CN104929568B - A kind of construction method for gas reservoir control water - Google Patents

A kind of construction method for gas reservoir control water Download PDF

Info

Publication number
CN104929568B
CN104929568B CN201510226350.4A CN201510226350A CN104929568B CN 104929568 B CN104929568 B CN 104929568B CN 201510226350 A CN201510226350 A CN 201510226350A CN 104929568 B CN104929568 B CN 104929568B
Authority
CN
China
Prior art keywords
gas
gel
gas reservoir
water
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510226350.4A
Other languages
Chinese (zh)
Other versions
CN104929568A (en
Inventor
王雷
丁保东
吴文明
何龙
杨祖国
欧阳冬
程仲富
邢钰
李淑杰
冯波
冯一波
王瑞
许艳艳
崔亚
高秋英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Original Assignee
China Petroleum and Chemical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp filed Critical China Petroleum and Chemical Corp
Priority to CN201510226350.4A priority Critical patent/CN104929568B/en
Publication of CN104929568A publication Critical patent/CN104929568A/en
Application granted granted Critical
Publication of CN104929568B publication Critical patent/CN104929568B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of construction method for gas reservoir control water, comprise the following steps:Gas is injected into gas reservoir, the encroached water in gas-bearing formation is pushed into remote well;Gel of the configuration with delay crosslinking ability, and gel is subjected to atomization process, to form gas phase dispersion gel;Gas phase dispersion gel and gas companion are noted into gas reservoir;Continue to inject gas, to realize migration of the gel in gas-bearing formation with disperseing;Carry out stewing well processing.The construction method for gas reservoir control water of the present invention can realize that Gelling Plugging Agent is atomized, and significantly reduce injection pressure, be adapted to middle low permeability gas reservoirs;Leading portion injection atomization Gelling Plugging Agent, is subsequently implanted into gas, can realize blocking agent deep water blockoff;Xie Shuisuo can be realized, can also realize that the later stage controls water, increase the term of validity;Long-term control water can be realized, the term of validity is more than half a year.

Description

A kind of construction method for gas reservoir control water
Technical field
The present invention relates to a kind of construction method for gas reservoir control water, the gas reservoir that is particularly suitable for use in, gas condensate reservoir high water-cut well Help lie and reproduce and control aquatic production.
Background technology
For natural gas as a kind of more cleaning, more high-quality, the more economical energy, the status in national economy is increasingly heavier Will.China's gas reservoir is broadly divided into low permeability gas reservoir, gas condensate reservoir and edge-bottom water gas reservoir.At present, China's gas reservoir, gas condensate reservoir are most Developed using exhaustion formula, altered by edge-bottom water into being influenceed, lain caused by liquid lock well number and High water cut caused by the aqueous rising of gas well Jing Jing numbers are increasing, and pressure, yield constantly decline even stop-spraying, have had a strong impact on the Efficient Development of gas reservoir.
At present, harness the river, water control technique mainly has curable particulate species closure to abandon water logging section, polymerization species partial selective Water blockoff, natural gas injection or nitrogen such as reproduce at the technology, but scale is ripe, adaptable technology still without being formed.It is comprehensive Think, the subject matter for causing early stage water blockoff, control water effect poorly efficient has:1) blocking agent system bad adaptability, gas well is in water, gas Two-phase, blocking agent poor selectivity, easily air water are the same as stifled;2) gas reservoir formation sensitivity is strong, is polluted by the external liquid of uncured liquid blocking agent Gas-bearing formation water is caused to be locked;3) process matching Technological adaptability is poor.
Wherein, Publication No. CN101397896A Chinese invention patent application " puts cement cooperation gas injection pressurization using inclining Following shutoff method is disclosed in the shutoff method of closing Gas well dewatering section ":Gas injection is implemented to target well, well internal water accumulation is pushed away Stratum is gone back to, makes to keep anhydrous state in well, while this gas injection, declines to incline using cable and puts device, make its lowering into stratum The section to be closed, when reaching closing section, control, which is inclined, puts the unlatching of device bottom end opening, flows out built-in laitance, laitance Outflow is first gathered in closing section, and laitance slowly flows into the gravel layer in annular distance between screen casing and the borehole wall, and it is straight to continue gas injection To laitance consolidation and sclerosis, reach the purpose of Plugging Water Zones.But aforesaid way can not realize deep water blockoff, be only applicable to gas-bearing formation Thickness is big or presss from both sides the gas reservoir of interlayer development, and otherwise easy stratum water, which streams, causes water blockoff to fail.
Therefore, the gas reservoir, gas condensate reservoir water blockoff, control hydraulic art of research and development wide adaptability are needed badly, improves such gas reservoir, condensate gas Hide the development effectiveness of development late stage high water cut stage.
The content of the invention
It is an object of the invention to provide one kind can effectively block water stream channel, realize that the High water cut of gas condensate reservoir is administered Construction method.
To achieve the above object, a kind of concrete technical scheme of construction method for gas reservoir control water of the invention is:
A kind of construction method for gas reservoir control water, comprise the following steps:Gas is injected into gas reservoir, by gas-bearing formation Encroached water is pushed into remote well;Gel of the configuration with delay crosslinking ability, and gel is subjected to atomization process, to form gas phase dispersion Gel;Gas phase dispersion gel and gas companion are noted into gas reservoir;Continue inject gas, with realize migration of the gel in gas-bearing formation with It is scattered;Carry out stewing well processing.
The construction method for gas reservoir control water of the present invention has advantages below:
1) it can realize that Gelling Plugging Agent is atomized, significantly reduce injection pressure, be adapted to middle low permeability gas reservoirs;
2) leading portion injection atomization Gelling Plugging Agent, is subsequently implanted into gas, can realize blocking agent deep water blockoff;
3) Xie Shuisuo can be realized, can also realize that the later stage controls water, increase the term of validity;
4) long-term control water can be realized, the term of validity is more than half a year.
Brief description of the drawings
Fig. 1 is the working sketch for gas reservoir control water of the present invention.
Description of reference numerals:1 nitrogen injection unit;2 gas phase ball-and-seats;3 supersonic atomizers;4 liquid phase ball-and-seats;5 notes Liquid pump;6 christmas tree oil pipe four-ways;7 four-way junction of casing;8 gas well sleeve pipes;9 gas well oil pipes;10 gas-bearing formations;11 gel particles;12 gas-bearing formation water Invade region.
Embodiment
In order to be better understood by the purpose of the present invention, structure and function, below in conjunction with the accompanying drawings, one kind of the present invention is used for The construction method of gas reservoir control water does further detailed description.
As shown in figure 1, the construction method for gas reservoir control water of the present invention comprises the following steps:
First, gas is injected into gas reservoir, the encroached water in gas-bearing formation 10 is pushed into remote well.Wherein, the gas of injection is excellent Elect nitrogen as, and the injection rate of nitrogen is more than 1.5 times of gas well highest hourly output, the amount for injecting nitrogen is 30~400,000 m3
Secondly, gel of the configuration with delay crosslinking ability, and gel is subjected to atomization process, coagulated with forming gas phase dispersion Glue.Wherein, gel is preferably the polyacrylamide gel with delay crosslinking ability, and atomization process preferably uses ultrasonic atomization Device, and the power of supersonic atomizer typically wants > 50kw.
Then, gas phase dispersion gel and gas companion are noted into gas reservoir.Wherein, gel injection rate be preferably 0.3~ 0.5m3/ h, gel injection rate are typically designed as 50~80m3.In addition, the injection timing of gel is preferably breakthrough of gas gas-bearing formation water enchroachment (invasion) Region 12, after gas injection pressure is decreased obviously.
Then, continue to inject gas, to realize migration of the gel in gas-bearing formation 10 with disperseing.
Finally, stewing well processing is carried out.
When gas well resumes production again, you can effectively block advancing by leaps and bounds again for edge-bottom water, realize the deep of gas well Water blockoff, control water.
The construction method construction is simple for gas reservoir control water of the present invention, it is applicable to the High water cut of gas reservoir, gas condensate reservoir Administer, disclosure satisfy that clastic rock gas reservoir, gas condensate reservoir High water cut gas well gas injection reproduce, controlled the demand of aquatic production.
Application example 1
Certain SL-1 condensate gas well, well depth 5289.7m, perforated interval 5026-5042m, positioned at gas reservoir high-order bit, history is most The high side of hourly output 1000.In April, 2014 is aqueous to rise to 95%, and daily gas is less than 1000 sides.
Start nitrogen injection+gas phase dispersion gel water-plugging control water in July, 2014 to construct, 1800 sides of nitrogen injection rate/hour, After injecting the side of nitrogen 1.3 ten thousand, gas injection pressure is down to 35MPa by 50MPa, then with gas injection phase dispersion gel, injection rate 0.5 Side/hour, ultrasonic unit power 55kw, the side of injection rate gel 60, with injection nitrogen after gas injection phase gel, is continued, add up note Enter the side of nitrogen 300,000.
In August, 2014 drives a well, aqueous to be down to 66%, adds up to increase the side of gas 2,700,000, is valid up to more than 8 months.
Application example 2
Certain SL-2 condensate gas well, well depth 4320.50m, 4495.2-4695.17m cutting seam sieve tube completion, positioned at the high portion of gas reservoir Position, the side of historical high hourly output 960.In April, 2010 is aqueous to rise to more than 95%, and the gas production that drives a well is few.
Start nitrogen injection+gas phase dispersion gel water-plugging control water within 2 months 2014 to construct, 1500 sides of nitrogen injection rate/hour, After injecting the side of nitrogen 50,000, gas injection pressure is down to 33MPa by 38MPa, then companion's gas injection phase dispersion gel, and the side of injection rate 0.5/ Hour, ultrasonic unit power 50kw, the side of injection rate gel 70, with injection nitrogen after gas injection phase gel, is continued, add up injection nitrogen The side of gas 400,000.
In April, 2014 drives a well, aqueous to be down to 70%, adds up to increase the side of gas 1,800,000, is valid up to 10 months.
The present invention makes shake gels or colloidal dispersed gel shape that polymer is lightly crosslinked by adding nitrogen in gel Into gas phase dispersion system, for gas reservoir water blockoff, the choice of technology is good, injury is low, is suitable for gas reservoir water blockoff, control water, contributes to The upper production of China's gas reservoir gas production, stable yields, are favorably improved economic benefit, can be that gas reservoir harness the river, control water and open up new way Footpath, technical support is provided to carry gas reservoir ultimate recovery.
The present invention is further described by specific embodiment above, it should be understood that, here specifically Description, should not be construed as the restriction to the spirit and scope of the invention, and one of ordinary skilled in the art is reading this explanation The various modifications made after book to above-described embodiment, belong to the scope that the present invention is protected.

Claims (7)

1. a kind of construction method for gas reservoir control water, it is characterised in that comprise the following steps:
Gas is injected into gas reservoir, the encroached water in gas-bearing formation is pushed into remote well;
Gel of the configuration with delay crosslinking ability, and gel is subjected to atomization process, to form gas phase dispersion gel;
Gas phase dispersion gel and gas companion are noted into gas reservoir;
Continue to inject gas, to realize migration of the gel in gas-bearing formation with disperseing;
Carry out stewing well processing.
2. the construction method according to claim 1 for gas reservoir control water, it is characterised in that the gas injected into gas reservoir For nitrogen.
3. the construction method according to claim 2 for gas reservoir control water, it is characterised in that gas is injected into gas reservoir Injection rate is more than 1.5 times of gas well highest hourly output, and the amount for injecting gas is 30~400,000 m3
4. the construction method according to claim 1 for gas reservoir control water, it is characterised in that gel is to be crosslinked with delay The polyacrylamide gel of ability.
5. the construction method according to claim 4 for gas reservoir control water, it is characterised in that the atomization process of gel uses Supersonic atomizer, and the power of supersonic atomizer wants > 50kw.
6. the construction method according to claim 1 for gas reservoir control water, it is characterised in that the injection timing of gel is gas Body breaks through gas-bearing formation water enchroachment (invasion) region, after gas injection pressure is decreased obviously.
7. the construction method according to claim 6 for gas reservoir control water, it is characterised in that the injection rate of gel is 0.3~0.5m3/ h, injection rate are 50~80m3
CN201510226350.4A 2015-05-06 2015-05-06 A kind of construction method for gas reservoir control water Active CN104929568B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510226350.4A CN104929568B (en) 2015-05-06 2015-05-06 A kind of construction method for gas reservoir control water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510226350.4A CN104929568B (en) 2015-05-06 2015-05-06 A kind of construction method for gas reservoir control water

Publications (2)

Publication Number Publication Date
CN104929568A CN104929568A (en) 2015-09-23
CN104929568B true CN104929568B (en) 2018-02-23

Family

ID=54116961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510226350.4A Active CN104929568B (en) 2015-05-06 2015-05-06 A kind of construction method for gas reservoir control water

Country Status (1)

Country Link
CN (1) CN104929568B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105525890B (en) * 2015-11-24 2019-01-08 中国石油化工股份有限公司 Method for sieve tube completion water plugging of horizontal well
CN108643873A (en) * 2018-05-09 2018-10-12 重庆科技学院 One kind after well well workover of calming the anger for reproducing method
CN109826601B (en) * 2019-02-27 2020-06-30 成都理工大学 Water lock removing method for tight reservoir
CN115059430B (en) * 2022-07-08 2024-01-23 中海石油(中国)有限公司 Selective cone pressing water plugging method for oil well of side bottom water reservoir

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101033392A (en) * 2007-03-30 2007-09-12 盘锦市庆联油田工程技术服务有限公司 Expansion type flow gel profile controlling water shutoff agent
CN101397896A (en) * 2007-09-30 2009-04-01 台湾中油股份有限公司 Water-shutoff method for sealing gas well effluent section by combination of incline cement and gas injection compression
CN101798500A (en) * 2010-04-01 2010-08-11 中国石油大学(华东) Plugging agent with double plugging function and filling method thereof
CN104087280A (en) * 2014-07-10 2014-10-08 中国石油大学(华东) Blocking system and blocking method for channeling inhibition in carbon dioxide non-miscible flooding of low permeability reservoir

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101033392A (en) * 2007-03-30 2007-09-12 盘锦市庆联油田工程技术服务有限公司 Expansion type flow gel profile controlling water shutoff agent
CN101397896A (en) * 2007-09-30 2009-04-01 台湾中油股份有限公司 Water-shutoff method for sealing gas well effluent section by combination of incline cement and gas injection compression
CN101798500A (en) * 2010-04-01 2010-08-11 中国石油大学(华东) Plugging agent with double plugging function and filling method thereof
CN104087280A (en) * 2014-07-10 2014-10-08 中国石油大学(华东) Blocking system and blocking method for channeling inhibition in carbon dioxide non-miscible flooding of low permeability reservoir

Also Published As

Publication number Publication date
CN104929568A (en) 2015-09-23

Similar Documents

Publication Publication Date Title
CN104929568B (en) A kind of construction method for gas reservoir control water
CN106703752B (en) A kind of system enclosure method for oil shale underground in situ exploitation
CA2591498C (en) Recovery process
CN110318721B (en) Method for improving recovery ratio by foam flooding auxiliary nitrogen huff and puff of fault block oil reservoir
CN101503957B (en) Aboveground and underground combined heat injection coal bed gas extraction method
MX2012001353A (en) Method to control driving fluid breakthrough during production of hydrocarbons from a subterranean reservoir.
CA2766838C (en) Enhancing the start-up of resource recovery processes
Sun et al. Enhance offshore heavy oil recovery by cyclic steam-gas-chemical co-stimulation
CN107587529B (en) Gas-water pressure balanced type underground anti-seepage sealing technique and equipment used
CN104653148A (en) Well group reforming comprehensive utilization method for waste oil wells
CN107816340A (en) Utilize the process of high-power ultrasonics conjugate branch horizontal well thermal production shale gas
CN109577909A (en) A kind of extra permeability oilfield selectivity frothy gel water plugging and profile controlling method
CN101086210A (en) Profile control and water plugging technology for coal bed gas
CN204457706U (en) A kind of single-well injection-production oil recovery by heating tubing string for straight well
CN111173480B (en) Natural gas hydrate exploitation method
CN105443098B (en) A kind of coal mine down-hole drilling segmentation fixed point hydraulic fracturing pore-fixing device and method
CN105089600A (en) Temporary blocking material assisted dragged hydraulic jet reconstruction method for horizontal well
CN112253070B (en) Method for sectional seam making, coal washing and outburst elimination of thick coal seam top-bottom linkage horizontal well
CN103437737A (en) Method for water plugging for petroleum well with oil phase microparticle plugging agent
CN107269255A (en) A kind of method and device that fine and close oil is exploited by the displacement of reservoir oil between cluster
CN104975826A (en) Method for improving recovery ratio of super heavy oil reservoir
CN104265258A (en) Fracture-assisted combustion of oil in-situ stimulation thickened oil exploiting method
CN104453806A (en) Method for removing sandstone condensate gas reservoir water lock through nitrogen injection
CN106382108B (en) Well fracturing and removal and stimulation method based on CO2 gas phase fracturing technique
CN104963674A (en) Low permeability coal bed liquid nitrogen freeze thawing cracking permeability increasing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant