CN105019553A - 地下室环形支撑支护结构 - Google Patents
地下室环形支撑支护结构 Download PDFInfo
- Publication number
- CN105019553A CN105019553A CN201510284234.8A CN201510284234A CN105019553A CN 105019553 A CN105019553 A CN 105019553A CN 201510284234 A CN201510284234 A CN 201510284234A CN 105019553 A CN105019553 A CN 105019553A
- Authority
- CN
- China
- Prior art keywords
- support
- basement
- deck
- concrete
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/10—Restraining of underground water by lowering level of ground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/16—Restraining of underground water by damming or interrupting the passage of underground water by placing or applying sealing substances
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
- E02D29/05—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
- E02D31/04—Watertight packings for use under hydraulic pressure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/1607—Shapes round, e.g. circle
- E02D2200/1621—Shapes round, e.g. circle made from multiple elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
Claims (7)
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710189849.1A CN106836240B (zh) | 2015-05-22 | 2015-05-22 | 地下室环形支撑支护施工方法 |
CN201510284234.8A CN105019553B (zh) | 2015-05-22 | 2015-05-22 | 地下室环形支撑支护结构 |
CN201710189850.4A CN106958247B (zh) | 2015-05-22 | 2015-05-22 | 地下室环形支撑支护体系 |
CN201710189946.0A CN106894420B (zh) | 2015-05-22 | 2015-05-22 | 地下室支护施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510284234.8A CN105019553B (zh) | 2015-05-22 | 2015-05-22 | 地下室环形支撑支护结构 |
Related Child Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710189850.4A Division CN106958247B (zh) | 2015-05-22 | 2015-05-22 | 地下室环形支撑支护体系 |
CN201710189849.1A Division CN106836240B (zh) | 2015-05-22 | 2015-05-22 | 地下室环形支撑支护施工方法 |
CN201710189946.0A Division CN106894420B (zh) | 2015-05-22 | 2015-05-22 | 地下室支护施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105019553A true CN105019553A (zh) | 2015-11-04 |
CN105019553B CN105019553B (zh) | 2017-07-28 |
Family
ID=54409820
Family Applications (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710189946.0A Active CN106894420B (zh) | 2015-05-22 | 2015-05-22 | 地下室支护施工方法 |
CN201710189850.4A Active CN106958247B (zh) | 2015-05-22 | 2015-05-22 | 地下室环形支撑支护体系 |
CN201510284234.8A Active CN105019553B (zh) | 2015-05-22 | 2015-05-22 | 地下室环形支撑支护结构 |
CN201710189849.1A Active CN106836240B (zh) | 2015-05-22 | 2015-05-22 | 地下室环形支撑支护施工方法 |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710189946.0A Active CN106894420B (zh) | 2015-05-22 | 2015-05-22 | 地下室支护施工方法 |
CN201710189850.4A Active CN106958247B (zh) | 2015-05-22 | 2015-05-22 | 地下室环形支撑支护体系 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710189849.1A Active CN106836240B (zh) | 2015-05-22 | 2015-05-22 | 地下室环形支撑支护施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (4) | CN106894420B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442508A (zh) * | 2018-02-24 | 2018-08-24 | 广州大学 | 一种双约束环框架结构体系 |
CN109680722A (zh) * | 2019-01-24 | 2019-04-26 | 江苏南通三建集团股份有限公司 | 地下室外墙体上直接留设外接建筑接入口的施工方法 |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867662B (zh) * | 2017-09-15 | 2020-09-15 | 叶长青 | 带钢锚索的大跨度基坑支护施工方法 |
CN108560582B (zh) * | 2018-04-09 | 2023-08-29 | 成都利拓重工机械有限公司 | 一种用于城市管囊建造的移动式支护护盾及其限位铰 |
CN108487261A (zh) * | 2018-04-10 | 2018-09-04 | 江西科技学院 | 一种拱形钢结构支撑 |
CN113550329A (zh) * | 2021-09-03 | 2021-10-26 | 朱彦达 | 一种多层地下室支护结构及支护施工方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09264024A (ja) * | 1996-03-29 | 1997-10-07 | Kawasaki Steel Corp | 土留め又は締切り工事方法 |
KR100412162B1 (ko) * | 2001-09-25 | 2003-12-24 | (주)신성엔지니어링 | 트러스식 지보구조에 의한 지반 굴착공법 |
EP1243702B1 (fr) * | 2001-03-13 | 2005-08-10 | Spie Fondations | Dispositif d'étayage d'une paroi de soutènement de fouille et utilisation d'un tel dispositif |
CN201347558Y (zh) * | 2008-12-10 | 2009-11-18 | 广州市设计院 | 深大基坑环形支撑结构体系 |
CN101666095A (zh) * | 2009-09-11 | 2010-03-10 | 朱奎 | 不规则基坑支护及施工方法 |
CN102535478A (zh) * | 2011-12-30 | 2012-07-04 | 北京工业大学 | 一种基坑支护用的方钢管轻质混凝土围檩 |
CN102828520A (zh) * | 2012-09-11 | 2012-12-19 | 中煤科工集团武汉设计研究院中汉岩土工程分公司 | 一种应用于深厚泥炭土深基坑中的环形内支撑结构 |
CN203684233U (zh) * | 2013-12-27 | 2014-07-02 | 中铁大桥局集团第一工程有限公司 | 圆形深基坑支护结构 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4865300B2 (ja) * | 2005-11-07 | 2012-02-01 | 株式会社ピーエス三菱 | 半地下道路の造成方法 |
CN201151909Y (zh) * | 2007-11-15 | 2008-11-19 | 王平 | 深基坑组合结构环形内支撑 |
KR101036173B1 (ko) * | 2010-11-10 | 2011-05-23 | 영인산업 주식회사 | 구면 지지식 지압장치 |
CN202416324U (zh) * | 2011-12-21 | 2012-09-05 | 上海建工一建集团有限公司 | 基坑工程逆梁顺板施工叠加梁板结构 |
CN103510524A (zh) * | 2012-06-26 | 2014-01-15 | 邹宗煊 | 一种倾斜圆环桩及其施工方法 |
CN203403422U (zh) * | 2013-06-06 | 2014-01-22 | 广西建工集团第五建筑工程有限责任公司 | 矩形深基坑大跨度钢筋混凝土内支撑结构 |
CN103397777B (zh) * | 2013-08-06 | 2015-12-02 | 胡彦彬 | 一种附着桁架式混凝土墙模板支撑 |
CN104264688B (zh) * | 2014-10-22 | 2016-06-08 | 广州市城市规划勘测设计研究院 | 人工挖孔变截面桩支护施工工艺 |
-
2015
- 2015-05-22 CN CN201710189946.0A patent/CN106894420B/zh active Active
- 2015-05-22 CN CN201710189850.4A patent/CN106958247B/zh active Active
- 2015-05-22 CN CN201510284234.8A patent/CN105019553B/zh active Active
- 2015-05-22 CN CN201710189849.1A patent/CN106836240B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09264024A (ja) * | 1996-03-29 | 1997-10-07 | Kawasaki Steel Corp | 土留め又は締切り工事方法 |
EP1243702B1 (fr) * | 2001-03-13 | 2005-08-10 | Spie Fondations | Dispositif d'étayage d'une paroi de soutènement de fouille et utilisation d'un tel dispositif |
KR100412162B1 (ko) * | 2001-09-25 | 2003-12-24 | (주)신성엔지니어링 | 트러스식 지보구조에 의한 지반 굴착공법 |
CN201347558Y (zh) * | 2008-12-10 | 2009-11-18 | 广州市设计院 | 深大基坑环形支撑结构体系 |
CN101666095A (zh) * | 2009-09-11 | 2010-03-10 | 朱奎 | 不规则基坑支护及施工方法 |
CN102535478A (zh) * | 2011-12-30 | 2012-07-04 | 北京工业大学 | 一种基坑支护用的方钢管轻质混凝土围檩 |
CN102828520A (zh) * | 2012-09-11 | 2012-12-19 | 中煤科工集团武汉设计研究院中汉岩土工程分公司 | 一种应用于深厚泥炭土深基坑中的环形内支撑结构 |
CN203684233U (zh) * | 2013-12-27 | 2014-07-02 | 中铁大桥局集团第一工程有限公司 | 圆形深基坑支护结构 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442508A (zh) * | 2018-02-24 | 2018-08-24 | 广州大学 | 一种双约束环框架结构体系 |
CN108442508B (zh) * | 2018-02-24 | 2023-07-14 | 广州大学 | 一种双约束环框架结构体系 |
CN109680722A (zh) * | 2019-01-24 | 2019-04-26 | 江苏南通三建集团股份有限公司 | 地下室外墙体上直接留设外接建筑接入口的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106836240B (zh) | 2018-08-10 |
CN106836240A (zh) | 2017-06-13 |
CN106894420A (zh) | 2017-06-27 |
CN106894420B (zh) | 2018-08-10 |
CN106958247B (zh) | 2018-11-09 |
CN105019553B (zh) | 2017-07-28 |
CN106958247A (zh) | 2017-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101614125B (zh) | V级围岩隧道施工方法 | |
CN105019553A (zh) | 地下室环形支撑支护结构 | |
CN103982188B (zh) | 岩质地层大断面深竖井的支护结构体系及其施工方法 | |
CN205742213U (zh) | 基坑支护结构 | |
CN203879506U (zh) | 一种岩质地层大断面深竖井的支护结构体系 | |
CN104929278A (zh) | 一种装配式密柱空心剪力墙结构 | |
CN101560766B (zh) | 格栅状地下连续墙板及其制作方法 | |
CN105484763B (zh) | 一种深部煤矿半封闭钢筋混凝土管片支护方法 | |
CN108374663B (zh) | 一种砂卵石地质隧道两次模筑施工工法 | |
CN106120803A (zh) | 承压水情况下基坑支护施工方法 | |
CN106480891B (zh) | 一种竖井施工方法 | |
CN108316328A (zh) | 一种用于沉井施工的加压下沉装置及其施工方法 | |
CN203160254U (zh) | 一种基坑围护结构 | |
CN105569329A (zh) | 单面支模地下室施工方法及地下室 | |
CN205977233U (zh) | 一种隧道锁脚旋喷桩结构 | |
CN104878763B (zh) | 带裙楼的主楼地下室支护结构 | |
CN212642730U (zh) | 一种湿陷性黄土地区隧道穿越人防结构 | |
CN103821149A (zh) | 大型深基坑留坡挖土及坑中坑混凝土后浇施工工法 | |
CN212270943U (zh) | 一种预制拼装式钢砼组合支撑桩 | |
CN207659988U (zh) | 地下厂房岩壁吊车梁现状基础加固结构 | |
CN207405615U (zh) | 一种渠式切割水泥土连续墙组合工形预制桩的支护结构 | |
CN105625435A (zh) | 海积岛屿多截面、多层次异型设备深基坑快速成型方法 | |
CN217999598U (zh) | 节理化岩层大跨度隧道导洞先行分部台阶开挖支护结构 | |
CN104594380A (zh) | 一种新型的地下构建物及其建造方法 | |
CN208456611U (zh) | 隧道中隔墙施工结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: No. 16, Tongjiang Avenue, Chengguan Town, Nandan county, Hechi City, Guangxi Zhuang Autonomous Region Patentee after: Zhu Kui Address before: Ouhai District of Zhejiang city in Wenzhou province 325000 Rong Road No. 39 Patentee before: Zhu Kui |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221216 Address after: 251221 Building A4, Collaborative Development Industrial Park, Dezhou High tech Zone, south of the west section of Tianchen Road, Yucheng National High tech Industrial Development Zone, Dezhou, Shandong Patentee after: Dezhou Paier mechanical equipment Co.,Ltd. Address before: No.16 Tongjiang Avenue, Chengguan Town, Nandan county, Hechi City, Guangxi Zhuang Autonomous Region 547200 Patentee before: Zhu Kui |