CN104895066B - The construction method of overlength churning strength core built pile - Google Patents

The construction method of overlength churning strength core built pile Download PDF

Info

Publication number
CN104895066B
CN104895066B CN201510313174.8A CN201510313174A CN104895066B CN 104895066 B CN104895066 B CN 104895066B CN 201510313174 A CN201510313174 A CN 201510313174A CN 104895066 B CN104895066 B CN 104895066B
Authority
CN
China
Prior art keywords
pile
section
overlength
steel
wing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510313174.8A
Other languages
Chinese (zh)
Other versions
CN104895066A (en
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huajiang Construction Group Co ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201510313174.8A priority Critical patent/CN104895066B/en
Publication of CN104895066A publication Critical patent/CN104895066A/en
Application granted granted Critical
Publication of CN104895066B publication Critical patent/CN104895066B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of overlength churning strength core built pile construction method, comprise the following steps: (1) determines the quantity of rotary churning pile expanding reach in overlength jet grouting pile pile body, the diameter of rotary churning pile expanding reach according to the vertically and horizontally distribution situation etc. of geology situation judging high artesian section and non-high artesian section;(2) use high-pressure rotary-spray drill bit to carry out organizing overlength jet grouting pile construction more, set the spacing of organizing overlength jet grouting pile according to the diameter of rotary churning pile expanding reach more;(3) make each parts of pile joint, utilize wing plate connecting bolt and wing plate connecting plate the wing plate assembly of the I-steel of constituent parts length to be connected in the horizontal, form the Section-steel Piles of unit length;(4) plugging Section-steel Piles, according to the design length of Section-steel Piles, the Section-steel Piles of constituent parts length is assembled by web connecting bolt and web connecting plate, and assembly limit, limit plugs, and completes the construction working of overlength churning strength core built pile;(5) construction of rotary churning pile expanding reach and overlength jet grouting pile is completed.

Description

The construction method of overlength churning strength core built pile
Technical field
The present invention relates to the construction method of a kind of hard and soft built pile, relate to a kind of multiple overlength jet grouting piles and construction method of a Section-steel Piles built pile be applicable to high artesian ground especially.
Background technology
Pressure Revolving Blast-Grout is the new technology introducing High-Pressure Water technology on the basis of the theory and practice of static pressure grouting and growing up, it is primarily used to consolidated subsoil, the shearing strength of raising ground, is usually used in the engineerings such as basic antiseepage, the current character improving foundation soil and stable side slope.According to the difference of injection method, single pipe method, double tube method and tri-tube method can be divided into.It is relatively wide that Pressure Revolving Blast-Grout has the scope of application, easy construction, and the induration proterties that formed of high pressure jet stream such as can control at the advantage.Triple tube jet-grouting pile construction technique is to make high pressure water and air simultaneously transverse injection, erosion cutting foundation soil body with three layers of playpipe, relends the climbing power of air and water and broken remaining soil paste is lifted to earth's surface discharges;Meanwhile, cement mortar is injected in ground cut, that stir by another nozzle with lower pressure injection, makes cement mortar mix consolidation pile with soil, reaches the purpose reinforced.It is applicable to the reinforcing soft foundations such as sandy soil, clay, artificial earth fill, mud.Have that equipment is simple and convenient to operate, reliable in quality, speed are fast, the advantage such as low cost and applied range.But, for some engineerings due to high artesian or the high-pressure rotary jet grouting pile degree of depth deeper time, groundwater pressure is relatively big, and common grouting equipment is difficult to, by the slurry injection of lower pressure to the soil body of surrounding, not be formed for the pile body of intended diameter.
But, in high artesian ground, just require that the intensity of pile body needs to reach certain requirement, though pure flexible pile can be suitably used for high artesian ground, but it is on the weak side in intensity, traditional rigid-flexible mechanical arm uses a soft firm integrated mode, in deep foundation pit support, connect more weak between this type of built pile, easily cause the phenomenons such as piping stream soil at the bottom of high artesian seepage, Foundation Pit.
Therefore, need badly at present and seek that one can meet that pile quality in high artesian ground is good, pile strength is easy to control, anti-seepage effect significant hard and soft built pile construction method simultaneously.
Summary of the invention
It is an object of the invention to overcome drawbacks described above, it is provided that the construction method of a kind of overlength churning strength core built pile.It is an object of the invention to be achieved through the following technical solutions:
A kind of overlength churning strength core built pile construction method, it is characterised in that described overlength churning strength core built pile includes that multiple overlength jet grouting pile and Section-steel Piles, three overlength jet grouting piles are connected as an entirety by a Section-steel Piles;Section-steel Piles is spliced to form by pile joint by I-steel, and pile joint includes wing plate connecting bolt, wing plate connecting plate, web connecting bolt and web connecting plate;The wing plate of three I-steel connects two-by-two, encloses fixing by wing plate connecting bolt and wing plate connecting plate, and cross section is triangular in shape;Web connecting bolt and the fixing splicing of web connecting plate is used between upper and lower I-steel;Overlength jet grouting pile descends accordingly and at the pile joint of high artesian section and Section-steel Piles, is provided with rotary churning pile expanding reach;
Described construction method comprises the following steps:
(1) according to geology situation judging high artesian section and the vertically and horizontally distribution situation of non-high artesian section, and according to the pile joint number of Section-steel Piles, the quantity of rotary churning pile expanding reach in overlength jet grouting pile pile body, the diameter of rotary churning pile expanding reach are determined;
(2) use high-pressure rotary-spray drill bit to carry out organizing overlength jet grouting pile construction more, diameter according to rotary churning pile expanding reach sets the spacing organizing overlength jet grouting pile more, the rotary churning pile expanding reach keeping adjacent overlength jet grouting pile can be completely overlapped, and in high artesian section top/bottom latitude, form rotary churning pile expanding reach, in the pile joint top/bottom latitude of Section-steel Piles, form rotary churning pile expanding reach simultaneously;
(3) each parts of pile joint are made, i.e. wing plate connecting bolt, wing plate connecting plate, web connecting bolt and web connecting plate, utilize wing plate connecting bolt and wing plate connecting plate the wing plate assembly of the I-steel of constituent parts length to be connected in the horizontal, form the Section-steel Piles of unit length;
(4) plugging Section-steel Piles, according to the design length of Section-steel Piles, the Section-steel Piles of constituent parts length is assembled by web connecting bolt and web connecting plate, and assembly limit, limit plugs, and completes the construction working of overlength churning strength core built pile;
(5) in high artesian section and pile joint lateral extent, complete the construction of rotary churning pile expanding reach, in non-high artesian section lateral extent, complete the construction of overlength jet grouting pile pile body.
Further, the length of rotary churning pile expanding reach is at least high artesian section or the twice of pile joint length.
Instant invention overcomes traditional rigid-flexible mechanical arm and use soft firm integrated mode bonding strength shortcoming on the weak side, use a how soft firm pattern to enhance the bonding strength between combination pile body by employing.
The combination shaped steel of the present invention can be combined press-in, separate extract, and can recycling again, save construction cost, improve section bar utilization rate.
The present invention setting by rotary churning pile expanding reach, enhances the integrated bond power of soft many just built piles, thus enhances vertically and horizontally bearing capacity and the water-retaining capacity of overlength churning strength core built pile.
The present invention is directed to high artesian area uses a how soft the most embedding integrated mode firm, double to tackle the impact that foundation ditch is caused by high artesian region, stops construction accident, for non-high artesian district, uses common flexible pile supporting pattern.
Accompanying drawing explanation
Fig. 1 is the utility model overlength churning strength core built pile site operation layout drawing.
Fig. 2 is that three overlength jet grouting piles are connected as the schematic diagram of entirety by a Section-steel Piles.
Fig. 3 is A-A generalized section in Fig. 2.
Fig. 4 is B-B generalized section in Fig. 2.
Fig. 5 is that the connection of Section-steel Piles makes schematic diagram.
Fig. 6 is the web connection diagram of upper and lower I-steel in Fig. 5.
In figure: 1-rotary churning pile expanding reach;2-overlength jet grouting pile;3-Section-steel Piles;4-pile joint;5-high artesian section;6-non-high artesian section;7-wing plate;8-web;9-web connecting bolt;10-web connecting plate;11-wing plate connecting bolt;12-wing plate connecting plate.
Detailed description of the invention
Fig. 1 is overlength churning strength core built pile site operation layout drawing of the present invention.Fig. 2 is that three overlength jet grouting piles are connected as the schematic diagram of entirety by a Section-steel Piles.Fig. 3 is A-A generalized section in Fig. 2.Fig. 4 is B-B generalized section in Fig. 2.Fig. 5 is that the connection of Section-steel Piles makes schematic diagram.Fig. 6 is the web connection diagram of upper and lower I-steel in Fig. 5.
Overlength churning strength core built pile as Figure 1-4, including multiple overlength jet grouting piles 2 and Section-steel Piles 3, three overlength jet grouting piles 2 are connected as an entirety by a Section-steel Piles 3.Overlength jet grouting pile descends accordingly and at the pile joint 4 of high artesian section 5 and Section-steel Piles, is provided with rotary churning pile expanding reach 1.
With reference to Fig. 5, Section-steel Piles 3 is spliced to form by pile joint 4 by I-steel, and pile joint 4 is made up of wing plate connecting bolt 11, wing plate connecting plate 12, web connecting bolt 9 and web connecting plate 10.The wing plate 7 of three I-steel connects two-by-two, encloses fixing by wing plate connecting bolt 11 and wing plate connecting plate 12, and cross section is triangular in shape;Web connecting bolt 9 and the fixing splicing of web connecting plate 10 is used between upper and lower I-steel.
Overlength churning strength core built pile construction method, specifically includes following construction procedure:
According to field geological investigation result, judge high artesian section 5 and the vertically and horizontally distribution situation of non-high artesian section 6, the genesis analysis scope of high artesian section 5 is between below ground 14 ~ 16m, the cross direction profiles area of high artesian section 5 is 6m × 6m, other region is then non-high artesian section 6, the unit length of the employing of Section-steel Piles 3 is 6m, the long 30m of stake, have four pile joints 4, therefore, the quantity of the rotary churning pile expanding reach 1 of single overlength churning strength core built pile is five, and the diameter of rotary churning pile expanding reach 1 uses 1m, and the diameter of overlength jet grouting pile 2 uses 0.75m.
nullAccording to the overlength churning strength core built pile arrangement form shown in Fig. 2,I.e. one overlength churning strength core built pile uses three overlength jet grouting piles 2 and the integrated mode of a Section-steel Piles 3,High-pressure rotary-spray drill bit is used first to carry out the construction of three overlength jet grouting piles,The center distance of the pile body of overlength churning strength core built pile is set to 0.875m,The rotary churning pile expanding reach 1 keeping adjacent overlength jet grouting pile can be completely overlapped,And in high artesian section 5 top/bottom latitude, form rotary churning pile expanding reach 1,In pile joint 4 top/bottom latitude of Section-steel Piles 3, form rotary churning pile expanding reach 1 simultaneously,The rotary churning pile expanding reach 1 i.e. arranged between churning pile body 13 ~ 17m,A diameter of 100cm、A length of 4m,At 6m、12m、18m、Rotary churning pile expanding reach 1 it is also provided with at 24m,A diameter of 100cm、A length of 0.5m,Other position is rotary churning pile pile body 2,A diameter of 75cm.
Make each parts of pile joint 4, i.e. wing plate connecting bolt 9, wing plate connecting plate 10, web connecting bolt 11 and web connecting plate 12, the angle of 12 liang of covering of the fans of wing plate connecting plate is 60 °, the length × width x thickness of each leaf plank is 200mm × 100mm × 5mm, the size being arranged on two trapezoidal shapes in wing plate connecting plate 12 top is: the upper end × go to the bottom × a height of 6.5mm × 11.5mm × 5.7mm, and the welding of each parts is formed wing plate connecting plate 12.The wing plate connecting plate 12 made is carried out oblique perforate according to Fig. 5, a diameter of 15mm in hole.Selecting the double end wing plate connecting bolt 11 of a length of 240mm, a diameter of 14mm, be configured with oblique coupling nut, the angle of inclination of nut is set to 60 °.On wing plate connecting plate 12, equidistant (spacing of 50mm) arranges four double end wing plate connecting bolts 11, offers the inclined hole of a diameter of 15mm on the I-steel wing plate 7 corresponding with wing plate connecting plate 12.With reference to Fig. 5, selection length × width x thickness is that the steel plate of 200mm × 100mm × 7.5mm is as web connecting plate 10, and equidistant four row two row perforates, the spacing of adjacent holes is 50mm, opening diameter is 15mm, accordingly, and perforate on each I-steel two end web 8, opening diameter is 15mm, is connected by upper and lower adjacent I-steel by the web connecting bolt 9 of long 32mm, diameter 14mm.Section-steel Piles 3 is defined by longitudinally connected and wing plate connecting bolt 11 and wing plate connecting plate 12 the lateral connection of web connecting bolt 9 and web connecting plate 10, the element length of one Section-steel Piles 3 is set to 6m, by pile joint 4 can extended pattern piling bar 3 length until design require length.
Crane is used to carry out in place by the Section-steel Piles 3 of the element length assembled, use press to carry out static pressure, when often having pressed the Section-steel Piles 3 of an element length, use pile joint 4 to carry out joint connection in site assembled, until Section-steel Piles 3 pressure forming 30m length sets end, ultimately form overlength churning strength core built pile.
Finally, according to the pile body construction plane distribution form shown in Fig. 1, according to above-mentioned embodiment, in high artesian section 5 lateral extent, it is gradually completing the construction of overlength churning strength core built pile, in non-high artesian section 6 lateral extent, completes the construction of rotary churning pile pile body 2.
Above-mentioned detailed description of the invention limits technical scheme the most in any form, and the technical scheme that the mode of every employing equivalent or equivalent transformation is obtained all falls within protection scope of the present invention.

Claims (2)

1. an overlength churning strength core built pile construction method, it is characterised in that described overlength churning strength core built pile includes that multiple overlength jet grouting pile and Section-steel Piles, three overlength jet grouting piles are connected as an entirety by a Section-steel Piles;Section-steel Piles is spliced to form by pile joint by I-steel, and pile joint includes wing plate connecting bolt, wing plate connecting plate, web connecting bolt and web connecting plate;The wing plate of three I-steel connects two-by-two, encloses fixing by wing plate connecting bolt and wing plate connecting plate, and cross section is triangular in shape;Web connecting bolt and the fixing splicing of web connecting plate is used between upper and lower I-steel;Overlength jet grouting pile descends accordingly and at the pile joint of high artesian section and Section-steel Piles, is provided with rotary churning pile expanding reach;
Described construction method comprises the following steps:
(1) according to geology situation judging high artesian section and the vertically and horizontally distribution situation of non-high artesian section, and according to the pile joint number of Section-steel Piles, the quantity of rotary churning pile expanding reach in overlength jet grouting pile pile body, the diameter of rotary churning pile expanding reach are determined;
(2) use high-pressure rotary-spray drill bit to carry out organizing overlength jet grouting pile construction more, diameter according to rotary churning pile expanding reach sets the spacing organizing overlength jet grouting pile more, the rotary churning pile expanding reach keeping adjacent overlength jet grouting pile can be completely overlapped, and in high artesian section top/bottom latitude, form rotary churning pile expanding reach, in the pile joint top/bottom latitude of Section-steel Piles, form rotary churning pile expanding reach simultaneously;
(3) each parts of pile joint are made, i.e. wing plate connecting bolt, wing plate connecting plate, web connecting bolt and web connecting plate, utilize wing plate connecting bolt and wing plate connecting plate the wing plate assembly of the I-steel of constituent parts length to be connected in the horizontal, form the Section-steel Piles of unit length;
(4) plugging Section-steel Piles, according to the design length of Section-steel Piles, the Section-steel Piles of constituent parts length is assembled by web connecting bolt and web connecting plate, and assembly limit, limit plugs, and completes the construction working of overlength churning strength core built pile;
(5) in high artesian section and pile joint lateral extent, complete the construction of rotary churning pile expanding reach, in non-high artesian section lateral extent, complete the construction of overlength jet grouting pile pile body.
Construction method the most according to claim 1, it is characterised in that the length of rotary churning pile expanding reach is at least high artesian section or the twice of pile joint length.
CN201510313174.8A 2015-06-09 2015-06-09 The construction method of overlength churning strength core built pile Active CN104895066B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510313174.8A CN104895066B (en) 2015-06-09 2015-06-09 The construction method of overlength churning strength core built pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510313174.8A CN104895066B (en) 2015-06-09 2015-06-09 The construction method of overlength churning strength core built pile

Publications (2)

Publication Number Publication Date
CN104895066A CN104895066A (en) 2015-09-09
CN104895066B true CN104895066B (en) 2016-08-24

Family

ID=54027995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510313174.8A Active CN104895066B (en) 2015-06-09 2015-06-09 The construction method of overlength churning strength core built pile

Country Status (1)

Country Link
CN (1) CN104895066B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107044120A (en) * 2017-04-20 2017-08-15 武汉谦诚桩工科技股份有限公司 A kind of major diameter ultra deep stirs spray stiff composite pile and its construction method
CN110172966A (en) * 2019-05-23 2019-08-27 上海长凯岩土工程有限公司 A kind of oblique steel pipe composite structure forms the construction method of beaer

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2111632A (en) * 1981-12-14 1983-07-06 Pee Hong Lee Pile joints
CN2410329Y (en) * 2000-01-27 2000-12-13 上海三佳建设(集团)有限公司 Reinforced concrete stirring device
CN102383432A (en) * 2011-02-23 2012-03-21 上海城地建设发展有限公司 Enclosure method for inserting H-shaped reinforced concrete slab piles in three-axis (two-axis) cement mixing pile
CN103195056A (en) * 2013-04-25 2013-07-10 福州市第三建筑工程公司 Prestress combined tubular pile and field assembly method thereof
CN103290848A (en) * 2013-06-20 2013-09-11 江苏城市职业学院 Large diameter arc-shaped steel sheet pile combined foundation pit retaining structure and construction method thereof
CN203238618U (en) * 2013-04-24 2013-10-16 山东同圆设计集团有限公司 Novel steel pile

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2111632A (en) * 1981-12-14 1983-07-06 Pee Hong Lee Pile joints
CN2410329Y (en) * 2000-01-27 2000-12-13 上海三佳建设(集团)有限公司 Reinforced concrete stirring device
CN102383432A (en) * 2011-02-23 2012-03-21 上海城地建设发展有限公司 Enclosure method for inserting H-shaped reinforced concrete slab piles in three-axis (two-axis) cement mixing pile
CN203238618U (en) * 2013-04-24 2013-10-16 山东同圆设计集团有限公司 Novel steel pile
CN103195056A (en) * 2013-04-25 2013-07-10 福州市第三建筑工程公司 Prestress combined tubular pile and field assembly method thereof
CN103290848A (en) * 2013-06-20 2013-09-11 江苏城市职业学院 Large diameter arc-shaped steel sheet pile combined foundation pit retaining structure and construction method thereof

Also Published As

Publication number Publication date
CN104895066A (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN103321244B (en) Sand foundation existing building sets up the construction method of basement
CN102124163A (en) Method for constructing a chair-type, self-supported earth retaining wall
CN103882881A (en) Underwater construction method for bearing platform deeply embedded in rock
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN206308569U (en) It is a kind of to reinforce the road structure for punishing the solution cavity that underlies
CN102733389B (en) High-pressure spray pile vibrosinking device and process
CN103290848B (en) Large diameter arc-shaped steel sheet pile combined foundation pit retaining structure and construction method thereof
CN111636417A (en) Grouting type steel pipe pile and construction method thereof
CN106948340A (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
WO2021004007A1 (en) Foundation reinforcement method for conventional building
CN105649073A (en) Static root drilling type construction method for planting piles
CN106498957A (en) Steel sheet pile cofferdam construction platform and integral construction method
CN104895066B (en) The construction method of overlength churning strength core built pile
CN107489106A (en) A kind of rocky bed subaqueous bearing platform construction method
CN102220764B (en) Construction method of deep foundation pit bracing system
CN103114602B (en) Foundation pit waterproof curtain achieving secondary melting mending through seepage dipping poly condensation bonding bodies and construction method
CN105714832B (en) A kind of large size prefabricated building enclosure of deep basal pit and construction method
CN104863152A (en) High-strength bare rock pipe pile inserting-driving method
CN105672329B (en) The large size prefabricated building enclosure of deep basal pit and construction method
CN104594360A (en) Composite double-row pile foundation pit supporting structure
CN204225101U (en) The construction equipment of concrete pile
CN206829147U (en) A kind of combined type shaped steel, slip casting steel pipe bearing diagonal foundation pit enclosure structure
CN203129143U (en) Static pressure jet flow piling wall forming equipment
CN215367226U (en) Well draw reaming body expanding pile of solid reinforcing of back slip casting root
CN204780871U (en) Strength core composite pile is spouted soon to overlength

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180601

Address after: 225200 Xindu Road, Jiangdu District, Yangzhou, Jiangsu Province, No. 399

Patentee after: JIANGSU HUAJIANG CONSTRUCTION GROUP Co.,Ltd.

Address before: 310015 office room 1901, block C, Wanda Plaza, intersection of Gongshu District Shi Xiang Road and Hang Hang Road, Hangzhou, Zhejiang.

Patentee before: HANGZHOU JIANGRUN TECHNOLOGY Ltd.

TR01 Transfer of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Construction method of super-long rotary jet stiffened core composite pile

Effective date of registration: 20230129

Granted publication date: 20160824

Pledgee: Yangzhou Branch of Bank of Jiangsu Co.,Ltd.

Pledgor: JIANGSU HUAJIANG CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2023980031288

PE01 Entry into force of the registration of the contract for pledge of patent right