要求小于25吨,每个钢梁分段均通过设置临时支撑对其进行安装;
(C)安装外框柱;预先在外框柱底部对应钢管支撑位置处焊接一个H型辅助牛腿,在辅助牛腿与钢管支撑之间放置一台千斤顶,主要用于外框柱定位的微调。待三角形体系倾斜钢柱卸载完成后,将辅助牛腿割除;
(D)将第一铸钢件吊装上外框柱的顶部定位焊接。
有益效果:本发明提供的三角形体系倾斜钢柱测量定位安装方法,实现了三角形体系倾斜钢柱现场的快速安装,使建筑大楼主体造型能够实现。
附图说明
图1是本发明中三角形体系倾斜钢柱的结构示意图。
具体实施方式
下面结合附图和具体实施方式,进一步阐明本发明,应理解下述具体实施方式仅用于说明本发明而不用于限制本发明的范围,在阅读了本发明之后,本领域技术人员对本发明的各种等同形式的修改均落于本申请权利要求所限定的范围。
实施例
本实施例中涉及的三角形体系倾斜钢柱包括:第一铸钢件1、第二铸钢件2、第三铸钢件3、外框柱4和箱型钢梁5;所述三角形体系倾斜钢柱为等腰三角形;所述第一铸钢件1、第二铸钢件2、第三铸钢件3位于等腰三角形的顶点,所述外框柱4为等腰三角形的腰;所述箱型钢梁5为等腰三角形的底边;所述三角形体系倾斜钢柱与垂直方向成40°倾斜。
上述三角形体系倾斜钢柱测量定位安装方法,具体步骤如下:
(A)、通过“吊装+滑移”的方式安装第二铸钢件2、第三铸钢件3;
(B)吊装箱型钢梁5;预先对箱型钢梁进行起拱;将此箱型钢梁合理的划分为6个分段,每个分段重量要求小于25吨,每个钢梁分段均通过设置临时支撑对其进行安装;
(C)安装外框柱4;预先在外框柱底部对应钢管支撑位置处焊接一个H型辅助牛腿,在辅助牛腿与钢管支撑之间放置一台千斤顶,主要用于外框柱定位的微调。待三角形体系倾斜钢柱卸载完成后,将辅助牛腿割除;
(D)将第一铸钢件1吊装上外框柱4的顶部定位焊接。

Claims (1)

1.一种三角形体系倾斜钢柱测量定位安装方法,其特征在于,所述三角形体系倾斜钢柱包括:第一铸钢件(1)、第二铸钢件(2)、第三铸钢件(3)、外框柱(4)和箱型钢梁(5);
所述三角形体系倾斜钢柱为等腰三角形;所述第一铸钢件(1)、第二铸钢件(2)、第三铸钢件(3)位于等腰三角形的顶点,所述外框柱(4)为等腰三角形的腰;所述箱型钢梁(5)为等腰三角形的底边;所述三角形体系倾斜钢柱与垂直方向成40°倾斜;
所述三角形体系倾斜钢柱测量定位安装方法的具体步骤如下:
(A)通过“吊装+滑移”的方式安装第二铸钢件(2)、第三铸钢件(3);
(B)吊装箱型钢梁(5);预先对箱型钢梁进行起拱;将此箱型钢梁合理的划分为6个分段,每个分段重量要求小于25吨,每个钢梁分段均通过设置临时支撑对其进行安装;
(C)安装外框柱(4);预先在外框柱底部对应钢管支撑位置处焊接一个H型辅助牛腿,在辅助牛腿与钢管支撑之间放置一台千斤顶,主要用于外框柱定位的微调,待三角形体系倾斜钢柱卸载完成后,将辅助牛腿割除;
(D)将第一铸钢件(1)吊装上外框柱(4)的顶部定位焊接。
CN201410172499.4A 2014-04-28 2014-04-28 一种三角形体系倾斜钢柱测量定位安装方法 Active CN105019667B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410172499.4A CN105019667B (zh) 2014-04-28 2014-04-28 一种三角形体系倾斜钢柱测量定位安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410172499.4A CN105019667B (zh) 2014-04-28 2014-04-28 一种三角形体系倾斜钢柱测量定位安装方法

Publications (2)

Publication Number Publication Date
CN105019667A CN105019667A (zh) 2015-11-04
CN105019667B true CN105019667B (zh) 2017-04-05

Family

ID=54409933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410172499.4A Active CN105019667B (zh) 2014-04-28 2014-04-28 一种三角形体系倾斜钢柱测量定位安装方法

Country Status (1)

Country Link
CN (1) CN105019667B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001115563A (ja) * 1999-10-18 2001-04-24 Hajime Onose 梁及柱の構造
JP2004156339A (ja) * 2002-11-07 2004-06-03 Shimizu Corp ラーメン構造物の補剛構造
CN101435235A (zh) * 2008-12-19 2009-05-20 北京工业大学 钢管混凝土-钢撑-钢板外包混凝土剪力墙及其制作方法
CN103015596A (zh) * 2012-12-11 2013-04-03 山西汾西矿业(集团)有限责任公司 可拆装式钢结构平台及其构造方法
CN103556837A (zh) * 2013-11-19 2014-02-05 中国五冶集团有限公司 一种在裙楼处实现钢柱安装的方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040139690A1 (en) * 2001-08-20 2004-07-22 Evelio Pina Form assembly for forming an eave, a roof slab, and a perimeter beam in a monolithic structure and method of forming the same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001115563A (ja) * 1999-10-18 2001-04-24 Hajime Onose 梁及柱の構造
JP2004156339A (ja) * 2002-11-07 2004-06-03 Shimizu Corp ラーメン構造物の補剛構造
CN101435235A (zh) * 2008-12-19 2009-05-20 北京工业大学 钢管混凝土-钢撑-钢板外包混凝土剪力墙及其制作方法
CN103015596A (zh) * 2012-12-11 2013-04-03 山西汾西矿业(集团)有限责任公司 可拆装式钢结构平台及其构造方法
CN103556837A (zh) * 2013-11-19 2014-02-05 中国五冶集团有限公司 一种在裙楼处实现钢柱安装的方法

Also Published As

Publication number Publication date
CN105019667A (zh) 2015-11-04

Similar Documents

Publication Publication Date Title
CN106193117B (zh) 一种地下预制综合管廊的拼装施工方法
CN102828469B (zh) 斜腿钢箱三角刚构墩定位安装施工方法
CN105926672B (zh) 一种地铁暗挖车站钢管柱施工方法
CN204097853U (zh) 一种可升降钢桥
CN104234082A (zh) 深基坑跃层逆作施工方法
CN204715366U (zh) 一种大面积深基坑分区顺逆工况下的支撑体系
CN112240025A (zh) 车站基坑工程盖挖施工方法
CN205224050U (zh) 一种钢筋笼挂放装置
CN205917601U (zh) 一种桥梁拱肋的整体提升装置
CN107938675A (zh) 一种高承台桩砼浇筑工艺及装置
CN104818729B (zh) 可供大小塔吊转换的共用基础
JP4796411B2 (ja) 橋梁一括撤去工法
CN105019667B (zh) 一种三角形体系倾斜钢柱测量定位安装方法
CN103924653B (zh) 一种框架式排水井及其施工方法
CN103981799B (zh) 一种钢管混凝土张弦劲性梁及其施工方法
CN105298147A (zh) 超深基坑螺旋下降物料快速运输通道及其施工方法
CN105625184A (zh) 桥、站合建模式的地铁站修建方法
CN206036408U (zh) 横跨基坑的管线原位悬吊保护结构
CN204475350U (zh) 高压线下钻孔灌注桩施工***
CN103758048A (zh) 采用钢波纹板加固危桥的方法
CN204509922U (zh) 下穿道结构
CN104088665A (zh) 暗挖车站钢管柱施工工艺
CN201128882Y (zh) 桥梁拱肋吊运及支撑支架一体化施工装置
CN203213399U (zh) 室内钢质支撑柱
CN107620301A (zh) 一种地质加固装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant