CN104978691A - Power grid risk pre-control method based on big data - Google Patents

Power grid risk pre-control method based on big data Download PDF

Info

Publication number
CN104978691A
CN104978691A CN201410133665.XA CN201410133665A CN104978691A CN 104978691 A CN104978691 A CN 104978691A CN 201410133665 A CN201410133665 A CN 201410133665A CN 104978691 A CN104978691 A CN 104978691A
Authority
CN
China
Prior art keywords
power grid
real
data
risk
control method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410133665.XA
Other languages
Chinese (zh)
Inventor
蒋雪冬
丁颖
李晓波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Wo Rui Power Tech Corp Inc
Original Assignee
Hangzhou Wo Rui Power Tech Corp Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Wo Rui Power Tech Corp Inc filed Critical Hangzhou Wo Rui Power Tech Corp Inc
Priority to CN201410133665.XA priority Critical patent/CN104978691A/en
Publication of CN104978691A publication Critical patent/CN104978691A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a power grid risk pre-control method based on big data. The method comprises steps of 1, scrolling check of multiclass scheduling plan modes; 2, component outage model construction based on reliable data, real-time external factor data and equipment status data; 3, fault filtering based on topology analysis, failure influence domain and probability to automatically generate a real-time fault set; 4, static safety analysis based on multiple algorithms and consideration of cascading failures; and 5, load loss calculation method based on sensitivity. According to the invention, the component outage probability modeling is achieved based on real-time external environmental information, the fault set is automatically generated based on topology analysis and failure influence domain, the static safety analysis based on consideration of cascading failures is achieved, potential risks of a power grid are quantified into load shedding amount, risk indexes are calculated, and a powerful tool for analyzing current power grid risks is provided to dispatchers.

Description

A kind of power grid risk pre-control method based on large data
Technical field
The present invention relates to power grid risk assessment technical field, in particular, relate to the power grid risk pre-control method based on large data.
Background technology
Along with the continuous progress of economic society, the whole society requires day by day to improve to power supply reliability, and the attention rate of the common people to power supply safety is more and more higher, and the external pressure that grid company faces is also increasing.2011, " electric power safety accident emergency dispose and regulations of investigating " (State Council 599 command), " State Grid Corporation of China's security incident investigation code " (No. (2011) 2024, national grid safety supervision) successively issuing and implementation, guarantee power network safety operation and reliable power supply to company, effectively evade electric power accident risk and have higher requirement.Urban district, Shenzhen on the 10th April in 2012 has a power failure on a large scale, Luohu, Feitian and Long Gang section continue to have a power failure about 2 hours on a large scale, the running of whole city is had a strong impact on, urban transportation falls into chaos, railway station because of have a power failure once interrupt run, many motor-cars late, a large amount of passenger is detained station, and residential elevator is stopped transport, and a large amount of people's life is stranded; Though this power outage does not directly cause casualties, cause very adverse influence socially, reflect current electric grid operation further and still there is many weak links, in power grid risk management and control, still have much work to need to be carried out.
Summary of the invention
In view of this, a kind of power grid risk pre-control method based on large data is embodiments provided, to solve the problem.
For achieving the above object, the embodiment of the present invention provides following technical scheme:
(1) bulk power grid real-time risk assessment and pre-control method
Research bulk power grid theory of risk assessment, sets up risk evaluation model, build provincial power network risk assessment and pre-control subsystem, realizes automatically providing change according to the change of the Outer risks factor in real time by the present invention
Fault set, and then carry out Risk Calculation, and give yardman different risk class promptings according to result of calculation, provide risk-aversion and control aid decision making.Particular content is as follows:
A) access weather data in real time, comprise thunder and lightning, typhoon, mountain fire, icing etc.; Real-time access device evaluation grade, sets up element outage model, calculates power failure probability and fault set in real time.
B) based on fault set and power failure probability, according to State Council 599 command, Guo Wang company " security incident investigation code ", Zhejiang company " risk management regulation ", extract real-time grid information, calculation risk grade, provides indicating risk in real time.
C) will take into account cascading failure in computation process, power shortage calculating produced, circuit overload become the load loss in each region with voltage out-of-limit equivalence.
D) with the coupling such as " accident ration the power supply tagmeme table ", " supply more than the planned quota power ration the power supply tagmeme table ", relevant prevention and control aid decision making is provided.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments of the invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the accompanying drawing provided.
A kind of power grid risk pre-control method process flow diagram based on large data that Fig. 1 provides for the embodiment of the present invention;
embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
In order to make persons skilled in the art understand and realize the present invention, now by reference to the accompanying drawings embodiments of the invention are described.Obviously; described embodiment is only some embodiments of the present application, instead of whole embodiments, based on the embodiment in the application; those of ordinary skill in the art are not making other embodiments all obtained under creative work prerequisite, all should belong to the scope of the application's protection.
In view of this, the power grid risk pre-control method based on large data is embodiments provided, to solve the problem.
At least can comprise the steps: see the above-mentioned power grid risk pre-control method based on large data of Fig. 1
Fundamental purpose of the present invention is the real-time assessment realizing power grid risk, the running status assessment data of the integration real-time information such as thunder and lightning, typhoon, icing of access and equipment, enables system assess the possibility that in current actual environment, fault occurs more really.Native system is on the basis of historical reliability data, and carried out the element short-term stoppage in transit probability calculation based on real time meteorological data, the real time meteorological data of introducing mainly comprises lightning current, typhoon wind speed, ice covering thickness etc.
For realizing power grid real-time risk assessment, reducing fault set to be evaluated and improving the performance of power flow algorithm, to reach the ability of efficient scanning fault.Fault set in current security and stability analysis of large power grid is many by manually safeguarding, when rack changes, cannot upgrade in time, and real-time risk is often caused by rack changes, therefore be necessary to upgrade in time to fault set, to reach the practical of risk assessment.Simultaneously due to risk emulation is extreme case, needs to consider due to yardman's operation cascading failure of causing of reason such as not in time.
The present invention quantizes risk class listed by the codes such as State Council 599 command, for the mainly cutting load amount of reflection risk bulk power grid, therefore needs all potential electrical network problems to be all finally converted to cutting load amount to characterize.This project adopts sensitivity method, and electrical network potential risk is quantified as load.

Claims (1)

1., based on a power grid risk pre-control method for large data, it is characterized in that, comprising:
(1) rolling of multiclass operation plan mode is checked;
(2) based on reliability data and real-time external factor data, device status data, element outage model is built;
(3) based on topological analysis and fault effects territory, and carry out fault filtering based on probability, automatically generate real time fail collection;
(4) based on many algorithms and the static security analysis considering cascading failure;
(5) based on the load loss computing method of sensitivity.
CN201410133665.XA 2014-04-02 2014-04-02 Power grid risk pre-control method based on big data Pending CN104978691A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410133665.XA CN104978691A (en) 2014-04-02 2014-04-02 Power grid risk pre-control method based on big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410133665.XA CN104978691A (en) 2014-04-02 2014-04-02 Power grid risk pre-control method based on big data

Publications (1)

Publication Number Publication Date
CN104978691A true CN104978691A (en) 2015-10-14

Family

ID=54275171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410133665.XA Pending CN104978691A (en) 2014-04-02 2014-04-02 Power grid risk pre-control method based on big data

Country Status (1)

Country Link
CN (1) CN104978691A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150094965A1 (en) * 2013-09-30 2015-04-02 Battelle Memorial Institute Electrical Power Grid Monitoring Apparatus, Articles of Manufacture, and Methods of Monitoring Equipment of an Electrical Power Grid
CN116663785A (en) * 2023-08-01 2023-08-29 国网四川省电力公司广安供电公司 Topology identification-based low-voltage fault positioning method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150094965A1 (en) * 2013-09-30 2015-04-02 Battelle Memorial Institute Electrical Power Grid Monitoring Apparatus, Articles of Manufacture, and Methods of Monitoring Equipment of an Electrical Power Grid
CN116663785A (en) * 2023-08-01 2023-08-29 国网四川省电力公司广安供电公司 Topology identification-based low-voltage fault positioning method
CN116663785B (en) * 2023-08-01 2023-10-10 国网四川省电力公司广安供电公司 Topology identification-based low-voltage fault positioning method

Similar Documents

Publication Publication Date Title
CN105005827B (en) A kind of emergency response method for early warning based on electric power accident
CN103700025B (en) A kind of assessment sort method of power system device importance degree based on risk analysis
CN102237720B (en) Analysis, early warning and control method for power grid security
US9239816B2 (en) Method of power system preventive control candidate measures identification self-adaptive to external environment
CN104966147A (en) Power grid operating risk analyzing method in view of base state and accident state
CN104050373B (en) The security risk quantitative estimation method of PCM equipment in a kind of power communication
CN103218754B (en) A kind of risk checking method of Forming Electrical Dispatching Command Tickets and device
CN103700039A (en) Power grid real-time risk assessment and precontrol method
CN103955609B (en) A kind of forecast failure collection automatic generation method based on typhoon model
CN103440400A (en) Power system short-term risk determination method taking disaster factors into account
CN103646286A (en) Data processing method for estimating efficiency of intelligent distribution network
CN103560590B (en) Electric network intelligent scheduling framework and its implementation
CN103903196A (en) Power grid dispatching operation real-time risk assessment method with equipment aging factors considered
CN103632311A (en) Fault examining system and method for power grid operation
CN105790442A (en) Distributed intelligent feeder automation system capable of achieving quick self-healing
CN103618297A (en) High-efficiency and high-reliability fault processing method aiming at complex power distribution network
CN104217261A (en) Operating state risk early-warning method for main transformer system
CN104268693A (en) Power grid dispatching determining method and system
CN108389002A (en) A kind of multiple failure generation method based on N-1 catastrophe failure collection
CN104281983A (en) Method and system for dispatching resources needed by emergency repair of power distribution network
CN106781229A (en) Coated by ice of overhead power transmission line method for early warning
CN104978691A (en) Power grid risk pre-control method based on big data
CN104836329A (en) Local-level dispatch supporting system capable of improving analyzing and processing capability of dispatcher during accident generation
CN105162117A (en) Online risk evaluation and safety pre-warning method for intelligent distribution network
CN111091294A (en) Elasticity evaluation method for power distribution system containing microgrid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151014

WD01 Invention patent application deemed withdrawn after publication