CN105018706A - Heat treatment device for long pipe - Google Patents

Heat treatment device for long pipe Download PDF

Info

Publication number
CN105018706A
CN105018706A CN201510390070.7A CN201510390070A CN105018706A CN 105018706 A CN105018706 A CN 105018706A CN 201510390070 A CN201510390070 A CN 201510390070A CN 105018706 A CN105018706 A CN 105018706A
Authority
CN
China
Prior art keywords
fixed
screw mandrel
base plate
mounting plates
motors
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510390070.7A
Other languages
Chinese (zh)
Other versions
CN105018706B (en
Inventor
周玉豹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Xu Hong Thermal Treatment Co Ltd
Original Assignee
Anhui Xu Hong Thermal Treatment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Xu Hong Thermal Treatment Co Ltd filed Critical Anhui Xu Hong Thermal Treatment Co Ltd
Priority to CN201510390070.7A priority Critical patent/CN105018706B/en
Publication of CN105018706A publication Critical patent/CN105018706A/en
Application granted granted Critical
Publication of CN105018706B publication Critical patent/CN105018706B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a heat treatment device for a long pipe. The device comprises a base plate. A positioning device is installed on the left side of the base plate. A first motor is installed at the upper end of the base plate. An inner-pipe-wall quenching device is installed on the right side of the base plate. The positioning device comprises a first lead screw. The first lead screw is installed on the base plate in the transverse direction. A first driving nut is arranged on the first lead screw. A first installing plate is fixed to the upper end of the first driving nut. Guide rods are arranged at the front end and the rear end of the first lead screw. A first supporting frame is arranged on the right side of the first lead screw. A second installing plate is fixed to the upper end of the first supporting frame. The first installing plate and the second installing plate are each fixedly provided with a roller adjusting device. The heat treatment device is reasonable in structural design, low in producing and manufacturing cost, convenient to use and the like; quenching machining on the inner wall of the pipe is achieved, and the quenching quality of the inner wall of the pipe is guaranteed; and meanwhile, the pipe is positioned through the adjustable positioning device, the using efficiency of the device is improved, production cost is saved, and production efficiency is improved.

Description

A kind of long tube equipment for Heating Processing
Technical field
The present invention relates to quenching apparatus technical field, specifically a kind of long tube equipment for Heating Processing.
Background technology
In mechanical field, quenching technology is a kind of application treatment process very widely.Quenching technology refers to and certain metallic substance is heated to certain temperature and keeps the regular hour, and change its alloy structure, its main object puies forward heavy alloyed mechanical property, increases rotproofness.Along with the development in epoch, tubing gets more and more in the utilization of the industries such as waterpower, electric power, mine, and the treatment process of tubing is also varied.In the production industry of China's tubing, most of enterprise adopts Large-scale Heater or heating container to carry out heat treated to tubing, and this method power consumption is high, and quenching efficiency is poor, can only carry out integral quenching.
Summary of the invention
In order to solve the problems of the technologies described above, the invention provides a kind of long tube equipment for Heating Processing.
The present invention solves its technical problem and realizes by the following technical solutions:
A kind of long tube equipment for Heating Processing, comprise base plate, the left side of described base plate is provided with locating device, and the upper end of described base plate is provided with a motor, and the right side of base plate is provided with inner tubal wall quenching device; During use, locating device is fixed tubing, utilizes the inner tubal wall quenching device on right side to carry out quench treatment to tubing inside.
Described locating device comprises a screw mandrel, a described screw mandrel is transversely arranged on base plate, a screw mandrel is connected with the axle of a motor, a screw mandrel is provided with a drive nut, the upper end of a described drive nut is fixed with a mounting plate, before a described screw mandrel, rear two ends are equipped with guide rod, described guide rod is installed on base plate, on described guide rod, all cover has a slide block, a described slide block is all fixed on the lower end of a mounting plate, the right side of a described screw mandrel is provided with a bracing frame, and bracing frame is fixed on the upper end of base plate, the upper end of a bracing frame is fixed with No. two mounting plates, a described mounting plate and No. two mounting plates are all fixed with rolling wheel regulator.During use, locating device can adjust according to the length of tubing and size, and the use range of device is wider.
Described rolling wheel regulator comprises No. three mounting plates, the upper end of described No. three mounting plates is fixed with retaining plate, the upper end edge of described retaining plate is longitudinally provided with the reverse screw mandrel of double end, before the reverse screw mandrel of described double end, rear two all cover have No. two drive nuts, the upper end of described No. two drive nuts is all fixed with a support roller, a left side for the reverse screw mandrel of described double end, right both sides are equipped with guide pillar, described guide pillar is arranged on No. three mounting plates, on guide pillar, all cover has No. two slide blocks, described No. two slide blocks are all connected with No. two drive nuts, on described No. three mounting plates, cover has a housing, before a described housing, rear both sides are equipped with support bar, the lower end of described support bar is all fixed on No. three mounting plates by hinged mode, the upper end of support bar is all fixed with No. two support rollers, the middle part of support bar is all fixed with hydro-cylinder by hinged mode, described hydro-cylinder is all by being fixed on the upper end of No. three mounting plates by hinged mode, the front end of a described housing is provided with No. two motors, the axle of described No. two motors is connected with the reverse screw mandrel of double end.During use, rotated by the reverse screw mandrel of the power wheel drive double end of No. two motors, a support roller can be slided along guide pillar, thus reach the object that tubing is positioned.
Described No. two motors are reducing motor.Reducing motor provides power for the reverse screw mandrel of double end, does not need too large power.
Described inner tubal wall quenching device includes No. two bracing frames, described No. two bracing frames are fixed on base plate, the upper end of No. two bracing frames is fixed with No. four mounting plates, a left side for described No. four mounting plates, right two ends are all fixed with supporting seat, being provided with in described supporting seat can the sliding bar of transversely movement, the front end of described sliding bar is provided with tooth bar, the upper end of described No. four mounting plates is provided with No. three motors, the mode that the axle of described No. three motors is connected by key is fixed with gear, described wheel and rack is meshed, the outer wall of described sliding bar left end is fixed with an annular fixing frame, the outer ring of a described annular fixing frame is evenly provided with shower nozzle, the left end of described sliding bar is provided with threaded hole, the mode be threaded connection in described threaded hole is fixed with threaded rod, the left end of described threaded rod is fixed with No. two annular fixing frames, the outer ring of described No. two annular fixing frames is fixed with intermediate frequency heater, on described No. two bracing frames, cover has No. two housings.During use, by the intermediate frequency heater on No. two annular fixing frames, pipe material inner wall is heated, then by the shower nozzle that is provided with on an annular fixing frame outer ring, tube wall is cooled, can be adjusted the distance between an annular fixing frame and No. two annular fixing frames by threaded rod simultaneously, reach the quenching effect of needs.
Its beneficial effect is: reasonable in design of the present invention, consume energy the advantage such as low and easy to use, achieve and the quenching of pipe material inner wall is processed, ensure that the quenching quality of pipe material inner wall, adopt adjustable positioning device to position tubing simultaneously, improve the service efficiency of device, save production cost, improve production efficiency.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is front view of the present invention;
Fig. 2 is perspective view of the present invention;
Fig. 3 is the front view of locating device of the present invention;
Fig. 4 is the perspective view of locating device of the present invention;
Fig. 5 is the right view of rolling wheel regulator of the present invention;
Fig. 6 is the perspective view of rolling wheel regulator of the present invention;
Fig. 7 is the annexation schematic diagram of mounting plate of the present invention, the reverse screw mandrel of double end, drive nut, support roller, guide pillar and slide block;
Fig. 8 is the perspective view of inner tubal wall quenching device of the present invention;
Fig. 9 is the perspective view after inner tubal wall quenching device of the present invention removes No. two housings;
Figure 10 is the vertical view after inner tubal wall quenching device of the present invention removes No. two housings;
Figure 11 is the perspective view of sliding bar of the present invention.
Embodiment
In order to make object of the present invention, technical scheme and beneficial effect clearly, below in conjunction with accompanying drawing, be described in detail the preferred embodiments of the present invention, the present invention will be further described, to facilitate the technical staff to understand.
As shown in Figure 1 to 11, a kind of long tube equipment for Heating Processing, comprises base plate 1, and the left side of described base plate 1 is provided with locating device 3, and the upper end of described base plate 1 is provided with a motor 4, and the right side of base plate 1 is provided with inner tubal wall quenching device 2; During use, locating device 3 pairs of tubing are fixed, and utilize inner tubal wall quenching device 2 pairs of tubing inside on right side to carry out quench treatment.
Described locating device 3 comprises a screw mandrel 5, a described screw mandrel 5 is transversely arranged on base plate 1, a screw mandrel 5 is connected with the axle of a motor 4, a screw mandrel 5 is provided with a drive nut 6, the upper end of a described drive nut 6 is fixed with a mounting plate 7, before a described screw mandrel 5, rear two ends are equipped with guide rod 8, described guide rod 8 is installed on base plate 1, on described guide rod 8, all cover has a slide block 12, a described slide block 12 is all fixed on the lower end of a mounting plate 7, the right side of a described screw mandrel 5 is provided with a bracing frame 10, and bracing frame 10 is fixed on the upper end of base plate 1, the upper end of a bracing frame 10 is fixed with No. two mounting plates 11, a described mounting plate 7 and No. two mounting plates 11 are all fixed with rolling wheel regulator 9.During use, locating device 3 pairs of tubing are fixed, and rolling wheel regulator 9 can adjust according to tubing simultaneously.
Described rolling wheel regulator 9 comprises No. three mounting plates 901, the upper end of described No. three mounting plates is fixed with retaining plate 902, the upper end edge of described retaining plate 902 is longitudinally provided with the reverse screw mandrel 903 of double end, before the reverse screw mandrel 903 of described double end, rear two all cover have No. two drive nuts 904, the upper end of described No. two drive nuts 904 is all fixed with a support roller 905, a left side for the reverse screw mandrel 903 of described double end, right both sides are equipped with guide pillar 906, described guide pillar 906 is arranged on No. three mounting plates 901, on guide pillar 906, all cover has No. two slide blocks 907, described No. two slide blocks 907 are all connected with No. two drive nuts 904, on described No. three mounting plates 901, cover has a housing 908, before a described housing 908, rear both sides are equipped with they sup-port bar 910, the lower end of described they sup-port bar 910 is all fixed on No. three mounting plates 901 by hinged mode, the upper end of they sup-port bar 910 is all fixed with No. two support rollers 912, the middle part of they sup-port bar 910 is all fixed with hydro-cylinder 911 by hinged mode, described hydro-cylinder 911 is all by being fixed on the upper end of No. three mounting plates 901 by hinged mode, the front end of a described housing 908 is provided with No. two motors 909, the axle of described No. two motors 909 is connected with the reverse screw mandrel 903 of double end.During use, rotated by the reverse screw mandrel 903 of the power wheel drive double end of No. two motors 909, a support roller 905 can be slided along guide pillar 906, thus reach the object that tubing is positioned.
Described No. two motors 909 are reducing motor.Reducing motor provides power for the reverse screw mandrel 903 of double end, does not need too large power, thus can reduce equipment use cost, energy efficient, improves No. two motor 909 operational efficiency.
Described inner tubal wall quenching device 2 includes No. two bracing frames 201, described No. two bracing frames 201 are fixed on base plate 1, the upper end of No. two bracing frames 201 is fixed with No. four mounting plates 202, a left side for described No. four mounting plates 202, right two ends are all fixed with supporting seat 213, being provided with in described supporting seat 213 can the sliding bar 203 of transversely movement, the front end of described sliding bar 203 is provided with tooth bar 204, the upper end of described No. four mounting plates 202 is provided with No. three motors 206, the mode that the axle of described No. three motors 206 is connected by key is fixed with gear 205, described gear 205 is meshed with tooth bar 204, the outer wall of described sliding bar 203 left end is fixed with an annular fixing frame 207, the outer ring of a described annular fixing frame 207 is evenly provided with shower nozzle 208, the left end of described sliding bar 203 is provided with threaded hole 203a, the mode be threaded connection in described threaded hole 203a is fixed with threaded rod 209, the left end of described threaded rod 209 is fixed with No. two annular fixing frames 210, the outer ring of described No. two annular fixing frames 210 is fixed with intermediate frequency heater 211, on described No. two bracing frames 201, cover has No. two housings 212.During use, heated by the 211 pairs of pipe material inner walls of the intermediate frequency heater on No. two annular fixing frames 210, then cooled by the shower nozzle 208 pairs of tube walls that are provided with on annular fixing frame 207 outer ring, can be adjusted the distance between an annular fixing frame 207 and No. two annular fixing frames 210 by threaded rod 209 simultaneously, reach the quenching effect of needs.
The present invention in use, a motor 4 works, a screw mandrel 5 is driven to rotate, a mounting plate 7 is slided along guide rod 8, when a mounting plate 7 slides into applicable position, a mounting plate 7 is by the top of tubing handling to locating device 3, a support roller 905 pairs of tubing are utilized to carry out supporting and location, hydro-cylinder 911 works simultaneously, promote they sup-port bar 910 to rotate, No. two support rollers 912 pairs of tubing of they sup-port bar 910 upper end are utilized to carry out auxiliary fixing, after tubing has been located, the action of No. three motors 206, driven gear 205 rotates, the tooth bar 204 engaged with gear 205 is stressed, sliding bar 203 is slided left along supporting seat 213, drive an annular fixing frame 207 and No. two annular fixing frames 210 to left dislocation, while an annular fixing frame 207 and the movement of No. two annular fixing frames 210, intermediate frequency heater 211 and shower nozzle 208 pairs of pipe material inner walls heat, lower the temperature afterwards, reach the quenching effect to pipe material inner wall, working efficiency is high, quenching effect is good, equipment use amount is few, operation steps is relatively simple.
What finally illustrate is, above preferred embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although by above preferred embodiment to invention has been detailed description, but those skilled in the art are to be understood that, various change can be made to it in the form and details, and not depart from claims of the present invention limited range.

Claims (3)

1. a long tube equipment for Heating Processing, comprises base plate, it is characterized in that: the left side of described base plate is provided with locating device, and the upper end of described base plate is provided with a motor, and the right side of base plate is provided with inner tubal wall quenching device;
Described locating device comprises a screw mandrel, a described screw mandrel is transversely arranged on base plate, a screw mandrel is connected with the axle of a motor, a screw mandrel is provided with a drive nut, the upper end of a described drive nut is fixed with a mounting plate, before a described screw mandrel, rear two ends are equipped with guide rod, described guide rod is installed on base plate, on described guide rod, all cover has a slide block, a described slide block is all fixed on the lower end of a mounting plate, the right side of a described screw mandrel is provided with a bracing frame, and bracing frame is fixed on the upper end of base plate, the upper end of a bracing frame is fixed with No. two mounting plates, a described mounting plate and No. two mounting plates are all fixed with rolling wheel regulator,
Described rolling wheel regulator comprises No. three mounting plates, the upper end of described No. three mounting plates is fixed with retaining plate, the upper end edge of described retaining plate is longitudinally provided with the reverse screw mandrel of double end, before the reverse screw mandrel of described double end, rear two all cover have No. two drive nuts, the upper end of described No. two drive nuts is all fixed with a support roller, a left side for the reverse screw mandrel of described double end, right both sides are equipped with guide pillar, described guide pillar is arranged on No. three mounting plates, on guide pillar, all cover has No. two slide blocks, described No. two slide blocks are all connected with No. two drive nuts, on described No. three mounting plates, cover has a housing, before a described housing, rear both sides are equipped with support bar, the lower end of described support bar is all fixed on No. three mounting plates by hinged mode, the upper end of support bar is all fixed with No. two support rollers, the middle part of support bar is all fixed with hydro-cylinder by hinged mode, described hydro-cylinder is all by being fixed on the upper end of No. three mounting plates by hinged mode, the front end of a described housing is provided with No. two motors, the axle of described No. two motors is connected with the reverse screw mandrel of double end.
2. a kind of long tube equipment for Heating Processing according to claim 1, is characterized in that: described No. two motors are reducing motor.
3. a kind of long tube equipment for Heating Processing according to claim 1, it is characterized in that: described inner tubal wall quenching device includes No. two bracing frames, described No. two bracing frames are fixed on base plate, the upper end of No. two bracing frames is fixed with No. four mounting plates, a left side for described No. four mounting plates, right two ends are all fixed with supporting seat, being provided with in described supporting seat can the sliding bar of transversely movement, the front end of described sliding bar is provided with tooth bar, the upper end of described No. four mounting plates is provided with No. three motors, the mode that the axle of described No. three motors is connected by key is fixed with gear, described wheel and rack is meshed, the outer wall of described sliding bar left end is fixed with an annular fixing frame, the outer ring of a described annular fixing frame is evenly provided with shower nozzle, the left end of described sliding bar is provided with threaded hole, the mode be threaded connection in described threaded hole is fixed with threaded rod, the left end of described threaded rod is fixed with No. two annular fixing frames, the outer ring of described No. two annular fixing frames is fixed with intermediate frequency heater, on described No. two bracing frames, cover has No. two housings.
CN201510390070.7A 2015-07-04 2015-07-04 A kind of long tube Equipment for Heating Processing Expired - Fee Related CN105018706B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510390070.7A CN105018706B (en) 2015-07-04 2015-07-04 A kind of long tube Equipment for Heating Processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510390070.7A CN105018706B (en) 2015-07-04 2015-07-04 A kind of long tube Equipment for Heating Processing

Publications (2)

Publication Number Publication Date
CN105018706A true CN105018706A (en) 2015-11-04
CN105018706B CN105018706B (en) 2017-03-15

Family

ID=54409004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510390070.7A Expired - Fee Related CN105018706B (en) 2015-07-04 2015-07-04 A kind of long tube Equipment for Heating Processing

Country Status (1)

Country Link
CN (1) CN105018706B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107775940A (en) * 2016-08-31 2018-03-09 和则宏(天津)新型建材有限公司 Circulating water cooling system with tubing aligning function
CN107825147A (en) * 2017-10-30 2018-03-23 武汉船用机械有限责任公司 A kind of correcting tool and bearing calibration
CN114160863A (en) * 2021-11-01 2022-03-11 燕山大学 Online cutting device and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5938332A (en) * 1982-08-28 1984-03-02 High Frequency Heattreat Co Ltd Method and device for hardening inside circumferential wall of cylindrical body having closed end face over entire length thereof by moving hardening
CN201056579Y (en) * 2007-06-12 2008-05-07 山西风雷机械制造有限责任公司 Intermediate frequency induction heat-treatment machine tool for thick-walled pipe
CN201190172Y (en) * 2008-05-20 2009-02-04 胜利油田高原石油装备有限责任公司 Steel tube quenching device
KR20100136768A (en) * 2009-06-19 2010-12-29 주식회사 성일에스아이엠 Cooling apparatus for pipe innner part
CN102418056A (en) * 2011-11-26 2012-04-18 江苏亚太轻合金科技股份有限公司 Quenching equipment for Al-Mg-Si system aluminum alloy cold drawn pipes, and quenching method thereof
CN104561506A (en) * 2015-01-08 2015-04-29 天津鼎天斯凯特机械有限公司 Equipment for surface quenching processing of rotary workpiece
CN204898007U (en) * 2015-07-04 2015-12-23 安徽旭鸿热处理有限公司 Long tube equipment for heat treatment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5938332A (en) * 1982-08-28 1984-03-02 High Frequency Heattreat Co Ltd Method and device for hardening inside circumferential wall of cylindrical body having closed end face over entire length thereof by moving hardening
CN201056579Y (en) * 2007-06-12 2008-05-07 山西风雷机械制造有限责任公司 Intermediate frequency induction heat-treatment machine tool for thick-walled pipe
CN201190172Y (en) * 2008-05-20 2009-02-04 胜利油田高原石油装备有限责任公司 Steel tube quenching device
KR20100136768A (en) * 2009-06-19 2010-12-29 주식회사 성일에스아이엠 Cooling apparatus for pipe innner part
CN102418056A (en) * 2011-11-26 2012-04-18 江苏亚太轻合金科技股份有限公司 Quenching equipment for Al-Mg-Si system aluminum alloy cold drawn pipes, and quenching method thereof
CN104561506A (en) * 2015-01-08 2015-04-29 天津鼎天斯凯特机械有限公司 Equipment for surface quenching processing of rotary workpiece
CN204898007U (en) * 2015-07-04 2015-12-23 安徽旭鸿热处理有限公司 Long tube equipment for heat treatment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107775940A (en) * 2016-08-31 2018-03-09 和则宏(天津)新型建材有限公司 Circulating water cooling system with tubing aligning function
CN107825147A (en) * 2017-10-30 2018-03-23 武汉船用机械有限责任公司 A kind of correcting tool and bearing calibration
CN107825147B (en) * 2017-10-30 2019-11-08 武汉船用机械有限责任公司 A kind of correcting tool and bearing calibration
CN114160863A (en) * 2021-11-01 2022-03-11 燕山大学 Online cutting device and method

Also Published As

Publication number Publication date
CN105018706B (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN202845652U (en) Steel bar on-line straightening device
CN106269874A (en) A kind of electro plasticity cross wedge rolling machine
CN105018706A (en) Heat treatment device for long pipe
CN204898007U (en) Long tube equipment for heat treatment
CN212894833U (en) Whole quenching device for planet carrier shaft
CN204897993U (en) Long tube inner wall guenching unit
CN210467976U (en) Lithium battery electrode copper foil coating device
CN203019110U (en) Adjustable carrier roller of long shaft workpieces
CN111730122A (en) Steel plate cutting equipment with caching device
CN204874622U (en) Thin wall part water -cooled generator
CN207061477U (en) A kind of multi-functional take-up of welding rod production copper facing
CN202701062U (en) Rounding machine
CN204898008U (en) Gyro wheel adjustable long tube heat treatment device
CN202779291U (en) Foursquare steel straightening machine
CN202364074U (en) Copper bar roller aligning device of motor rotor coil edgewise-winding machine
CN206046752U (en) A kind of portable manual peculiar to vessel rolls corrugating machine
CN206195357U (en) But control voltage's reactive power compensator
CN202193809U (en) Quenching device for forged piece
CN105177241A (en) Long pipe inner wall quenching device
CN203513743U (en) Sucker rod pipe nipple heat treatment equipment of adjustable straightening device
CN204897981U (en) Aluminium alloy parts quenching treatment postcooling is with forced air cooling machine
CN203955830U (en) A kind of after-combustion packing is with pressing copper belt machine
CN215236871U (en) High-quality steel material rolling machine
CN208168700U (en) A kind of photovoltaic inversion cabinet maintenance door
CN210358678U (en) Rotary flat roller

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170315

Termination date: 20190704

CF01 Termination of patent right due to non-payment of annual fee