CN104895108A CN201510287826.5A CN201510287826A CN104895108A CN 104895108 A CN104895108 A CN 104895108A CN 201510287826 A CN201510287826 A CN 201510287826A CN 104895108 A CN104895108 A CN 104895108A
Authority
CN
China
Prior art keywords
truss
beret
billet
construction method
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510287826.5A
Other languages
Chinese (zh)
Other versions
CN104895108B (en
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG NEW DAWN CONSTRUCTION CO., LTD.
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201510287826.5A priority Critical patent/CN104895108B/en
Publication of CN104895108A publication Critical patent/CN104895108A/en
Application granted granted Critical
Publication of CN104895108B publication Critical patent/CN104895108B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a bailey piece assembly movable-type truss unilateral framework system construction method. The construction steps comprise: 1) fixing a steel base plate; 2) mounting a track beam; 3) assembling a bailey truss; 4) mounting a side wall template; 5) mounting and fixing a threaded rod; 6) and mounting an extra support. According to the invention, the structure provided herein has the characteristics of convenient disassembly and assembly, and high construction efficiency; the structure provided herein is adaptive to the requirement of a unilateral framework with different angles, different heights and a unilateral framework of variable cross-section wall body, thus the economy and technology benefits are good.

Description

The assembled portable truss single side formwork system construction method of beret truss
Technical field
The present invention relates to one-sided body of wall formwork system, particularly relate to the assembled portable truss single side formwork system construction method of removable rotating beret truss.
Background technology
Cellarway is because of technique and function needs, often become U-shaped mouth, side wall is higher and be gradual change type, exterior wall and land red-line close together, simultaneously along with the development of multiple material handling method of deep foundation pit, vertical supporting is widely adopted, and the construction of underground passage side wall adopts bilateral formwork to realize, and must adopt single side formwork.
Traditional single side formwork technique adopts steel pipe to set up the support system of framed bent as template, this technique uses steel pipe quantity large, and the cycle of setting up is long, and one time formwork height is lower, and easily there is the defects such as Form floating, swollen mould, concrete wall surface evenness, verticality difference, construction quality is difficult to ensure.For highly larger body of wall formwork, difficulty of construction is larger.Triangular shape formwork system after improvement can solve the larger body of wall formwork of one-sided height, it is disposable that to install form height high, and staying of horizontal construction joint can be reduced and establish quantity, but when running into as gradual change type bodies of wall such as U-type groove, template is set up and fix just not satisfactory.The big basement one side formwork construction of domestic routine all adopts shaped steel to do support system, and often adopt No. 20 i iron for supporting, No. 12 channel-section steels are the template system of keel.It is large that this template system has shaped steel processing capacity, easily tens tons even nearly hundred tons, cost is very high, and the engineering had has again car ramp, airshaft, elevator shaft and staircase etc. along outer wall of basement, meet this situation, type steel support system not easily decomposes use, as half-hearted process, often meet elevator shaft and airshaft place, form the weak link in whole outer wall template system, once burst-mode, by the Forming Quality of the whole exterior wall concrete of impact, very easily form the cold seam of construction, cause seepage, so the applicability of this template system is not strong.
Given this, need a kind of speed of application of invention at present badly fast, realize the horizontal movement of supporting die system and rotation, can differing heights be adapted to, the body of wall single side formwork system in the gradient and cross section and construction method.
Summary of the invention
The object of the invention is to overcome deficiency of the prior art, a kind of easy construction is provided, rotatably, removable, differing heights, the gradient and cross section side wall formwork needs can be adapted to, the practical assembled portable truss single side formwork system construction method of beret truss can be repeated.
For achieving the above object, present invention employs following technical scheme:
The assembled portable truss single side formwork system construction method of this beret truss, comprises the following steps:
1) billet is fixed: first lay billet on base plate top before construction, billet is fixed on substrate by sill anchor, and billet length is determined according to Track desigh length;
2) rail beam is installed: by rail beam lifting to precalculated position on billet, fix bottom flange with bolt; Then lift top flange backing plate bolt to fix;
3) beret truss truss installa-tion: on-site consolidation beret truss, is assembled into beret truss truss, beret truss truss bottom end connection of rotating hinged-support; Lift whole beret truss truss on track, tighten the connecting bolt on hinged-support, fix by temporary support;
4) side wall model sheetinstallat: first remove temporary support, mobile beret truss truss is to precalculated position, unclamp bearing connecting bolt, rotate truss to precalculated position, screw rod one end with disrance sleeve is anchored in fender post, and the other end is by backing plate, with bolts in beret truss panel point, on side wall template precalculated position, both sides, reserved screw rod hole, seals with waterproofing materials after screw rod is fixing;
5) additional support is installed: additional support is the scalable steel pipe of combined type, each reserving hole of both sides steel pipe, and outside is provided with backing plate, fixes after length adjustment with bolt; Additional support one end welding additional support backing plate is bolted in beret truss panel point, and the other end is welded on bottom steel backing plate, and arranges single angle baffle plate bottom being close to, and adopts bolt to fix.
As preferably: step 1) in billet width be that outermost additional support bottom position expands 200 ~ 400mm outward.
As preferably: step 2) described in rail beam be arranged on above billet, adopt sill anchor to fix, and track pad be set at Liang Shangyiyuanchu.
As preferably: step 3) described in rotating hinge rest base be provided with universal wheel, whole bearing is placed on rail beam, can carry out the movement of vertical and horizontal.
As preferably: step 5) described in when side wall formwork template is installed, beret truss truss and the upper and lower three screw rod middle wall body of the fixing employing of side wall template arrange without other built-in fittings and are connected, and on side wall scope inner screw, cover has disrance sleeve.
The invention has the beneficial effects as follows:
(1) after leading portion wall construction, without the need to carrying out dismounting again, only need remove screw rod, arrive next section of body of wall position along rail moving, then be fixed formwork, construction period obviously shortens.
(2) run into variable cross-section body of wall, dismountable baffle plate, carry out transverse shifting, and carry out the rotation of angle as required, without the need to readjusting dismounting, easy construction, operation greatly reduces.
(3) the upper and lower three place's screw rods of whole formwork system are fixing fixes with additional support, and upper screw is provided with disrance sleeve at side wall place, and construction terminates rear screw rod and can simply pull out, and little to body of wall disturbance, component all can reuse, and construction quality is high, cost-saving.
Accompanying drawing explanation
Fig. 1 is the assembled portable truss single side formwork architectural schematic of beret truss of the present invention;
Fig. 2 is that in Fig. 1, A place screw rod is connected detail drawing with beret truss truss;
Fig. 3 is that the additional support two ends at B place in Fig. 1 connect detail drawing;
Fig. 4 is that the additional support two ends at C place in Fig. 1 connect detail drawing;
Fig. 5 is that in Fig. 1, scalable additional support connects detail drawing D;
Fig. 6 is the lateral view of Fig. 5;
Fig. 7 is construction flow chart of the present invention;
Description of reference numerals: 1. fender post; 2. Guan Liang; 3. side wall template; 4. disrance sleeve; 5. screw rod; 6. beret truss truss; 7. additional support; 8. wood block filler; 9. rotating hinge bearing; 10 billets; 11. stone bolt; 12. base plates; 13. backing plates; 14. single angle baffle plates; 15. rail beams; 16. additional support screw rods; 17. holes; 18. bolts.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is described further.Although the present invention will be described in conjunction with preferred embodiment, should know, and not represent and limit the invention in described embodiment.On the contrary, the present invention will contain can be included in attached claims limit scope of the present invention in alternative, modified and equivalent.
Just do not state tired in these enforcements such as present embodiment welding for steel structure technique, bolt connection construction technique, side wall template-setup technique and concrete pouring construction technique, emphasis sets forth the embodiment that the present invention relates to structure.
Fig. 1 is the assembled portable truss single side formwork architectural schematic of beret truss of the present invention.With reference to shown in Fig. 1, the assembled portable truss single side formwork system of beret truss of the present invention mainly comprises: the assembled truss 6 of side wall formwork template 3, screw rod 5, beret truss, additional support 7, rotating hinge bearing 9, billet 10, rail beam 15.
Before the assembled portable truss single side formwork system of beret truss is set up, first the billet 10 after 10mm is laid on base plate top, be fixed on above base plate 12 by sill anchor 11, length is determined according to Track desigh length, and width is that outermost additional support 7 bottom position expands 200 ~ 400mm outward.
With reference to shown in Fig. 1, after billet 10 is fixing, rail beam 15 is lifted precalculated position to billet 10, fixes bottom flange with bolt; Then lift top flange backing plate bolt to fix.
On-site consolidation beret truss, is assembled into beret truss truss 6, truss bottom end connection of rotating hinged-support 9.Lift whole beret truss truss on track, tighten the connecting bolt on hinged-support, fix by temporary support.
Side wall formwork template 3 is installed, remove temporary support, mobile beret truss truss 6 to precalculated position, unclamp bearing 9 connecting bolt, rotate truss to precalculated position, screw rod 5 one end with disrance sleeve 4 is anchored in fender post 1, with reference to Fig. 2, the other end is by backing plate 13, with bolts on beret truss rod member.
With reference to Fig. 3, additional support 7 one end composition backing is bolted in panel point, and the other end is welded on bottom steel backing plate 10, and arranges single angle baffle plate 14 bottom being close to, and adopts bolt 18 to fix.
With reference to Fig. 4, additional support 7 is the scalable steel pipe of combined type, and each reserving hole 17 of both sides steel pipe, outside is provided with backing plate 13, fixes after length adjustment with bolt.
When running into variable cross-section body of wall, first fixed-hinged support, transversely moves to precalculated position by truss, fixes wheel with baffle plate, unclamps bolt and carries out angular adjustment.
The invention provides the assembled portable truss single side formwork system construction method of above-mentioned beret truss, mainly comprise the following steps:
1) billet 10 is fixed: the billet 10 before construction first after 10mm is laid on base plate 12 top, be fixed on above base plate 12 by sill anchor 11, length is determined according to Track desigh length, and width is that outermost additional support 7 bottom position expands 200 ~ 400mm outward.
2) rail beam 15 is installed: rail beam 15 is lifted precalculated position to billet 10, fixes bottom flange with bolt; Then lift top flange backing plate bolt to fix.
3) beret truss truss 6 is installed: on-site consolidation beret truss, is assembled into beret truss truss 6, truss bottom end connection of rotating hinged-support 9.Lift whole beret truss truss on track, tighten the connecting bolt on hinged-support, fix by temporary support.
4) side wall template 3 is installed: reserved screw rod 5 hole on side wall template precalculated position, both sides, seals with waterproofing materials after screw rod 5 is fixing.
5) screw rod is installed fixing: screw rod 5 one end with disrance sleeve 4 is anchored in fender post 1, and the other end is by backing plate 13, with bolts on beret truss rod member.
6) additional support is installed: additional support 7 is the scalable steel pipe of combined type, each reserving hole 17 of both sides steel pipe, and outside is provided with backing plate 13, fixes after length adjustment with bolt; Additional support 7 one end composition backing is bolted in panel point, and the other end is welded on bottom steel backing plate 10, and arranges single angle baffle plate 14 bottom being close to, and adopts bolt 18 to fix.
Present invention also offers the construction method of above-mentioned high-altitude long-span cast-in-place arcading aqueduct supporting die system, mainly comprise the following steps:
1) billet 10 is fixed: the billet 10 before construction first after 10mm is laid on base plate 12 top, be fixed on above base plate 12 by sill anchor 11, length is determined according to Track desigh length, and width is that outermost additional support 7 bottom position expands 200 ~ 400mm outward.
2) rail beam 15 is installed: rail beam 15 is lifted precalculated position to billet 10, fixes bottom flange with bolt; Then lift top flange backing plate bolt to fix.
3) beret truss truss 6 is installed: on-site consolidation beret truss, is assembled into beret truss truss 6, truss bottom end connection of rotating hinged-support 9.Lift whole beret truss truss on track, tighten the connecting bolt on hinged-support, fix by temporary support.
4) side wall template 3 is installed: reserved screw rod 5 hole on side wall template precalculated position, both sides, seals with waterproofing materials after screw rod 5 is fixing.
5) screw rod is installed fixing: screw rod 5 one end with disrance sleeve 4 is anchored in fender post 1, and the other end is by backing plate 13, with bolts on beret truss rod member.
6) additional support is installed: additional support 7 is the scalable steel pipe of combined type, each reserving hole 17 of both sides steel pipe, and outside is provided with backing plate 13, fixes after length adjustment with bolt; Additional support 7 one end composition backing is bolted in panel point, and the other end is welded on bottom steel backing plate 10, and arranges single angle baffle plate 14 bottom being close to, and adopts bolt 18 to fix.

Claims (5)

1. the assembled portable truss single side formwork system construction method of beret truss, is characterized in that comprising the following steps:
1) billet (10) is fixed: first lay billet (10) on base plate (12) top before construction, billet (10) is fixed on above base plate (12) by sill anchor (11), and billet (10) length is determined according to Track desigh length;
2) rail beam (15) is installed: by rail beam (15) lifting to the upper precalculated position of billet (10), fix bottom flange with bolt; Then lift top flange backing plate bolt to fix;
3) beret truss truss (6) is installed: on-site consolidation beret truss, is assembled into beret truss truss (6), beret truss truss (6) bottom end connection of rotating hinged-support (9); Lift whole beret truss truss (6) on track, tighten the connecting bolt on hinged-support (9), fix by temporary support;
4) side wall template (3) is installed: first remove temporary support, mobile beret truss truss (6) is to precalculated position, unclamp bearing (9) connecting bolt, rotate truss to precalculated position, screw rod (5) one end with disrance sleeve (4) is anchored in fender post (1), the other end is by backing plate (13), with bolts on beret truss truss (6) node, on side wall template (3) precalculated position, both sides, reserved screw rod (5) hole, seals with waterproofing materials after screw rod (5) is fixing;
5) additional support (7) is installed: additional support (7) is the scalable steel pipe of combined type, each reserving hole of both sides steel pipe (17), and outside is provided with backing plate (13), fixes after length adjustment with bolt; Additional support (7) one end welding additional support backing plate (13) is bolted on beret truss truss (6) node, the other end is welded on bottom steel backing plate (10), and bottom being close to, single angle baffle plate (14) is set, adopt bolt (18) to fix.
2. the assembled portable truss single side formwork system construction method of beret truss according to claim 1, is characterized in that: step 1) in billet (10) width be that outermost additional support (7) bottom position expands 200 ~ 400mm outward.
3. the assembled portable truss single side formwork system construction method of beret truss according to claim 1, it is characterized in that: step 2) described in rail beam (15) be arranged on above billet (10), employing sill anchor is fixed, and arranges track pad at Liang Shangyiyuanchu.
4. the assembled portable truss single side formwork system construction method of beret truss according to claim 1, it is characterized in that: step 3) described in rotating hinge bearing (9) bottom be provided with universal wheel, whole bearing is placed on rail beam (15), can carry out the movement of vertical and horizontal.
5. the assembled portable truss single side formwork system construction method of beret truss according to claim 1, it is characterized in that: step 5) described in when side wall formwork template (3) is installed, beret truss truss (6) and the upper and lower three screw rod middle wall body of the fixing employing of side wall template (3) arrange without other built-in fittings and are connected, and have disrance sleeve (4) at the upper cover of side wall scope inner screw (5).
CN201510287826.5A 2015-05-28 2015-05-28 Beret truss assembled movable type truss single side formwork system construction method Active CN104895108B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510287826.5A CN104895108B (en) 2015-05-28 2015-05-28 Beret truss assembled movable type truss single side formwork system construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510287826.5A CN104895108B (en) 2015-05-28 2015-05-28 Beret truss assembled movable type truss single side formwork system construction method

Publications (2)

Publication Number Publication Date
CN104895108A true CN104895108A (en) 2015-09-09
CN104895108B CN104895108B (en) 2017-03-08

Family

ID=54028037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510287826.5A Active CN104895108B (en) 2015-05-28 2015-05-28 Beret truss assembled movable type truss single side formwork system construction method

Country Status (1)

Country Link
CN (1) CN104895108B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586987A (en) * 2015-12-24 2016-05-18 中铁十四局集团有限公司 Open type main structure side wall bailey truss formwork of open trench tunnel and construction process thereof
CN105672337A (en) * 2016-03-03 2016-06-15 杭州江润科技有限公司 Construction method for cast-in-situ caisson formwork-supporting system
CN107119717A (en) * 2017-06-15 2017-09-01 中铁十六局集团第三工程有限公司 A kind of waters tunnel is without punching Screw arbor with nut at both-ends formwork erecting structure
CN109441025A (en) * 2018-12-17 2019-03-08 北京凯盛建材工程有限公司 A kind of fabricated roofing cornice support rod component, support unit and installation method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4000400A1 (en) * 1990-01-09 1991-07-11 Baumann Verwertungs Gmbh Support for shuttering panel - is used for erecting concrete structure and has struts of adjustable length
CN104314305A (en) * 2014-10-15 2015-01-28 中铁四局集团有限公司 Integral moving formwork for stalk concrete pouring and application thereof
CN204151823U (en) * 2014-10-11 2015-02-11 中铁一局集团有限公司 Along building the one-sided cantilever hydraulic template trolley of side wall under covered back-digging structural slab

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4000400A1 (en) * 1990-01-09 1991-07-11 Baumann Verwertungs Gmbh Support for shuttering panel - is used for erecting concrete structure and has struts of adjustable length
CN204151823U (en) * 2014-10-11 2015-02-11 中铁一局集团有限公司 Along building the one-sided cantilever hydraulic template trolley of side wall under covered back-digging structural slab
CN104314305A (en) * 2014-10-15 2015-01-28 中铁四局集团有限公司 Integral moving formwork for stalk concrete pouring and application thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郁雷: "贝雷架单面超高将变墙体中的应用", 《门窗》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586987A (en) * 2015-12-24 2016-05-18 中铁十四局集团有限公司 Open type main structure side wall bailey truss formwork of open trench tunnel and construction process thereof
CN105672337A (en) * 2016-03-03 2016-06-15 杭州江润科技有限公司 Construction method for cast-in-situ caisson formwork-supporting system
CN105672337B (en) * 2016-03-03 2018-06-19 浙江沧海建设有限公司 The construction method of cast-in-place open caisson formwork system
CN107119717A (en) * 2017-06-15 2017-09-01 中铁十六局集团第三工程有限公司 A kind of waters tunnel is without punching Screw arbor with nut at both-ends formwork erecting structure
CN107119717B (en) * 2017-06-15 2023-02-28 中铁十六局集团第三工程有限公司 No-through opposite-pulling screw rod formwork structure for water area tunnel
CN109441025A (en) * 2018-12-17 2019-03-08 北京凯盛建材工程有限公司 A kind of fabricated roofing cornice support rod component, support unit and installation method
CN109441025B (en) * 2018-12-17 2024-03-29 北京凯盛建材工程有限公司 Assembled roof cornice supporting rod assembly, supporting unit and installation method

Also Published As

Publication number Publication date
CN104895108B (en) 2017-03-08

Similar Documents

Publication Publication Date Title
CN106894639B (en) The hanging reverse construction method of installation of steel construction under a kind of
CN205012651U (en) Novel side wall unilateral formwork system of underground space
CN101538936B (en) Hydraulic slip-and-lift construction method for water tower
CN106193282B (en) Assembling frame girder construction based on 3D printing
CN204457802U (en) Formed by integrally casting formula formwork jumbo
CN201367728Y (en) Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction
CN104895108A (en) Bailey piece assembled movable-type truss unilateral framework system construction method
CN105952148A (en) Easy-to-demount inner aluminum form support system for narrow deformation joint and construction method
CN107419746A (en) A kind of mobile formwork system and its construction method
CN204691259U (en) The assembled portable truss single side formwork system of beret truss
CN110847050B (en) Large-span prefabricated corrugated steel web composite beam top and bottom plate synchronous pouring template and application method thereof
CN103982014B (en) A kind of reducing steel work spiral ramp and construction techniques thereof
CN105155846A (en) Construction method for arc-shaped reinforced concrete stand
CN103074871A (en) Arc-shaped slope concrete sliding and lifting template
CN207944339U (en) A kind of prefabricated superposed type anti-collision wall for urban viaduct
CN203878979U (en) Bolt opposite-pulling type track sliding formwork
CN106381810B (en) With the cast-in-place outstanding method for filling beam of beam-column type bracket
CN110565537B (en) Swivel bridge with shock insulation function and construction method thereof
CN202401667U (en) Prefabricated column with reserved embedded column porous channel and embedded column type full-assembly anti-seismic building
CN108951699B (en) Festival segmentation removal centre form and support of utility tunnel
CN114263275B (en) Construction method for same-layer construction of high-rise assembled steel structure-core tube
CN111424948A (en) Construction method and construction platform for cantilever structure layer of high-rise building
CN206052565U (en) A kind of beam-column type bracket
CN113668773A (en) Y-shaped cast steel column and mounting process thereof
CN109610707A (en) A kind of design and rapid constructing method of prefabricated girder steel and floor fit flush

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 310015 Hangzhou, Gongshu District Wanda Commercial Center, building 3, room 3, unit 1901, room

Applicant after: Hangzhou Jiang Run Science and Technology Ltd.

Address before: Gongshu District Shi Xiang Road Hangzhou city Zhejiang province 310015 and Hangzhou Road intersection C Wanda Plaza office building room 1901

Applicant before: Hangzhou Jiang Run Science and Technology Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180517

Address after: 315010 four four, Ling Qiao Road, Haishu District, Ningbo, Zhejiang.

Patentee after: ZHEJIANG NEW DAWN CONSTRUCTION CO., LTD.

Address before: 310015 room 1901, unit 3, 3 Wanda Commercial Center, Gongshu District, Hangzhou, Zhejiang.

Patentee before: Hangzhou Jiang Run Science and Technology Ltd.

TR01 Transfer of patent right