CN104929039A CN201510362745.7A CN201510362745A CN104929039A CN 104929039 A CN104929039 A CN 104929039A CN 201510362745 A CN201510362745 A CN 201510362745A CN 104929039 A CN104929039 A CN 104929039A
Authority
CN
China
Prior art keywords
arc
pier
guardrail
mast
bridge pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510362745.7A
Other languages
Chinese (zh)
Inventor
范军立
王晓明
岳丽雅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhao Qinghu
Original Assignee
Yi Bolian City Henan Planning Building Design Co Ltd Luoyang Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yi Bolian City Henan Planning Building Design Co Ltd Luoyang Co filed Critical Yi Bolian City Henan Planning Building Design Co Ltd Luoyang Co
Priority to CN201510362745.7A priority Critical patent/CN104929039A/en
Publication of CN104929039A publication Critical patent/CN104929039A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a hoisting frame for overhaul of a pier. The hoisting frame is used for the overhaul of the pier, particularly for the overhaul of a cylindric pier. The hoisting frame is characterized by comprising hoisting rings, a bottom board, an arc-shaped guardrail, two fixed guardrails, a movable guardrail and four universal wheels, wherein the arc-shaped guardrail is perpendicularly fixed on the lateral side of the inner arc of the bottom board; the two fixed guardrails are respectively and perpendicularly fixed on both sides of the bottom board; one side of the movable guardrail is connected with one fixed guardrail through a hinge, and the other side of the movable guardrail is connected with the other fixed guardrail through a door bolt; the four universal wheels are symmetrically arranged on the lateral side of the arc-shaped guardrail; the hoisting rings are arranged at the tops of the two fixed guardrails. The hoisting frame for the overhaul of the pier not only can prevent the hoisting frame from being bumped during the overhaul of the pier, but also enlarges the overhaul area, and is convenient for the hoisting frame to be close to the pier to move; the hoisting frame is not only convenient for the overhaul of workers, but also convenient for the repair of the workers; the hoisting frame also prevents the pier from being damaged due to the bumping while in hoisting.

Description

A kind of bridge pier maintenance mast-up
Technical field
The present invention relates to bridge pier maintenance field, particularly a kind of bridge pier maintenance mast-up.
Background technology
Record according to interrelated data, the current bridge quantity of China has reached more than 50 ten thousand, builds respectively in different times, in recent years bridge to build development especially flourishing.Due to the important component part that bridge is road and rail traffic, its maintenance situation directly determines and affects the unimpeded of road and traffic safety, also namely directly affect economic benefit and the social benefit of road and rail traffic, in national economy, account for very important effect.
In recent years, the bridge of China is faced with the problem same with the bridge of numerous country in the world, that is exactly the growth of large quantities of bridge along with service life, enter " aging " stage fast, it in use, along with the interaction of environmental factor and traffic load, its technology status constantly worsens, and has been difficult to the traffic needs adapting to increasingly be good at.When reaching far away design service life, just there is the phenomenon of endurance quality serious degradation, therefore, being extremely necessary to carry out comprehensive service work to bridge in Partial Bridges.
Now, when overhauling bridge pier, conventional mast-up is manned comprehensively overhauls around bridge pier; But, existing bridge pier maintenance mast-up is generally rectangular structure, collide with when carrying out bridge pier maintenance and particularly overhauling Cylindrical Pier the frame of mast-up or guardrail unavoidably, and the easy like this deformed damaged causing mast-up, has had a strong impact on the application life of mast-up.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of bridge pier maintenance mast-up, and this mast-up is provided with maintenance frame and the universal wheel of arc, not only avoid the colliding with to mast-up when bridge pier overhauls, and increases maintenance area.
In order to realize the object solved the problems of the technologies described above, present invention employs following technical scheme:
A kind of bridge pier maintenance mast-up, particularly overhauls Cylindrical Pier for bridge pier maintenance, it is characterized in that: comprise hoisting ring, base plate, arc guardrail, two nonfloating rails, a movable rail and four universal wheels;
Described base plate is the flat board being provided with an arc side, and the radian of arc guardrail matches with the radian of dull and stereotyped arc side, and arc guardrail is vertically fixed on the arc side of base plate; Two nonfloating rails are vertically fixed on the both sides of base plate respectively and are connected with arc guardrail; The position of movable rail is corresponding with arc guardrail and movable rail both sides connect two nonfloating rails respectively; Movable rail while with a nonfloating rail by gemel connection, another side is connected by door bolt with another nonfloating rail; Four universal wheels are symmetricly set on arc protective marge side;
Described hoisting ring is arranged on the top of two nonfloating rails.
Concrete: described plate upper surface is provided with anti-skidding projection.Anti-skidding projection can be the lines of salient point or projection.
Preferred further, be provided with four road wheels below base plate.This set, facilitates the movement of bridge pier maintenance mast-up.
Using method: during use, after workman enters mast-up by movable rail, utilizing the hoisting ring on nonfloating rail to coordinate rope steadily to be sling by this mast-up, when overhauling bridge pier, making the arc guardrail of this mast-up just to bridge pier; When detecting Cylindrical Pier, because the intrados of arc guardrail and the side of bridge pier match, mast-up can be made more to press close to bridge pier, be not only convenient to the maintenance of workman, and facilitate workman and to place under repair operation; In addition, the corner of arc protective marge side is equipped with universal wheel, no matter be maintenance Cylindrical Pier or rectangular pier, can both be convenient to mast-up and press close to bridge pier motion and prevent colliding with between mast-up and bridge pier, when avoiding lifting, owing to colliding with to the infringement of bridge pier.
These technical schemes also can combine mutually or combine, thus reach better technique effect.
By adopting technique scheme, the present invention has following beneficial effect:
A kind of bridge pier maintenance mast-up of this patent, compared with traditional mast-up, can not only avoid the colliding with to mast-up when bridge pier overhaul, and increases maintenance area and be convenient to mast-up to press close to bridge pier and move; Make mast-up more press close to bridge pier, be not only convenient to the maintenance of workman, and facilitate workman and to place under repair operation; When it also avoid lifting, owing to colliding with to the infringement of bridge pier.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present invention.
In figure: 1-universal wheel, 2-arc guardrail, 3-hoisting ring, 4-nonfloating rail, 5-movable rail, 6-base plate.
Detailed description of the invention
Below in conjunction with accompanying drawing, further explanation is explained to this patent.But the protection domain of this patent is not limited to concrete embodiment.
Embodiment 1
As shown in the figure, a kind of bridge pier maintenance mast-up of this patent, particularly overhauls Cylindrical Pier for bridge pier maintenance, it is characterized in that: comprise hoisting ring 3, base plate 6, arc guardrail 2, two nonfloating rails 4, movable rail 5 and four universal wheels 1.
Base plate 6 is for being provided with the flat board of an arc side, and the radian of arc guardrail 2 matches with the radian of dull and stereotyped arc side, and arc guardrail 2 is vertically fixed on the arc side of base plate 6; Two nonfloating rails 4 are vertically fixed on the both sides of base plate 6 respectively and are connected with arc guardrail 2; The position of movable rail 5 is corresponding with arc guardrail 2 and movable rail 5 both sides connect two nonfloating rails 4 respectively; Movable rail 5 while with a nonfloating rail 4 by gemel connection, another side is connected by door bolt with another nonfloating rail 4; Four universal wheels 1 are symmetricly set on arc guardrail 2 lateral surface; Hoisting ring 3 is arranged on the top of two nonfloating rails 4.
Wherein, base plate 6 upper surface is provided with anti-skidding projection, and anti-skidding projection can be the lines of salient point or projection; Base plate 6 is provided with four road wheels, this set below, facilitates the movement of bridge pier maintenance mast-up.
During use, after workman enters mast-up by movable rail 5, utilizing the hoisting ring 3 on nonfloating rail 4 to coordinate rope steadily to be sling by this mast-up, when overhauling bridge pier, making the arc guardrail 2 of this mast-up just to bridge pier; When detecting Cylindrical Pier, because the intrados of arc guardrail 2 and the side of bridge pier match, mast-up can be made more to press close to bridge pier, be not only convenient to the maintenance of workman, and facilitate workman and to place under repair operation; In addition, the corner of arc guardrail 2 lateral surface is equipped with universal wheel 1, no matter be maintenance Cylindrical Pier or rectangular pier, can both be convenient to mast-up and press close to bridge pier motion and prevent colliding with between mast-up and bridge pier, when avoiding lifting, owing to colliding with to the infringement of bridge pier.

Claims (3)

1. a bridge pier maintenance mast-up, particularly overhauls Cylindrical Pier for bridge pier maintenance, it is characterized in that: comprise hoisting ring, base plate, arc guardrail, two nonfloating rails, a movable rail and four universal wheels;
Described base plate is the flat board being provided with an arc side, and the radian of arc guardrail matches with the radian of dull and stereotyped arc side, and arc guardrail is vertically fixed on the arc side of base plate; Two nonfloating rails are vertically fixed on the both sides of base plate respectively and are connected with arc guardrail; The position of movable rail is corresponding with arc guardrail and movable rail both sides connect two nonfloating rails respectively; Movable rail while with a nonfloating rail by gemel connection, another side is connected by door bolt with another nonfloating rail; Four universal wheels are symmetricly set on arc protective marge side;
Described hoisting ring is arranged on the top of two nonfloating rails.
2. bridge pier overhauls mast-up according to claim 1, it is characterized in that: described plate upper surface is provided with anti-skidding projection.
3. bridge pier overhauls mast-up according to claim 1, it is characterized in that: be provided with four road wheels below described base plate.
CN201510362745.7A 2015-06-29 2015-06-29 Hoisting frame for overhaul of pier Pending CN104929039A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510362745.7A CN104929039A (en) 2015-06-29 2015-06-29 Hoisting frame for overhaul of pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510362745.7A CN104929039A (en) 2015-06-29 2015-06-29 Hoisting frame for overhaul of pier

Publications (1)

Publication Number Publication Date
CN104929039A true CN104929039A (en) 2015-09-23

Family

ID=54116448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510362745.7A Pending CN104929039A (en) 2015-06-29 2015-06-29 Hoisting frame for overhaul of pier

Country Status (1)

Country Link
CN (1) CN104929039A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113818345A (en) * 2021-09-29 2021-12-21 武汉理工大学 All-round structure detection of prefabricated type pier and maintenance platform

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2314008Y (en) * 1997-10-24 1999-04-14 王玉群 High-lift operation installation on surface of conic building
KR20010070666A (en) * 2001-05-30 2001-07-27 유춘종 A movable working pulley
CN2653504Y (en) * 2003-09-30 2004-11-03 武汉理工大学 Suspending basket for bridge detection
JP2007051416A (en) * 2005-08-12 2007-03-01 Gijutsu Kaihatsu Kenkyusho:Kk Scaffold device
CN201753438U (en) * 2010-06-07 2011-03-02 中铁二局股份有限公司 Self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails
CN203452012U (en) * 2013-09-09 2014-02-26 中建八局第三建设有限公司 Mobile hanging basket for guard bar outer side construction
CN203613463U (en) * 2013-11-22 2014-05-28 中铁三局集团有限公司 Anti-collision wall beautifying trolley
CN204825638U (en) * 2015-06-29 2015-12-02 河南易博联城规划建筑设计有限公司洛阳分公司 Pier overhauls hoist and mount frame

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2314008Y (en) * 1997-10-24 1999-04-14 王玉群 High-lift operation installation on surface of conic building
KR20010070666A (en) * 2001-05-30 2001-07-27 유춘종 A movable working pulley
CN2653504Y (en) * 2003-09-30 2004-11-03 武汉理工大学 Suspending basket for bridge detection
JP2007051416A (en) * 2005-08-12 2007-03-01 Gijutsu Kaihatsu Kenkyusho:Kk Scaffold device
CN201753438U (en) * 2010-06-07 2011-03-02 中铁二局股份有限公司 Self-traveling hanging basket for forming and trimming of bridge anti-collision guardrails
CN203452012U (en) * 2013-09-09 2014-02-26 中建八局第三建设有限公司 Mobile hanging basket for guard bar outer side construction
CN203613463U (en) * 2013-11-22 2014-05-28 中铁三局集团有限公司 Anti-collision wall beautifying trolley
CN204825638U (en) * 2015-06-29 2015-12-02 河南易博联城规划建筑设计有限公司洛阳分公司 Pier overhauls hoist and mount frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113818345A (en) * 2021-09-29 2021-12-21 武汉理工大学 All-round structure detection of prefabricated type pier and maintenance platform

Similar Documents

Publication Publication Date Title
CN107512661A (en) A kind of replacing of vehicle wheel method
CN105236300A (en) Automatic-locking lifter lifting platform
CN204825638U (en) Pier overhauls hoist and mount frame
CN104929039A (en) Hoisting frame for overhaul of pier
CN207092620U (en) A kind of packaged type reinforcing steel processing shed
CN202643084U (en) Small hoisting tool for dismantling and installing steel beam
CN204823870U (en) Bridge crane and dolly
CN106800265A (en) A kind of aerial work platform collision-proof method
CN211646007U (en) Bridge pier hanging surrounding basket construction platform
CN204675629U (en) The suspender that a kind of mill housing is installed or removed
CN203402848U (en) Anti-tilting device of lifting machine for portable transformer
CN204040442U (en) Integral lifting type elevator shaft operating platform
CN103086257A (en) Hoisting device and using method thereof
CN203667818U (en) Suspension cage for travelling crane trolley line construction
CN203402829U (en) Frame of lifting machine for portable transformer
CN201553557U (en) Broken rail passing single-beam bridge crane
CN206720594U (en) A kind of Novel double-girder bridge crane
CN202322176U (en) Self-detachable type gantry trolley
CN203959675U (en) Crane shaped rail coaster
CN207079471U (en) A kind of Bridge guardrail
CN206266131U (en) A kind of auxiliary connecting device for double lifting point super-starting balance weight bracket
CN103879901A (en) Lifting method suitable for being used in narrow space
CN107288354B (en) Construction method for overall displacement of gantry crane
CN104671110A (en) Platform for stabilizing and maintaining bridge crane trolley
CN202499656U (en) Overall detection device for multipurpose crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Zhao Qinghu

Inventor before: Fan Junli

Inventor before: Wang Xiaoming

Inventor before: Yue Liya

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20170213

Address after: 471000 Henan Province, Luoyang city Luolong District Quanshun minbquan yuan 2-1-2204

Applicant after: Zhao Qinghu

Address before: 471000 Henan province Luoyang City three road and road intersection Heluo High-tech Zone Runsheng building room 1106

Applicant before: Yi Bolian city, Henan planning building design Co., Ltd Luoyang Company

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150923