CN104899691B CN201510309086.0A CN201510309086A CN104899691B CN 104899691 B CN104899691 B CN 104899691B CN 201510309086 A CN201510309086 A CN 201510309086A CN 104899691 B CN104899691 B CN 104899691B
Authority
CN
China
Prior art keywords
electric car
controllability
matrix
capacity
grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510309086.0A
Other languages
Chinese (zh)
Other versions
CN104899691A (en
Inventor
张祥文
陈梅
许晓慧
孙海顺
汪春
张聪
刘海璇
吴可
桑丙玉
彭佩佩
江星星
居蓉蓉
薛金花
崔红芬
叶季蕾
夏俊荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazhong University of Science and Technology
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Tianjin Electric Power Co Ltd
Original Assignee
Huazhong University of Science and Technology
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huazhong University of Science and Technology, State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, State Grid Tianjin Electric Power Co Ltd filed Critical Huazhong University of Science and Technology
Priority to CN201510309086.0A priority Critical patent/CN104899691B/en
Publication of CN104899691A publication Critical patent/CN104899691A/en
Application granted granted Critical
Publication of CN104899691B publication Critical patent/CN104899691B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The present invention relates to a kind of methods of determining schedulable capacity of scale electric car, comprising: (1) defines the matrix of characterization electric car controllability and initialized and set the schedulable capacity duration of electric car;(2) current information of each electric car is obtained based on real-time status;(3) judged according to controllability of the current information of the duration and electric car to electric car;(4) assignment is carried out to the matrix of the definition characterization electric car controllability according to the actual situation;(5) controllability of the matrix to the definition characterization electric car controllability and the electric car calculates the schedulable capacity of electric car and exports according to the actual situation.Technical solution of the present invention preferably realizes electric car and interacts with the close friend of power grid.

Description

A kind of method of the determining schedulable capacity of scale electric car
Technical field:
The present invention relates to electric car fields, are more particularly to a kind of side of determining schedulable capacity of scale electric car Method.
Background technique:
Currently, more and more people begin to focus on and explore such as with the deterioration increasingly of energy crisis and environmental problem What is just able to achieve the mode of sustainable development with environment harmonious coexistence.There is investigation to find, currently, transportation occupies The about consumption of petroleum of whole world half, and the greenhouse gas emissions in the almost whole world 15% are brought, to the ring of All Around The World Border climate change produces tremendous influence.Electric car replaces petroleum as its major impetus energy using electric power, has carbon row The features such as loweing, is environmental-friendly in alleviating energy crisis, makes full use of renewable energy, reduces greenhouse gas emission, promote people The advantage that class and environment harmonious development etc. have traditional combustion engine automobile incomparable.Under the promotion of enterprise, it also by Gradually become the strategic industry direction that each Main Auto manufacturing power government, the world determines.
But electric car should be able to meet the trip requirements of user as a kind of vehicles first, need to study The controllability of electric car, i.e., the auxiliary power grid after meeting user demand, the corresponding capacity of controllable electric automobile are to assist The controllable capacity of power grid.In order to realize that electric car is interacted with the close friend of power grid, needing to calculate scale electric car can The schedulable amount of capacity provided for power grid.
Summary of the invention:
The object of the present invention is to provide a kind of methods of determining schedulable capacity of scale electric car, preferably realize Electric car is interacted with the close friend of power grid.
To achieve the above object, the invention adopts the following technical scheme: a kind of determining schedulable appearance of scale electric car The method of amount, includes the following steps:
(1) it defines the matrix of characterization electric car controllability and is initialized and set the schedulable capacity of electric car and hold Continuous duration;
(2) current information of each electric car is obtained based on real-time status;
(3) judged according to controllability of the current information of the duration and electric car to electric car;
(4) assignment is carried out to the matrix of the definition characterization electric car controllability according to the actual situation;
(5) according to the actual situation to it is described definition characterization electric car controllability matrix and the electric car it is controllable Property calculate the schedulable capacity of electric car and export;
In the step (1), the matrix of the controllability includes defining matrix Yd, and define matrix Yu;Shown definition Matrix Yd indicates load resectability;
Yd=[yd1 yd2 ... ydi ... ydN-1 ydN] (1)
In formula, ydi=1, it indicates that i-th electric car can stop charging according to grid side demand, can be used to do Lower load;ydi=0, indicate that i-th electric car is uncontrollable or is not useable for doing downward load;To Yd matrix assign zero with It is initialized;
The definition matrix Yu characterizes load increase property;
Yu=[yu1 yu2 ... yui ... yuN-1 yuN] (2)
In formula, yui=1, it indicates that i-th electric car can charge according to grid side demand, can be used to do Raise load;yui=0, indicate that i-th electric car is uncontrollable or is not useable for doing up-regulation load;To Yu matrix assign zero with It is initialized;
In the step (2), when the current information of the electric car includes electric car estimated time of departure, leaves Expected energy, current time electricity, charge power and batteries of electric automobile capacity;
The judgement of electric car controllability in the step (3) includes that grid-connected criterion and user's charge requirement criterion carry out Judgement;
In the step (4), to the matrix progress of characterization electric car controllability, assignment, judgement can again according to the actual situation Charged state of the electric car at current time is controlled, then indicates that the electric car needs according to power grid and stopped if it is charged state It only charges, as load can be lowered, enables ydi=1;If grid-connected but do not charge, the electric car is according to power grid needs And charge, as load can be raised, enable yui=1;And it is unsatisfactory for the other amounts yd of above-mentioned conditioni=0, yui=0;
In the step (5), it is calculate by the following formula the schedulable amount of capacity of scale electric car:
Calculation of capacity formula can be raised
Calculation of capacity formula can be lowered
Wherein, yuiAnd ydiFor the matrix for characterizing electric car controllability, PCiFor the charge power of electric car.
In the step (1), the schedulable capacity duration of electric car is according to different application settings.
The grid-connected criterion such as following formula (3):
t0≤t≤td-Δt (3)
In formula: t0For electric car grid-connected moment, tdFor the electric car off-network moment, Δ t is the schedulable capacity of electric car Lasting duration;If the criterion is invalid, indicate that electric car does not access power grid or leaves electricity within following Δ t time Net is uncontrollable;It indicates that electric car is persistently connected to the grid in current time t to t+ Δ t if setting up in the criterion, meets Grid-connected criterion, controllability are further judged by charging requirement criterion.
The charging requirement criterion is as follows:
In formula:For the Expected energy of user,For the current electric quantity of batteries of electric automobile, tdFor electronic vapour Vehicle off-network moment, Δ t are the lasting duration of the schedulable capacity of electric car, PCiFor the charge power of electric car, η is charging effect Rate, CiIndicate battery capacity;
Formula (4) indicates not charge in current time t to moment t+ Δ t when electric car, and since moment t+ Δ t Until automobile departure time tdIt is carried out continuously charging, if met the needs of users when leaving, then it is assumed that electric car is from working as Allow to be removed in preceding moment t to t+ Δ t, which is controllable;If cannot be met the needs of users when leaving, Then illustrate that during this period of time, electric car must charge since sometime, is uncontrollable.
Compared with the nearest prior art, the technical scheme provide by that invention has the following excellent effect
1, can technical solution of the present invention it is controllable to propose a kind of judgement electric car to meet user demand as criterion The scheme of property;
2, it can be power grid that technical solution of the present invention, which calculates the electric car in the case where meeting user's primary demand, The amount of capacity of offer;
3, technical solution of the present invention can calculate the schedulable capacity of different durations, to be applied to different fields It closes;
4, technical solution of the present invention is for realizing that the optimal coordinated control of scale electric car and power grid has future Important practical significance;
5, technical solution of the present invention can not only provide the ancillary services such as peak-frequency regulation, spinning reserve for power grid, improve Unit utilization rate guarantees the safety and reliability of operation of power networks;
6, technical solution of the present invention realizes the coordinated control of electric car and renewable energy, and improving power grid consumption can be again The ability of the raw energy, improves the economy of operation of power networks.
Detailed description of the invention
Fig. 1 is the method flow diagram that technical solution of the present invention provides;
Fig. 2 is the grid-connected criterion schematic diagram of electric car controllability provided in the embodiment of the present invention;
Fig. 3 is the schedulable capacity curve figure of scale electric car provided in the embodiment of the present invention.
Specific embodiment
Below with reference to embodiment, the invention will be described in further detail.
Embodiment 1:
The invention of this example provides a kind of method of determining schedulable capacity of scale electric car, is for electric car The traffic control that power grid is participated in as a kind of controllability load, proposes a kind of calculating side of schedulable capacity of scale electric car Method.This method is based on electric car real time charging status data, specifically includes current time electricity, estimated time of departure, expectation Can the information such as electricity, charge power, battery capacity judge the controllability of electric car to meet user demand as criterion, can Control is that can be controlled the charged state of electric car according to the demand of grid side.It is filled according to controllable electric automobile is current Schedulable capacity is divided into upper capacitance-adjustable and lower capacitance-adjustable by electricity condition.This method can calculate different durations simultaneously Schedulable capacity, to be applied to different occasions.This method is for realizing that the optimization of scale electric car and power grid is assisted future Regulation fixture has important practical significance.
As shown in Figure 1, the method includes following steps:
Step 1: definition characterizes the matrix of electric car controllability and is initialized.Define matrix Yd (ydi=1/0), Indicate load resectability;And define matrix Yu (yui=1/0) load increase property, is characterized, two matrixes are carried out just respectively Beginningization enables Yd=0, Yu=0.According to different application demands, the schedulable capacity duration Δ t of electric car is set, respectively Take Δ t=0, Δ t=0.5, Δ t=1, the corresponding schedulable amount of capacity of more different durations.
Step 2: obtaining the current information of each electric car based on real-time status.The current information packet of electric car Expected energy, current time electricity, charge power, batteries of electric automobile when including electric car estimated time of departure, leaving hold The acquisition of amount etc., above- mentioned information is needed by intelligence instrument, communication apparatus etc. as support.For analogue simulation, according to related text Guidance is offered, the above-mentioned data of electric car are obtained by the method for data fitting sampling.Specially grid-connected time t0Obedience N (19, 1.2) normal distribution, time departure tdThe normal distribution of N (7.5,0.5) is obeyed, starting electricity obeys the normal state of N (40,15) Distribution, Expected energy are uniformly set asCharge power PcBeing uniformly distributed for U (3,4) is obeyed, it is single Position is kW, and battery capacity is uniformly set as C=60kWh, and electric car charge efficiency is uniformly set as η=90%, electric car Scale is set as N=1000.To stabilize the fluctuation of power distribution network total load for target, the charging schedules of each electric car are obtained, And then the electricity at each electric car each moment can be calculated
Step 3: the information data current according to electric car, judges its controllability, electric car controllability Criterion mainly includes grid-connected criterion and user's charge requirement criterion.
1) grid-connected criterion:
t0≤t≤td-Δt (1)
If the criterion is invalid, indicate that electric car does not access power grid or leaves power grid within following Δ t time, It is as uncontrollable.It indicates that electric car is persistently connected to the grid in current time t to t+ Δ t if setting up in the criterion, meets Grid-connected criterion, controllability are further judged by charging requirement criterion.
2) charging requirement criterion:
Formula (2) indicates not charge in current time t to moment t+ Δ t when electric car, and since moment t+ Δ t Until automobile departure time tdIt is carried out continuously charging, if can satisfy the demand of user when leaving, then it is assumed that electric car Allow to be removed in Δ t from current time t to t+, i.e., the electric car is controllable.On the contrary, if not being able to satisfy when leaving The demand of user then illustrates that during this period of time, electric car must charge since sometime, as uncontrollable.
Step 4: carrying out assignment again to the matrix of characterization electric car controllability according to the actual situation.Judge controllable electric Charged state of the automobile at current time then indicates that the electric car can need according to power grid and be stopped if it is charged state Charging enables yd that is, as that can lower loadi=1;If grid-connected but do not charge, which can be according to power grid It needs and charges, i.e., as load can be raised, enable yui=1.And it is unsatisfactory for the other amounts yd of above-mentioned conditioni=0, yui= 0。
Step 5: the schedulable amount of capacity of calculation scale electric car simultaneously exports according to the controllability of electric car As a result, this example calculates the schedulable amount of capacity at each integral point moment.
Fig. 2 is the grid-connected criterion schematic diagram of electric car controllability, certain electric car simulated in the embodiment of the present invention Design parameter and one day status data of this electric car respectively such as Tables 1 and 2:
Table 1
Battery capacity (kWh) 60
Charge power (kW) 4
The grid-connected time 20
The off-network time 7
It originates SOC (100%) 42
User demand SOC (100%) >80
It can be calculated the charging time (h) at least needed 6
SOC (100%) when leaving 82
Table 2
Fig. 3 is schedulable capacity curve figure in scale electric car one day, each integral point moment in the embodiment of the present invention The load capacity size that electric car can raise is shown in Table 3, and the load capacity that can be lowered is shown in Table 4:
Table 3
Table 4
As can be seen from tables 3 and 4 that due to it is different at the time of electric car controllability will change, advise The schedulable capacity of modelling electric car also can constantly change at any time.And at grid-connected initial stage, as electric car is grid-connected Quantity is continuously increased, and schedulable capacity is also continuously increased.But in grid-connected latter stage, in order to meet the electricity need of user It asks, the controllability of electric car is deteriorated, therefore schedulable capacity is also reduced therewith.
It can also be seen that the schedulable capacity of different durations is not also identical, the reason is that required lasting in synchronization Time is longer, and the controllability of electric car is poorer, therefore schedulable capacity can reduce with the increase of duration.
Finally it should be noted that: the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, institute The those of ordinary skill in category field is although should be understood with reference to the above embodiments: still can be to a specific embodiment of the invention It is modified or replaced equivalently, these are without departing from any modification of spirit and scope of the invention or equivalent replacement, in Shen Within claims of the invention that please be pending.

Claims (2)

1. a kind of method of the determining schedulable capacity of scale electric car, it is characterised in that: include the following steps:
(1) when defining the matrix of characterization electric car controllability and being initialized and set the schedulable capacity of electric car persistently It is long;
(2) current information of each electric car is obtained based on real-time status;
(3) judged according to controllability of the current information of the duration and electric car to electric car;
(4) assignment is carried out to the matrix of the definition characterization electric car controllability according to the actual situation;
(5) matrix of electric car controllability and the controllability meter of the electric car are characterized to the definition according to the actual situation It calculates the schedulable capacity of electric car and exports;
In the step (1), the matrix of the controllability includes defining matrix Yd, and define matrix Yu;Shown definition matrix Yd, Indicate load resectability;
Yd=[yd1 yd2 ... ydi ... ydN-1 ydN] (1)
In formula, ydi=1, it indicates that i-th electric car can stop charging according to grid side demand, it is negative to can be used for doing downward Lotus;ydi=0, indicate that i-th electric car is uncontrollable or is not useable for doing downward load;Zero is assigned to carry out just to Yd matrix Beginningization;
The definition matrix Yu characterizes load increase property;
Yu=[yu1 yu2 ... yui ... yuN-1 yuN] (2)
In formula, yui=1, it indicates that i-th electric car can charge according to grid side demand, it is negative to can be used for doing up-regulation Lotus;yui=0, indicate that i-th electric car is uncontrollable or is not useable for doing up-regulation load;Zero is assigned to carry out just to Yu matrix Beginningization;
Expectation in the step (2), when the current information of the electric car includes electric car estimated time of departure, leaves Electricity, current time electricity, charge power and batteries of electric automobile capacity;
The judgement of electric car controllability in the step (3) includes that grid-connected criterion and user's charge requirement criterion are sentenced It is disconnected;
The grid-connected criterion such as following formula (3):
t0≤t≤td-Δt (3)
In formula: t0For electric car grid-connected moment, tdFor the electric car off-network moment, Δ t continues for the schedulable capacity of electric car Duration;
If the criterion is invalid, indicate that electric car does not access power grid or leaves power grid within following Δ t time, for not Controllably;
It indicates that electric car is persistently connected to the grid in current time t to t+ Δ t if setting up in the criterion, meets and grid-connected sentence According to controllability is further judged by charging requirement criterion;
User's charge requirement criterion is as follows:
In formula:For the Expected energy of user,For the current electric quantity of batteries of electric automobile, tdFor electric car from It nets the moment, Δ t is the lasting duration of the schedulable capacity of electric car, PCiFor the charge power of electric car, η is charge efficiency, CiIndicate battery capacity;
Formula (4) indicates not charged in current time t to moment t+ Δ t when electric car, and since moment t+ Δ t up to Automobile departure time tdIt is carried out continuously charging;
If met the needs of users when leaving, then it is assumed that electric car allows to be removed from current time t to t+ in Δ t, The electric car is controllable;
If cannot be met the needs of users when leaving, illustrate during this period of time, the electric car since sometime It must charge, be uncontrollable;
In the step (4), assignment again is carried out to the matrix of characterization electric car controllability according to the actual situation, judges controllable electric Charged state of the electrical automobile at current time then indicates that the electric car needs according to power grid and stops filling if it is charged state Electricity enables yd as that can lower loadi=1;If grid-connected but do not charge, the electric car according to power grid need and into Row charging, as that can raise load, enables yui=1;And it is unsatisfactory for the other amounts yd of above-mentioned conditioni=0, yui=0;
In the step (5), it is calculate by the following formula the schedulable amount of capacity of scale electric car:
Calculation of capacity formula can be raised
Calculation of capacity formula can be lowered
Wherein, yuiAnd ydiFor the matrix for characterizing electric car controllability, PCiFor the charge power of electric car.
2. a kind of method of the determining schedulable capacity of scale electric car as described in claim 1, it is characterised in that: in institute It states in step (1), the schedulable capacity duration of electric car is according to different application settings.
CN201510309086.0A 2015-06-08 2015-06-08 A kind of method of the determining schedulable capacity of scale electric car Active CN104899691B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510309086.0A CN104899691B (en) 2015-06-08 2015-06-08 A kind of method of the determining schedulable capacity of scale electric car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510309086.0A CN104899691B (en) 2015-06-08 2015-06-08 A kind of method of the determining schedulable capacity of scale electric car

Publications (2)

Publication Number Publication Date
CN104899691A CN104899691A (en) 2015-09-09
CN104899691B true CN104899691B (en) 2019-06-25

Family

ID=54032344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510309086.0A Active CN104899691B (en) 2015-06-08 2015-06-08 A kind of method of the determining schedulable capacity of scale electric car

Country Status (1)

Country Link
CN (1) CN104899691B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105553057B (en) * 2015-12-22 2018-06-12 华中科技大学 A kind of electric automobile charging station control system based on electric network protection
CN106203720B (en) * 2016-07-15 2019-06-14 合肥工业大学 A kind of schedulable capacity prediction methods of Multiple Time Scales electric car cluster
CN107367285B (en) * 2017-05-23 2020-04-10 西安交通大学 Pure electric bus running route planning method based on battery capacity decline and workload reverse order matching
CN109861208B (en) * 2019-01-07 2020-09-01 南京工程学院 Electric vehicle grid-connected optimization scheduling method based on two-stage preprocessing strategy
CN110525259B (en) * 2019-07-23 2021-06-08 广东电网有限责任公司广州供电局 Charging demand response method and device for electric automobile and computer equipment
CN111564852B (en) * 2020-03-25 2021-10-08 上海电力大学 Frequency control method and device for hybrid power system comprising electric automobile
CN112926818A (en) * 2020-12-11 2021-06-08 天津大学 Electric vehicle demand response capability assessment method based on user demand relaxation degree

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102479350A (en) * 2010-11-25 2012-05-30 国网能源研究院 New-energy large-scale grid connection based electric power analysis system and method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011142131A1 (en) * 2010-05-11 2011-11-17 パナソニック株式会社 Electrical device control system, server, electrical device, and electrical device control method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102479350A (en) * 2010-11-25 2012-05-30 国网能源研究院 New-energy large-scale grid connection based electric power analysis system and method thereof

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
含电动汽车和风电机组的虚拟发电厂竞价策略;杨甲甲等;《电力***自动化》;20140710;第38卷(第13期);第93-100页
规模化电动汽车和风电协同调度的机组组合问题研究;汪春等;《电力***保护与控制》;20150601;第43卷(第11期);第41-47页
集中充电模式下的电动汽车调频策略;姚伟锋等;《电力***自动化》;20140510;第38卷(第9期);第69-75页

Also Published As

Publication number Publication date
CN104899691A (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN104899691B (en) A kind of method of the determining schedulable capacity of scale electric car
Luo et al. Optimal coordination of plug-in electric vehicles in power grids with cost-benefit analysis—Part I: Enabling techniques
Khayyam et al. Intelligent control of vehicle to grid power
CN104052055B (en) A kind of electric automobile frequency modulation centralized dispatching control method towards active intelligent grid
CN107453381B (en) Electric car cluster power regulating method and system based on two stages cross-over control
CN107745650A (en) A kind of orderly charge control method of electric automobile based on Peak-valley TOU power price
CN109599856A (en) Electric car management of charging and discharging optimization method and device in a kind of more building of microgrid
CN103997091A (en) Scale electric automobile intelligent charging control method
CN105337324A (en) Intelligent charging strategy for controlling charging time of electric car
CN104836259A (en) Multi-energy resource ship micro-grid real-time energy optimal scheduling method
CN106945558A (en) Cluster electric automobile V2G control strategies
CN106992544A (en) Microgrid energy real-time management control method
CN107769235A (en) A kind of microgrid energy management method based on hybrid energy-storing and electric automobile
CN104332985B (en) DC distribution network operation control and optimal scheduling method based on hybrid control strategy
CN106114253A (en) A kind of off-board charging pile control method of loaded self-adaptive
CN106786692A (en) One kind is based on the orderly charge control method of distributed electric automobile
Zheng et al. Optimal short-term power dispatch scheduling for a wind farm with battery energy storage system
Jiang et al. A coordinated charging strategy for electric vehicles based on multi-objective optimization
CN109088454A (en) A kind of electric car charging method based on automatic demand response and Spot Price
CN110091727A (en) A kind of distributing energy management method for electric car hybrid power system
CN104410091A (en) Wind energy storage management system based on converter control and wind energy storage management system control method
CN114865664A (en) Method for participating in three-phase imbalance and carbon emission treatment of power distribution network through demand response
CN102897043A (en) Method for allocating energy of extended-range type electric vehicle
CN103414201A (en) Regulation and control method of electric bus power battery cluster participating in sea island micro-grid operation
CN108258694A (en) Alternating current-direct current microgrid control method for coordinating based on electric power electric transformer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant