CN104898070B - Power supply test method and device - Google Patents
Power supply test method and device Download PDFInfo
- Publication number
- CN104898070B CN104898070B CN201510268584.5A CN201510268584A CN104898070B CN 104898070 B CN104898070 B CN 104898070B CN 201510268584 A CN201510268584 A CN 201510268584A CN 104898070 B CN104898070 B CN 104898070B
- Authority
- CN
- China
- Prior art keywords
- test
- devices
- power supply
- module
- network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Power Sources (AREA)
Abstract
The present invention proposes a kind of power supply test method and device, wherein, power supply test method of the invention includes:Automated log on file is set;It is automatic to call network test script by reading automatic log file;Test whether the mutual network of Devices to test, test equipment, power supply module connects by network test script;In the case of network-in-dialing, Devices to test sends the address information of itself and test request to test equipment;Test equipment receives address information and test request, and the instruction for disconnecting the power supply of Devices to test corresponding to address information is sent to power supply module;Power supply module receives instruction, and the power supply of Devices to test corresponding to address information is disconnected;After Devices to test power supply is disconnected scheduled duration, test equipment, which is called, wakes up instrument start-up Devices to test;After Devices to test startup, Devices to test again reads off automated log on file.By the method for testing of the present invention, the automatic test of the power module of device under test can be completed.
Description
Technical field
The present invention relates to testing field, it particularly relates to a kind of power supply test method and device.
Background technology
Each server complete machine is required for before dispatching from the factory by burn-in test, but in test process, for power supply
Alternating current test is but perfect not to the utmost, so as to cause product to occur the machine of delaying, loss of data and component damage after dispatching from the factory
Etc. potential danger.Once there is above-mentioned hidden danger, the normal work of server will be influenceed, and it is possible to the number in server
According to causing very big influence.Therefore, become very necessary for power supply stability test.So to add during burn-in test
With perfect, server is set to be adjusted before dispatching from the factory to optimum state.
By the test to power supply, the generation of potential safety hazard on aging test production, can be just avoided.It is but traditional
The test to power supply, be all by manual testing, it is necessary to have substantial amounts of manual labor.Take a substantial amount of time and resource.
Therefore, if during to power supply test, realize that automatic test just becomes most important.
The problem of in correlation technique, effective solution is not yet proposed at present.
The content of the invention
The problem of in correlation technique, the present invention propose a kind of power supply test method and device, being capable of device under test
Power supply realize batch, automatic test.
The technical proposal of the invention is realized in this way:
According to an aspect of the invention, there is provided a kind of power supply test method, this method is applied to power detecting system,
The system includes:At least one Devices to test, interchanger, test equipment, power supply module;And Devices to test, test are set
Standby, power supply module is respectively connected to interchanger;Devices to test is connected with power supply module.
This method includes:
Automated log on file is set;
Then, it is automatic to call network test script by reading automatic log file;
Then, test whether the mutual network of Devices to test, test equipment, power supply module connects by network test script
It is logical;
Then, in the case of network-in-dialing, Devices to test sends the address information of itself and test request to test
Equipment;
Then, test equipment receives address information and test request, and is sent to power supply module and disconnect address information pair
The instruction of the power supply for the Devices to test answered;
After power supply module receives instruction, power supply module can disconnect the power supply of Devices to test corresponding to address information;
Then, after Devices to test power supply is disconnected scheduled duration, test equipment, which is called, wakes up instrument start-up Devices to test;
After Devices to test startup, Devices to test again reads off the automated log on file.
Preferably, in one embodiment of the invention, power supply module receives instruction, and will be to be measured corresponding to address information
The power supply of equipment disconnects, and further comprises:
Power supply module includes mapping table, wherein, mapping table to be measured sets for the port of power supply module with what each was accessed
The corresponding relation of standby address information.
Preferably, in one embodiment of the invention, after Devices to test startup, Devices to test is again read off to be stepped on automatically
Record file when, test equipment by by detect the network between test equipment and Devices to test whether intercommunication, judge that Devices to test is
It is no to be successfully entered operating system;
If the network interworking between test equipment and Devices to test, it is determined that Devices to test is successfully entered operating system;
If the network between test equipment and Devices to test is obstructed, it is determined that Devices to test enters operating system not successfully;
Preferably, in one embodiment of the invention, after Devices to test is successfully entered operating system, test equipment will
The result of test is recorded, and the result of test is sent to Devices to test;
Devices to test receives test result, and test result is output into specified daily record.
Preferably, in one embodiment of the invention, address information includes at least one of:
The MAC Address of Devices to test, the IP address of Devices to test.
According to another aspect of the present invention, there is provided a kind of power supply testing device.The device applies equally to power supply test
System, the system include:At least one Devices to test, interchanger, test equipment, power supply module;And Devices to test, survey
Examination equipment, power supply module are respectively connected to interchanger;Devices to test is connected with power supply module.
The device includes:
Setup module, for setting automated log on file;
Read module, for by reading automatic log file, calling network test script automatically;
Network test module, it is mutual for testing Devices to test, test equipment, power supply module by network test script
Network whether connect;
Sending module, in the case of network-in-dialing, by the address information of Devices to test and test request send to
Test equipment;
Command module, for receiving address information and test request, and send disconnection address information to power supply module and correspond to
Devices to test power supply instruction;
Module is disconnected, receives and instructs for power supply module, and the power supply of Devices to test corresponding to address information is disconnected;
Wake module, for after Devices to test power supply is disconnected scheduled duration, calling and waking up instrument start-up Devices to test;
Read module is further used for after Devices to test starts, and again reads off automated log on file.
Preferably, in one embodiment of the invention, power supply module includes mapping table, wherein, mapping table is power supply
The port of module and the corresponding relation of the address information of the Devices to test of each access.
Preferably, in one embodiment of the invention, network detection module is further used for opening in the Devices to test
After dynamic, by detect the network between test equipment and Devices to test whether intercommunication, judge whether Devices to test is successfully entered operation
System;
And judge module, if for the network interworking between test equipment and Devices to test, it is determined that Devices to test success
Into operating system;If the network between test equipment and Devices to test is obstructed, it is determined that Devices to test enters operation system not successfully
System;
Preferably, in one embodiment of the invention, device of the invention also includes:Logging modle, for when to be measured
After equipment is successfully entered operating system, test result is recorded, and test result is sent to Devices to test;
And output module, it is output to specified daily record for receiving test result, and by test result.
Preferably, address information includes at least one of:
The MAC Address of Devices to test, the IP address of Devices to test.
The present invention realizes the device under test in test process by calling corresponding test script and waking up instrument
Power module electrical testing up and down, so as to complete the automatic test of the power module of device under test.With it,
The power module of multiple Devices to tests can also be tested simultaneously, it is achieved thereby that batch, automation to power module
Test.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to institute in embodiment
The accompanying drawing needed to use is briefly described, it should be apparent that, drawings in the following description are only some implementations of the present invention
Example, for those of ordinary skill in the art, on the premise of not paying creative work, can also be obtained according to these accompanying drawings
Obtain other accompanying drawings.
Fig. 1 is power detecting system schematic diagram according to embodiments of the present invention;
Fig. 2 is power supply test method flow diagram according to embodiments of the present invention;
Fig. 3 is the particular flow sheet of the single supply test of power supply test method according to embodiments of the present invention;
Fig. 4 is the particular flow sheet of the dual power supply test of power supply test method according to embodiments of the present invention;
Fig. 5 is the idiographic flow of electrical testing above and below the dual power supply alternating of power supply test method according to embodiments of the present invention
Figure;
Fig. 6 is the block diagram of power supply testing device according to embodiments of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, the every other embodiment that those of ordinary skill in the art are obtained, belong to what the present invention protected
Scope.
According to an embodiment of the invention, there is provided a kind of power supply test method.This method is applied to power detecting system, institute
State system as shown in figure 1, including:At least one Devices to test, interchanger, test equipment, power supply module, wherein, Devices to test
Including the first power module and second source module;And Devices to test, test equipment, power supply module are set by each respectively
The standby network interface of itself connects with the corresponding ports of interchanger;Devices to test is connected with power supply module.It is specifically, preferable at one
In embodiment, power management module is included in power supply module.And method of the invention be applicable in device under test
One power module is tested and/or second source module testing, and to the first power module and the feelings of second source module energization
Electrical testing above and below alternating under condition.
As shown in Fig. 2 power supply test method according to embodiments of the present invention, including:
Step S201, automated log on file is set.Specifically, in one embodiment of the invention, can be by order line
Automated log on file is write, the effect of the order line is automatic testing software involved in the present invention and script is transported automatically
OK.Preferably, automated log on file can be/etc/bashrc.
Step S203, it is automatic to call network test script by reading automatic log file.
Step S205, testing the mutual network of Devices to test, test equipment, power supply module by network test script is
No connection.Because Devices to test, test equipment, power supply module are connected into the port of interchanger respectively, therefore, exchange opportunity is each
The fixed IP of access device distribution corresponding to port.Particularly, in a preferred embodiment, the power supply test of this method application
Multiple power supply modules can be included in system, exchange opportunity is that each power supply module distributes a fixed IP, is thus obtained each
IP address range corresponding to power supply module.So as to establish mapping table in each power supply module, the mapping table in each module is
Each port and the corresponding relation of the IP address of the Devices to test of access in power module.One-to-many pair can so be formed
It should be related to, test equipment can efficiently controls the electric power thus supplied of the power module in each Devices to test.
Step S207, in the case of network-in-dialing, Devices to test by the address information of itself and test request send to
Test equipment.Wherein, address above mentioned information includes at least one of:IP address information, mac address information.
Step S209, test equipment receives address information and test request, and is sent to power supply module and disconnect address letter
The instruction of the power supply of Devices to test corresponding to breath.After test equipment receives address information, it is possible to determine that Devices to test institute is right
The address information answered, so as to which the power management module in order power supply module disconnects the electricity of Devices to test corresponding to the address information
The power supply of source module.
Step S211, after power supply module receives instruction, power supply module can be by Devices to test corresponding to address information
Power supply disconnects.Wherein, after power supply module receives instruction, the power management module in power supply module can be searched according to mapping table
To the Devices to test of deenergization port corresponding in power supply module is needed, power management module can be by forcing up and down
Electricity order controls the ON/OFF of the port, so as to disconnect the power supply of device under test.
Step S213, after Devices to test power supply is disconnected scheduled duration, test equipment calls wake-up instrument start-up to be measured
Equipment.Wherein, wake up instrument before testing begins, have been deployed in test equipment end, and have been actuated while.Pass through calling
Wake-up instrument, it can remotely start Devices to test.
Step S215, after Devices to test startup, Devices to test again reads off automated log on file.Specifically, at one
In preferred embodiment, after Devices to test enters operating system, automated log on file can be again read off, then re-calls network
Test script tests the connectedness of Devices to test and test equipment, if network interworking, shows that this time is successfully tested, test is set
The monitoring programme of standby middle operation can be collected to test result, and be sent in Devices to test.Wherein, test result includes single
Secondary test is time-consuming, and cycle-index.Then, Devices to test exports test result to specified daily record, so that operating personnel read
Take.If network not intercommunication, show that Devices to test is introduced into operating system, i.e. this time test is unsuccessful, in test equipment
Monitoring programme can be alarmed.Particularly, in one embodiment of the invention, the method that the present invention can be utilized, to be measured
Power module in equipment carries out electrical testing above and below the circulation of predetermined number of times.
In summary, can be by calling corresponding test script and wake-up by the method described by the present embodiment
Instrument, the electrical testing up and down of the power module of device under test in test process is realized, so as to complete device under test
Power module automatic test.With it, the power module of multiple Devices to tests can also be tested simultaneously,
It is achieved thereby that batch, automatic test to power module.
Preferably, in one embodiment of the invention, the Devices to test in power detecting system includes the first power supply mould
Block and second source module.In one particular embodiment of the present invention, can be with the first power module in device under test
And second source module carries out the alternating electrical measurement up and down in the case of single supply test, dual power supply test and dual power supply are powered
Examination.
Specifically, if Fig. 3 is in one embodiment of the invention, when the first power module or second in Devices to test
Power module single supply module carries out particular flow sheet during single supply module testing in the case of being powered.In figure 3:
Step S301:Devices to test is communicated with test equipment.
Step S303:In the case of communication successfully, power management module of the test equipment into power supply module, which is sent, to be cut
The instruction of the power supply of disconnected all Devices to tests.
Step S305:After the scheduled time, Devices to test is restarted by waking up instrument.
Step S307:Devices to test and the mutual communication of test equipment are tested, if communication connection is normal, is shown to be measured
Device systems normal work.
Step S309:After all Devices to tests all start, power supply is again switched off, repeat step S303-S309, and
Circulate predetermined number of times.
Preferably, if Fig. 4 is in one embodiment of the invention, when the first power module and second in Devices to test
Module carries out particular flow sheet during dual-power module test in the case of accessing power supply module simultaneously.In Fig. 4:
Step S401:Devices to test is communicated with test equipment.
Step S403:In the case of communication successfully, power management module of the test equipment into power supply module, which is sent, to be cut
The instruction of the power supply of disconnected all Devices to tests.
Step S405:After the scheduled time, Devices to test is restarted by waking up instrument.
Step S407:Devices to test and the mutual communication of test equipment are tested, if communication connection is normal, is shown to be measured
Device systems normal work.
Step S409:After all Devices to tests all start, power supply is again switched off, repeat step S403-S409, and
Circulate predetermined number of times.
Preferably, if Fig. 5 is in one embodiment of the invention, when the first power module and second in Devices to test
Module carries out particular flow sheet during electrical testing above and below dual-power module alternating in the case of accessing power supply module simultaneously.In Fig. 5
In:
Step S501:Devices to test is communicated with test equipment.
Step S503:In the case of communication successfully, power management module of the test equipment into power supply module, which is sent, to be cut
The instruction of the power supply of the disconnected Devices to test to connect with the odd-numbered port in power supply module.
Step S505:After the scheduled time, power management module of the test equipment into power supply module, which is sent, to be opened and supplies
The power supply for the Devices to test that odd-numbered port in electric module connects, and disconnect connect with the even port in power supply module it is to be measured
The instruction of the power supply of equipment.
Step S507:After the scheduled time, power management module of the test equipment into power supply module, which is sent, to be opened and supplies
The power supply for the Devices to test that even port in electric module connects, and disconnect connect with the odd-numbered port in power supply module it is to be measured
The instruction of the power supply of equipment.
Step S509:Predetermined number of times step S505-S507 is repeated, and test equipment monitors Devices to test system and is in real time
No normal work.
In order to be better understood from technical scheme, it is illustrated below with specific embodiment:
Multiple Run Scripts are included in the power supply test method of the present invention.It is specific as follows:
Test lead
Test lead program bag (folder) containing following file:
Aconoff_server.sh server end main programs;
Aconoff_server_deploy.sh is responsible for deployment services;
Aconoff_server_service.o is responsible for monitoring the solicited message sent;
Aconoff_tools deposits related tool bag;
The program is configured to system service (Service) during deployment, remains on state during test, main program can pass through
The mode of WOL restarts it after machine to be measured is closed.
End to be measured
End program bag to be measured contains following file:
Autologin.sh is used for automated log on operating system after realization start;
Autoopen.sh is used to perform test script main program automatically after realizing login;
Client.o communicates with server host;
Reboot.sh client main programs;
Result.sh is used for object information and the preservation for collecting each cyclic process;
Document directory structure is as shown below:
In test process, software running process is as follows:
1) under the mono-/bis-electricity "on" position of Devices to test, on-premise network wakes up kit in a test device, and opens
Move the service;
2) the related command row write of automatic running software is entered bashrc files by Devices to test end, can by reading this document
With automatic running test software and script;
3) network connectivty for calling client.o scripts device under test mutual with test equipment is tested, and is tested
After success, the MAC Address of Devices to test and IP address are uploaded into test equipment end, and test request is sent to test lead;
4) test equipment termination receives request, transmits commands to power management module NPM, cuts off the power supply of the Devices to test
Power supply (cuts off single-point power supply, two point power supply is cut off under double electricity conditions) under single electricity condition;
5) after the scheduled time, WOL instrument start-up Devices to test is called at test equipment end, and monitors in real time to be measured
The state of equipment, record single cycle is time-consuming and the information such as cycle-index.
6) predetermined number of times above-mentioned steps are repeated after restarting;
7) then carry out device under test dual-power module alternately up and down electrical testing.Idiographic flow and script call with it is upper
It is roughly the same to state step, it is specific as follows:Devices to test and test equipment network-in-dialing, i.e. Devices to test are under operating system,
By the connection of two power modules alternating, the cut-out in Devices to test, predetermined number of times is circulated, checks Devices to test after alternating every time
System mode, if it find that the problems such as machine of delaying, system alarm, interrupt the process and show result.
According to an embodiment of the invention, a kind of power supply testing device is additionally provided.
As shown in fig. 6, power supply testing device according to embodiments of the present invention includes:
Setup module 61, the module are used to set automated log on file;
Read module 62, the module are used for by reading the automated log on file, automatic to call network test script;
Network test module 63, the module are used to set by the network test script test Devices to test, test
Whether the network standby, power supply module is mutual connects;
Sending module 64, the module are used in the case of network-in-dialing, please by the address information of Devices to test and test
Transmission is asked to test equipment;
Command module 65, the module is used to receive address information and test request, and is sent to power supply module and disconnect address
The instruction of the power supply of Devices to test corresponding to information;
Module 66 is disconnected, the module is used for power supply module and receives instruction, and by the electricity of Devices to test corresponding to address information
Source disconnects;
Wake module 67, the module are used for after Devices to test power supply is disconnected scheduled duration, call and wake up instrument start-up
Devices to test;
Wherein, read module 62 is further used for after the Devices to test starts, and again reads off the automated log on text
Part.
Preferably, in one embodiment of the invention, power supply module includes mapping table, wherein, mapping table is power supply
The port of module and the corresponding relation of the address information of the Devices to test of each access.
Preferably, in one embodiment of the invention, network detection module 63 is further used in the Devices to test
After startup, by detect the network between test equipment and Devices to test whether intercommunication, judge whether Devices to test is successfully entered behaviour
Make system.
And judge module (not shown), if the network interworking that the module is used between test equipment and Devices to test, really
Determine Devices to test and be successfully entered operating system;If the network between test equipment and Devices to test is obstructed, it is determined that Devices to test is not
It is successfully entered operating system;
Preferably, in one embodiment of the invention, device of the invention also includes:Logging modle (not shown), should
Module is used for after Devices to test is successfully entered operating system, and test result is recorded, and test result is sent to be measured
Equipment;
And output module (not shown), the module is used to receive test result, and test result is output into specified day
Will.
Preferably, address information includes at least one of:
The MAC Address of Devices to test, the IP address of Devices to test.
In summary, by means of the above-mentioned technical proposal of the present invention, by calling corresponding test script and waking up work
Tool, the electrical testing up and down of the power module of device under test in test process is realized, so as to complete device under test
The automatic test of power module.With it, the power module of multiple Devices to tests can also be tested simultaneously, from
And realize the batch to power module, automatic test.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
God any modification, equivalent substitution and improvements made etc., should be included in the scope of the protection with principle.
Claims (8)
- A kind of 1. power supply test method, it is characterised in that methods described is applied to power detecting system, and the system includes:Extremely Few Devices to test, interchanger, test equipment, a power supply module;And the Devices to test, test equipment, power supply module point The interchanger is not accessed;The Devices to test is connected with the power supply module;Methods described includes:Automated log on file is set;It is automatic to call network test script by reading the automated log on file;Test whether the mutual network of the Devices to test, test equipment, power supply module connects by the network test script It is logical;In the case of the network-in-dialing, the Devices to test sends the address information of itself and test request to the survey Try equipment;The test equipment receives the address information and the test request, and sends and disconnected describedly to the power supply module The instruction of the power supply of Devices to test corresponding to the information of location;The power supply module receives the instruction, and the power supply of Devices to test corresponding to the address information is disconnected;After the Devices to test power supply is disconnected scheduled duration, the test equipment, which is called, wakes up to be measured described in instrument start-up set It is standby;After Devices to test startup, the Devices to test again reads off the automated log on file;Wherein, it is described after Devices to test startup, when the Devices to test again reads off the automated log on file, enter one Step includes:The test equipment by detect the network between the test equipment and the Devices to test whether intercommunication, treat described in judgement Whether measurement equipment is successfully entered operating system;If the network interworking between the test equipment and the Devices to test, it is determined that the Devices to test is successfully entered operation system System.
- 2. according to the method for claim 1, it is characterised in that the power supply module includes mapping table, wherein, it is described to reflect Port and the corresponding relation of the address information of the Devices to test of each access of the firing table for the power supply module.
- 3. according to the method for claim 1, it is characterised in that including:When the Devices to test is successfully entered operating system, the test equipment is recorded the result of test, and by institute The result for stating test is sent to the Devices to test;The Devices to test receives the test result, and the test result is output into specified daily record.
- 4. according to the method for claim 1, it is characterised in that the address information includes at least one of:The IP address of the MAC Address of the Devices to test, the Devices to test.
- 5. a kind of power supply testing device, it is characterised in that described device is applied to power detecting system, and the system includes:Extremely Few Devices to test, interchanger, test equipment, a power supply module;And the Devices to test, test equipment, power supply module point The interchanger is not accessed;The Devices to test is connected with the power supply module;Described device includes:Setup module, for setting automated log on file;Read module, for by reading the automated log on file, calling network test script automatically;Network test module, for testing the Devices to test, test equipment, power supply module phase by the network test script Whether the network between mutually connects;Sending module, in the case of the network-in-dialing, by the address information of Devices to test and test request send to The test equipment;Command module, sent for receiving the address information and the test request, and to the power supply module described in disconnection The instruction of the power supply of Devices to test corresponding to address information;Module is disconnected, the instruction is received for the power supply module, and by the electricity of Devices to test corresponding to the address information Source disconnects;Wake module, it is to be measured described in wake-up instrument start-up for after the Devices to test power supply is disconnected scheduled duration, calling Equipment;The read module is further used for after the Devices to test starts, and again reads off the automated log on file;Wherein, network test module is further used for after the Devices to test starts, by detecting the test equipment and institute State network between Devices to test whether intercommunication, judge whether the Devices to test is successfully entered operating system;Judge module, if for the network interworking between the test equipment and the Devices to test, it is determined that the Devices to test It is successfully entered operating system;If the network between the test equipment and the Devices to test is obstructed, it is determined that the Devices to test Enter operating system not successfully.
- 6. device according to claim 5, it is characterised in that further comprise:The power supply module includes mapping table, wherein, port and each access of the mapping table for the power supply module Devices to test address information corresponding relation.
- 7. device according to claim 5, it is characterised in that including:Logging modle, for after the Devices to test is successfully entered operating system, being recorded to the result of test, and by institute Test result is stated to send to the Devices to test;Output module, specified daily record is output to for receiving the test result, and by the test result.
- 8. device according to claim 7, it is characterised in that the address information includes at least one of:The IP address of the MAC Address of the Devices to test, the Devices to test.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510268584.5A CN104898070B (en) | 2015-05-22 | 2015-05-22 | Power supply test method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510268584.5A CN104898070B (en) | 2015-05-22 | 2015-05-22 | Power supply test method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104898070A CN104898070A (en) | 2015-09-09 |
CN104898070B true CN104898070B (en) | 2018-01-30 |
Family
ID=54030838
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510268584.5A Active CN104898070B (en) | 2015-05-22 | 2015-05-22 | Power supply test method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104898070B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107423172A (en) * | 2017-04-27 | 2017-12-01 | 郑州云海信息技术有限公司 | One kind power supply start and stop test system and method |
CN107907838A (en) * | 2017-11-22 | 2018-04-13 | 郑州云海信息技术有限公司 | A kind of redundant power module tests system and method |
CN113190392B (en) * | 2021-05-14 | 2023-08-01 | 宁畅信息产业(北京)有限公司 | Stability testing method and device for power module, controller and storage medium |
CN114328182B (en) * | 2021-11-30 | 2023-11-10 | 苏州浪潮智能科技有限公司 | Switch PSU testing method and related device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102045211A (en) * | 2009-10-19 | 2011-05-04 | 英业达股份有限公司 | Power supply circulating pressure testing method |
CN102214131A (en) * | 2010-04-12 | 2011-10-12 | 英业达股份有限公司 | Server power supply test system and method for performing power supply test on server |
CN102404162A (en) * | 2010-09-17 | 2012-04-04 | 鸿富锦精密工业(深圳)有限公司 | Test system and method for network wakeup function of computer |
CN102411525A (en) * | 2011-12-31 | 2012-04-11 | 曙光信息产业股份有限公司 | Test method of power board of blade server |
CN102520370A (en) * | 2011-12-31 | 2012-06-27 | 曙光信息产业股份有限公司 | Server switching power supply testing method and server switching power supply testing device |
CN102799504A (en) * | 2011-05-23 | 2012-11-28 | 鸿富锦精密工业(深圳)有限公司 | Power supply testing system and method |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100663159B1 (en) * | 2004-02-05 | 2007-01-03 | 주식회사 엠엔티 | Tester of power module |
-
2015
- 2015-05-22 CN CN201510268584.5A patent/CN104898070B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102045211A (en) * | 2009-10-19 | 2011-05-04 | 英业达股份有限公司 | Power supply circulating pressure testing method |
CN102214131A (en) * | 2010-04-12 | 2011-10-12 | 英业达股份有限公司 | Server power supply test system and method for performing power supply test on server |
CN102404162A (en) * | 2010-09-17 | 2012-04-04 | 鸿富锦精密工业(深圳)有限公司 | Test system and method for network wakeup function of computer |
CN102799504A (en) * | 2011-05-23 | 2012-11-28 | 鸿富锦精密工业(深圳)有限公司 | Power supply testing system and method |
CN102411525A (en) * | 2011-12-31 | 2012-04-11 | 曙光信息产业股份有限公司 | Test method of power board of blade server |
CN102520370A (en) * | 2011-12-31 | 2012-06-27 | 曙光信息产业股份有限公司 | Server switching power supply testing method and server switching power supply testing device |
Also Published As
Publication number | Publication date |
---|---|
CN104898070A (en) | 2015-09-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100536403C (en) | Method and equipment of intelligent patrol detection for communication network | |
CN104898070B (en) | Power supply test method and device | |
CN101539877A (en) | Embedded device testing system and testing method thereof | |
CN108965374A (en) | Integrated monitoring apparatus, comprehensive monitoring and controlling method and storage medium | |
CN107612775A (en) | A kind of node two level connects the DC method of testings and system of server | |
CN109587005A (en) | Connecting detection method, apparatus, computer equipment and readable storage medium storing program for executing | |
CN113746501B (en) | Test method for evaluating high-speed power line carrier HPLC deepening application function | |
CN104268041B (en) | A kind of Vehicular display device equipment frequently switches on machine automatic closed loop test method | |
CN104734904B (en) | The automatic test approach and system of bypass equipment | |
WO2016082543A1 (en) | Device testing method and testing device | |
CN105302680A (en) | Automatic testing method for AC stability of RACK cabinet | |
CN104678337A (en) | Automatic detection method for performance indicators of optical digital relay protection testers | |
CN109557453B (en) | Multi-master-control-chip identification processing method and system | |
CN103533069A (en) | Method for starting automatic configuration of network equipment and network equipment | |
CN207588113U (en) | Network interface plug-in and pull-off device and network interface insert-pull detection system | |
CN216134483U (en) | Communication test device for decentralized control system | |
CN108549297A (en) | A kind of server test equipment | |
CN103326897A (en) | Distributed computing environment general monitoring device and failure detection method | |
CN109861722B (en) | Method and system for testing reliability of automatic networking of power line modem | |
CN116667469A (en) | Management system and method for power supply and energy storage battery pack network | |
CN109257186A (en) | A kind of method and system making server automatically from PXE network startup | |
CN107449984A (en) | A kind of method and device of BBU discharge and recharges interactive testing | |
CN112904105A (en) | Method, device and system for testing initialization function of transformer substation relay protection device | |
CN216622550U (en) | Power-on and power-off testing device | |
CN111447111B (en) | Method and system for testing instantaneous power failure of intelligent equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220727 Address after: 100089 building 36, courtyard 8, Dongbeiwang West Road, Haidian District, Beijing Patentee after: Dawning Information Industry (Beijing) Co.,Ltd. Patentee after: DAWNING INFORMATION INDUSTRY Co.,Ltd. Address before: 100193 No. 36 Building, No. 8 Hospital, Wangxi Road, Haidian District, Beijing Patentee before: Dawning Information Industry (Beijing) Co.,Ltd. |
|
TR01 | Transfer of patent right |