CN104949591A - 一种降低台阶***根底产出率的施工控制方法 - Google Patents

一种降低台阶***根底产出率的施工控制方法 Download PDF

Info

Publication number
CN104949591A
CN104949591A CN201510432186.2A CN201510432186A CN104949591A CN 104949591 A CN104949591 A CN 104949591A CN 201510432186 A CN201510432186 A CN 201510432186A CN 104949591 A CN104949591 A CN 104949591A
Authority
CN
China
Prior art keywords
blasting
laser level
level plane
horizontal plane
control method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510432186.2A
Other languages
English (en)
Other versions
CN104949591B (zh
Inventor
孙金山
姜清辉
李正川
刘贵应
周彬
杨思琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University WHU
Original Assignee
Wuhan University WHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University WHU filed Critical Wuhan University WHU
Priority to CN201510432186.2A priority Critical patent/CN104949591B/zh
Publication of CN104949591A publication Critical patent/CN104949591A/zh
Application granted granted Critical
Publication of CN104949591B publication Critical patent/CN104949591B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

本发明公开了一种降低台阶***根底产出率的施工控制方法,包括:步骤1,激光扫平仪架设于***区地表面;步骤2,调整激光扫平仪,使激光扫平仪打出的激光水平面高于***区地表面最高点,且***区地表面最高点和激光水平面的距离不大于1m;步骤3,根据***设计方案布置炮孔平面位置,量测各炮孔顶部到激光水平面的高度,获得炮孔顶部到激光水平面的平均高度;步骤4,使钻机钻杆与激光水平面相交,分别对各炮孔进行钻进,直至激光水平面以上的钻机钻杆长度达到控制长度时,停止钻进。本发明可使炮孔底部基本处于一个水平面,可有效减少***时根底的形成,提高***效果和施工效率。

Description

一种降低台阶***根底产出率的施工控制方法
技术领域
本发明属于岩石***开挖技术领域,特别涉及一种降低台阶***根底产出率的施工控制方法。
背景技术
岩石***开挖过程中,常采用台阶***开挖成型相对平整的建基面,但在工程实践中往往因多种因素形成***根底,即***后出现电铲难以挖掘的凸出采掘工作面的一定高度的硬坎、岩梗。根底产生的原因主要有孔网参数选择不当、起爆顺序和毫秒间隔时间不合理、底部装药不足等。工程实践中,施工工艺也直接影响根底的形成。钻孔过程中由于钻孔深度不一,孔底难以保持在同一水平面上,炮孔间的相互作用减弱,易形成超欠挖问题,且欠挖时需进行二次***,施工效率低。因此,控制好钻孔精度是消除根底问题的重要途径。实际作业过程中,现场工人一般通过水准仪控制钻孔深度,作业时需专人值守,作业效率低,降雨和灰尘大时难以观测控制。因此,采用该方法仅能大致估算钻孔深度,***成型效果差,开挖面超欠挖问题突出,或开挖成倾斜面。
发明内容
针对现有技术存在的不足,本发明提供了一种方便高效的降低台阶***根底产出率的施工控制方法。
本发明通过激光扫平仪精确控制炮孔钻进深度,使得开挖区炮孔孔底基本位于同一水平面,***时可降低根底产出率,从而提高***效果和施工效率。
为了解决上述技术问题,本发明采用如下的技术方案:
一种降低台阶***根底产出率的施工控制方法,包括步骤:
步骤1,激光扫平仪架设于***区地表面;
步骤2,调整激光扫平仪,使激光扫平仪打出的激光水平面高于***区地表面最高点,且***区地表面最高点和激光水平面的距离不大于1m;
步骤3,根据***设计方案布置炮孔平面位置,量测各炮孔顶部到激光水平面的高度,获得炮孔顶部到激光水平面的平均高度;
步骤4,使钻机钻杆与激光水平面相交,分别对各炮孔进行钻进,直至激光水平面以上的钻机钻杆长度达到控制长度时,停止钻进;
所述的控制长度H=L-D-X,其中,D为炮孔设计深度,X为炮孔顶部到激光水平面的平均高度,L为钻机钻杆总长度。
步骤3中,各炮孔顶部到激光水平面的高度采用标尺量测。
步骤4中,激光水平面以上的钻机钻杆长度采用标尺量测。
和现有技术相比,本发明具有如下积极意义和效果:
(1)炮孔钻进施工时,利用激光扫平仪形成可见的激光水平参照面,不需专人值守,节约人力。
(2)利用激光水平面和标杆控制炮孔深度,精度高,且方便快捷。
(3)不受降雨、大雾和灰尘等环境的影响。
(4)激光平扫仪价格便宜,所以成本不高。
(3)***区炮孔孔底基本位于同一水平面,***时炮孔相互作用显著,岩石破碎效果好,可有效减少根底和大块的形成,减少二次作业,形成的开挖面光滑平整,提高了***效果。
附图说明
图1为实施例中激光扫平仪布置示意图;
图2为实施例中激光水平面位置示意图;
图3为实施例中炮孔布置示意图。
图中:1—***区地表面;2—激光扫平仪;3—激光水平面;4.1、4.2、4.3、4.4—炮孔;5—标尺。
具体实施方式
下面将结合附图和实施例对本发明作进一步说明。
某台阶***工程,钻孔时采用一下步骤控制炮孔钻孔精度:
第1步:***区地表面架设激光扫平仪。
在***区地表面(1)选择基准点,激光扫平仪(2)架设于基准点。基准点应尽量位于平坦地表面,便于架设激光扫平仪(2),见图1。
第2步:调整激光水平面位置。
调整激光扫平仪(2)的高度和水平度,使激光扫平仪(2)打出的激光水平面(3)高于***区地表面(1)最高点,且***区地表面(1)最高点和激光水平面(3)的距离不大于1m,见图2。
第3步:获取炮孔顶部到激光水平面的平均高度。
见图3,根据***设计方案布置炮孔(4.1、4.2、4.3、4.4)平面位置,分别采用标尺(5)量测炮孔(4.1、4.2、4.3、4.4)顶部到激光水平面(3)的高度Xi,i=1,2,...,n,n为炮孔数,这里n=4。计算Xi的平均值X,即炮孔顶部到激光水平面的平均高度。
第4步:确定控制长度。
见图3,根据炮孔设计深度D、炮孔顶部到激光水平面的平均高度X、钻机钻杆总长度L,确定各炮孔钻进时的控制长度H=L-D-X。
第5步:根据控制长度对炮孔进行钻进。
使钻机钻杆与激光水平面(3)相交,然后分别对各炮孔(4.1、4.2、4.3、4.4)进行钻进,采用标尺(5)量测激光水平面(3)以上的钻机钻杆长度h,当h达到控制长度H时,停止钻进。采用该步骤依次完成所有炮孔(4.1、4.2、4.3、4.4)的钻进。
采用本发明可使得***区炮孔孔底基本位于同一水平面,这样,***时炮孔相互作用显著,岩石破碎效果好,可有效减少根底和大块的形成,从而提高***效果和施工效率。

Claims (3)

1.一种降低台阶***根底产出率的施工控制方法,其特征在于,包括:
步骤1,激光扫平仪架设于***区地表面;
步骤2,调整激光扫平仪,使激光扫平仪打出的激光水平面高于***区地表面最高点,且***区地表面最高点和激光水平面的距离不大于1m;
步骤3,根据***设计方案布置炮孔平面位置,量测各炮孔顶部到激光水平面的高度,获得炮孔顶部到激光水平面的平均高度;
步骤4,使钻机钻杆与激光水平面相交,分别对各炮孔进行钻进,直至激光水平面以上的钻机钻杆长度达到控制长度时,停止钻进;
所述的控制长度H=L-D-X,其中,D为炮孔设计深度,X为炮孔顶部到激光水平面的平均高度,L为钻机钻杆总长度。
2.如权利要求1所述的降低台阶***根底产出率的施工控制方法,其特征在于:
步骤3中,各炮孔顶部到激光水平面的高度采用标尺量测。
3.如权利要求1所述的降低台阶***根底产出率的施工控制方法,其特征在于:
步骤4中,激光水平面以上的钻机钻杆长度采用标尺量测。
CN201510432186.2A 2015-07-21 2015-07-21 一种降低台阶***根底产出率的施工控制方法 Active CN104949591B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510432186.2A CN104949591B (zh) 2015-07-21 2015-07-21 一种降低台阶***根底产出率的施工控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510432186.2A CN104949591B (zh) 2015-07-21 2015-07-21 一种降低台阶***根底产出率的施工控制方法

Publications (2)

Publication Number Publication Date
CN104949591A true CN104949591A (zh) 2015-09-30
CN104949591B CN104949591B (zh) 2016-04-27

Family

ID=54164451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510432186.2A Active CN104949591B (zh) 2015-07-21 2015-07-21 一种降低台阶***根底产出率的施工控制方法

Country Status (1)

Country Link
CN (1) CN104949591B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106403740A (zh) * 2016-11-25 2017-02-15 葛洲坝易普力四川***工程有限公司 精确控制结构面开挖倾斜向下光面***孔方向的方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1375680A (zh) * 2001-03-20 2002-10-23 T&Rb株式会社 提高***效率降低***损害的岩石阶地***方法
US20050010385A1 (en) * 1999-09-08 2005-01-13 Heck Jay Howard Blasting method
KR20050112716A (ko) * 2004-05-28 2005-12-01 주식회사 현대발파엔지니어링 벤치발파에서 암반 사면의 보호를 위한 제어 발파 방법
CN102691299A (zh) * 2012-06-19 2012-09-26 中国水利水电第七工程局有限公司 一种高地应力坝基开挖施工工艺
CN104141483A (zh) * 2014-07-25 2014-11-12 北京北矿亿博科技有限责任公司 用于露天深孔***的数字化钻孔控制方法和***
CN104197867A (zh) * 2014-09-15 2014-12-10 武汉大学 一种基于近景摄影测量技术的台阶面平整度统计方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050010385A1 (en) * 1999-09-08 2005-01-13 Heck Jay Howard Blasting method
CN1375680A (zh) * 2001-03-20 2002-10-23 T&Rb株式会社 提高***效率降低***损害的岩石阶地***方法
KR20050112716A (ko) * 2004-05-28 2005-12-01 주식회사 현대발파엔지니어링 벤치발파에서 암반 사면의 보호를 위한 제어 발파 방법
CN102691299A (zh) * 2012-06-19 2012-09-26 中国水利水电第七工程局有限公司 一种高地应力坝基开挖施工工艺
CN104141483A (zh) * 2014-07-25 2014-11-12 北京北矿亿博科技有限责任公司 用于露天深孔***的数字化钻孔控制方法和***
CN104197867A (zh) * 2014-09-15 2014-12-10 武汉大学 一种基于近景摄影测量技术的台阶面平整度统计方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
施传斌: "浅析深孔***施工技术与成本控制的关系", 《工程***》 *
璩世杰,唐纪库,米子军: "台阶***根底成因及减少根底的技术措施", 《***》 *
雷化南等: "降低露天台阶***不合理大块率和根底率的有效方法", 《包头钢铁学院学报》 *
韩同斌: "武警基地石方***及根底分析", 《科技咨询导报》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106403740A (zh) * 2016-11-25 2017-02-15 葛洲坝易普力四川***工程有限公司 精确控制结构面开挖倾斜向下光面***孔方向的方法

Also Published As

Publication number Publication date
CN104949591B (zh) 2016-04-27

Similar Documents

Publication Publication Date Title
CN104947690B (zh) 地下连续墙入岩成槽施工方法
CN106759282B (zh) 一种超大直径硬岩灌注桩半机械成孔方法
CN107478113B (zh) 一种特高压输电线路桩井一次成型***方法
CN104913696A (zh) 边坡开挖光面***法施工方法
CN109238054A (zh) 一种斜向岩层高边坡开挖支护施工方法
CN102041807A (zh) 密集孔预松硬斜岩施工技术
CN103774690A (zh) 一种抓钻冲相结合的地下连续墙成槽施工方法
CN109113757A (zh) 隧道交叉口快速施工方法
CN107084648B (zh) 一种采用先导孔导向定位及光面***施工方法
CN108589711A (zh) 一种串珠式溶洞发育区围护桩的施工方法
CN109914395A (zh) 一种大直径嵌岩桩快速施工方法及其结构
CN109594918A (zh) 水磨钻岩层钻凿方法
CN204299468U (zh) 一种潜孔钻钻孔的定位导向***装置
CN103643673B (zh) 自进式可回收钢管桩及施工方法
CN104949591B (zh) 一种降低台阶***根底产出率的施工控制方法
CN207111088U (zh) 激光精确指向装置
CN110984132A (zh) 复杂地质条件下地下连续墙成槽的施工方法
CN104947664A (zh) 一种厚密石块填海层预应力高强混凝土方桩施工方法
CN109973011A (zh) 一种提高台阶***预裂孔钻孔精度的钻孔方法及钻孔装置
CN105200994A (zh) 预留盾构穿越复合式基坑围护装置的施工工法
CN109610439A (zh) 地下障碍物超深地下连续墙成槽的施工方法
CN107529583A (zh) 钻爆施工经济最小超挖方法及其激光精确指向装置
CN103850248A (zh) 一种承端桩桩孔的施工工艺及装置
CN105065004A (zh) 一种浅埋大跨度岩石隧道洞口段弱***开挖施工方法
CN205100226U (zh) 地下连续墙入岩成槽施工设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant