CN104947955B - Load transferring method used for hydraulic lifting device replacement - Google Patents

Load transferring method used for hydraulic lifting device replacement Download PDF

Info

Publication number
CN104947955B
CN104947955B CN201410120942.3A CN201410120942A CN104947955B CN 104947955 B CN104947955 B CN 104947955B CN 201410120942 A CN201410120942 A CN 201410120942A CN 104947955 B CN104947955 B CN 104947955B
Authority
CN
China
Prior art keywords
load
support
steel
hydraulic
jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410120942.3A
Other languages
Chinese (zh)
Other versions
CN104947955A (en
Inventor
陈辉
张海礁
蒋国明
邱顶宏
李旻
张福川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201410120942.3A priority Critical patent/CN104947955B/en
Publication of CN104947955A publication Critical patent/CN104947955A/en
Application granted granted Critical
Publication of CN104947955B publication Critical patent/CN104947955B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to device lifting, in particular to a load lifting method of a hydraulic lifting device. According to the method, as three temporary supports are additionally arranged at lower chord joints of a roof structure, the roof structure is directly supported through the support in the middle, and two hydraulic jacks are installed at the tops of the supports on the two sides, the load on a failing lifting mechanism is safely and reliably transferred to a temporary supporting load transferring device; meanwhile, after device replacement is completed, the load is retransferred to the lifting mechanism. By means of the method, it is guaranteed that device replacement and load transferring are safely and smoothly completed in the whole process.

Description

A kind of load conversion method changed for hydraulic lifting device
Technical field
The present invention relates to equipment lifting, more particularly to a kind of method of hydraulic lifting device increasing productivity.
Background technology
In hydraulic pressure lift work progress, when hydraulic lifting device breaks down, conventional method is directly below structure Single support is added, by cutting off steel strand wires unloading by root.Power on steel strand wires is very big, and roof structure has one at the strong point Fixed deformation (amount of deflection), it is breakneck operation that load is transformed into suddenly in single support;It is exactly in addition by there is failure Lift cylinder unload in load forced branch to support tower, unloading behaviour is carried out when lift cylinder failure, steel strand wires are stranded Make security risk very big.
The content of the invention
Present invention seek to address that the drawbacks described above of prior art, there is provided a kind of to turn for the load that hydraulic lifting device is changed Change method.The present invention is by jacking hydraulic jack by the safe and reliable conversion of the load of hoisting mechanism to supporting apparatus On, it is ensured that the replacing of equipment is smoothed out.
In order to solve above-mentioned technical problem, a kind of load conversion method changed for hydraulic lifting device, under it includes Row step:
Step one, when steel structural roof is in hydraulic pressure lift work progress, lift cylinder outlet failure cannot exclude necessary When changing or lifting the stranded phenomenon of steel strand wires outlet, need to set up temporary support load conversion device immediately:First by hanging Machine or hoist engine add an interim main support at roof structure lower-chord panel point, then increase by two tops in main support both sides Rise and support, jacking support top end respectively disposes a hydraulic jack, main support to support with jacking and be linked to be entirety by anchor ear, utilize The Auxiliary support of four direction guarantees stablizing for main support;
Step 2, after the completion of temporary support load conversion device is installed, welded, two hydraulic jacks are synchronously divided Level loads jacking, and now the load of hoisting mechanism is passively being laid down step by step simultaneously, when steel structural roof departs from interim by jack-up During support load conversion device, because roof structure has certain deflection deformation at the strong point, the load of hoisting mechanism is still not Unload, now the gap in temporary support load conversion device between steel pipe support and steel structural roof lower edge adopts different-thickness Steel plate tracking plug fill out;In the case of confirming that each several part is N/R, next stage jacking loading can be continued, until hoisting mechanism Load when being zero, lock hydraulic lifting jack, the work of jacking load conversion is completed, the oil cylinder that starts to change hoisting mechanism or Person lifts steel strand wires;
Step 3, after the completion of lift cylinder or lifting steel strand wires are changed, is carried by the tensioning of lift cylinder multistage loadings Steel strand wires are risen, now the load of hydraulic jack is unloaded step by step on temporary support load conversion device, until steel structural roof When load in disengaging steel pipe support, hydraulic jack is zero, load conversion work is fully completed, and steel structural roof recovers normally to carry The state of liter.
The described load conversion method changed for hydraulic lifting device, in the step 2, two hydraulic pressure thousand Jin top is synchronous to load hierarchical loading jacking according to 20%, 40%, 60%, 80%, 100% accumulation.
The described load conversion method changed for hydraulic lifting device, in the step 3, the lift cylinder is pressed According to 20%, 40%, 60%, 80%, 100% accumulation multistage loadings, tensioning lifts steel strand wires.
By adding one group of three temporary support in roof structure lower-chord panel point, intermediate supports directly support roof system to the present invention Two hydraulic jacks are installed at structure, supported on both sides top, will appear from that load on the hoisting mechanism of problem is safe and reliable to be turned Shift on supporting apparatus, while after the completion of equipment replacement, and load is transformed on hoisting mechanism again, whole process guarantees to set For replacing, load conversion safety, smoothly complete.The present invention can safely and efficiently process steel structural roof and construct in hydraulic pressure lift During most dangerous equipment replacement when problem.
Description of the drawings
Below in conjunction with the accompanying drawings the present invention is further illustrated:
Fig. 1 is schematic diagram of the present invention.
Specific embodiment
As shown in figure 1, the present invention when steel structural roof 9 in hydraulic pressure lift work progress, the outlet failure of lift cylinder 7 without Method is excluded when must change or lift the stranded phenomenon of the outlet of steel strand wires 8, with load conversion method of the invention by hoisting mechanism On the safe and reliable conversion of load to temporary support load conversion device, comprise the following steps that:
Technical staff provides equipment replacement scheme, and the temporary support load conversion device of the present invention is determined by calculating analysis The specification of each part, size, complex node carries out finite element analyses using ANSYS;
The model of hydraulic jack 5 determines:The tonnage size of jack 5 is determined according to the counter-force value of temporary support point;Root Become according to uneven deformation value Δ and lifting steel strand wires elasticity of the temporary support point of roof structure 9 in the state that lifted and jacking state The shortening amount Δ L of shape determines the pushing tow stroke of jack 5:
Jack pushing tow stroke=structure jacking state deformation-structure lifts state deformation(Negative value)+ steel strand wires shorten Δ L
Since when lift cylinder 7 breaks down or steel strand wires 8 there is stranded phenomenon, the safety coefficient drop of hoisting mechanism Low, job site should be made with most fast speed, install temporary support load conversion device.
After temporary support load conversion device installation, two synchronization hierarchical loadings of hydraulic jack 5(20% accumulation Loading), now the load of lift cylinder 7 also laying down step by step, when steel structural roof 9 is by jack-up, in order to ensure jacking process Stationarity, when jack is per jacking 30mm, follows and adopt between steel pipe support 1 and the lower edge of steel structural roof 11 in supporting apparatus Filled out closely with the plug of steel plate strip 6, stretch that cylinder is long to bring unnecessary stable problem to evade jack 8.It is as good as in confirmation each several part In the case of often, next stage jacking loading can be continued, until when liter steel strand wires 8 are lax, the load of lift cylinder 7 is zero, lock Determine hydraulic jack 5, start to change lift cylinder 7 or lifting steel strand wires 8.
Lifting means is changed after finishing, and lifting steel strand wires is tensioned step by step by lift cylinder, now on supporting apparatus Load in hydraulic jack 5 is laid down step by step, until the load that steel structural roof 9 departs from steel pipe 1 hydraulic jack 5 of support is When zero, load conversion is fully completed.

Claims (3)

1. it is a kind of for hydraulic lifting device change load conversion method, it is characterised in that it comprises the following steps:
Step one, when steel structural roof is in hydraulic pressure lift work progress, lift cylinder outlet failure cannot be excluded and must changed Or when lifting the stranded phenomenon of steel strand wires outlet, need to set up temporary support load conversion device immediately:First by loop wheel machine or Person's hoist engine adds an interim main support at roof structure lower-chord panel point, then increases by two jackings in main support both sides Support, jacking support top end respectively disposes a hydraulic jack, and main support is supported with jacking and is linked to be entirety by anchor ear, using four The Auxiliary support in direction guarantees stablizing for main support;
Step 2, after the completion of temporary support load conversion device is installed, welded, synchronously classification adds two hydraulic jacks Jacking is carried, now the load of hoisting mechanism is passively being laid down step by step simultaneously, when steel structural roof departs from temporary support lotus by jack-up During idling changing device, because the load that roof structure has certain deflection deformation, hoisting mechanism at the strong point is not still unloaded Complete, now the gap in temporary support load conversion device between steel pipe support and steel structural roof lower edge adopts the steel of different-thickness Plate tracking plug is filled out;In the case of confirming that each several part is N/R, next stage jacking loading can be continued, until hoisting mechanism is negative When load is zero, hydraulic lifting jack is locked, the work of jacking load conversion is completed, start to change the oil cylinder of hoisting mechanism or carry Rise steel strand wires;
Step 3, after the completion of lift cylinder or lifting steel strand wires are changed, by the tensioning of lift cylinder multistage loadings steel is lifted Twisted wire, now the load of hydraulic jack is unloaded step by step on temporary support load conversion device, until steel structural roof departs from When load in steel pipe support, hydraulic jack is zero, load conversion work is fully completed, and steel structural roof recovers normal hoisting shape State.
2. it is according to claim 1 for hydraulic lifting device change load conversion method, it is characterised in that the step In rapid two, two hydraulic jacks are synchronous to load hierarchical loading jacking according to 20%, 40%, 60%, 80%, 100% accumulation.
3. it is according to claim 1 for hydraulic lifting device change load conversion method, it is characterised in that the step In rapid three, the lift cylinder lifts steel strand wires according to 20%, 40%, 60%, 80%, 100% accumulation multistage loadings, tensioning.
CN201410120942.3A 2014-03-28 2014-03-28 Load transferring method used for hydraulic lifting device replacement Active CN104947955B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410120942.3A CN104947955B (en) 2014-03-28 2014-03-28 Load transferring method used for hydraulic lifting device replacement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410120942.3A CN104947955B (en) 2014-03-28 2014-03-28 Load transferring method used for hydraulic lifting device replacement

Publications (2)

Publication Number Publication Date
CN104947955A CN104947955A (en) 2015-09-30
CN104947955B true CN104947955B (en) 2017-04-19

Family

ID=54162966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410120942.3A Active CN104947955B (en) 2014-03-28 2014-03-28 Load transferring method used for hydraulic lifting device replacement

Country Status (1)

Country Link
CN (1) CN104947955B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502475B (en) * 2020-11-27 2022-07-19 上海建工五建集团有限公司 Supporting bearing capacity conversion device and using method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH508791A (en) * 1968-06-28 1971-06-15 Bacci Luigi Procedure for raising a monolithic cell of a building structure at height, in particular for roofing and for the installation of the support pillars with the reciprocal connection, as well as a device for carrying out this procedure
CN2663585Y (en) * 2003-10-31 2004-12-15 润弘精密工程事业股份有限公司 Ancillary shoring component for adjusting height of precast floorslab
CN200964695Y (en) * 2006-11-01 2007-10-24 北京城建集团有限责任公司 Load conversion bracket
CN101666163B (en) * 2009-09-15 2010-12-01 中冶建工有限公司 High-altitude long-span roofing pipe truss installation method
CN203430059U (en) * 2013-08-22 2014-02-12 中国十七冶集团有限公司 Temporary fixing device used for installing large-span steel structure roof primary truss

Also Published As

Publication number Publication date
CN104947955A (en) 2015-09-30

Similar Documents

Publication Publication Date Title
CN107044090B (en) A kind of construction method of dual deck bridge
CN106013601A (en) Large-span roof steel truss structure and accumulative slipping construction technology
CN109973130B (en) Construction system and method for realizing one-time traction of extra-long tunnel anchor narrow space by main cable strand
CN103437563B (en) A kind of mounting method for large steel-strctrue building steel frame
CN105970819A (en) Installation construction method for steel anchor beams
CN102180426B (en) Follow-up supporting device and method
CN102134832B (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN105804400A (en) Hoisting construction method of curved truss
CN104947955B (en) Load transferring method used for hydraulic lifting device replacement
CN106567542A (en) Super high-rise double tower building steel structure corridor assembling method
CN109055637B (en) Hydraulic lifting process for mounting furnace shell in blast furnace overhaul
CN106759203A (en) Self-elevating ocean platform pile leg structure installs the method closed up
CN102926547B (en) Installation method of curved-surface net rack of roof
CN111622528A (en) Servo axial force steel supporting device and construction method
CN101818563B (en) Jack-up integral lifting mobile platform and using method
CN204326570U (en) Truss temporary support structure
CN108545629B (en) Utilize the construction method of tower crane lifting girder truss
CN110016864A (en) One kind having camber line polymorphic structure bridge upper beam construction method
CN103541574B (en) Steel-making diffusing tower installation construction in narrow regions
CN202643086U (en) Hoisting tool of hydroxylation reactor
CN101858165B (en) Tower mast structural segmented sheathing and piercing drawout integral installation technology
CN105317031B (en) A kind of ship lift main equipment room bridge main beam hanging method
CN209260563U (en) A kind of Bailey beam truss entirety transverse sliding device for cast-in-situ continuous beam
CN104675140B (en) Newly-increased load-bearing pillar is installed and roof truss load transfer method
CN104762881B (en) A kind of method of mobile formwork girder whole lateral moving

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant