CN105019406A - Water tunnel construction method and water tunnel system - Google Patents
Water tunnel construction method and water tunnel system Download PDFInfo
- Publication number
- CN105019406A CN105019406A CN201510332375.2A CN201510332375A CN105019406A CN 105019406 A CN105019406 A CN 105019406A CN 201510332375 A CN201510332375 A CN 201510332375A CN 105019406 A CN105019406 A CN 105019406A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- high pressure
- segment
- communicated
- pressure waters
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
A water tunnel construction method comprises the following steps that A, a tunnel is drilled, wherein the tunnel is provided with a first end communicated with the land face and a second end which is close to but not communicated with the high-pressure water area; B, a gate is arranged at the position, close to the second end, of the tunnel, the tunnel is divided into a first section close to the land face and a second section located on the side of the first section reverse to the gate, and the length of the first section is far larger than the length of the second section; C, water injection is carried out on at least the first section; and D, the second section and the high-pressure water area are communicated, the gate is opened, and the water tunnel for the land face and the high-pressure water area to be communicated is formed. After the tunnel is drilled, water is injected at least to the first section, corresponding water pressure contending against the high-pressure seawater produced when the second section and the high-pressure water area are communicated can be formed, and possibility of damaging the water tunnel and related facilities is reduced.
Description
Technical field
The invention relates to a kind of seepage tunnel construction method, refer to a kind of high pressure waters seepage tunnel construction method and seepage tunnel system especially.
Background technology
Consult Fig. 1, existing deep sea water water intake engineering, first, near the marine site 10 for drawing deep sea water, to connect on ground, inshore land 12 setting pierce a little 13.Then, horizontal directional drilling machine 14 is arranged on and pierces a little above 13, then horizontal drill 14 is adjusted angle of slope, deflection is seated on ground, land 12, and to stratum 15 Drilling with formed water intaking passage 16, then through passage 16 of fetching water thus to Drilling in stratum 15 until desired depth is assigned on sea level 11.Then, creep into so that the direction parallel with 11 one-tenth, sea level is horizontal forward, until drill sea bed 17, complete Drilling engineering.
But, when in the end drilling the step of sea bed 17, because the marine site 10 near dry point 18 is for having the deep ocean water of high pressure, after boring fried crag, when guiding deep ocean water enters water intaking passage 16, if without the process of appropriateness, a large amount of seawater pours in and probably destroys water intaking passage 16 and related facility.
Summary of the invention
Therefore, object of the present invention, is namely providing a kind of seepage tunnel construction method avoiding high pressure sea water to damage.
So seepage tunnel of the present invention construction method, comprises following steps:
(A) Drilling is genuine, and this tunnel has the first end being communicated to face, land, and close to but be not communicated with second end in high pressure waters.
(B) in this tunnel, this second end place contiguous arranges gate, this tunnel is divided into the first paragraph near face, land and the second segment of position in the contrary side at first paragraph of this gate, and the length of first paragraph is long-range in second segment.
(C) at least this first paragraph water filling.
(D) be communicated with second segment and high pressure waters, and open this gate, form the seepage tunnel being communicated with this face, land and this high pressure waters.
Wherein, step (D) arranges one or more non-through aperture in advance at the second end, and ignite in advance at the explosive near external high pressure waters, blow the non-through crag of aperture near high pressure waters, high pressure waters is made to inject second segment in advance with small amount of water, be communicated with second segment and high pressure waters more comprehensively, and open this gate, form the diversion in this face, land of connection and this high pressure waters with road.
Wherein, explosive setting is carried out at second end in this tunnel in the front elder generation of step (C), step (C) is also in this second segment water filling, step (D) is communicated with this high pressure waters with blasting method, if explosion failure, then extract the water body injected in second segment, again carry out explosive setting, again after second segment water filling, again explosion again, if there are security concerns, then this second segment discarded, extract the water body of this first paragraph, again excavate separately in the same level degree of depth, another second segment is set, repeatedly carry out until be successfully communicated with genuine and high pressure waters, becoming can the seepage tunnel of diversion.
Wherein, be arrange to draw water unit to extract the water body injected in second segment in step (D).
Wherein, step (A) is gone back parallel this seepage tunnel of Drilling and to be extended and in order to the liaison tunnel safeguarded and ventilate, and connects this seepage tunnel and assist access road with road with this.
Wherein, step (D) is communicated with the mode in second segment and high pressure waters, the second end first in this tunnel to be carried out after explosive arranges from the second end toward direction, high pressure waters mode radially, after explosive at the explosive near high pressure waters first, close to the second end, progressively carry out explosion from outside to inside, discharge toward high pressure waters with the ground that explosion is produced.
Another object of the present invention, is namely providing a kind of seepage tunnel system.
Seepage tunnel of the present invention system invention comprises seepage tunnel and gate.
Diversion is with road, and end is communicated to face, land, and end is communicated to high pressure waters; And
Gate, this seepage tunnel is divided into the first paragraph near face, land and the second segment of position in the contrary side at first paragraph of this gate, and the length of first paragraph is long-range in second segment, in order to close and the open first paragraph of this seepage tunnel and being communicated with of second segment.
This tunnel end is communicated to face, land, and end is communicated to high pressure waters.
This tunnel is divided into first paragraph and the second segment of position in the contrary side at first paragraph of this gate in close face, land by this gate, and the length of first paragraph is long-range in second segment, in order to close and the open first paragraph in this tunnel and being communicated with of second segment.
Described seepage tunnel system, also comprises the unit that draws water that at least can extract the water body injected in second segment, and parallel this seepage tunnel extends and in order to the liaison tunnel safeguarded and ventilate, and connects this seepage tunnel and assist access road with road with this.
Wherein, this seepage tunnel tilts down to extend to predetermined vertical depth, then toward direction, high pressure waters horizontal-extending, this gate locating is at the horizontal-extending place of this seepage tunnel.
Wherein, this second segment is communicated with high pressure waters with the opening outwards carried out in taper.
The invention has the advantages that: behind Drilling tunnel, by least this first paragraph water filling, can be communicated with second segment and high pressure sea water during high pressure waters have corresponding hydraulic pressure and contend with, reduce the possibility of destruction seepage tunnel and related facility.
Accompanying drawing explanation
Fig. 1 is schematic view illustrating prior art deep sea water water intake engineering;
Fig. 2 is the preferred embodiment that flow chart illustrates seepage tunnel of the present invention construction method;
Fig. 3 is this preferred embodiment of schematic view illustrating;
Fig. 4 is close-up schematic view, and the state in this preferred embodiment construction is described;
Fig. 5 is close-up schematic view, and the state in this preferred embodiment construction is described;
Fig. 6 is schematic diagram, illustrate this preferred embodiment complete after state.
Detailed description of the invention
Consult Fig. 2 and Fig. 3, the preferred embodiment of seepage tunnel of the present invention construction method comprises following steps:
Step claims S1-Drilling tunnel 20, and this tunnel 20 has the first end 27 being communicated to face, land 7, and close to but be not communicated with second end 28 in high pressure waters 8.This high pressure waters 8 is the deep ocean water water source of marine dark about 300 meters in the present embodiment, but looks demand also adjustable depth drilled.This tunnel 20 locates toward downward-extension 3000 meters to vertical depth 300 meters with the proportional tilt of length and depth ratio 10:1, again toward direction, high pressure waters 8 horizontal-extending, end forms this second end 28, the distance about 5 to 8 meters in this second end 28 and this high pressure waters 8.Based on the consideration safeguarded with ventilate, also to extend and in order to the liaison tunnel 5 safeguarded and ventilate Drilling this seepage tunnel 20 parallel again, and connect the access road 6 of this seepage tunnel 20 and this liaison tunnel 5.But liaison tunnel 5 is nonessential, its difference holds rear explanation.
Step S2-in this tunnel 20, the horizontal-extending place of this second end 28 contiguous arranges gate 3, this tunnel 20 is divided into the first paragraph 21 near face, land 7 and the second segment 22 of position in the contrary side at first paragraph 21 of this gate 3.The length of first paragraph 21 as aforementioned about 3000 meters, the long-range second segment 22 at about 30 meters.Access road is located at this gate 3 place, maintains easily.
Step S3-at least this first paragraph 21 water filling.It should be noted that except the mode directly entering step S4 after this first paragraph 21 water filling, to also have two kinds also in the enforcement aspect of second segment 22 water filling except closed shutter 3.
One is as shown in Figure 4, first one or more non-through aperture 221 is arranged in advance with the drilling technique of advanced person at the second end 28, and to arrange explosive 222 from the second end 28 toward direction, high pressure waters 8 mode radially, explosive 222 closest to high pressure waters 8 part, with high pressure waters 8 at a distance of about 0.6 to 1 meter.Ignite in advance at the explosive 222 near external high pressure waters 8 during explosion, blow crag non-through between aperture 221 and high pressure waters 8, this second segment 22 is communicated with high pressure waters 8 part with aperture 221, second segment 22 is injected in advance with a small amount of seawater in high pressure waters 8, then enters step S4 and be communicated with second segment 22 and high pressure waters 8 comprehensively.
Another kind is as shown in Figure 5, the second end 28 first in this tunnel 20 is with after being carried out explosive and arranging from the second end 28 toward direction, high pressure waters 8 mode radially, keep gate 3 in opening, directly in this first paragraph 21 and the water filling simultaneously of this second segment 22, then enter step S4.
Step S4-be comprehensively communicated with second segment 22 and high pressure waters 8.The state that this gate 3 is being opened, the diversion in this face, land 7 of formation connection as schematically shown in Figure 6 and this high pressure waters 8 is with road 2.This step adopts comprehensive explosion, this high pressure waters 8 of comprehensive connection, when high pressure sea water enters seepage tunnel 2, due at least this first paragraph 21 water filling, and can have the hydraulic pressure that formed in first paragraph 21 and contend with, reduce the possibility destroying seepage tunnel 2 and related facility.Wherein this second end blows rear formation is the opening 223 that taper is outwards carried out, and its objective is the possibility of wishing that minimizing opening 223 is hindered by ground.
Supplementary notes, comprehensive explosion is herein the mode taked from outside to inside, from as tunneling mode from inside to outside different.The explosion of explosive need retain on uncrossed " scope of freedom ", the direction that the rock after namely meaning retains explosion can be discharged.General tunneling or as this tunnel 20 digs the process of the second end 28, the order of igniting after explosive is set be by tunnel internal first, rock is made to be able to towards the uncrossed discharge of tunnel internal, ignite outside again, namely compared with the explosive in the crag of depths, the ground blown is transported by last personnel again.Namely order from outside to inside is herein with marine direction for " scope of freedom ", by ground towards discharging, avoids the rock collapsed to hinder water inlet in the sea.Because after explosion, namely seawater pours in, personnel cannot enter again and remove ground, therefore must take detonation way from outside to inside.
When as shown in Figure 5 direct in second segment 22 water filling, if explosion failure, then the unit 4 that draws water is set to extract the water body injected in second segment 22, again carries out explosive setting, again after second segment 22 water filling, then explosion again.If but have security concerns, then this second segment 22 discarded, (unit 4 that draws water also can be arranged on ground to extract the water body of first paragraph 21, draw water with water pipe, this mode arranges not shown), again excavate separately in the same level degree of depth, another second segment (not shown) is set, repeatedly carry out until be successfully communicated with genuine 20 with high pressure waters 8, becoming can the seepage tunnel 2 of diversion.
The convenience having or be without caused difference operation of liaison tunnel 5, because personnel cannot walk after genuine water filling, need treat first paragraph draw water after personnel just can again be entered by ground, if there is liaison tunnel 5, and at access road 6, another auxiliary gate (not shown) is set to separate this tunnel 20 and this liaison tunnel 5, personnel can when still there is water filling in this tunnel 20 just at the bottom of ground (in this liaison tunnel 5) await orders, wait to draw water and completely just can carry out subsequent treatment immediately, motor-driven behaviour.If without liaison tunnel 5, then because personnel after water filling in genuine 20 cannot pass in and out the open and close that genuine 20 carry out regulating gate 3, therefore the control circuit of this gate 3 need be connected to face, land 7, so that personnel control on face, land 7.
In sum, behind Drilling tunnel 20, by least this first paragraph 21 water filling, can be communicated with second segment 22 and high pressure sea water during high pressure waters 8 have corresponding hydraulic pressure and contend with, reduce the possibility destroying seepage tunnel 2 and related facility, therefore really can reach object of the present invention.
As described above, be only preferred embodiment of the present invention, when not limiting scope of the invention process with this.
Claims (10)
1. a seepage tunnel construction method, comprises following steps:
(A) Drilling one is genuine, and this tunnel has the first end being communicated to face, land, and close to but be not communicated with second end in high pressure waters;
(B) in this tunnel, this second end place contiguous arranges gate, this tunnel is divided into the first paragraph near face, land and the second segment of position in the contrary side at first paragraph of this gate, and the length of first paragraph is long-range in second segment;
(C) at least this first paragraph water filling;
(D) be communicated with second segment and high pressure waters, and open this gate, form the seepage tunnel being communicated with this face, land and this high pressure waters.
2. seepage tunnel construction method according to claim 1, it is characterized in that, step (D) arranges one or more non-through aperture in advance at the second end, and ignite in advance at the explosive near external high pressure waters, blow the non-through crag of aperture near high pressure waters, make high pressure waters inject second segment in advance with small amount of water, then be communicated with second segment and high pressure waters comprehensively, and open this gate, form the seepage tunnel being communicated with this face, land and this high pressure waters.
3. seepage tunnel construction method according to claim 1, it is characterized in that, before step (C), second end in this tunnel carries out explosive setting, step (C) is also in this second segment water filling, step (D) is communicated with this high pressure waters with blasting method, if explosion failure, then extract the water body injected in second segment, again carry out explosive setting, again after second segment water filling, again explosion again, if there are security concerns, then this second segment discarded, extract the water body of this first paragraph, again excavate separately in the same level degree of depth, another second segment is set, repeatedly carry out until be successfully communicated with genuine and high pressure waters, becoming can the seepage tunnel of diversion.
4. seepage tunnel construction method according to claim 3, is characterized in that, is to arrange to draw water unit to extract the water body injected in second segment in step (D).
5. seepage tunnel construction method according to claims 1, it is characterized in that, step (D) is communicated with the mode in second segment and high pressure waters, the second end first in this tunnel to be carried out after explosive arranges from the second end toward direction, high pressure waters mode radially, after explosive at the explosive near high pressure waters first, close to the second end, progressively carry out explosion from outside to inside, discharge toward high pressure waters with the ground that explosion is produced.
6. seepage tunnel construction method according to claims 1, is characterized in that, step (A) is gone back parallel this seepage tunnel of Drilling and to be extended and in order to the liaison tunnel safeguarded and ventilate, and connects the access road of this seepage tunnel and this liaison tunnel.
7. diversion is with a road system, it is characterized in that, comprises:
Diversion is with road, and end is communicated to face, land, and end is communicated to high pressure waters;
Gate, this seepage tunnel is divided into the first paragraph near face, land and the second segment of position in the contrary side at first paragraph of this gate, and the length of first paragraph is long-range in second segment, in order to close and the open first paragraph of this seepage tunnel and being communicated with of second segment.
8. according to claim 7 diversion with road system, it is characterized in that, also comprise the unit that draws water that at least can extract the water body injected in second segment, parallel this seepage tunnel extend and in order to safeguard and ventilate auxiliary with road, and connect the communication channel of this diversion with road and this liaison tunnel.
9. seepage tunnel system according to claims 7, is characterized in that, this seepage tunnel tilts down to extend to predetermined vertical depth, then toward direction, high pressure waters horizontal-extending, this gate locating is at the horizontal-extending place of this seepage tunnel.
10. state seepage tunnel system according to claim 7, it is characterized in that, this second segment is communicated with high pressure waters with the opening outwards carried out in taper.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510332375.2A CN105019406A (en) | 2015-06-16 | 2015-06-16 | Water tunnel construction method and water tunnel system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510332375.2A CN105019406A (en) | 2015-06-16 | 2015-06-16 | Water tunnel construction method and water tunnel system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105019406A true CN105019406A (en) | 2015-11-04 |
Family
ID=54409678
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510332375.2A Pending CN105019406A (en) | 2015-06-16 | 2015-06-16 | Water tunnel construction method and water tunnel system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105019406A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112796368A (en) * | 2020-12-31 | 2021-05-14 | 中国电力工程顾问集团中南电力设计院有限公司 | Method for repairing large-diameter water intake head top cover |
-
2015
- 2015-06-16 CN CN201510332375.2A patent/CN105019406A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112796368A (en) * | 2020-12-31 | 2021-05-14 | 中国电力工程顾问集团中南电力设计院有限公司 | Method for repairing large-diameter water intake head top cover |
CN112796368B (en) * | 2020-12-31 | 2023-08-18 | 中国电力工程顾问集团中南电力设计院有限公司 | Repairing method for large-diameter water intake head top cover |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20220213773A1 (en) | Deep low-permeability high gassy seam drilling-slitting-sealing-fracturing drilling device and method | |
EP3455451B1 (en) | Geothermal energy extraction subterranean system | |
CN103867229B (en) | A kind of coal mine large-mining is dark prevents and treats comprehensive treatment method for water with lower group of coal mining | |
CN101581231B (en) | Gas drainage method for loosening coal body through cross layer boring and hydraulic fracture | |
CN105239984B (en) | A kind of coal mine underground fracturing crack extends control method | |
CN106996295A (en) | Slurry balance shield mud circulating system and slurry balance shield | |
WO2016019826A1 (en) | Freezing cross-cut coal cutting method based on hydraulic seam-cutting | |
CN104405283A (en) | Technique for extracting gas from L-shaped ground drilling well in mining area | |
CN103742188B (en) | Colliery drawing-off gas well and boring method | |
CN104806249B (en) | A kind of short vertical shaft pilot shaft tunneling construction method | |
CN109653787B (en) | Coordinated extraction pressure relief method for high-pressure-bearing water and high-gas coal seam group | |
CN105804754B (en) | A kind of coal seam is Main aquifer pitshaft method for uncovering coal | |
CN105201480B (en) | Surface well underground long drilled holes pressure break coal seam method | |
CN107975383A (en) | Underground chamber tee T intersection excavation supporting construction method | |
CN108801086A (en) | Deep hole loosens stress pre-released hydraulically blasting method and device | |
CN107575249A (en) | A kind of high-pressure slurry wall protecting method and device | |
CN107035376A (en) | One kind common law in huge thick bedrock aquifer digs shaft construction method | |
CN104265357A (en) | Pre-drainage outburst prevention method of strong outburst coal seam | |
JP2010031556A (en) | Construction method of tunnel in large depth and at high water pressure | |
CN105019406A (en) | Water tunnel construction method and water tunnel system | |
CN102562080A (en) | Method and system for dredging clogged slurry door by reverse circulation of slurry shield | |
RU2664281C1 (en) | Method for developing kimberlite deposits | |
KR20140080852A (en) | Freezimg pipe and ground freezing method using freezimg pipe | |
TW201428174A (en) | Construction method of headrace tunnel and headrace tunnel system | |
JP6276093B2 (en) | Tunneling method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151104 |
|
WD01 | Invention patent application deemed withdrawn after publication |