CN104929279B - Pre-cast shear wall vertical rebar centralized restraint lap joint construction - Google Patents

Pre-cast shear wall vertical rebar centralized restraint lap joint construction Download PDF

Info

Publication number
CN104929279B
CN104929279B CN201510362691.4A CN201510362691A CN104929279B CN 104929279 B CN104929279 B CN 104929279B CN 201510362691 A CN201510362691 A CN 201510362691A CN 104929279 B CN104929279 B CN 104929279B
Authority
CN
China
Prior art keywords
shear wall
vertical reinforcement
precast shear
duct
connection duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510362691.4A
Other languages
Chinese (zh)
Other versions
CN104929279A (en
Inventor
冯健
刘亚非
金如元
陈耀
庞涛
蔡建国
刘立新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201510362691.4A priority Critical patent/CN104929279B/en
Publication of CN104929279A publication Critical patent/CN104929279A/en
Application granted granted Critical
Publication of CN104929279B publication Critical patent/CN104929279B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses pre-cast shear wall vertical rebar centralized restraint lap joint construction. Upper vertical rebars of a lower shear wall are bent with equal angles and extend into connecting pore passages preserved in the lower portion of an upper shear wall, spiral stirrups with different screw pitches are arranged on the outer sides of the pore passages, vertical rebars and additional vertical rebars are distributed for multiple rows in the direction of wall thickness in the pore passages, and the upper shear wall and lower shear wall vertical rebar centralized restraint lap joint is achieved through grouting materials which are injected afterwards. According to the pre-cast shear wall vertical rebar centralized restraint lap joint construction, the difficulties of production and construction are reduced, the material requirements on the grouting materials and the spiral stirrups are reduced, and the reliable connection and the structural integrity of longitudinal bars are guaranteed.

Description

Precast shear wall vertical reinforcement concentrates constraint overlap joint connecting structure
Technical field
The present invention relates to a kind of Vertical bar connection construction of prefabrication and assembly construction shear wall, belong to architectural engineering precast concrete Shear wall structure technical field.
Background technology
Shear wall structure has bearing capacity and lateral deformation stiffness higher, horizontal shear can be reasonably resistant to, with good Good anti-seismic performance.After introducing prefabrication and assembly construction technology, precast shear wall structure also has to be easy to factory normalization to manufacture, shows Wet trade is few, easy construction, surrounding environment influence is mitigated, the advantages of transport resource and human resources input are reduced.Cause This, with China's building industrialization and the current demand of housing industrialization, precast shear wall structure is lived in China's multilayer and high level To be had broad application prospects in residence building.
Between the core technology of precast shear wall structure is the component such as shear wall and beam, upper strata shear wall and lower floor's shear wall Connecting structure form, its quality directly influences bearing capacity and ductile performance of structure etc..And the vertical reinforcement of precast shear wall Connecting structure is one of main contents, and current existing shear wall Vertical bar connection technology is by shear wall structure lower floor Vertical applied force reinforcing bar in wall inward flange component replaces that (lower end of bar reinforcement is embedded in down with an other equivalent bar reinforcement Layer wall), and the upper end of bar reinforcement is stretched into the reserved grout hole in upper wall bottom;Or by lower floor's wall inward flange structure Every vertical reinforcement in part is inserted in the reserving hole that upper wall pre-sets respectively.
There is, additional vertical reinforcement high to grouting material requirement or hoop in above-mentioned shear wall Vertical bar connection technology Muscle, to field operation and construction precision requirement it is higher, site operation amount is big the problems such as.Therefore, on the basis of existing interconnection technique On, propose that a kind of improved precast shear wall vertical reinforcement concentrates constraint overlap joint interconnection technique, precast shear wall structure is pushed away Wide and application has more important meaning.
Interconnection technique between the component such as precast shear wall and wall, beam is the key point of precast construction system, how structure Build that stress performance is good, construction measure rationally, construction easily new connecting structure, be always that precast shear wall structural elements connects The technological difficulties for connecing.
The content of the invention
Technical problem:Low difficulty, the convenient, meterial saving and high efficiency of construction, type of attachment letter are manufactured the invention provides one kind The clear and definite precast shear wall vertical reinforcement of single, stress concentrates constraint overlap joint connecting structure.
Technical scheme:Precast shear wall vertical reinforcement of the invention concentrates constraint overlap joint connecting structure, under the construction includes Layer precast shear wall and upper strata precast shear wall, top vertical reinforcement and the upper strata precast shear wall of lower floor's precast shear wall The reserved connection duct of correspondence that bottom is set is staggered setting, after top vertical reinforcement is through bending, stretches into corresponding reserved connecting hole Road, the reserved connection duct outside is the tie hoop or welding hoop for surrounding its setting, in described top vertical reinforcement In the range of bending part region, it is provided with what is be connected with the vertical reinforcement of lower floor's precast shear wall and upper strata precast shear wall Bar dowel, the diameter of described bar dowel is not less than 8mm.It is provided with each reserved connection duct additional no less than 1 vertical Reinforcing bar, its diameter and stretch into reserved connection duct length it is identical with top vertical reinforcement, stretch into it is reserved connect in duct it is upper Portion's vertical reinforcement, additional vertical reinforcement are each perpendicular to flooring, and along the multiple rows of distribution of precast shear wall thickness direction, described top The grouting material that vertical reinforcement, additional vertical reinforcement inject after passing through with reserved connection duct realizes that levels precast shear wall is vertical Reinforcing bar concentrates constraint overlap joint connection.
Further, the top vertical reinforcement need to bend twice, and bending angle is not more than 10 °, and top vertical reinforcement Diameter is not more than 18mm, and the bending angle twice of every top vertical reinforcement is identical.
Further, the pitch not wait tie hoop vertical height be connected the highly identical of duct, spiral hoop The coiling diameter of muscle is the diameter+10mm, the pitch h in the altitude range of tie hoop bottom 1/2 for connecting ductbFor 40~ 70mm, and the pitch h in the altitude range of top 1/2tIt is 1.2hb~2.4hb
Further, the connection duct vertical height of precast shear wall edge member part is (llE+ 50mm), remainder The vertical height for connecting duct is (laE+ 50mm), wherein llEIt is the minimum lap of splice of top vertical reinforcement and vertical reinforcement, laEIt is the anchorage length of top vertical reinforcement, the diameter span in the connection duct is 0.5bwTo bw- 2c, wherein bwFor The section thickness of upper strata precast shear wall, c is the thickness of concrete cover of upper strata precast shear wall.
Beneficial effect:Compared with prior art, the present invention has advantages below:
(1) vertical reinforcement in levels precast shear wall is using concentrating constraint, vertical overlap joint connection, it is to avoid existing perpendicular It is to being needed in rebar connecting technology that connection duct in every reinforcing bar each self-corresponding reserving hole of insertion and reserved is larger, The performance requirement to grouting material is reduced, while ensure that vertical reinforcement reliably overlaps switching performance.
(2) every top vertical reinforcement angularly bends twice, is on the one hand conducive to reserving hole channel internal upper part vertical reinforcement Regular distribution and positioning, be on the other hand significantly reduced structure manufacture, production difficulty, improve the convenient of site operation Property and high efficiency.
(3) routine techniques is not specific enough to the status requirement of connected vertical reinforcement, and generally there are many reinforcing bars and be located at It is inefficient on the center line of shear wall.In the present invention, the vertical reinforcement point after connection is multiple rows of parallel to shear wall's thickness direction Set, and be regularly distributed in the inwall in reserved connection duct, apart from shear wall center line farther out, it is thus possible to cut for prefabricated Power wall goes out planes carry power there is provided certain, improves structural behaviour.
(4) the pre-buried tie hoop of hole inwall can effectively constrain compressive region concrete, improve its intensity and to institute The bond stress of vertical reinforcement is overlapped, and increased the area of compressive region concrete.Compared with routine techniques, duct has been taken into full account The different loading characteristics (lower rebar stress is more unfavorable) of vertical reinforcement, targetedly set spiral shell in upper and lower 1/2 altitude range Away from the tie hoop not waited, bottom pitch is set into closeer, top pitch and sets sparse, it is efficient with material-saving and stress The features such as.Additionally, having larger-diameter tie hoop energy operative constraint compressive region concrete, its intensity is improved and for cutting The bond stress of power vertical reinforcement within the walls.
(5) construction measure such as bar dowel and additional vertical reinforcement is increased, vertical reinforcement overlap joint connection is further ensure that Reliability and integrality performance of the structure.On the premise of the globality and ductility for ensureing structure, the connecting structure is relatively simple, receives Power is clear and definite.
Brief description of the drawings
Fig. 1 is the vertical reinforcement concentration constraint overlap joint connection diagram of lower floor of the present invention and upper strata precast shear wall.
Fig. 2 is the A-A profiles of Fig. 1 precast shear walls at the middle and upper levels.
Fig. 3 is the signal of the preceding upper strata precast shear wall of Vertical bar connection and pre- embedded pitch tie hoop not etc. Figure.
Fig. 4 is lower floor's precast shear wall and its vertical reinforcement angularly bending sketch map before Vertical bar connection.
Wherein:1 is lower floor's precast shear wall, and 2 is the top vertical reinforcement that lower floor's precast shear wall intends stretching into duct, and 3 are Upper strata precast shear wall, 4 is the reserving hole channel of upper strata precast shear wall bottom, and 5 is the varying pitch that duct outside pre-sets Tie hoop or welding hoop, 6 is the vertical reinforcement in the precast shear wall of upper strata, and 7 is bar dowel of the diameter not less than 8mm, and 8 are The additional vertical reinforcement that lower floor's precast shear wall top is set, 9 is stirrup.
Specific embodiment
With reference to specific embodiment, and referring to the drawings, the present invention is described further:
Fig. 1 is the vertical reinforcement concentration constraint overlap joint connection of lower floor's precast shear wall 1 of the present invention and upper strata precast shear wall 3 Illustrate, and Fig. 2 correspond to the A-A profiles of Fig. 1 precast shear walls 3 at the middle and upper levels.As shown in Figure 1 and Figure 2, a kind of precast shear wall Vertical reinforcement concentrates constraint overlap joint connecting structure, after the top vertical reinforcement 2 of lower floor's precast shear wall 1 is through bending, stretches into upper strata The reserved connection duct 4 that the bottom of precast shear wall 3 is set, the outside of the reserved connection duct 4 is provided with the spiral that pitch is not waited Stirrup or welding hoop 5.Should not be connected using concentrating constraint to overlap when the diameter of top vertical reinforcement 2 is excessive.Reserving hole channel 4 Diameter it is unsuitable excessive, it is also unsuitable too small, to ensure the switching performance of vertical muscle.
In the range of the described bending of top vertical reinforcement 2, the phase of vertical reinforcement 6 with upper strata precast shear wall 3 is provided with Bar dowel 7 even, the diameter of described bar dowel 7 is not less than 8mm.This is the corner for causing stirrup 9 later due to indulging muscle bending Vacancy position is left, it is necessary to set bar dowel 7.
Edge member part each reserving hole channel 4 planted agent increases setting and is no less than 1 additional bar 8, and additional bar should set Put in dry wall shearing and have enough anchorage lengths.As shown in Figure 1 and Figure 2, it is provided with not in each reserved connection duct 4 Less than 1 additional vertical reinforcement 8, its diameter and stretch into reserved connection duct 4 length it is identical with top vertical reinforcement 2, stretch into Top vertical reinforcement 2, additional vertical reinforcement 8 in reserved connection duct 4 are each perpendicular to flooring, and along precast shear wall thickness side To multiple rows of distribution, and be regularly distributed in the inwall in reserved connection duct 4, apart from shear wall center line farther out, with conventional skill Art is compared, and efficiency is higher, certain can go out planes carry power for precast shear wall is provided.It is described top vertical reinforcement 2, attached Plus vertical reinforcement 8 pass through with reserved connection duct 4 after inject grouting material realize levels precast shear wall vertical reinforcement concentrate Constraint overlap joint connection.8 pairs of performances of guarantee vertical reinforcement overlap joint connection of bar dowel 7 and additional vertical reinforcement are especially in dry wall The stress performance of top vertical reinforcement 2 has a very important role.
As shown in Figure 1, Figure 3, the pitch not wait tie hoop 5 vertical height be connected the highly identical of duct 4, The coiling diameter of tie hoop 5 is the diameter+10mm for connecting duct 4.In view of the stress of bottom vertical reinforcement 2 of reserving hole channel 4 It is larger, and top half stress is smaller, therefore the pitch of top half tie hoop can suitably increase.The bottom 1/2 of tie hoop 5 Pitch h in altitude rangebIt is 40~70mm, and the pitch h in the altitude range of top 1/2tIt is 1.2hb~2.4hb
As Figure 1 and Figure 4, the top vertical reinforcement 2 need to angularly be bent twice, and place is stretched out in lower floor's shear wall 1 First time bending is carried out, and second bending is carried out in the porch of stretching of reserving hole channel 4, bending angle is not more than 10 °, and top is perpendicular It is not more than 18mm, the every bending angle all same of top vertical reinforcement 2 to the diameter of reinforcing bar 2.Every top vertical reinforcement isogonism Degree bending twice, is on the one hand conducive to regular distribution and the positioning of the internal upper part vertical reinforcement 2 of reserving hole channel 4, on the other hand also shows Work reduces structure manufacture, the difficulty of production, improves the convenience and high efficiency of site operation.When the top of lower floor's dry wall 1 When last layer is highly larger, two inflection points of top vertical reinforcement 2 may be provided in last layer, remaining situation bottom inflection point It is arranged in dry wall, top inflection point is arranged in last layer.
In the present invention, the vertical height that duct 4 is connected described in edge member part is (llE+ 50mm), described in remainder The vertical height for connecting duct 4 is (laE+ 50mm), wherein llEIt is the lap of splice between top and bottom vertical reinforcement, laEFor The anchorage length of vertical reinforcement, the diameter span in the connection duct 4 is 0.5bwTo bw- 2c, wherein bwFor upper strata is prefabricated The section thickness of shear wall 3, c is the thickness of concrete cover of upper strata precast shear wall 3.Can be set using metal bellows and cut The connection duct 4 that power is reserved within the walls, can be screwed out during structure manufacture.
Below schematically the present invention and embodiments thereof are described, the description does not have restricted, accompanying drawing 1 --- It is one of embodiments of the present invention shown in Fig. 4.When presently disclosed connected mode is applied to more generally shear wall When, can be set up in the middle part of shear wall bottom surface according to actual needs no less than a reserving hole channel, and in the pre-buried spiral shell of duct inwall Away from the tie hoop not waited, vertical reinforcement radical and distribution form in reserving hole channel also can be adjusted suitably.Therefore, if other Technical staff in the case of without departing from the invention objective, using the means of structural connection and reality similar to the technical scheme Example is applied, protection scope of the present invention all should be belonged to.

Claims (2)

1. a kind of precast shear wall vertical reinforcement concentrates constraint overlap joint connecting structure, it is characterised in that the construction includes that lower floor is pre- Shear wall (1) processed and upper strata precast shear wall (3), the top vertical reinforcement (2) of lower floor's precast shear wall (1) are pre- with upper strata Reserved connection duct (4) of correspondence that shear wall (3) bottom processed is set is staggered setting, after top vertical reinforcement (2) is through bending, is stretched into Corresponding reserved connection duct (4), reserved connection duct (4) outside is tie hoop (5) or the welding for surrounding its setting Hoop, in the range of described top vertical reinforcement (2) bending part region, is provided with and lower floor's precast shear wall (1) And the connected bar dowel (7) of vertical reinforcement (6) of upper strata precast shear wall (3), the diameter of described bar dowel (7) is not less than 8mm;
It is provided with each reserved connection duct (4) no less than 1 additional vertical reinforcement (8), its diameter and stretches into reserved connection The length in duct (4) is identical with top vertical reinforcement (2), stretches into top vertical reinforcement (2) in reserved connection duct (4), attached Plus vertical reinforcement (8) is each perpendicular to flooring, and along the multiple rows of distribution of precast shear wall thickness direction, described top vertical reinforcement (2) grouting material injected after, additional vertical reinforcement (8) passes through with reserved connection duct (4) realizes that levels precast shear wall is erected Constraint overlap joint connection is concentrated to reinforcing bar;
The top vertical reinforcement (2) need to bend twice, and bending angle is not more than 10 °, and the diameter of top vertical reinforcement (2) is little In 18mm, the bending angle twice of every top vertical reinforcement (2) is identical;
Pitch not wait tie hoop (5) vertical height be connected the highly identical of duct (4), the winding of tie hoop (5) Diameter+the 10mm of a diameter of connection duct (4), the pitch h in the altitude range of tie hoop (5) bottom 1/2bIt is 40~70mm, And the pitch h in the altitude range of top 1/2tIt is 1.2hb~2.4hb
2. precast shear wall vertical reinforcement according to claim 1 concentrates constraint overlap joint connecting structure, it is characterised in that pre- Connection duct (4) vertical height of shear wall edge member part processed is (llE+ 50mm), remainder connects the perpendicular of duct (4) It is (l to heightaE+ 50mm), wherein llEIt is top vertical reinforcement (2) and the minimum lap of splice of vertical reinforcement (6), laEFor upper The anchorage length of portion's vertical reinforcement (2), the diameter span of the connection duct (4) is 0.5bwTo bw- 2c, wherein bwFor upper The section thickness of layer precast shear wall (3), c is the thickness of concrete cover of upper strata precast shear wall (3).
CN201510362691.4A 2015-06-26 2015-06-26 Pre-cast shear wall vertical rebar centralized restraint lap joint construction Active CN104929279B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510362691.4A CN104929279B (en) 2015-06-26 2015-06-26 Pre-cast shear wall vertical rebar centralized restraint lap joint construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510362691.4A CN104929279B (en) 2015-06-26 2015-06-26 Pre-cast shear wall vertical rebar centralized restraint lap joint construction

Publications (2)

Publication Number Publication Date
CN104929279A CN104929279A (en) 2015-09-23
CN104929279B true CN104929279B (en) 2017-05-24

Family

ID=54116684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510362691.4A Active CN104929279B (en) 2015-06-26 2015-06-26 Pre-cast shear wall vertical rebar centralized restraint lap joint construction

Country Status (1)

Country Link
CN (1) CN104929279B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760054B (en) * 2017-03-01 2023-01-31 同济大学 Prefabricated reinforced concrete shear wall
CN107741381B (en) * 2017-09-28 2023-10-27 江苏省建筑科学研究院有限公司 Device and method for detecting grouting compactness of slurry anchor lap joint connection node
CN108914779B (en) * 2018-08-01 2019-10-25 武汉理工大学 The anchorage length of reserved grout hole bolt anchor head connection reinforcing bar determines method
CN111119378A (en) * 2020-01-14 2020-05-08 韩静 Prefabricated hollow superposed shear wall with vertical steel bars penetrating through edge members
CN111236527A (en) * 2020-03-26 2020-06-05 沈阳促晋科技有限公司 Fabricated concrete wallboard with steel bars avoiding and reinforcing connection

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020076721A (en) * 2001-03-30 2002-10-11 현대건설주식회사 Free-Edge Wall Ends with Interlocking Spiral Reinforcement
CN1391016A (en) * 2002-04-28 2003-01-15 上海建筑设计研究院浦东分院 H-shaped pile frame-brickwork combined wall structure and its construction method
CN2679243Y (en) * 2004-01-15 2005-02-16 康宪泉 Helical dog-log stirrup
CN201217847Y (en) * 2008-06-05 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Plug-in type preformed hole grouting reinforcement lapping connection component
CN101649656A (en) * 2009-09-03 2010-02-17 同济大学 Overlapped shear wall with prefabricated part and cast-in-situ part and manufacturing method thereof
CN101812899A (en) * 2009-06-15 2010-08-25 黑龙江宇辉新型建筑材料有限公司 Bifurcate lap connection of reinforcing steel bars and connection method thereof
CN201649299U (en) * 2010-04-22 2010-11-24 周正海 Reinforcing steel bar connecting structure in vertical structural component of reinforced concrete
CN201649078U (en) * 2010-02-25 2010-11-24 福建省大地管桩有限公司 Prestressed concrete heading hollow square pile with pyramid pile tip
CN102661012A (en) * 2012-05-31 2012-09-12 东南大学 Edge member connecting structure of assembly type concrete shear wall
CN102691365A (en) * 2012-05-31 2012-09-26 东南大学 Connecting structure for assembly type concrete shear wall edge member
CN102936929A (en) * 2012-11-29 2013-02-20 东南大学 Prefabricated assembling whole type shear wall connected with staggered-height vertical steel bar
CN102943536A (en) * 2012-11-29 2013-02-27 东南大学 Prefabricated integral type shear wall
CN103184774A (en) * 2013-01-22 2013-07-03 北京工业大学 Single-row reinforced concrete shear wall provided with cross diagonal bars and manufacturing method thereof
CN104453015A (en) * 2014-11-19 2015-03-25 沈阳建筑大学 Reinforcing bar splicing connection component comprising thin-wall sleeves constrained by spiral bars
CN204876199U (en) * 2015-06-26 2015-12-16 东南大学 Restraint overlap joint structure is concentrated to precast shear wall vertical reinforcement

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020076721A (en) * 2001-03-30 2002-10-11 현대건설주식회사 Free-Edge Wall Ends with Interlocking Spiral Reinforcement
CN1391016A (en) * 2002-04-28 2003-01-15 上海建筑设计研究院浦东分院 H-shaped pile frame-brickwork combined wall structure and its construction method
CN2679243Y (en) * 2004-01-15 2005-02-16 康宪泉 Helical dog-log stirrup
CN201217847Y (en) * 2008-06-05 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Plug-in type preformed hole grouting reinforcement lapping connection component
CN101812899A (en) * 2009-06-15 2010-08-25 黑龙江宇辉新型建筑材料有限公司 Bifurcate lap connection of reinforcing steel bars and connection method thereof
CN101649656A (en) * 2009-09-03 2010-02-17 同济大学 Overlapped shear wall with prefabricated part and cast-in-situ part and manufacturing method thereof
CN201649078U (en) * 2010-02-25 2010-11-24 福建省大地管桩有限公司 Prestressed concrete heading hollow square pile with pyramid pile tip
CN201649299U (en) * 2010-04-22 2010-11-24 周正海 Reinforcing steel bar connecting structure in vertical structural component of reinforced concrete
CN102661012A (en) * 2012-05-31 2012-09-12 东南大学 Edge member connecting structure of assembly type concrete shear wall
CN102691365A (en) * 2012-05-31 2012-09-26 东南大学 Connecting structure for assembly type concrete shear wall edge member
CN102936929A (en) * 2012-11-29 2013-02-20 东南大学 Prefabricated assembling whole type shear wall connected with staggered-height vertical steel bar
CN102943536A (en) * 2012-11-29 2013-02-27 东南大学 Prefabricated integral type shear wall
CN103184774A (en) * 2013-01-22 2013-07-03 北京工业大学 Single-row reinforced concrete shear wall provided with cross diagonal bars and manufacturing method thereof
CN104453015A (en) * 2014-11-19 2015-03-25 沈阳建筑大学 Reinforcing bar splicing connection component comprising thin-wall sleeves constrained by spiral bars
CN204876199U (en) * 2015-06-26 2015-12-16 东南大学 Restraint overlap joint structure is concentrated to precast shear wall vertical reinforcement

Also Published As

Publication number Publication date
CN104929279A (en) 2015-09-23

Similar Documents

Publication Publication Date Title
US10865557B2 (en) Prestressed assembled concrete frame-joint connecting structure and constructing method thereof
CN104929279B (en) Pre-cast shear wall vertical rebar centralized restraint lap joint construction
CN100365229C (en) Constructing the large-span self-braced buildings of composite load-bearing wall-panels and floors
CN201087480Y (en) Prestressed concrete composite beam
CN109469202A (en) Prestressed assembly integral concrete frame structure system and construction method thereof
CN102561553A (en) Prefabricated concrete-filled steel tube frame-shear wall and construction method thereof
CN110439109B (en) Prestressed assembled concrete beam column connecting node and construction method
CN104234192A (en) Prestress concrete groove type plate with bent steel bars at upper part and framework structure system
CN105735469A (en) Partially-bonded precast prestressed concrete frame structure
CN204876199U (en) Restraint overlap joint structure is concentrated to precast shear wall vertical reinforcement
US20230235557A1 (en) Structural truss, assembly and method of manufacture
CN105822000A (en) Steel plate and concrete composite beam and slab structure system
CN103334497A (en) Connection method of scope system frame column steel bar
CN106337561B (en) Template reinforcing method for external corner and door opening positions of shear wall body
CN103726589A (en) H-shaped steel and steel pipe framework assembly shear wall with protruding interfaces and bent steel bars and manufacturing method
CN114482400A (en) Superposed beam connected with prefabricated vertical component
CN104110097B (en) A kind of end enhancement mode reinforcing bar concrete composite beam
CN203939144U (en) For the device of connecting building structure shear wall and concrete floor
CN106368353B (en) A kind of composite plate shear wall structure
CN211421637U (en) Connecting structure of prefabricated gutter
CN108468379A (en) A kind of novel precast prestressed continuous beam connecting node of assembly concrete
CN211007043U (en) Prestress assembly type concrete beam column connecting node
CN209261310U (en) The concrete prefabricated assembly combined storehouse of Contiuum type
CN217027742U (en) Superposed beam connected with prefabricated vertical component
CN207063145U (en) A kind of house being assembled by hollow concrete shear wall slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant