CN104908159B - The big industrialized mass production pipelining equipment of entity square pile - Google Patents
The big industrialized mass production pipelining equipment of entity square pile Download PDFInfo
- Publication number
- CN104908159B CN104908159B CN201510291367.8A CN201510291367A CN104908159B CN 104908159 B CN104908159 B CN 104908159B CN 201510291367 A CN201510291367 A CN 201510291367A CN 104908159 B CN104908159 B CN 104908159B
- Authority
- CN
- China
- Prior art keywords
- square pile
- reinforcing bar
- prestressing force
- tie
- prestressing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/04—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
The big industrialized mass production pipelining equipment of entity square pile, at the two ends of the implement, on the concrete foundation pile concordant with operation ground, provided with some cup buckets wide at the top and narrow at the bottom, in cup bucket, the vertical bearing column for being provided with two platoon leader's cube shapes, on the corresponding lateral surface of two ends bearing column, it is fixed with the prestressing force arm-tie of the parallel rectangle of two rows, on the prestressing force arm-tie, uniform correspondence is laid with the anchor hole that multiple anchoring full prestressing reinforcing bars are passed through, and in the outside of prestressing force arm-tie, is sequentially with anchorage, stretching machine and protecting wall.Entity square pile quality that the equipment is not only produced is high, length is big, and mechanization degree is higher, cost is low, simple in construction, batch production efficiency high, safe and reliable.
Description
Technical field
The present invention relates to a kind of big industrialized mass production entity square pile pipelining equipment, especially entity square pile is big
Industrialized mass production pipelining equipment.
Background technology
With the fast development of China's economy, some high-rise buildings, a large amount of constructions of high-speed rail bridge etc., not only to its base
The quality kind of plinth entity square pile requires more and more higher, and also increasing to the demand of entity square pile, and this is accomplished by factory
Family not only allows for producing high-volume, high-quality, overlength degree entity square pile, and also more to pay attention to that it can be reduced
Cost, makes batch bigger, the speed speed that it is produced faster, producer is also had preferable productivity effect, so as to make
Producer keeps the high speed development of long life, therefore provides a kind of simple in construction, big industrialization entity with compared with high efficiency
The demand of the quick production line of square pile is just necessary.
The content of the invention
In order to overcome traditional entity square pile production mechanization degree not high, processing efficiency is relatively low, it is impossible to meet China's warp
The problem of Ji builds fast-developing, the invention provides a kind of big industrialized mass production pipelining equipment of entity square pile;
Entity square pile quality that the equipment is not only produced is high, length is big, and mechanization degree is higher, cost is low, simple in construction, raw
Produce efficiency high, safe and reliable.
The technical solution adopted for the present invention to solve the technical problems is:The big industrialized mass production streamline of entity square pile
Implement, including:Protecting wall, stretching machine, prestressing force arm-tie, bearing column, concrete square pile, full prestressing reinforcing bar;In the operation
The two ends of equipment, on the concrete foundation pile concordant with operation ground, provided with some cup buckets wide at the top and narrow at the bottom, in cup bucket, are vertically provided with
The bearing column of two platoon leader's cube shapes, on the corresponding lateral surface of two ends bearing column, is fixed with the pre- of the parallel rectangle of two rows
On stress tension plate, the prestressing force arm-tie, uniform correspondence is laid with the anchor hole that multiple anchoring full prestressing reinforcing bars are passed through,
The outside of prestressing force arm-tie, is sequentially with anchorage, stretching machine and protecting wall, when entity concrete square pile pouring practice, first root
Factually the model and radical of the selected reinforcing bar needed of body square pile sectional dimension length, pass through reinforcing bar the prestressing force arm-tie at two ends
Anchor hole and the anchorage fixation on the outside of prestressing force arm-tie, make reinforcing bar fixed on the prestressing force arm-tie at two ends,
Reinforcing bar is stretched out outside the anchor hole of the prestressing force arm-tie at two ends, and be connected with the stretching machine at two ends, reinforcing bar is carried out entirely in advance should
Power tensioning, reaches in reinforcing bar after required prestressing force, forms full prestressing reinforcing bar, full prestressing reinforcing bar then is passed through into anchor again
Tool is fixed again, now can be carried out pouring practice to the entity concrete square pile of the different length of same group of full prestressing reinforcing bar, be treated
After during concrete through-hardening, then the full prestressing reinforcing bar being connected to same group of each entity concrete square pile individual is split, so that
It can once produce multiple prestressing force entity concrete square piles.
In plane on the prestressing force arm-tie, on diagonal intersection and from large to small uniform square horizontal straight line,
The uniform through hole for being provided with the full prestressing reinforcing bar distribution that can correspond to size square pile section;This structure is that can adapt to production respectively
Plant the square pile of specification.
On the large batch of production line of the prestressing force entity concrete square pile, according to the size of factory, the operation is set
The long line of production of 20 rows is discharged to for 10 can be arranged out simultaneously, and is each produced on long line, and 4 pairs to 10 pairs can be accommodated simultaneously
Concrete square pile is produced simultaneously, therefore, and it is produced, and batch is larger, and the quality of square pile production can also be protected.Whole equipment can be
The safely and effectively production operation of factory building, efficiency high, quality are good, simple in construction, cost is relatively low.
In use, the two ends of full prestressing reinforcing bar are fixed on prestressing force arm-tie on by anchor hole and by anchorage, lead to
The bearing column crossed on the corresponding medial surface of prestressing force arm-tie is by the prestressing force arm-tie fix tightly with full prestressing reinforcing bar
Gu, then full prestressing reinforcing bar is constantly stretched by stretching machine, the protecting wall at the rear of stretching machine, can effectively prevent complete
Deformed bar is broken the danger of bounce-back injury human body because of pulling force tension.Whole equipment can safely and effectively giving birth in factory building
Produce that operation, efficiency high, quality be good, simple in construction, cost is relatively low.
The beneficial effects of the invention are as follows:Entity square pile quality that the equipment is not only produced is high, length is big, and mechanization
Degree is higher, cost is low, simple in construction, batch production efficiency high, safe and reliable.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the principle schematic diagram of the present invention.
1. protecting wall in figure, 2. stretching machines, 3. prestressing force arm-ties, 4. bearing columns, 5. concrete square piles, 6. full prestressing steel
Muscle.
Embodiment
In figure, the big industrialized mass production pipelining equipment of entity square pile, including:It is protecting wall 1, stretching machine 2, pre-
Stress tension plate 3, bearing column 4, concrete square pile 5, full prestressing reinforcing bar 6;At the two ends of the implement, concordant with operation ground
Concrete foundation pile on, provided with some cup buckets wide at the top and narrow at the bottom, in cup bucket, the vertical bearing column 4 for being provided with two platoon leader's cube shapes, at two ends
On the corresponding lateral surface of bearing column 4, the prestressing force arm-tie 3 of the parallel rectangle of two rows is fixed with, the prestressing force arm-tie 3
On, uniform correspondence is laid with the anchor hole that multiple anchoring full prestressing reinforcing bars 6 are passed through, in the outside of prestressing force arm-tie 3, order
Provided with anchorage, stretching machine 2 and protecting wall 1, when entity concrete square pile pouring practice, first according to entity square pile sectional dimension length
The model and radical of the selected reinforcing bar needed, the anchor hole for the prestressing force arm-tie that reinforcing bar is passed through two ends and by prestressed stretch-draw
Anchorage fixation on the outside of plate, makes reinforcing bar fixed on the prestressing force arm-tie at two ends, reinforcing bar is stretched out the prestressing force at two ends
Outside the anchor hole of stretch board, and it is connected with the stretching machine 2 at two ends, full prestressing tensioning is carried out to reinforcing bar, reaches and wants in reinforcing bar
After the prestressing force asked, full prestressing reinforcing bar 6 is formed, then again fixes full prestressing reinforcing bar 6 again by anchorage, now i.e. can
Pouring practice is carried out to the entity concrete square pile 5 of the different length of same group of full prestressing reinforcing bar 6, when concrete through-hardening after, then
The full prestressing reinforcing bar 6 that same group of each individual of entity concrete square pile 5 is connected to is split, so as to can once produce
Multiple prestressing force entity concrete square piles 5.
In figure, in the plane on the prestressing force arm-tie 3, diagonal intersection and from large to small uniform square horizontal stroke
On straight line, the through hole that the full prestressing reinforcing bar 6 in size square pile section is distributed can be corresponded to by being uniformly provided with;This structure is to fit
The square pile of all size should be produced.
,, should according to the size of factory on the large batch of production line of the prestressing force entity concrete square pile 5 in figure
Implement can arrange out 10 simultaneously and be discharged to the long line of production of 20 rows, and each produce on long line, and can accommodate 4 pairs simultaneously
Produced simultaneously to 10 pairs of concrete square piles 5, therefore, it is produced, and batch is larger, and the quality of square pile production can also be protected.Whole equipment
Can good, simple in construction, cost be relatively low in the safely and effectively production operation of factory building, efficiency high, quality.
In use, the two ends of full prestressing reinforcing bar 6 are fixed on prestressing force arm-tie 3 on by anchor hole and by anchorage,
By the bearing column 4 on the corresponding medial surface of prestressing force arm-tie 3 by the prestressing force arm-tie 3 with full prestressing reinforcing bar 6
Fixation, is then constantly stretched full prestressing reinforcing bar 6 by stretching machine 2, the protecting wall 1, Neng Gouyou at the rear of stretching machine 2
What is imitated prevents full prestressing reinforcing bar 6 to be broken the danger of bounce-back injury human body because of pulling force tension.Whole equipment can be in factory building
Safely and effectively production operation, efficiency high, quality are good, simple in construction, cost is relatively low.
Claims (2)
1. the big industrialized mass production pipelining equipment of entity square pile, including:Protecting wall(1), stretching machine(2), prestressing force
Stretch board(3), bearing column(4), concrete square pile(5), full prestressing reinforcing bar(6);It is characterized in that:At the two ends of the implement,
It is vertical provided with two platoon leader's cube shapes in cup bucket provided with some cup buckets wide at the top and narrow at the bottom on the concrete foundation pile concordant with operation ground
Bearing column(4), in two ends bearing column(4)Corresponding lateral surface on, be fixed with the prestressed stretch-draw of the parallel rectangle of two rows
Plate(3), the prestressing force arm-tie(3)On, uniform correspondence is laid with multiple anchoring full prestressing reinforcing bars(6)The anchor hole passed through,
In prestressing force arm-tie(3)Outside, be sequentially with anchorage, stretching machine(2)And protecting wall(1), the prestressing force arm-tie(3)
On plane on, diagonal to intersect and from large to small on uniform square horizontal straight line, size square pile can be corresponded to by being uniformly provided with
The full prestressing reinforcing bar in section(6)The through hole of distribution, this structure is the square pile that can adapt to produce all size;When entity concrete
During square pile pouring practice, first according to the model and radical of the selected reinforcing bar needed of entity square pile sectional dimension length, reinforcing bar
Anchor hole by the prestressing force arm-tie at two ends and the anchorage fixation on the outside of prestressing force arm-tie, make reinforcing bar at two ends
Prestressing force arm-tie on it is fixed, reinforcing bar is stretched out outside the anchor hole of the prestressing force arm-tie at two ends, and with the stretching machine at two ends
(2)Connection, full prestressing tensioning is carried out to reinforcing bar, is reached in reinforcing bar after required prestressing force, forms full prestressing reinforcing bar
(6), then again by full prestressing reinforcing bar(6)Fixed again by anchorage, now i.e. can be to same group of full prestressing reinforcing bar(6)'s
The entity concrete square pile of different length(5)Carry out pouring practice, adjacent entities concrete square pile(5)It is staggered relatively, when concrete through-hardening
Afterwards, then to same group of each entity concrete square pile(5)The full prestressing reinforcing bar that individual is connected to(6)Split, so that i.e. can
Once produce multiple prestressing force entity concrete square piles(5).
2. the big industrialized mass production pipelining equipment of entity square pile according to claim 1, it is characterized in that:At this
Prestressing force entity concrete square pile(5)Large batch of production line on, according to the size of factory, the implement can be arranged simultaneously
List 10 and be discharged to the long line of production of 20 rows, and each produce on long line, and 4 pairs to 10 pairs concrete square piles can be accommodated simultaneously(5)Together
When produce, therefore, its produce batch it is larger, square pile production quality can also be protected, whole equipment can factory building peace
Complete effective production operation, efficiency high, quality are good, simple in construction, cost is relatively low.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510291367.8A CN104908159B (en) | 2015-06-01 | 2015-06-01 | The big industrialized mass production pipelining equipment of entity square pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510291367.8A CN104908159B (en) | 2015-06-01 | 2015-06-01 | The big industrialized mass production pipelining equipment of entity square pile |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104908159A CN104908159A (en) | 2015-09-16 |
CN104908159B true CN104908159B (en) | 2017-09-29 |
Family
ID=54077797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510291367.8A Active CN104908159B (en) | 2015-06-01 | 2015-06-01 | The big industrialized mass production pipelining equipment of entity square pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104908159B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109397523A (en) * | 2018-12-25 | 2019-03-01 | 郴州远大住宅工业有限公司 | A kind of deformed bar tensioning tooling and its application method |
CN113211625B (en) * | 2021-04-25 | 2022-12-20 | 河北雄安大型市政预制构件有限公司 | Processing platform is used in prestressed concrete production |
CN115416153A (en) * | 2022-09-19 | 2022-12-02 | 涿州市恒旗建材有限公司 | Long-direction stretching steel die prestress production process |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4186169A (en) * | 1976-10-21 | 1980-01-29 | Universal Development Company Limited | Process and apparatus for continuously prestressing concrete products |
JP2676126B2 (en) * | 1992-06-15 | 1997-11-12 | 株式会社ジオトップ | Equipment for manufacturing PC concrete pillars, etc. |
JP2632773B2 (en) * | 1993-04-14 | 1997-07-23 | 東洋重機工業株式会社 | Coupler for introducing tension in concrete pile shaft reinforcement |
CN103448140B (en) * | 2013-08-21 | 2016-04-13 | 大连大金马基础建设有限公司 | Full prestressing solid square pile long line platform production line |
CN203831571U (en) * | 2014-04-25 | 2014-09-17 | 江苏山海建设工程有限公司 | Multipurpose pre-stressed tension plate |
CN203831572U (en) * | 2014-04-30 | 2014-09-17 | 江苏山海建设工程有限公司 | Pre-stressed reinforced concrete solid square pile tensioning pedestal |
-
2015
- 2015-06-01 CN CN201510291367.8A patent/CN104908159B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104908159A (en) | 2015-09-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104908159B (en) | The big industrialized mass production pipelining equipment of entity square pile | |
CN204983662U (en) | To drawing screw rod and steel pipe framed bent combination unilateral formwork device | |
CN203923924U (en) | No. 0 section bracket prepressing device | |
CN102418425B (en) | Prefabrication integral casting building structure system with cast-in-site haunched beams, and construction method for prefabrication integral casting building structure system | |
CN104947603A (en) | Reinforced concrete girder bridge girder reinforcing structure and method | |
CN106381833A (en) | FRP rebar high-tenacity sea sand seawater concrete stress component | |
CN201794161U (en) | Prefabricated integrally cast building structure system with cast-in-place haunched beam | |
CN201785940U (en) | Reinforced concrete prefabricated beam | |
CN110965474A (en) | Construction method of cable tower cross beam | |
CN201794217U (en) | Pretensioned prestressing reinforced concrete precast beam | |
CN105672690B (en) | Load bearing wall reinforcing method | |
CN204001746U (en) | A kind of wall, column template supporting adn fixing device | |
CN206554277U (en) | A kind of antidetonation beam column construction of low-rise building | |
CN107829444B (en) | Wind turbine generator system prestressing force foundation structure | |
CN214833470U (en) | Connecting structure of concrete filled steel tubular column and raft foundation | |
CN109853513A (en) | A kind of preparation method of geotechnical grid and the geotechnical grid | |
CN105133788A (en) | CFST-RC horizontal batten plate-lattice column structure and construction method thereof | |
CN205804745U (en) | A kind of precast concrete shear wall component | |
CN206256545U (en) | Steel bar connecting structure of beam column node | |
CN201730313U (en) | Floorslab template used for building | |
CN202247938U (en) | Wedge-shaped foundation bolt preformed hole core formwork device | |
CN209837372U (en) | Wall structure member built by cutting barred rocks by prestress machine | |
CN206220359U (en) | A kind of support heel for reinforced bar and support system | |
CN207004052U (en) | A kind of pre-stress stretching device for assembled sheet material | |
CN108612113B (en) | Foundation pit arch prestress supporting structure and supporting system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 221300, No. 1, garlic Road, Su Yang Town, Xuzhou, Jiangsu, Pizhou Applicant after: JIANGSU SHANHAI NOVEL CONSTRUCTION MATERIAL CO., LTD. Address before: 221300, No. 1, garlic Road, Su Yang Town, Xuzhou, Jiangsu, Pizhou Applicant before: Jiangsu mountain and sea construction engineering corporation, Ltd |
|
COR | Change of bibliographic data | ||
GR01 | Patent grant | ||
GR01 | Patent grant |