CN104893762B - Raw gas ash disposal system - Google Patents

Raw gas ash disposal system Download PDF

Info

Publication number
CN104893762B
CN104893762B CN201510325569.XA CN201510325569A CN104893762B CN 104893762 B CN104893762 B CN 104893762B CN 201510325569 A CN201510325569 A CN 201510325569A CN 104893762 B CN104893762 B CN 104893762B
Authority
CN
China
Prior art keywords
heat exchanger
water
useless pot
connection
scrubbing tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510325569.XA
Other languages
Chinese (zh)
Other versions
CN104893762A (en
Inventor
林兆晟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510325569.XA priority Critical patent/CN104893762B/en
Publication of CN104893762A publication Critical patent/CN104893762A/en
Application granted granted Critical
Publication of CN104893762B publication Critical patent/CN104893762B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P20/00Technologies relating to chemical industry
    • Y02P20/10Process efficiency
    • Y02P20/129Energy recovery, e.g. by cogeneration, H2recovery or pressure recovery turbines

Landscapes

  • Treating Waste Gases (AREA)
  • Industrial Gases (AREA)

Abstract

The present invention relates to a kind of raw gas ash disposal system, including gasification furnace, accurate filter, first useless pot, second useless pot, scrubbing tower, the raw gas outlet connection accurate filter bottom of gasification furnace, the bottom inlet of the useless pot of top exit connection first of accurate filter, the bottom inlet of the useless pot of top exit connection second of the first useless pot, the top exit of the second useless pot connects the bottom inlet of scrubbing tower, the top exit of scrubbing tower is sequentially connected the first boiler feedwater heat exchanger, second boiler feedwater heat exchanger, desalination water- to-water heat exchanger, Heat Exchanger in Circulating Water System and gas-liquid separator.By setting accurate separator, compared with original technique, reduce the use of process water in the outlet of gasification furnace raw gas, the yield of dust-laden waste water is reduced, the pressure of biochemical treatment is reduced;By setting up a useless pot, realize waste heat squeezes utilization to greatest extent more;The yield of system greasy filth greatly reduces, and the shower water of scrubbing tower and aftertreatment systems consumption greatly reduces.

Description

Raw gas ash disposal system
Technical field
The present invention relates to separation ash disposal field, ash disposal system is separated more particularly, to a kind of gasification furnace raw gas.
Background technology
Due to the development of Coal Gasification Technology, Coal Chemical Industry was quickly grown in China in recent years, and it is former to provide basic chemical industry for China Material, guarantee energy resource supply serve positive effect;The raw gas content of ashes of gasification furnace generation, temperature are higher, follow-up Before system is utilized, ash disposal, the dust in cooling system removing raw gas, reduction temperature, current cool-down method are first passed through Be by pot destroying process realize cooling while byproduct steam, the method for ash disposal is to use HTHP water washing, as shown in Figure 2 It is existing ash disposal system, has the following disadvantages:1st, substantial amounts of high-temperature high pressure water will be consumed by washing cold tower, while producing substantial amounts of contain Dirt waste water, pressure is brought to biochemical treatment;2nd, the high level heat in raw gas, which is entered, washes the high-temperature high pressure water of cold tower and takes away, It is not carried out recycling;3rd, preceding system except dust it is not thorough, cause the oily substance carried in script gas to be mixed with dust After form greasy filth, influence line clogging, in order to not make greasy filth block pipeline, scrubbing tower and follow-up system need to consume substantial amounts of spray Water.
The content of the invention
In order to overcome drawbacks described above, the invention provides a kind of raw gas ash disposal system, the use of process water is reduced, is reduced The yield of dust-laden waste water, reduces the pressure of biochemical treatment, and realize waste heat squeeze utilization to greatest extent.
The technical solution adopted for the present invention to solve the technical problems is:A kind of raw gas ash disposal system, including gasification furnace, Accurate filter, the first useless pot, the second useless pot, scrubbing tower, the raw gas outlet connection accurate filter bottom of gasification furnace is accurate The bottom inlet of the useless pot of top exit connection first of filter, the bottom of the useless pot of top exit connection second of the first useless pot is entered Mouthful, the top exit of the second useless pot connects the bottom inlet of scrubbing tower, the top exit of scrubbing tower be sequentially connected the first boiler to Water- to-water heat exchanger, the second boiler feedwater heat exchanger, desalination water- to-water heat exchanger, Heat Exchanger in Circulating Water System and gas-liquid separator.
In the preferred embodiment of the present invention, the outlet at bottom of accurate filter is connected with grey lock, thick for holding The dust filtered down in coal gas.
In the preferred embodiment of the present invention, the bottom for washing tower is additionally provided with circulating pump, the import and washing of circulating pump The bottom connection of tower, the outlet of circulating pump and the top of scrubbing tower are connected, and circulating pump is also connected with outer flowing line.
In the preferred embodiment of the present invention, the top exit of scrubbing tower is connected at the top of the first boiler feedwater heat exchanger Import, the outlet at bottom of the first boiler feedwater heat exchanger connects the import of the second boiler feedwater heat exchanger, and the second boiler feedwater is changed The import of the outlet connection desalination water- to-water heat exchanger of hot device, the outlet at bottom of desalination water- to-water heat exchanger connects the top of Heat Exchanger in Circulating Water System Import.
In the preferred embodiment of the present invention, shower pipe is led in first useless pot of bottom connection first, is pressed and is steamed in the connection of top Shower pipe, top connection and low-pressure steam pipeline are led in steam pipe road, second useless pot of bottom connection second.
The beneficial effects of the invention are as follows:By setting accurate separator in the outlet of gasification furnace raw gas, with original technique phase Than dust removing effects become apparent from, while reducing the use of process water, reduce the yield of dust-laden waste water, reduce the pressure of biochemical treatment Power;Furthermore compared with original technique, by setting up a useless pot more, can by the high level heat in raw gas to greatest extent by Utilization is squeezed to produce steam, realize waste heat squeezes utilization to greatest extent;Finally compared with original technique, system greasy filth Yield greatly reduces, and the shower water of scrubbing tower and aftertreatment systems consumption greatly reduces.
Brief description of the drawings
Fig. 1 is present system structural representation;
Fig. 2 is system structure diagram before improving.
Embodiment
Presently preferred embodiments of the present invention is described in detail below in conjunction with the accompanying drawings, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, apparent is clearly defined so as to be made to protection scope of the present invention.
A kind of raw gas ash disposal system as shown in Figure 1, including gasification furnace 1, accurate filter 2, the first useless pot 4, second gives up Pot 5, scrubbing tower 10, raw gas outlet connection accurate filter 2 bottom of gasification furnace 1, the top exit connection of accurate filter 2 The bottom inlet of first useless pot 4, the bottom inlet of the useless pot 5 of top exit connection second of the first useless pot 4, the top of the second useless pot 5 The bottom inlet of portion outlet connection scrubbing tower 10, the top exit of scrubbing tower 10 is sequentially connected the first boiler feedwater heat exchanger 12, Second boiler feedwater heat exchanger 13, desalination water- to-water heat exchanger 14, Heat Exchanger in Circulating Water System 15 and gas-liquid separator 16.
The outlet at bottom of accurate filter 2 is connected with ash lock 3.
The bottom of scrubbing tower 10 is additionally provided with circulating pump 11, and the import of circulating pump 11 is connected with the bottom of scrubbing tower 10, circulation The outlet of pump 11 is connected with the top of scrubbing tower 10, and circulating pump 10 is also connected with outer flowing line.
The top exit connection top inlet of the first boiler feedwater heat exchanger 12 of scrubbing tower 10, the first boiler feedwater heat exchanger 12 outlet at bottom connects the import of the second boiler feedwater heat exchanger 13, the outlet connection desalination of the second boiler feedwater heat exchanger 13 The import of water- to-water heat exchanger 14, the outlet at bottom of desalination water- to-water heat exchanger 14 connects the top inlet of Heat Exchanger in Circulating Water System 15.
Shower pipe 8, top connection Medium Pressure Steam Pipeline 6, the second useless bottom of pot 5 connection are led in the first useless bottom of pot 4 connection first Second leads shower pipe 9, top connection and low-pressure steam pipeline 7.
The raw gas produced from gasification furnace 1 passes out to the import of the bottom of accurate filter 2 through middle part, through filter core(Ceramics or Metal)The dust in raw gas is separated with coal gas after filtering, dust lowers into discharge system after ash lock 3, clean after filtering Purified gas sequentially enters the heat in the useless pot 4 being connected in series, useless pot 5, gas recovery and pressed in producing respectively, low-pressure steam, Discharged through Medium Pressure Steam Pipeline and low-pressure steam pipeline, the tar by-product containing a small amount of water that condensation is produced in coal gas temperature-fall period Product first lead shower pipe 8, second lead the discharge system of shower pipe 9 by the pot 4 that gives up, the useless bottom head of pot 5, from the useless top of pot 5 out Coal gas washes away oily substance therein into scrubbing tower 10 and then sequentially enters boiler feedwater heat exchanger 12, boiler feedwater heat exchanger 13rd, desalination water- to-water heat exchanger 14, Heat Exchanger in Circulating Water System 15 are cooled and reclaim heat step by step, and sharp during heat is reclaimed The oily substance in gas is further washed away with sprinkling shower water.Gas finally enters gas-liquid separator 16 and carries out gas-liquid separation Gas phase sends into subsequent processing afterwards.
When the change of accurate filter inlet outlet pressure differential is big, illustrates that filter core top layer is adsorbed with a large amount of dusts, now pass through and introduce More than 500 DEG C of high-temperature steam carries out blowback, you can reduction pressure difference, is continuing with.
It is system structure diagram before improving as shown in Figure 2, first, the raw gas that gasification furnace 1 is produced is passed out to through middle part The upper gas import of cold tower 2 is washed, high-temperature high pressure water enters the part ash washed and washed off in cold tower 2 in raw gas by pipeline 7 Dirt, while the tentatively temperature of reduction raw gas, by wash it is cold after raw gas the bottom of useless pot 3 is entered from the bottom for washing cold tower 2, The dust-containing water washed simultaneously after cold raw gas enters the bottom of useless pot 3 from the bottom for washing cold tower 2, and dust-laden waste water is pooled to the useless bottom of pot 3 Portion, be partly sent to by circulating pump 10 wash cold tower 2 middle and upper part realize recycle, be partly expelled directly out system, washed it is cold after Raw gas further enter the middle part of separator 4 after reduction temperature from the top of useless pot 3 in useless pot 3, enter in separator 4 Row gas-liquid separation, liquid phase is discharged into the bottom of useless pot 3 from the tapering of separator, and the gas phase come out from the top of separator 4 is entered Scrubbing tower 5 is washed again by high pressure spray jetting, is further removed the dust in gas, is washed away oily substance and cool again, The middle and upper part of raw gas from scrubbing tower 5 after washing again is again introduced into separator 6 and carries out gas-liquid separation, and liquid phase is pooled to point From the bottom tapering of device 6, the middle and upper part that a part is sent to scrubbing tower 5 by circulating pump 11, which is realized, to be recycled, and remainder is direct Give off system.The gas sent out from the top of separator 6 sequentially enters boiler feedwater heat exchanger 12, boiler feedwater heat exchanger 13rd, desalination water- to-water heat exchanger 14, Heat Exchanger in Circulating Water System 15 are cooled and reclaim heat step by step, and sharp during heat is reclaimed The oily substance in gas is further washed away with sprinkling shower water.Gas finally enters gas-liquid separator 16 and carries out gas-liquid separation Gas phase sends into subsequent processing afterwards.
Knowable to ash disposal system before improving and after improvement is contrasted, by setting accurate in the outlet of gasification furnace raw gas Separator, compared with original technique, dust removing effects become apparent from, while reducing the use of process water, reduce the generation of dust-laden waste water Amount, reduces the pressure of biochemical treatment;Furthermore, can be by raw gas by setting up a useless pot compared with original technique more High level heat is squeezed utilization to produce steam to greatest extent, and realize waste heat squeezes utilization to greatest extent;Finally with original Carry out technique to compare, the yield of system greasy filth greatly reduces, the shower water of scrubbing tower and aftertreatment systems consumption greatly reduces.
It is emphasized that:Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, Equivalent structure or equivalent flow conversion that every utilization description of the invention and accompanying drawing content are made, or be directly or indirectly used in Other related technical fields, are included within the scope of the present invention.

Claims (3)

1. a kind of raw gas ash disposal system, it is characterised in that:Including gasification furnace(1), accurate filter(2), the first useless pot(4), Second useless pot(5), scrubbing tower(10), the gasification furnace(1)Raw gas outlet connection accurate filter(2)Bottom, the essence Close filter(2)The useless pot of top exit connection first(4)Bottom inlet, the first useless pot(4)Top exit connection second Useless pot(5)Bottom inlet, the second useless pot(5)Top exit connection scrubbing tower(10)Bottom inlet, the scrubbing tower (10)Top exit be sequentially connected the first boiler feedwater heat exchanger(12), the second boiler feedwater heat exchanger(13), desalted water changes Hot device(14), Heat Exchanger in Circulating Water System(15)And gas-liquid separator(16), the scrubbing tower(10)Top exit connect first pot Stove is to water- to-water heat exchanger(12)Top inlet, the first boiler feedwater heat exchanger(12)Outlet at bottom connect the second boiler feedwater Heat exchanger(13)Import, the second boiler feedwater heat exchanger(13)Outlet connection desalination water- to-water heat exchanger(14)Import, The desalination water- to-water heat exchanger(14)Outlet at bottom connection Heat Exchanger in Circulating Water System(15)Top inlet, the described first useless pot(4) Shower pipe is led in bottom connection first(8), top connection Medium Pressure Steam Pipeline(6), the described second useless pot(5)Pouring is led in bottom connection second Pipe(9), top is connected and low-pressure steam pipeline(7).
2. raw gas ash disposal system according to claim 1, it is characterised in that:The accurate filter(2)Outlet at bottom It is connected with grey lock(3).
3. raw gas ash disposal system according to claim 1, it is characterised in that:The scrubbing tower(10)Bottom be additionally provided with and follow Ring pump(11), the circulating pump(11)Import and scrubbing tower(10)Bottom connection, circulating pump(11)Outlet and scrubbing tower (10)Top connection, circulating pump(11)It is also connected with outer flowing line.
CN201510325569.XA 2015-06-15 2015-06-15 Raw gas ash disposal system Active CN104893762B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510325569.XA CN104893762B (en) 2015-06-15 2015-06-15 Raw gas ash disposal system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510325569.XA CN104893762B (en) 2015-06-15 2015-06-15 Raw gas ash disposal system

Publications (2)

Publication Number Publication Date
CN104893762A CN104893762A (en) 2015-09-09
CN104893762B true CN104893762B (en) 2017-07-14

Family

ID=54026730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510325569.XA Active CN104893762B (en) 2015-06-15 2015-06-15 Raw gas ash disposal system

Country Status (1)

Country Link
CN (1) CN104893762B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4333510C1 (en) * 1993-10-01 1995-01-12 Gutehoffnungshuette Man Process and apparatus for treating flue gases from waste incineration plants
CN101161792A (en) * 2007-09-29 2008-04-16 上海惠生化工工程有限公司 Heat recovering technique for synthetic gas production process by coal gasification
CN101451173A (en) * 2007-11-28 2009-06-10 中冶赛迪工程技术股份有限公司 Converter gas dry method pocket type purification and recovery process and system
CN102154035A (en) * 2011-03-01 2011-08-17 安徽淮化股份有限公司 Fuel gas and tail gas exhaust device
CN102199453A (en) * 2011-04-01 2011-09-28 青岛科技大学 Improved Lurgi gasification furnace waste heat recovering method and device
CN102492490A (en) * 2011-11-30 2012-06-13 中国五环工程有限公司 Gas purification process and system
CN202610195U (en) * 2012-06-01 2012-12-19 中国石油和化工勘察设计协会煤化工设计技术中心 Device for preparing ammonia synthesis gas through pressurization and continuous gasification of anthracite
CN103789045A (en) * 2014-01-21 2014-05-14 成都易态科技有限公司 Dry-method purifying and recycling process for dry distillation gas and mixed type gas condensation device
CN204779502U (en) * 2015-06-15 2015-11-18 林兆晟 Raw gas ash removal system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4333510C1 (en) * 1993-10-01 1995-01-12 Gutehoffnungshuette Man Process and apparatus for treating flue gases from waste incineration plants
CN101161792A (en) * 2007-09-29 2008-04-16 上海惠生化工工程有限公司 Heat recovering technique for synthetic gas production process by coal gasification
CN101451173A (en) * 2007-11-28 2009-06-10 中冶赛迪工程技术股份有限公司 Converter gas dry method pocket type purification and recovery process and system
CN102154035A (en) * 2011-03-01 2011-08-17 安徽淮化股份有限公司 Fuel gas and tail gas exhaust device
CN102199453A (en) * 2011-04-01 2011-09-28 青岛科技大学 Improved Lurgi gasification furnace waste heat recovering method and device
CN102492490A (en) * 2011-11-30 2012-06-13 中国五环工程有限公司 Gas purification process and system
CN202610195U (en) * 2012-06-01 2012-12-19 中国石油和化工勘察设计协会煤化工设计技术中心 Device for preparing ammonia synthesis gas through pressurization and continuous gasification of anthracite
CN103789045A (en) * 2014-01-21 2014-05-14 成都易态科技有限公司 Dry-method purifying and recycling process for dry distillation gas and mixed type gas condensation device
CN204779502U (en) * 2015-06-15 2015-11-18 林兆晟 Raw gas ash removal system

Also Published As

Publication number Publication date
CN104893762A (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN104030381B (en) A kind of system and method utilizing oil field ground waste heat to prepare injection boiler feedwater
CN107158891A (en) A kind of coal gasified black water flashed vapour utilizes technique
CN102587884B (en) Utilizing process for underground gasified gas condensate
CN204779502U (en) Raw gas ash removal system
CN106000056A (en) Yellow phosphorus tail gas purification method and system
CN104893762B (en) Raw gas ash disposal system
CN205556588U (en) Device that circulating oil washing high temperature coal gas removed dust
CN102010732B (en) Method and device for condensing and recovering shale oil in gas tower section of oil shale distillation system
CN203513702U (en) Heating system using low-temperature waste heat of blast furnace slag flushing water
CN204079875U (en) A kind of new Type Coke Oven raw gas waste-heat recovery device
CN106281474A (en) A kind of pressurization moving bed coal gasifier high-temperature gas duster and waste-heat recovery device and method thereof
CN207483640U (en) Dry acetylene generators washing pipeline system
CN106370028A (en) Coking raw gas waste heat recovery method and apparatus
CN201901653U (en) Pipeline washing device of a dry-process acetylene generator
CN206494726U (en) The quick production system of yellow phosphorus
CN206018551U (en) Integral type waste heat recoverer
CN104927929A (en) Crude benzene distilling and washing oil regenerating heating system and method
CN104447340B (en) DOP esterification system and production technique
CN103968359B (en) Boiler and the production method of superheated steam are prepared in a kind of Natural Circulation height salt feedwater
CN204752648U (en) Oil washing of low order pyrolysis of coal gas purifies oil washing tower
CN205528639U (en) Raw coke oven gas purifying circulation device
CN205740523U (en) Sewage drainage system
CN204714648U (en) A kind of dregs of beans leaches workshop washing water filtration unit
CN202379757U (en) Recovery installation for slurry generated in titanium tetrachloride production
CN204454591U (en) A kind of device utilizing high temperature slurry filtration gas heat energy

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant