CN104967534B - A kind of Grid Central and distribution substation's cable resource unified management and planing method - Google Patents

A kind of Grid Central and distribution substation's cable resource unified management and planing method Download PDF

Info

Publication number
CN104967534B
CN104967534B CN201510287495.5A CN201510287495A CN104967534B CN 104967534 B CN104967534 B CN 104967534B CN 201510287495 A CN201510287495 A CN 201510287495A CN 104967534 B CN104967534 B CN 104967534B
Authority
CN
China
Prior art keywords
port
management
line
cable
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510287495.5A
Other languages
Chinese (zh)
Other versions
CN104967534A (en
Inventor
杜剑坡
张国平
焦晓波
魏乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuchang Power Supply Co of Henan Electric Power Co
Original Assignee
State Grid Corp of China SGCC
Xuchang Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xuchang Power Supply Co of Henan Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201510287495.5A priority Critical patent/CN104967534B/en
Publication of CN104967534A publication Critical patent/CN104967534A/en
Application granted granted Critical
Publication of CN104967534B publication Critical patent/CN104967534B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of Grid Central and distribution substation's cable resource unified management and planing methods, including the following steps: first, by fixed form by existing EXCEL, the formats such as WORD record the data of cable connection relationship: then, forming a text connection relationship about cable original equipment, initial port and end device, destination port in system by line ralation method and record;Finally, being presented in systems with graphic model by three-dimensional simulation technique, true building, true cabinet, the line relationship of real ports is shown in real equipment.The present invention by platform to fixed form by existing EXCEL, the formats such as WORD carry out record importing to the data of cable connection relationship and data are extracted and sorted out, then by pair so data port is marked, it is reproduced finally by 3-D image, so that forming one can be to module all in distribution system, component, device simulation state diagram.

Description

A kind of Grid Central and distribution substation's cable resource unified management and planing method
Technical field
The present invention relates to power grid and distributing cable resource management field more particularly to a kind of Grid Centrals and distribution substation's cable Resource unified management and planing method.
Background technique
Existing Grid Central lacks a unified management platform, this platform can meet centring machine room and change simultaneously All kinds of communication information cable resources in power station are uniformly managed;
Because existing various optical cables, core equipment, PCM and light matches, count match, net is matched and sound with etc. Wiring modules, network Equipment, server apparatus assets lack effective management platform can not intuitively show mostly also in artificial controlled state The currently used state of related resource, connection relationship, utilization rate etc.;
PCM equipment, as a node of service bearer, the business that the port on board is carried is to manage and maintain people The object that member is concerned about the most lacks a management platform realization to the system of substation's bearer service in current management means One management and intuitive displaying.
For Wiring module, current most management work requires artificial to carry out by way of excel table Maintenance, lacks unified management and Naming conventions, as the mode of connection changes, variation to Wiring module and it includes respectively match The state of line terminals all would become hard to effectively be safeguarded, data missing.
Between all kinds of communication resources, there is a large amount of connection relationship, the presence of these connection relationships still lacks at present One effective intuitive management means.The upper peer end of the connection and this connection for how showing current device port are used for Which kind of business carried? it is all the hang-up for perplexing communication information operation maintenance personnel.
Summary of the invention
The object of the present invention is to provide a kind of Grid Central and distribution substation's cable resource unified management and planing methods, can Huge database deposit platform is established, power grid special equipment knowledge base is established by professional level, is run and is established by platform Unified management specification, thoroughly reverses state unordered in the past.
The present invention adopts the following technical solutions:
A kind of Grid Central and distribution substation's cable resource unified management and planing method, including the following steps:
Firstly, the formats such as WORD record the data of cable connection relationship by fixed form by existing EXCEL: Text is become into computer recognizable character by the importing of system platform, export function and is stored in the database;
Then, one is formed in system by line ralation method about cable original equipment, initial port and terminal Equipment, the text connection relationship of destination port record;
Finally, true building, true cabinet, real equipment is presented with graphic model in systems by three-dimensional simulation technique The line relationship of upper real ports is shown: three-dimensional simulation technique carries out cable bend by backstage algorithm, refraction calculates, and presentation is patrolled Collect line.
The line ralation method specifically includes the following steps:
Firstly, doing a label in each port;Secondly, wherein the line relationship between every two port determines it Afterwards, two ports connected with line
Line rule in wiring algorithm are as follows:
A1, after the line relationship between any two port comes out, first outward the connecting line level of one of port A distance is walked, simulation goes to cabinet edge;Then A2 starts to be walked upwards, go to a fixed height (mould in space Varioloid plate height) after, carry out the horizontal position for finding second port with its line;A3 passes through horizontal x-axis and y-axis Searching twice, find the upright position of second port;A4, then line starts to walk downward, and goes to the water of second port Prosposition is set;A5, line link up a port and second port.
According to the above method, a management platform can be formed, following function may be implemented in the management platform:
1, macroscopic visual displaying is carried out to substation in some urban district core computer room and institute's scope;
2, the cable resource displaying between different substation and attributes edit;
3, (including core transmission equipment, PCM are set for the three-dimensional display of all kinds of transfer resources in computer room and substation and management Standby, number is with equipment and light with Wiring modules, server apparatus, the network equipments such as equipment etc.);
4, all kinds of resource informations described above are directed to, user can visually be checked in system, can To define the information such as its underlying assets attribute, including number, title, manufacturer and opposite end connectivity port in systems;
5, user's custom field can be increased simultaneously, user flexibility is facilitated to manage the resource object.
The management platform can also realize following management:
Number is matched, light carries out the grouping management of Wiring module with equipment;
The management of cable resource;
The management of optical transmission device, PCM equipment;
The management of link;
The management of data switched network.
The present invention by platform to fixed form by existing EXCEL, data of the formats such as WORD to cable connection relationship Carry out that record imports and data are extracted and sorted out, then by pair so data port is marked, again finally by 3-D image It is existing, so that forming one can be to module all in distribution system, component, device simulation state diagram, in all modules above It is provided with visualization interface, platform is managed by this, operator can in time, accurately increase, delete, changes, look into.
Detailed description of the invention
Fig. 1 is flow chart of the invention.
Specific embodiment
As shown in Figure 1, firstly, passing through fixed form for existing EXCEL, data of the formats such as WORD to cable connection relationship It is recorded: text being become by computer recognizable character by the importing of system platform, export function and is stored in database In;
Then, one is formed in system by line ralation method about cable original equipment, initial port and terminal Equipment, the text connection relationship of destination port record;Firstly, doing a label in each port;
The label can use bar code, two dimensional code or other marks with the certain information of storage.Such as number, name The information such as title, manufacturer and opposite end connectivity port.User's custom field can be increased simultaneously, facilitate user flexibility management should Resource object.Secondly, wherein after the line relationship between every two port determines, two ports are carried out with line repeatedly It connects;It is specific as follows:
A1, after the line relationship between any two port comes out, first outward the connecting line level of one of port A distance is walked, simulation goes to cabinet edge;Then A2 starts to be walked upwards, go to a fixed height (mould in space Varioloid plate height) after, carry out the horizontal position for finding second port with its line;A3 passes through horizontal x-axis and y-axis Searching twice, find the upright position of second port;A4, then line starts to walk downward, and goes to the water of second port Prosposition is set;A5, line link up a port and second port.It repeats the above steps, the port of label is passed through Line connection.
Finally, true building, true cabinet, real equipment is presented with graphic model in systems by three-dimensional simulation technique The line relationship of upper real ports is shown: three-dimensional simulation technique carries out cable bend by backstage algorithm, refraction calculates, and presentation is patrolled Collect line.
It, can be with real simulation field device situation, to make management, operation by three-dimensional simulation technique treated image Personnel are very clear, cable resource situation, the planning situation, service condition, work in the place such as existing computer room, cabinet, power distribution room State etc..The three-dimensional artificial image processing techniques is existing mature technology, and details are not described herein.
Previous center and distribution substation's cable resource do not unify effective way to manage and platform, and reason has substantially such as Under:
1. cable resource quantity is excessively huge, growth rate is too fast
2. unconventional equipment it is excessive (such as all kinds of PCM and light matches, count match, net is matched and sound is with Wiring module)
Cable resource deployment is without unified standard standard (each province and city unit at county level is independently built)
The present invention can be very good to solve the above problems, and by the above method, can be with one virtual management of stroke Platform, entire Platform Designing is to show and manage computer room, cabinet, equipment and end where Grid Central and distribution substation's cable resource The resource objects such as mouth are target to design, and main contents are described as follows:
1, it realizes and macroscopic visual displaying is carried out to substation in some urban district core computer room and institute's scope;
2, the cable resource displaying between different substation and attributes edit;
3, (including core transmission equipment, PCM are set for the three-dimensional display of all kinds of transfer resources in computer room and substation and management Standby, number is with equipment and light with Wiring modules, server apparatus, the network equipments such as equipment etc.);
4, all kinds of resource informations described above are directed to, user can visually be checked in system, can To define the information such as its underlying assets attribute, including number, title, manufacturer and opposite end connectivity port in systems.Simultaneously User's custom field can be increased, user flexibility is facilitated to manage the resource object.
It can also specifically realize following management:
Number is matched, light carries out the grouping management of Wiring module with equipment:
A) selects one or more numbers to match the creation for carrying out Wiring module with module with light;
B) is directed to the distribution terminal management of Wiring module, and user can intuitively check current wiring mould in three-dimensional scenic The state (used, be not used) of distribution terminal included in block, while the attribute and wound of each configuration terminal can be edited Build a connection management relevant to the distribution terminal.
The management of cable resource
A) system can import all cable resources currently existed with user, while cable resource occurring afterwards When variation, system can permit user and increase and delete;
B) system can show that two substation informations that an optical cable is connected, while can show the current light The service condition (for example the optical cable of 72 cores is used for 48 cores, is in unused state there are also 24 cores) of cable.
The management of optical transmission device, PCM equipment
A) intuitively shows position of the relevant device in computer room scene, and user can check and modify
The attribute of relevant device;
B) is directed to optical transmission device, PCM equipment board equipment that may be present, and system supports the independence to board equipment Inquiry and editor, and user is supported voluntarily to increase related board resource;
C) is for all of the port resource in relevant device, the attribute of the customized each port of system supports user, and Connection relationship is created for the port.
D) is for there are the port object (po)s of connection management, and system can intuitively relevant line moves towards with three-dimensional mode With opposite equip. and port.
E) user can allow system completely to go out the list of the current port in three dimension system by specifying a port It jumps or link moves towards end to end, and can be with the information of each connecting node in real-time query end-to-end path.
If f) port of some PCM equipment of or the port of optical transmission device are directly connected to some specific business, it is System allows the relating attribute of user's increase business and port;
The management of link
Link as the direct object in port is relied on, mainly examine from link displaying when managing it by system Amount, thus facilitate user in a numerous and complicated port and the link world, the reality for finding certain link of quicklook It moves towards and by way of node.
After some PCM multi-port connection terminal business, when check its arrive core computer room end-to-end path when effect, system In realization, on the one hand allow the intuitive brief displaying full link figure of user, while user being allowed to click each node, system The 3 d effect graph and related port information of the current node will intuitively be shown
The management of data switched network
Intuitively show the use state and location information of each port in distributing frame in cabinet, and its company is inquired in energy quicklook The opposite equip. connect.
Some switch port is selected, it is chosen to occupy port, system can intuitively show walking for designated port link To distribution, system can be supported to show that the link of interchanger multiplex roles moves towards information simultaneously.

Claims (3)

1. a kind of Grid Central and distribution substation's cable resource unified management and planing method, it is characterised in that: including following Step:
Firstly, WORD format records the data of cable connection relationship by fixed form by existing EXCEL: passing through and be Text is become computer recognizable character and stored in the database by the importing of system platform, export function;
Then, formed in system by line ralation method one about cable original equipment, initial port and end device, The text connection relationship of destination port records;
The line ralation method specifically includes the following steps:
Firstly, doing a label in each port;Secondly, wherein after the line relationship between every two port determines, Two ports connected with line;
Line rule in wiring algorithm are as follows:
The connecting line level of one of port after the line relationship between any two port comes out, is first walked toward outside one by A1 Section distance, simulation go to cabinet edge;Then A2 starts to be walked upwards, a fixed height for going to space simulates day After card height, the horizontal position for finding second port with its line is carried out;A3 passes through the two of horizontal x-axis and y-axis The upright position of second port is found in secondary searching;A4, then line starts to walk downward, and goes to the horizontal position of second port It sets;A5, line link up a port and second port;
Finally, by three-dimensional simulation technique in systems with true in the true building of graphic model presentation, true cabinet, real equipment The line relationship of real port is shown: three-dimensional simulation technique carries out cable bend by backstage algorithm, refraction calculates, and logic is presented and connects Line.
2. Grid Central according to claim 1 and distribution substation's cable resource unified management and planing method, feature exist In: according to the above method, a management platform can be formed, following function may be implemented in the management platform:
1, macroscopic visual displaying is carried out to substation in some urban district core computer room and institute's scope;
2, the cable resource displaying between different substation and attributes edit;
3, the three-dimensional display of all kinds of transfer resources in computer room and substation and management, all kinds of transfer resources include that core transmission is set Standby, PCM equipment, number match Wiring module, server apparatus, the network equipment of equipment with equipment and light;
4, all kinds of resource informations described above are directed to, user can visually be checked in system, Ke Yi Its underlying assets attribute, including number, title, manufacturer and opposite end connectivity port information are defined in system;
5, user's custom field can be increased simultaneously, user flexibility is facilitated to manage the resource object.
3. Grid Central according to claim 2 and distribution substation's cable resource unified management and planing method, feature exist In:
The management platform can also realize following management:
Number is matched, light carries out the grouping management of Wiring module with equipment;
The management of cable resource;
The management of optical transmission device, PCM equipment;
The management of link;
The management of data switched network.
CN201510287495.5A 2015-05-29 2015-05-29 A kind of Grid Central and distribution substation's cable resource unified management and planing method Active CN104967534B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510287495.5A CN104967534B (en) 2015-05-29 2015-05-29 A kind of Grid Central and distribution substation's cable resource unified management and planing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510287495.5A CN104967534B (en) 2015-05-29 2015-05-29 A kind of Grid Central and distribution substation's cable resource unified management and planing method

Publications (2)

Publication Number Publication Date
CN104967534A CN104967534A (en) 2015-10-07
CN104967534B true CN104967534B (en) 2019-02-15

Family

ID=54221482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510287495.5A Active CN104967534B (en) 2015-05-29 2015-05-29 A kind of Grid Central and distribution substation's cable resource unified management and planing method

Country Status (1)

Country Link
CN (1) CN104967534B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105488283B (en) * 2015-11-30 2019-01-11 中国能源建设集团广东省电力设计研究院有限公司 The modeling method and system of computer room data transmission cable
CN107451222B (en) * 2017-07-17 2020-02-07 中国电子科技集团公司第二十八研究所 Vehicle model data management system
CN110737962B (en) * 2018-07-02 2024-01-30 中国科学院沈阳计算技术研究所有限公司 Intelligent judging method and system for network wiring
CN109815301A (en) * 2018-12-21 2019-05-28 平安科技(深圳)有限公司 Wire label management method, device, computer equipment and storage medium
JP7225410B2 (en) * 2018-12-28 2023-02-20 華為技術有限公司 Method and apparatus for establishing optical cable connection

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102254251A (en) * 2011-07-18 2011-11-23 广东省电力设计研究院 Power grid three-dimensional design result data management system and digital management method thereof
CN102262758A (en) * 2011-08-17 2011-11-30 国电南瑞科技股份有限公司 Method for unified modeling and management of space-time multidimensional power grid model based on CIME (certified internet marketing engineer) file
CN102508989A (en) * 2011-09-27 2012-06-20 福建省电力有限公司 Dynamic power grid panorama display system on basis of virtual reality
CN102798802A (en) * 2012-08-07 2012-11-28 广州供电局有限公司 Cable fault locating visual simulation experimental method
CN103577930A (en) * 2013-10-25 2014-02-12 深圳供电局有限公司 System for evaluating influence of electric construction project on reliability of power distribution network

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102254251A (en) * 2011-07-18 2011-11-23 广东省电力设计研究院 Power grid three-dimensional design result data management system and digital management method thereof
CN102262758A (en) * 2011-08-17 2011-11-30 国电南瑞科技股份有限公司 Method for unified modeling and management of space-time multidimensional power grid model based on CIME (certified internet marketing engineer) file
CN102508989A (en) * 2011-09-27 2012-06-20 福建省电力有限公司 Dynamic power grid panorama display system on basis of virtual reality
CN102798802A (en) * 2012-08-07 2012-11-28 广州供电局有限公司 Cable fault locating visual simulation experimental method
CN103577930A (en) * 2013-10-25 2014-02-12 深圳供电局有限公司 System for evaluating influence of electric construction project on reliability of power distribution network

Also Published As

Publication number Publication date
CN104967534A (en) 2015-10-07

Similar Documents

Publication Publication Date Title
CN104967534B (en) A kind of Grid Central and distribution substation's cable resource unified management and planing method
CN102819861B (en) Electric system three dimensional device scene modeling method
CN102411765B (en) Three-dimensional power grid construction method and device
CN102411764B (en) The data management system of grid equipment and management method
CN109150640A (en) A kind of method for discovering network topology and system based on double layer network agreement
CN104767642B (en) ODN wiring based on GIS platform manages method and system
CN101820532A (en) Method for realizing full three-dimensional intelligent virtual computer room
CN104102790B (en) Power supply figure automatic mapping system and method based on GIS
CN109889358B (en) 3D visual IT monitoring management system
CN112698953A (en) Power grid intelligent operation and detection platform based on micro-service
CN102622463A (en) Drawing-model uniformity based method for automatic check of design drawings
CN104133943A (en) Distribution network pattern automatic generating method based on target guide
CN109887068B (en) 3D visual computer lab
US20070220451A1 (en) Method for modeling and documenting a network
CN108520163A (en) Three-dimensional net rack method for automatic modeling based on CIM model and SVG figures
CN109245923A (en) Communications optical cable route resource management method and system
WO2020098553A1 (en) Optical fiber network node management method and system
CN104866613A (en) Method for establishing three-dimensional component model database of power grid equipment and facility
CN109933634B (en) Power system graph drawing method based on power radiation range
CN103093007A (en) Power transmission iron tower three-dimensional virtual assembly method
CN106787189A (en) Intelligent substation method for visualizing and system
CN107452063A (en) A kind of construction method and device of cloud data center three-dimensional 3D intelligent monitoring computer rooms
CN107194533A (en) A kind of power distribution network full information model building method and system
CN106452887A (en) Electric power communication system visual display system based on diagram-model-data integration
CN112862232A (en) Integrated monitoring method and device for power wireless heterogeneous network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant