CN104894932B - Urban road integrated design method based on parking demand - Google Patents

Urban road integrated design method based on parking demand Download PDF

Info

Publication number
CN104894932B
CN104894932B CN201510297651.6A CN201510297651A CN104894932B CN 104894932 B CN104894932 B CN 104894932B CN 201510297651 A CN201510297651 A CN 201510297651A CN 104894932 B CN104894932 B CN 104894932B
Authority
CN
China
Prior art keywords
lane
length
road
parking
bus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510297651.6A
Other languages
Chinese (zh)
Other versions
CN104894932A (en
Inventor
蒋贤才
马艳丽
李亚辉
王安妮
杨帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin University of Technology Robot Group Co., Ltd.
Original Assignee
Harbin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology filed Critical Harbin Institute of Technology
Priority to CN201510297651.6A priority Critical patent/CN104894932B/en
Publication of CN104894932A publication Critical patent/CN104894932A/en
Application granted granted Critical
Publication of CN104894932B publication Critical patent/CN104894932B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The present invention provides a kind of urban road integrated design method based on parking demand, as follows:Step one:Judge whether section meets the condition for arranging lay-by;Step 2:Judge whether crossing space layout meets the condition for arranging lay-by;Step 3:The determination of bus parking station location and length;Step 4:Section lay-by position determines and parking stall arrangement form;Step 5:The method for arranging of bicycle lane;The path space resource for rationally utilizing a part idle of the invention is used to stop, the problem difficult to alleviate city parking;And consider the problem of the convenience and non-motor vehicle safety of bus parking.The present invention is applied on the newly-built road in city or reconstruction road, on the basis of equal transport need is met, road construction quantities can be reduced, reduced investment outlay, parking supply can be increased again, avoid motor vehicles and non-motor vehicle from interfering, to lifting urban road space level of resources utilization effect is significant.

Description

Urban road integrated design method based on parking demand
Technical field
The invention belongs to traffic engineering field, and in particular to a kind of urban road integrated design side based on parking demand Method.
Background technology
As the rapid growth of automobile pollution, urban parking facilities imbalance between supply and demand become increasingly conspicuous, road traffic is exacerbated The confusion of crowded and urban transportation running order.And urban highway traffic runs unimpeded bottleneck not in section in crossing, The current demand of motor vehicles is flowed to meet difference, crossing inlet track is often divided into the difference work(such as left-hand rotation, straight trip, right-hand rotation Energy track, consequently, it is possible to it is empty less than exit lane to the situation to exit lane number, is caused to have occurred as soon as import Through Lane number Between resource waste.Based on this, intend for this crossing space layout, on the premise of intersection capacity is not affected, A part of section space resources is rationally utilized for stopping, alleviates the difficult problem of city parking.
Additionally, at present the method to set up of China's bicycle lane is (adjacent with car lane and divided by traffic marking From) be first easily caused machine inoperative and interfere (unless plus isolation guardrail), there is serious traffic safety hidden danger, second exist Intersection, the stop and walking of non-motor vehicle can produce impact to the operation of the vehicle of adjacent car lane, so as to suppress to intersect The performance of the mouth traffic capacity.Based on this, intend from being spatially segregated car lane and bicycle lane, it is to avoid the interference between the two, Improve road traffic operational efficiency and safety.
The content of the invention
Based on above weak point, the purpose of the present invention discloses a kind of urban road integrated design based on parking demand Method, is that the path space resource for rationally utilizing a part idle is used to stop, the problem difficult to alleviate city parking.
Using technology it is as follows:A kind of urban road integrated design method based on parking demand, it is as follows:
Step one:Judge whether section meets the condition for arranging lay-by
If entrance driveway peak hour queue length sum in road two ends is less than section total length, meets section in the road and set Put the condition of lay-by;Otherwise, do not possess setting condition;
For reconstruction road, queue length is directly obtained by traffic study;And for newly-built road, queue length is estimated The traffic signal control scheme generated according to prognosis traffic volume is calculated being estimated;
Not only red light duration r effective with signalized intersections phase place is relevant for motorcade length L waited in line in entrance driveway, also T the time required to bright rear start wave is delivered to tail of the queue is opened with green light0Relevant, the evaluation method of queue length is as follows:
L=5N+ (N-1) d (1)
N=(r+t0)·q (2)
t0=rqt1/(1-q·t1) (3)
L in formula --- the motorcade length waited in line in entrance driveway, m;
N --- the vehicle number waited in line in entrance driveway, veh;
D --- average parking space, m;1.0m is taken typically;
R --- the effective red light duration of signalized intersections phase place, s;
Q --- vehicle arriving rate, veh/s;
t0--- the time required to start wave is delivered to tail of the queue, s;
t1--- the average start-up time of the adjacent queuing vehicle of entrance driveway is poor, s;Take 1s;
Step 2:Judge whether crossing space layout meets the condition for arranging lay-by
If entering the main wagon flow number of share of stock of inlet/outlet less than exit lane number, possess and lay-by is set in exit road stage casing Condition, otherwise, does not possess setting condition;
Step 3:The determination of bus parking station location and length
Because entering the main wagon flow number of share of stock of inlet/outlet less than exit lane number, for the path space for making full use of outlet section rich Resource and the street crossing demand of the passenger that conveniently gets on or off the bus, bus stop are arranged at intersection exit, and will export outermost One segment distance in track is arranged to public transportation lane, uses when specializing in public transit vehicle turnover website;
Public transportation lane length LBIt is made up of three parts:Public transport length of deceleration lane, Stop of bus bit length and public transport add Fast Moving Vehicle Lane length, public transport length of deceleration lane are counted from outlet starting point, its length LSubtractMeet equation below:
LSubtract=v2/2a (4)
L in formulaSubtract--- public transport length of deceleration lane, m;
V --- buses enter average speed during inlet/outlet, km/h;Or replaced with road speed limit;
A --- normal deceleration when public transport pulls in, m/s2
Parking bit length is related to public bus network number, when the number of lines is less than 3, only arranges 1 Stop of bus position;When When the number of lines is less than 5 more than 3,2 Stop of bus positions are set;When the number of lines is more than 5,3 Stop of bus are set Position;
The length of acceleration lane is identical with deceleratuib lane, therefore, public transportation lane length LBDetermination method it is as follows:
LB=LSubtract+n·l+LPlus=nl+v2/a (5)
L in formulaB--- public transportation lane length, m;
V --- public transit vehicle enters average speed during inlet/outlet, km/h;Or replaced with road speed limit;
Normal deceleration or acceleration when a --- public transport pulls in or is leaving from station, m/s2
N --- need the Stop of bus position number for arranging;
L --- the length of single Stop of bus position, m;
Step 4:Section lay-by position determines and parking stall arrangement form
To reduce impact of the curb parking to other current motor vehicles and not affecting road two ends intersection energy as far as possible The performance of power, curb parking lot are provided only on midblock, and lay-by place section is widened into 'bus harbors' bus stop Pattern, lay-by widen 1.5 meters to pavement side, take 1.0 meters of the car lane in outside;
The queue length and public transportation lane length determined in removing step one and step 3 is outside one's consideration, section residue length LTI.e. For Roadside Parking, lay-by is opened up into;
According to《Road signs and graticule》(GB5768.3-2009), compact car parking position size be 6.0 × 2.5m, because tying up sidewalk width 1.5m, the actual width only 1m for taking car lane on the outside of section, outside car lane are still remained Remaining 3.0~3.25m, borrow when entering or roll away from for vehicle parking, be unlikely to affect the current of fellow road-users, kerb lane When stopping without vehicles while passing, still use as car lane;Here lays form using the parking stall of run-in index;
Step 5:The method for arranging of bicycle lane
Bicycle lane is arranged on the outside of footpath, is designed using identical basic unit with footpath, and road surface elevation position On same plane, footpath is mated formation guidance tape, and non-motor vehicle road surface needs asphalt or concrete, at the intersection, non- Car lane, footpath need to carry out accessibility designs, with car lane seamless connection.
Beneficial effects of the present invention and advantage:The path space resource for rationally utilizing a part idle of the invention is used to stop Car, the problem difficult to alleviate city parking;And consider the problem of the convenience and non-motor vehicle safety of bus parking. Have the advantage that:
(1) car lane is taken to separate the method for arrangement with bicycle lane on path space (by bicycle lane cloth Put on the outside of footpath, bicycle lane adopts same structure design with footpath), it is to avoid interfering between the two, with Improve road traffic operational efficiency and safety, bicycle lane and car lane separate design, both avoided motor vehicles with it is non- Motor vehicles are interfered, and can be effectively improved the traffic capacity of intersection and be improved traffic circulation level of security;Can reduce again non- Car lane structural design criteria, reduces road construction quantities, reduces cost.
(2) often the set location of curb parking mainly has four kinds:Arrange on pavement, on bicycle lane, machine On immiscible runway and on car lane.Curb parking lot is arranged on pavement, it is desirable to which boundary lines of roads is sufficiently wide;Arrange Lay-by on non-motor vehicle track, causes non-motor vehicle saturation to increase due to occupying non-motor vehicle partial width, clothes Business level declines;The road-surface concrete band being arranged on Computer method track, what this kind of lay-by often took are non-motor lines Road surface is sailed, is forced non-motor vehicle to invade car lane, is formed Computer method, either to motor vehicles or non-vehicle flow all shapes Into very big interference;The road-surface concrete band being arranged on car lane, such case affect maximum to section motor vehicles, application compared with It is few.Herein on the premise of intersection capacity is not reduced, the rich path space in section stage casing both sides is opened up into similar The lay-by of bay type multi-storied, is to reduce vehicle to drive into the interference sailed out of to adjacent lane motor vehicles, and parking lot uses run-in index, Tie up sidewalk width 1.5m, the actual width only 1m for taking car lane on the outside of section, outside car lane is still remaining 3.0~ 3.25m, is available for vehicle parking to borrow when entering or rolling away from, is unlikely to affect the current of fellow road-users.Kerb lane is in nothing When vehicles while passing is stopped, still can use as car lane, can greatly alleviate city parking pressure.
(3) apply on the newly-built road in city or reconstruction road, on the basis of equal transport need is met, can reduce Road construction work amount, reduce investment outlay, parking supply can be increased again, avoid motor vehicles and non-motor vehicle from interfering, to lifting city City's path space level of resources utilization effect is significant, with important engineering application value.
Description of the drawings
Fig. 1 is existing road instance graph;
Fig. 2 is improvement road example schematic;
Specific embodiment
The present invention is further explained below according to Figure of description citing:
Embodiment 1
Step one:Judge whether section meets the condition for arranging lay-by
If entrance driveway peak hour queue length sum in road two ends is less than section total length, meets section in the road and set Put the condition of lay-by;Otherwise, do not possess setting condition.
For reconstruction road, queue length directly can be obtained by traffic study;And for newly-built road, queue length Estimation can be estimated according to the traffic signal control scheme that prognosis traffic volume is generated.
Queue length (L) is not only relevant with crossing phase place red time (r), and the transmission of bright rear start wave is also opened with green light Time (t0) relevant.The evaluation method of queue length is as follows:
L=5N+ (N-1) d (1)
N=(r+t0)·q (2)
t0=rqt1/(1-q·t1) (3)
L in formula --- the motorcade length waited in line in entrance driveway, m;
N --- the vehicle number waited in line in entrance driveway, veh;
D --- average parking space, m;1.0m is taken typically;
R --- the effective red light duration of signalized intersections phase place, s;
Q --- vehicle arriving rate, veh/s;
t0--- the time required to start wave is delivered to tail of the queue, s;
t1--- the average start-up time of the adjacent queuing vehicle of entrance driveway is poor, s;1s is taken typically.
Step 2:Judge whether crossing space layout meets the condition for arranging lay-by
If entering the main wagon flow number of share of stock of inlet/outlet less than exit lane number (not considering right-hand rotation wagon flow), possess in exit road Stage casing arranges the condition of lay-by, otherwise, does not possess setting condition.
In the crossing as shown in Fig. 1, two-way 10 track of Huaihe Road, two-way 6 track in Song Shan road is exported into the Huaihe River north of a road Main wagon flow be southing mouth straight traffic.Southing mouth Through Lane number 3, wagon flow number of share of stock are 3, and the number of track-lines of north outlet is 5, more than the main wagon flow number of share of stock into the outlet, therefore north outlet section meets the condition for arranging lay-by.
Step 3:The determination of bus parking station location and length
Because entering the main wagon flow number of share of stock of inlet/outlet less than exit lane number, for the path space for making full use of outlet section rich Resource and the street crossing demand of the passenger that conveniently gets on or off the bus, bus stop are arranged at intersection exit, and will export outermost One segment distance in track is arranged to public transportation lane, uses when specializing in public transit vehicle turnover website.
Public transportation lane length (LB) be made up of three parts:Deceleratuib lane, parking stall and acceleration lane.Deceleratuib lane is from going out Mouth starting point is counted, its length (LSubtract) meet equation below:
LSubtract=v2/2a (4)
L in formulaSubtract--- public transport length of deceleration lane, m;
V --- buses enter average speed during inlet/outlet, km/h;Available road speed limit replaces;
A --- normal deceleration when public transport pulls in, m/s2
Parking bit length is related to public bus network number.According to relevant research, when the number of lines is less than 3,1 can be only arranged Individual Stop of bus position;When the number of lines is less than 5 more than 3,2 Stop of bus positions are preferably set;When the number of lines is more than 5 Bar, preferably arranges 3 Stop of bus positions.
The length of acceleration lane is typically identical with deceleratuib lane.Therefore, public transportation lane length (LB) determination method such as Under:
LB=LSubtract+n·l+LPlus=nl+v2/a (5)
L in formulaB--- public transportation lane length, m;
V --- public transit vehicle enters average speed during inlet/outlet, km/h;Available road speed limit replaces;
Normal deceleration or acceleration when a --- public transport pulls in or is leaving from station, m/s2
N --- need the Stop of bus position number for arranging;
L --- the length of single Stop of bus position, m.
Step 4:Section lay-by position determines and parking stall arrangement form
To reduce impact of the curb parking to other current motor vehicles and not affecting road two ends intersection energy as far as possible The performance of power, curb parking lot are provided only on midblock, and lay-by place section is widened into stop similar to 'bus harbors' The pattern for pulling in, lay-by widen 1.5 meters to pavement side, take 1.0 meters of the car lane in outside.
The queue length and public transportation lane length determined in removing step one and step 3 is outside one's consideration, section residue length LTI.e. Can be used for Roadside Parking, open up into lay-by.
According to《Road signs and graticule》(GB5768.3-2009), compact car parking position size be 6.0 × 2.5m.Because tying up sidewalk width 1.5m, the actual width only 1m for taking car lane on the outside of section, outside car lane are still remained Remaining 3.0~3.25m, be available for vehicle parking to borrow when entering or rolling away from, be unlikely to affect the current of fellow road-users.Outside car Road still can be used as car lane when stopping without vehicles while passing.
Parking stall arranges and is divided into run-in index, indented form and rectilinear three class.Because indented form and the rectilinear footpath that ties up it is empty Between it is larger, for limited road of expanding space, be not suitable for.Therefore here lays form using the parking stall of run-in index.
Step 5:The method for arranging of bicycle lane
Bicycle lane is arranged on the outside of footpath, is designed using identical basic unit with footpath, and road surface elevation position On same plane, consequently, it is possible to by quantities when reducing bicycle lane construction (with existing bicycle lane set-up mode Compare), investment reduction.Only footpath needs guidance tape of mating formation, and bicycle lane to improve the comfortableness of bicyclist, road Face needs asphalt or concrete.At the intersection, bicycle lane, footpath need to carry out accessibility designs, and motor-driven Track seamless connection, is easy to the street crossing of non-motor vehicle.
Embodiment 2
Two road intersection of signalized intersections as shown in Figure 2, road is two-way 8 track, and track width is 3.5m, Each import is provided with a left turn lane, two Through Lanes and a right-turn lane;Another road is two-way 4 car Road.Each import is respectively provided with a straight right lane and a straight-left lane.The distance at two neighboring crossing is 400m.By following step It is rapid that temporary parking berth is set:
Step one:Judge whether section meets the condition for arranging lay-by
If entrance driveway peak hour queue length sum in road two ends is less than section total length, meets section in the road and set Put the condition of lay-by;Otherwise, do not possess setting condition.
For reconstruction road, queue length directly can be obtained by traffic study;And for newly-built road, queue length Estimation can be estimated according to the traffic signal control scheme that prognosis traffic volume is generated.
Queue length (L) is not only relevant with crossing phase place red time (r), and the transmission of bright rear start wave is also opened with green light Time (t0) relevant.The evaluation method of queue length is as follows:
L=5N+ (N-1) d (1)
N=(r+t0)·q (2)
t0=rqt1/(1-q·t1) (3)
L in formula --- the motorcade length waited in line in entrance driveway, m;
N --- the vehicle number waited in line in entrance driveway, veh;
D --- average parking space, m;1.0m is taken typically;
R --- the effective red light duration of signalized intersections phase place, s;
Q --- vehicle arriving rate, veh/s;
t0--- the time required to start wave is delivered to tail of the queue, s;
t1--- the average start-up time of the adjacent queuing vehicle of entrance driveway is poor, s;1s is taken typically.
The vehicle arriving rate for assuming main roads peak hour main wagon flow (straight traffic) is 750/when, during effective red light A length of 50s, the average parking space 1.0m of vehicle, before and after entrance driveway, the starting time difference of Adjacent vehicles is 1s, can obtain entrance driveway Maximum queue length L is:
Due to 2L=155.90m < 400m, so meeting setting condition.
Step 2:Judge whether crossing space layout meets the condition for arranging lay-by
If entering the main wagon flow number of share of stock of inlet/outlet less than exit lane number (not considering right-hand rotation wagon flow), possess in exit road Stage casing arranges the condition of lay-by, otherwise, does not possess setting condition.
As import Through Lane is 2, and exit lane has 4, meets the condition for arranging curb parking lot.
Step 3:The determination of bus stop set location and length
To make full use of the space resources of exit lane affluence and reducing impact of the bus parking to intersection capacity, Bus stop is arranged on into exit, and one segment length L of outlet outermost track is opened up into into public transportation lane, specialize in public transport Turnover is used when stopping website.Bus stop is arranged on the passenger flow that exit is also convenient for taking pubic transport and gets on or off the bus and cross the street.
Public transportation lane length LBIt is made up of three parts:Deceleratuib lane, platform and acceleration lane.Deceleratuib lane is from outlet Point starts to count, and its length meets formula (4):
LSubtract=v2/2a (4)
The length of platform is related to public bus network number, according to correlational study, when circuit number is less than 3, only can arrange 1 Stop of bus position;When the number of lines is less than 5 more than 3,2 Stop of bus positions are preferably set;When the number of lines is more than 5, 3 Stop of bus positions are preferably set.
The length of acceleration lane is typically identical with deceleratuib lane.Therefore, length L of public transportation laneBDetermine that formula is as follows:
LB=LSubtract+n·l+LPlus=nl+v2/a (5)
In formula:LB--- public transportation lane length (m);
V --- continuous wagon flow enters the average speed (km/h) in intersection exit track, can use road speed limit;
Acceleration, deceleration degree (m/s when a --- buses normally enter the station or be leaving from station2)。
N --- Stop of bus digit;
L --- the length of single Stop of bus position.According to《Motor pool design specification》, the length of general Stop of bus position The parking space for 12m and two buses safety stop is spent, 2.5m is typically taken.
If main roads speed limit 40km/h, the normal acceleration, deceleration degree of public transit vehicle is 2.0m/s2, the public transport line that here is stopped Road has 7, then need to arrange 3 bus parking berths, can obtain length L of public transportation laneB
Step 4:The determination of parking area and parking stall arrangement form
To reduce impact of the curb parking to other current motor vehicles and not affecting road two ends intersection energy as far as possible The performance of power, curb parking lot are provided only on midblock, and lay-by place section is widened into stop similar to 'bus harbors' The pattern for pulling in, lay-by widen 1.5 meters to pavement side, take 1.0 meters of the car lane in outside.
The queue length and public transportation lane length determined in removing step one and step 3 is outside one's consideration, and section residue length is about 224m, you can for Roadside Parking, opens up into lay-by.
According to《Road signs and graticule》(GB5768.3-2009), compact car parking position size be 6.0 × 2.5m.Because tying up sidewalk width 1.5m, the actual width only 1m for taking car lane on the outside of section, outside car lane are still remained Remaining 3.0~3.25m, be available for vehicle parking to borrow when entering or rolling away from, be unlikely to affect the current of fellow road-users.Outside car Road still can be used as car lane when stopping without vehicles while passing.
Parking stall arranges and is divided into run-in index, indented form and rectilinear three class.Because indented form and the rectilinear footpath that ties up it is empty Between it is larger, for limited road of expanding space, be not suitable for.Therefore here lays form using the parking stall of run-in index.
Step 5:Non-motor vehicle and driving passage space method for arranging
Bicycle lane is arranged on the outside of footpath, is designed using identical basic unit with footpath, and road surface elevation position On same plane, consequently, it is possible to by quantities when reducing bicycle lane construction (with existing bicycle lane set-up mode Compare), investment reduction.Only footpath needs guidance tape of mating formation, and bicycle lane to improve the comfortableness of bicyclist, road Face needs asphalt or concrete.At the intersection, bicycle lane, footpath need to carry out accessibility designs, and motor-driven Track seamless connection, is easy to the street crossing of non-motor vehicle.

Claims (1)

1. a kind of urban road integrated design method based on parking demand, it is characterised in that method is as follows:
Step one:Judge whether section meets the condition for arranging lay-by
If entrance driveway peak hour queue length sum in road two ends is less than section total length, meets section setting in the road and stop The condition of car band;Otherwise, do not possess setting condition;
For reconstruction road, queue length is directly obtained by traffic study;And for newly-built road, the estimation root of queue length It is predicted that the traffic signal control scheme that the volume of traffic is generated is being estimated;
Not only red light duration r effective with signalized intersections phase place is relevant for motorcade length L waited in line in entrance driveway, also with it is green Lamp opens t the time required to bright rear start wave is delivered to tail of the queue0Relevant, the evaluation method of queue length is as follows:
L=5N+ (N-1) d (1)
N=(r+t0)·q (2)
t0=rqt1/(1-q·t1) (3)
L in formula --- the motorcade length waited in line in entrance driveway, m;
N --- the vehicle number waited in line in entrance driveway, veh;
D --- average parking space, m;1.0m is taken typically;
R --- the effective red light duration of signalized intersections phase place, s;
Q --- vehicle arriving rate, veh/s;
t0--- the time required to start wave is delivered to tail of the queue, s;
t1--- the average start-up time of the adjacent queuing vehicle of entrance driveway is poor, s;Take 1s;
Step 2:Judge whether signalized intersections space layout meets the condition for arranging lay-by
If entering the main wagon flow number of share of stock of inlet/outlet less than exit lane number, possess and the bar of lay-by is set in exit road stage casing Part, otherwise, does not possess setting condition;
Step 3:The determination of bus parking station location and length
Because entering the main wagon flow number of share of stock of inlet/outlet less than exit lane number, for the path space resource for making full use of outlet section rich Conveniently get on or off the bus the street crossing demand of passenger, bus stop is arranged on into signalized intersections exit, and outermost will be exported One segment distance in track is arranged to public transportation lane, uses when specializing in public transit vehicle turnover website;
Public transportation lane length LBIt is made up of three parts:Public transport length of deceleration lane, Stop of bus bit length and public transport acceleration lane Length, public transport length of deceleration lane are counted from outlet starting point, its length LSubtractMeet equation below:
LSubtract=v2/2a (4)
L in formulaSubtract--- public transport length of deceleration lane, m;
V --- buses enter average speed during inlet/outlet, km/h;Or replaced with road speed limit;
A --- normal deceleration when public transport pulls in, m/s2
Stop of bus bit length is related to public bus network number, when the number of lines is less than 3, only arranges 1 Stop of bus position;When When the number of lines is less than 5 more than 3,2 Stop of bus positions are set;When the number of lines is more than 5,3 Stop of bus are set Position;
The length of public transport acceleration lane is identical with public transport deceleratuib lane, therefore, public transportation lane length LBDetermination method it is as follows:
LB=LSubtract+n·l+LPlus=nl+v2/a (5)
L in formulaB--- public transportation lane length, m;
V --- public transit vehicle enters average speed during inlet/outlet, km/h;Or replaced with road speed limit;
Normal deceleration or acceleration when a --- public transport pulls in or is leaving from station, m/s2
N --- need the Stop of bus position number for arranging;
L --- the length of single Stop of bus position, m;
Step 4:Section lay-by position determines and parking stall arrangement form
To reduce impact of the curb parking to other current motor vehicles and not affecting the signalized intersections at road two ends to pass through as far as possible The performance of ability, curb parking lot are provided only on midblock, and lay-by place section is widened into 'bus harbors' bus stop Pattern, lay-by widens 1.5 meters to pavement side, takes 1.0 meters of the car lane in outside;
The queue length and public transportation lane length determined in removing step one and step 3 is outside one's consideration, section residue length LTIt is used for Roadside Parking, opens up into lay-by;
According to《Road signs and graticule》(GB5768.3-2009), compact car parking position size is 6.0 × 2.5m, because Tie up sidewalk width 1.5m, the actual width only 1m for taking car lane on the outside of section, outside car lane is still remaining 3.0~ 3.25m, borrows when entering or roll away from for vehicle parking, is unlikely to affect the current of fellow road-users, and kerb lane is without car Turnover stop when, still use as car lane;Here lays form using the parking stall of run-in index;
Step 5:The method for arranging of bicycle lane
Bicycle lane is arranged on the outside of footpath, is designed using identical basic unit with footpath, and road surface elevation is located at together In one plane, footpath is mated formation guidance tape, and non-motor vehicle road surface needs asphalt or concrete, at signalized intersections, non- Car lane, footpath need to carry out accessibility designs, with car lane seamless connection.
CN201510297651.6A 2015-05-29 2015-05-29 Urban road integrated design method based on parking demand Active CN104894932B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510297651.6A CN104894932B (en) 2015-05-29 2015-05-29 Urban road integrated design method based on parking demand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510297651.6A CN104894932B (en) 2015-05-29 2015-05-29 Urban road integrated design method based on parking demand

Publications (2)

Publication Number Publication Date
CN104894932A CN104894932A (en) 2015-09-09
CN104894932B true CN104894932B (en) 2017-03-29

Family

ID=54027862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510297651.6A Active CN104894932B (en) 2015-05-29 2015-05-29 Urban road integrated design method based on parking demand

Country Status (1)

Country Link
CN (1) CN104894932B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105590457A (en) * 2016-03-06 2016-05-18 黄宝文 Road with arrangement of bus priority of right of road and parking in lane
CN105679053A (en) * 2016-03-23 2016-06-15 黄宝文 Bus stop realizing multi-bus docking and passenger simultaneous getting on and off
DE102017203408A1 (en) * 2017-03-02 2018-09-06 Robert Bosch Gmbh Concept for generating parking space for vehicles
CN109208981A (en) * 2017-06-30 2019-01-15 北京顺到科技有限公司 Intelligent parking management method and device
CN107881867A (en) * 2017-11-01 2018-04-06 宁波工程学院 A kind of Urban Road Cross-section of suitable multimode traffic transfer
CN109955848B (en) * 2017-12-25 2021-06-11 郑州宇通客车股份有限公司 Automatic operation control method and system for vehicle parking
CN108252169A (en) * 2018-01-24 2018-07-06 中南民族大学 The layout of One-road one-line pattern cross junction and traffic control and transfer plan
CN110093821A (en) * 2018-06-02 2019-08-06 张光裕 The major-minor cross alternating expression setting of urban road
CN109183534A (en) * 2018-09-28 2019-01-11 大连交通大学 Cross the street the on-street parking spaces setting method and on-street parking spaces at crossing
CN109543949A (en) * 2018-10-24 2019-03-29 上海市政工程设计研究总院(集团)有限公司 A kind of curb parking planing method based on VISUM simulation software
CN109658000B (en) * 2018-12-26 2021-09-03 中兴智能交通股份有限公司 Method for calculating static traffic index
CN115457771A (en) * 2022-09-05 2022-12-09 张丽丽 Urban traffic management system and method based on big data

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2117089C1 (en) * 1996-09-18 1998-08-10 Индивидуальное частное предприятие "Персональная творческая архитектурная мастерская Р.Гаспаряна" Urban arterial road
CN101117784A (en) * 2006-08-01 2008-02-06 潘玉恒 Non-obstacle overpass in city road T-shaped crossing
CN101333794A (en) * 2008-07-29 2008-12-31 东南大学 Control method for setting temporary stop area for automobile by vehicle-bicycle separation zone
CN103321117A (en) * 2013-05-02 2013-09-25 刘长寿 Laminated parking harbour and vehicle segment-free road
CN104532704A (en) * 2014-12-16 2015-04-22 哈尔滨工业大学 Setting method for straight-going waiting area of motor vehicle at signalized intersection

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2117089C1 (en) * 1996-09-18 1998-08-10 Индивидуальное частное предприятие "Персональная творческая архитектурная мастерская Р.Гаспаряна" Urban arterial road
CN101117784A (en) * 2006-08-01 2008-02-06 潘玉恒 Non-obstacle overpass in city road T-shaped crossing
CN101333794A (en) * 2008-07-29 2008-12-31 东南大学 Control method for setting temporary stop area for automobile by vehicle-bicycle separation zone
CN103321117A (en) * 2013-05-02 2013-09-25 刘长寿 Laminated parking harbour and vehicle segment-free road
CN104532704A (en) * 2014-12-16 2015-04-22 哈尔滨工业大学 Setting method for straight-going waiting area of motor vehicle at signalized intersection

Also Published As

Publication number Publication date
CN104894932A (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN104894932B (en) Urban road integrated design method based on parking demand
CN100425768C (en) Zero commuter station structure of bus and zero transferring fast public traffic system
CN100418117C (en) Automatic control method for green wave of pedestrian crossing street signal lamp
CN102376162B (en) Method for setting optimal distance between curb parking lot of intersection exit lane and intersection
CN101476271A (en) Setting method for multi-mode parking and transfer facilities in lough type bus station
CN102051845A (en) Flat intersection left turn entrance lane removing method and method for driving on flat intersection left turn entrance lane
CN102277806B (en) Shift-type interchange for all-time omnidirectional traffic at intersection of roads
CN103498394B (en) A kind of automobile-use planar road net system
CN103956053A (en) Method for arranging non-motor vehicle stop-in-advance line at two-phase signal-controlled intersection
CN200985480Y (en) Non-obstacle crossroad road structure
CN103643607A (en) Totally-closed full-interchange rapid public transport road system
CN101333794A (en) Control method for setting temporary stop area for automobile by vehicle-bicycle separation zone
CN204676382U (en) People walks level land car and walks up and down only this bus and to give in each other intersection
CN108442197B (en) Channeling and passing method for arranging bus stop and bus lane at intersection
CN103898820B (en) Quasi rail transit road system
CN108978384A (en) A kind of ground straight trip viaduct
CN102182125B (en) Balance bridge at entrance and exit of main and auxiliary roads and method for easing traffic jam
CN203639771U (en) Totally-enclosed all-interchange rapid bus road system
CN101487214A (en) Humanized multifunctional intersection for urban crossroad
CN201241305Y (en) Tunnel type non-obstacle crossroad road structure
Xingdong et al. Traffic countermeasures research for Guangzhou City in traffic mode transferring period after “Motorcycle Forbidden Ban” effect
CN102535908A (en) Overhead type parking lot beside urban road
CN107687115A (en) The bus rapid transit runtime of most simple province
CN211112965U (en) Three-dimensional traffic bridge
CN202194042U (en) Traffic junction utilizing lane changing way

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190613

Address after: 150000 Heilongjiang Harbin Dalian economic and Trade Zone, the North Road and Xingkai Road intersection

Patentee after: Harbin University of Technology Robot Group Co., Ltd.

Address before: 150090 School of Transportation Science and Engineering, Harbin University of Technology, No. 73 Huanghe Road, Nangang District, Harbin City, Heilongjiang Province

Patentee before: Harbin Institute of Technology

TR01 Transfer of patent right