CN104947953B - A kind of 10kV transmission line cement poles replacing options and the interim bar of replacing - Google Patents

A kind of 10kV transmission line cement poles replacing options and the interim bar of replacing Download PDF

Info

Publication number
CN104947953B
CN104947953B CN201510261622.4A CN201510261622A CN104947953B CN 104947953 B CN104947953 B CN 104947953B CN 201510261622 A CN201510261622 A CN 201510261622A CN 104947953 B CN104947953 B CN 104947953B
Authority
CN
China
Prior art keywords
cross
arm assembly
arm
cement
transmission line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510261622.4A
Other languages
Chinese (zh)
Other versions
CN104947953A (en
Inventor
周杰
祖二军
毛卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510261622.4A priority Critical patent/CN104947953B/en
Publication of CN104947953A publication Critical patent/CN104947953A/en
Application granted granted Critical
Publication of CN104947953B publication Critical patent/CN104947953B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

A kind of 10kV transmission line cement poles replacing options and the interim bar of replacing, belong to tower erection technical field.The 10kV transmission line cement poles replacing options include following operating procedure:A, the interim bar of installation;B, support cement rod cross arm to be replaced using interim bar;C, by cement rod cross arm to be replaced remove;D, dismounting cement pole to be replaced;E, more renew cement pole;The connection of f, new cement pole and transmission line of electricity;G, the interim bar of dismounting.It is not required to all remove transmission line of electricity using 10kV transmission line cement poles replacing options of the present invention, overcome the complex operation step of conventional cement bar replacing options presence, expend the defects such as more manpower and materials, shorten cement pole replacing construction, improve operating efficiency.

Description

A kind of 10kV transmission line cement poles replacing options and the interim bar of replacing
Technical field
The present invention relates to a kind of 10kV transmission line cement poles replacing options and the interim bar of replacing, belong to tower erection technology Field.
Background technology
In 10kV transmission lines of electricity, generally using cement pole as support circuit main bar base type, it is including terminal pole, resistance to Tension rod and angle pole, because cement pole is by after long-time use, it may appear that body of rod weathering phenomenon, security performance reduction, because This is frequently encountered the problem of cement pole replacing during Maintenance of Electric Transmission Line.
According to traditional 10kV transmission line cement pole replacing options, circuit need to be all removed, after cement pole replacing again Reinstall, not only complex operation step, and to expend more manpower and materials.For example shown in accompanying drawing 1, Fig. 2, Fig. 3 one Angle pole 1 is planted, it is provided with upper strata cross-arm 2 and lower floor's cross-arm 3, and upper strata cross-arm 2 and lower floor's cross-arm 3 are bilateral cross-arm structure, led to Cross the connecting wire of strain insulator string 4.The angle pole 1 is according to traditional replacing options, and a 6 people work groups needs 6 are small When time could complete, therefore innovate during a kind of 10kV transmission line cement poles replacing options turn into Maintenance of Electric Transmission Line work The task of top priority.
The content of the invention
Problem is changed it is an object of the invention to be directed to 10kV transmission line cement poles, there is provided one kind can shorten cement pole more Change the time, improve the 10kV transmission line cement pole replacing options of operating efficiency.
The purpose of the present invention is achieved through the following technical solutions:
A kind of 10kV transmission line cement poles replacing options, including following operating procedure:
A, the interim bar of installation:Installed on interim bar with the first cross-arm assembly of cement rod cross arm location matches to be replaced and Second cross-arm assembly, and the steel for supporting cement rod cross arm to be replaced is installed on the first cross-arm assembly and the second cross-arm assembly Cord and euphroe, after the bottom assembling body of rod base of interim club shaft, by between the embedment of body of rod base and cement pole to be replaced In soil at a certain distance, tamp;
B, support cement rod cross arm to be replaced using interim bar:The steel wire rope and euphroe that will be installed on first cross-arm assembly Upper strata cross-arm with cement pole to be replaced is connected, will on the second cross-arm assembly install steel wire rope and euphroe with it is to be replaced Lower floor's cross-arm of cement pole is connected;
C, by cement rod cross arm to be replaced remove:Upper strata cross-arm and lower floor's cross-arm are removed from cement pole to be replaced;
D, dismounting cement pole to be replaced:Cement pole to be replaced is removed using crane equipment is removed;
E, more renew cement pole:New cement pole is installed at former cement pole position according to electric transmission line erection code requirement;
The connection of f, new cement pole and transmission line of electricity:Upper strata cross-arm and lower floor's cross-arm are arranged on new cement pole, its peace Holding position is consistent with the upper strata cross-arm and lower floor's cross-arm of former cement pole;
G, the interim bar of dismounting:Steel wire rope and euphroe are unclamped, interim cement pole is removed using crane equipment.
Above-mentioned 10kV transmission line cement poles replacing options, in step a, after interim bar is installed, the first cross-arm of adjustment is total Into, it is fixed after making it parallel with the upper strata cross-arm of cement pole to be replaced, the second cross-arm assembly is adjusted, make it with cement pole to be replaced Lower floor's cross-arm it is parallel after it is fixed.
Above-mentioned 10kV transmission line cement poles replacing options, in step a, after interim bar is installed, in the first cross-arm assembly Lower section installation is lower with the first cross-arm assembly working condition to bear the first opposite bracing wire of direction of pull, under the second cross-arm assembly Side's installation is lower with the second cross-arm assembly working condition to bear the second opposite bracing wire of direction of pull.
10kV transmission line cement poles replacing options of the present invention, before cement pole to be replaced dismounting, use first Interim bar supports cross-arm on cement pole to be replaced, then removes cross-arm on cement pole to be replaced, removes cement club shaft, changes New cement pole, then former cement rod cross arm is installed on new cement pole.As can be seen here, it is defeated using 10kV of the present invention Electric line cement pole replacing options are not required to all remove transmission line of electricity, overcome the operation of conventional cement bar replacing options presence The defects such as the more manpower and materials of complex steps, consuming, shorten cement pole replacing construction, improve operating efficiency.
Interim bar is changed it is a further object of the present invention to provide a kind of 10kV transmission line cement poles, to coordinate above-mentioned 10kV Transmission line cement pole replacing options complete the replacement operation of 10kV transmission line cement poles.
Above-mentioned purpose of the invention is achieved through the following technical solutions:
A kind of 10kV transmission line cement poles change interim bar, including interim club shaft, the first cross-arm assembly, the second cross-arm Assembly and body of rod base;The interim club shaft top is installed by the first cross-arm assembly and the second cross-arm assembly;First cross-arm Assembly is provided with the first diagonal brace for improving its non-deformability;The second cross-arm assembly is provided with for improving its resistance to deformation energy Second diagonal brace of power;The body of rod base is fixed on interim club shaft bottom, when interim bar is installed, in being placed into the soil.
Above-mentioned 10kV transmission line cement poles change the main body of interim bar, the first cross-arm assembly and the second cross-arm assembly " work " word steel construction is, first fixing hole of the quantity no less than four groups is provided with the first cross-arm assembly main body, it is horizontal second Load assembly main body is provided with second fixing hole of the quantity no less than four groups.
Above-mentioned 10kV transmission line cement poles change interim bar, also set up and are filled with the first cross-arm assembly or the second cross-arm assembly The steel wire rope and euphroe matched somebody with somebody;The steel wire rope and the quantity of euphroe assembled on the first cross-arm assembly and the second cross-arm assembly Two groups are no less than, they are by the first fixing hole on U-shaped retainer ring and the first cross-arm assembly or the second cross-arm assembly the Two fixing holes are equipped with.
Above-mentioned 10kV transmission line cement poles change interim bar, and the U-shaped retainer ring is penetrated first on the first cross-arm assembly On fixing hole or the second cross-arm assembly in the second fixing hole, locking bolt is set in its openend.
Above-mentioned 10kV transmission line cement poles change interim bar, and the body of rod base is angle iron structure, by U-bolts It is fixed on interim club shaft.
10kV transmission line cement poles of the present invention change interim bar, relative to the beneficial effect acquired by prior art Fruit is identical with above-mentioned 10kV transmission line cement poles replacing options, will not be repeated here.
Brief description of the drawings
Fig. 1 is a kind of front view of the angle pole involved by the embodiment of the present invention;
Fig. 2 is a kind of side view of the angle pole involved by the embodiment of the present invention;
Fig. 3 is a kind of top view of the angle pole involved by the embodiment of the present invention;
Fig. 4 is the front view that 10kV transmission line cement poles of the present invention change interim bar;
Fig. 5 is the side view that 10kV transmission line cement poles of the present invention change interim bar;
Fig. 6 is the top view that 10kV transmission line cement poles of the present invention change interim bar;
Fig. 7 is A-A cross-sectional views in Fig. 6(After amplification);
Fig. 8 is that 10kV transmission line cement poles of the present invention change interim bar working state schematic representation.
Each list of reference numerals is in figure:1st, angle pole, 2, upper strata cross-arm, 3, lower floor's cross-arm, 4, strain insulator string, 5, lead Line, 6, interim bar, the 7, first cross-arm assembly, 7-1, the first diagonal brace, 7-2, the first fixing hole, the 8, second cross-arm assembly, 8-1, Two diagonal braces, 8-2, the second fixing hole, the 9, second bracing wire, 10, body of rod base, 11, U-bolts, the 12, first bracing wire, 13, U-shaped solid Determine ring, 14, locking bolt, 15, steel wire rope, 16, euphroe.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment the invention will be further described.
Referring to Fig. 1, Fig. 2, Fig. 3, a specific implementation of 10kV transmission line cement poles replacing options of the present invention Example is directed to the replacing options of angle pole 1, and the angle pole 1 is provided with upper strata cross-arm 2 and lower floor's cross-arm 3, upper strata cross-arm 2 and lower floor Cross-arm 3 is bilateral cross-arm structure, by the connecting wire of strain insulator string 4.
Referring to Fig. 4 to Fig. 8, when being changed to above-mentioned angle pole 1, using 10kV transmission line cement poles of the present invention Replacing options, including following operating procedure:
A, the interim bar 6 of installation:The first cross-arm with cross-arm location matches on angle pole to be replaced 1 is installed on interim bar 6 The cross-arm assembly 8 of assembly 7 and second, and installed for supporting corner to be replaced on the first cross-arm assembly 7 and the second cross-arm assembly 8 The steel wire rope 15 and euphroe 16 of the cross-arm of bar 1, after body of rod base 10 is assembled in the bottom of the body of rod of interim bar 6, by body of rod base 10 In the embedment soil spaced apart with angle pole to be replaced 1, tamp, and installed and first below the first cross-arm assembly 7 Cross-arm assembly working condition is lower to bear the first opposite bracing wire 12 of direction of pull, is installed and the below the second cross-arm assembly 8 Two cross-arm assembly working conditions are lower to bear the second opposite bracing wire 9 of direction of pull, then adjusts the first cross-arm assembly 7, makes it It is fixed after parallel with the upper strata cross-arm 2 of angle pole to be replaced 1, the second cross-arm assembly 8 is adjusted, make it with angle pole to be replaced 1 It is fixed after lower floor's cross-arm 3 is parallel;
B, the cross-arm of angle pole to be replaced 1 is supported using interim bar 6:Will on the first cross-arm assembly 7 install steel wire rope 15 and Euphroe 16 is connected with the upper strata cross-arm 2 of angle pole to be replaced 1, will on the second cross-arm assembly 8 install steel wire rope 15 and Euphroe 16 is connected with lower floor's cross-arm 3 of angle pole to be replaced 1;
C, by the cross-arm of angle pole to be replaced 1 remove:Upper strata cross-arm 2 and lower floor's cross-arm 3 are removed from angle pole to be replaced 1;
D, dismounting angle pole 1 to be replaced:Angle pole 1 to be replaced is removed using crane equipment, is removed;
E, more renew cement pole:New cement pole is installed at the position of former angle pole 1 according to electric transmission line erection code requirement;
The connection of f, new cement pole and transmission line of electricity:Upper strata cross-arm 2 and lower floor's cross-arm 3 are arranged on new cement pole, its Installation site is consistent with the upper strata cross-arm and lower floor's cross-arm of former angle pole 1;
G, the interim bar 6 of dismounting:Steel wire rope 15 and euphroe 16 are unclamped, interim bar 6 is removed using crane equipment.
To coordinate the replacement operation of angle pole 1 in above-mentioned 10kV transmission lines of electricity, specific embodiment of the invention is additionally provided A kind of 10kV transmission lines of electricity angle pole 1 changes interim bar, and as shown in accompanying drawing 4, Fig. 5, Fig. 6, the interim bar 6 includes interim bar bar Body, the first cross-arm assembly 7, the second cross-arm assembly 8 and body of rod base 10;The interim club shaft top is installed by the first cross-arm assembly 7 and the second cross-arm assembly 8;The first cross-arm assembly 7 is provided with the first diagonal brace 7-1 for improving its non-deformability;It is described Second cross-arm assembly 8 is provided with the second diagonal brace 8-1 for improving its non-deformability;The body of rod base 10 is angle iron structure, The bottom of interim club shaft is fixed on by U-bolts 11, when interim bar 6 is installed, in being placed into the soil.
Referring to Fig. 4, Fig. 5, Fig. 6, Fig. 7, the main body of the first cross-arm assembly 7 and the second cross-arm assembly 8 is " work " word Steel construction, is provided with first fixing hole 7-2 of the quantity no less than four groups, in the second cross-arm assembly master in the first cross-arm assembly main body Body is provided with second fixing hole 8-2 of the quantity no less than four groups.
Referring to Fig. 4 to Fig. 8,10kV transmission lines of electricity angle pole 1 changes interim bar 6 described in specific embodiment of the invention, also The steel wire rope 15 and euphroe 16 assembled with the first cross-arm assembly 7 or the second cross-arm assembly 8 are set;The first cross-arm assembly 7 Two groups are no less than with the steel wire rope 15 and the quantity of euphroe 16 assembled on the second cross-arm assembly 8, they are by U-shaped fixation Second fixing hole 8-2 is equipped with first fixing hole 7-2 or the second cross-arm assembly 8 on the cross-arm assembly 7 of ring 13 and first;It is described U-shaped Retainer ring 13 is penetrated on the first cross-arm assembly 7 on first fixing hole 7-2 or the second cross-arm assembly 8 in second fixing hole 8-2, at it Openend sets locking bolt 14.
10kV can also be completed using 10kV transmission line cement poles replacing options of the present invention and the interim bar of replacing The replacing of terminal pole, tension-resistant rod and cross-bar in transmission line of electricity, detailed process is identical with the Renewal process of above-mentioned angle pole 1, herein Repeat no more.

Claims (8)

1. a kind of 10kV transmission line cement poles replacing options, it is characterized in that, the 10kV transmission line cement poles replacing options Including following operating procedure:
A, the interim bar of installation(6):In interim bar(6)Upper the first cross-arm assembly installed with cement rod cross arm location matches to be replaced (7)With the second cross-arm assembly(8), and in the first cross-arm assembly(7)And the second cross-arm assembly(8)On install to be replaced for supporting The steel wire rope of cement rod cross arm(15)And euphroe(16), in interim bar(6)The bottom assembling body of rod base of the body of rod(10)Afterwards, will Body of rod base(10)In the embedment soil spaced apart with cement pole to be replaced, tamp;
B, using interim bar(6)Support cement rod cross arm to be replaced:By the first cross-arm assembly(7)The steel wire rope of upper installation(15)And Euphroe(16)With the upper strata cross-arm of cement pole to be replaced(2)It is connected, by the second cross-arm assembly(8)The steel wire rope of upper installation (15)And euphroe(16)With lower floor's cross-arm of cement pole to be replaced(3)It is connected;
C, by cement rod cross arm to be replaced remove:Upper strata cross-arm is removed from cement pole to be replaced(2)And lower floor's cross-arm(3);
D, dismounting cement pole to be replaced:Cement pole to be replaced is removed using crane equipment, is removed;
E, more renew cement pole:New cement pole is installed at former cement pole position according to electric transmission line erection code requirement;
The connection of f, new cement pole and transmission line of electricity:By upper strata cross-arm(2)And lower floor's cross-arm(3)On new cement pole, its Installation site is consistent with the upper strata cross-arm and lower floor's cross-arm of former cement pole;
G, the interim bar of dismounting(6):By steel wire rope(15)And euphroe(16)Unclamp, using crane equipment by interim bar(6)Remove.
2. 10kV transmission line cement poles replacing options according to claim 1, it is characterized in that, in step a, interim bar (6)After installation, the first cross-arm assembly is adjusted(7), make its upper strata cross-arm with cement pole to be replaced(2)It is fixed after parallel, adjustment Second cross-arm assembly(8), make its lower floor's cross-arm with cement pole to be replaced(3)It is fixed after parallel.
3. 10kV transmission line cement poles replacing options according to claim 2, it is characterized in that, in step a, interim bar (6)After installation, in the first cross-arm assembly(7)Lower section installs that lower with the first cross-arm assembly working condition to bear direction of pull opposite The first bracing wire(12), in the second cross-arm assembly(8)Install and bear pulling force side with the second cross-arm assembly working condition is lower in lower section To the second opposite bracing wire(9).
4. a kind of 10kV transmission line cement poles change interim bar, it is characterized in that, the interim bar(6)For in claims 1 to 3 Interim bar described in any one, it includes interim club shaft, the first cross-arm assembly(7), the second cross-arm assembly(8)With body of rod base (10);The interim club shaft top is installed by the first cross-arm assembly(7)With the second cross-arm assembly(8);The first cross-arm assembly (7)It is provided with the first diagonal brace for improving its non-deformability(7-1);The second cross-arm assembly(8)It is provided with for improving it Second diagonal brace of non-deformability(8-1);The body of rod base(10)The bottom of interim club shaft is fixed on, in interim bar(6) During installation, in being placed into the soil.
5. 10kV transmission line cement poles according to claim 4 change interim bar, it is characterized in that, first cross-arm is total Into(7)With the second cross-arm assembly(8)Main body be " work " word steel construction, it is many to be provided with quantity in the first cross-arm assembly main body In four groups of the first fixing hole(7-2), second fixing hole of the quantity no less than four groups is provided with the second cross-arm assembly main body(8- 2).
6. 10kV transmission line cement poles according to claim 5 change interim bar, it is characterized in that, it also sets up and first Cross-arm assembly(7)Or the second cross-arm assembly(8)The steel wire rope of assembling(15)And euphroe(16);The first cross-arm assembly(7) With the second cross-arm assembly(8)The steel wire rope of upper assembling(15)And euphroe(16)Quantity be no less than two groups, they pass through U Type retainer ring(13)With the first cross-arm assembly(7)Upper first fixing hole(7-2)Or the second cross-arm assembly(8)Upper second fixing hole (8-2)It is equipped.
7. 10kV transmission line cement poles according to claim 6 change interim bar, it is characterized in that, the U-shaped retainer ring (13)Penetrate the first cross-arm assembly(7)Upper first fixing hole(7-2)Or the second cross-arm assembly(8)Upper second fixing hole(8-2)In, In its openend, locking bolt is set(14).
8. the 10kV transmission line cement poles according to any one of claim 4 to 7 change interim bar, it is characterized in that, institute State body of rod base(10)It is angle iron structure, by U-bolts(11)It is fixed on interim club shaft.
CN201510261622.4A 2015-05-21 2015-05-21 A kind of 10kV transmission line cement poles replacing options and the interim bar of replacing Expired - Fee Related CN104947953B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510261622.4A CN104947953B (en) 2015-05-21 2015-05-21 A kind of 10kV transmission line cement poles replacing options and the interim bar of replacing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510261622.4A CN104947953B (en) 2015-05-21 2015-05-21 A kind of 10kV transmission line cement poles replacing options and the interim bar of replacing

Publications (2)

Publication Number Publication Date
CN104947953A CN104947953A (en) 2015-09-30
CN104947953B true CN104947953B (en) 2017-06-06

Family

ID=54162964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510261622.4A Expired - Fee Related CN104947953B (en) 2015-05-21 2015-05-21 A kind of 10kV transmission line cement poles replacing options and the interim bar of replacing

Country Status (1)

Country Link
CN (1) CN104947953B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106081873B (en) * 2016-08-18 2019-05-28 国家电网公司 A method of replacement linear tension electric pole
CN107386770B (en) * 2017-08-22 2022-09-02 三峡大学 Vibration-damping composite cross arm electric pole convenient for replacing cross arm
CN108683122B (en) * 2018-06-08 2020-07-28 国网山东省电力公司青岛供电公司 Auxiliary device and method for sharing straight line rod of corridor in live migration

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100815836B1 (en) * 2007-12-28 2008-03-24 대원전기 주식회사 Cutting replacement works on concrete electric poles without cutting off power supply using pole clamps and pole crushers
CN101692549B (en) * 2009-09-23 2011-08-31 绵阳电业局 Pole replacing operation method for fixed double aluminum alloy holding poles
CN203160808U (en) * 2013-03-19 2013-08-28 国家电网公司 Device for replacing double concrete poles of high-voltage power transmission line
CN203839885U (en) * 2014-05-27 2014-09-17 于兴利 10kV/35kV double-loop straight-line electrified pole replacing device
CN104410008B (en) * 2014-11-26 2017-11-24 国网河南省电力公司平顶山供电公司 The device and construction method of cable between a kind of replacing 35kV line linear bars
CN104538888B (en) * 2014-12-03 2017-03-29 国家电网公司 A kind of distribution line straight line pole cross-arm charged for replacement method
CN204754283U (en) * 2015-05-21 2015-11-11 国家电网公司 Interim pole is changed to 10KV transmission line cement pole

Also Published As

Publication number Publication date
CN104947953A (en) 2015-09-30

Similar Documents

Publication Publication Date Title
US8584429B2 (en) Tower erection system and method
CN104947953B (en) A kind of 10kV transmission line cement poles replacing options and the interim bar of replacing
MX2018002590A (en) System and method for installing a tensioning tendon in a wind turbine tower.
CN202530769U (en) Large span steel structure high-altitude subsection hoisting support system
CN204848091U (en) Steel sheet cross arm hoisting accessory
CN104420656A (en) Traction tension forming mounting method of spherical rib annular type cable dome structure
CN102255261A (en) Shifting device for two-circuit hot-line work of transmission line
CN105016220B (en) A kind of pole guide support adding device
CN203794440U (en) Assembled roofing color plate lifting frame
CN203284128U (en) Hoisting tool of main mechanism of switch blade
CN204754283U (en) Interim pole is changed to 10KV transmission line cement pole
CN204474202U (en) Large-tonnage steel member integrated hoisting fixture
CN110485792A (en) A kind of vertical safe construction method of iron tower of power transmission line group
CN105858556B (en) Lightning-Rod Protection Disign In Substations more exchange device and application method
CN106193754A (en) A kind of straight line pole increases bar
JP6554610B2 (en) Assembly method for a DC converter valve
CN104314354A (en) High-voltage electric tower base
CN204355942U (en) For the suspension centre adjustable carrying pole beam construction of prefabricated panel lifting
JP2009221763A (en) Reinforcement assembling apparatus and reinforcement assembling method
CN104343276A (en) Adjustable cross arm electric power steel pipe rod
CN103174323A (en) Multifunctional hoisting support frame
CN202578116U (en) Single-person on-pole assembler for dual-fan cross arm
CN105977860A (en) Composite cross-arm insulator device and method for replacing overhead transmission line
CN108396735B (en) Self-lifting operation platform for large-aperture hole digging pile
CN205447177U (en) Equipment for power transmission and distribution rack

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170606