CN104863378B - Concrete rises the method for repairing and mending of mould - Google Patents

Concrete rises the method for repairing and mending of mould Download PDF

Info

Publication number
CN104863378B
CN104863378B CN201510233569.7A CN201510233569A CN104863378B CN 104863378 B CN104863378 B CN 104863378B CN 201510233569 A CN201510233569 A CN 201510233569A CN 104863378 B CN104863378 B CN 104863378B
Authority
CN
China
Prior art keywords
concrete
mould
repairing
mending
rises
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510233569.7A
Other languages
Chinese (zh)
Other versions
CN104863378A (en
Inventor
王传博
孙姝瑾
陈鹏
郭春华
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201510233569.7A priority Critical patent/CN104863378B/en
Publication of CN104863378A publication Critical patent/CN104863378A/en
Application granted granted Critical
Publication of CN104863378B publication Critical patent/CN104863378B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

Rise the method for repairing and mending of mould the invention discloses a kind of concrete, including step:Polished in the outside of the mould part of rising of concrete structural surface, to form the smooth surface section enclosed located at the mould portion outboard that rises;Engraving tool is carried out to the mould part of rising within smooth surface section to remove, obtain the concrete surface removed by engraving tool using electric tool;By the thin formation hair side of concrete surface chisel removed by engraving tool;The surface of concrete structure is repaired.The present invention is by the way of electronic engraving tool is removed, electronic chisel is thin and chisel is carefully combined by hand; chisel is carved using three times, and engraving tool chisel is carried out successively to the mould part of rising of concrete surface; both efficiency of construction can be improved; the smooth surface section polished in advance can also be utilized; ensure the engraving tool chisel scope that electronic engraving tool is removed, it is to avoid damage normal concrete surface and avoid damage to bar construction.

Description

Concrete rises the method for repairing and mending of mould
Technical field
The present invention relates to the field of engineering construction, more particularly to a kind of concrete rises the method for repairing and mending of mould.
Background technology
Pouring now with using pump concrete concrete more, the slump and mobility of pump concrete all than larger, And one-time-concreting concrete amount is more very fast, easily causes and lateral pressure under template is further increased;And in casting concrete, Concrete is also larger to lateral pressure under template in itself;And personnel of vibrating sometimes can not vibrate by operational procedure, thus easily Cause template to rise mould phenomenon, influence the flatness and perpendicularity of concrete surface, influence follow-up float work.
It is generally for the rise method for repairing and mending of mould of concrete:
1. being cut first to the concrete to be repaired for rising by mould part, accomplish that hand hammer is carefully dug, it is to avoid damaged structure reinforcing bar, It is required that the concrete surface perception after digging into reaches the effect of artificial stone, non-loosening stone and concrete particle;
2. pair cut position is cleaned down with hairbrush, and is rinsed with water, make its non-loosening stone and dust.
3. one layer of pair mend brushing makes cement mortar with identical cement and carries out interface processing, so that new-old concrete energy It is well combined.
4. after concrete final set, strengthen watering maintenance, it is to avoid ftractureed at conjunction old and new concret.
Yet with this way, concrete mould part of rising all carefully is dug using the manual hand hammer of workman, efficiency of construction It is lower, it is impossible to the engraving tool chisel for the concrete surface of mould that rises suitable for large area.
The content of the invention
The technical problems to be solved by the invention are to provide one kind and both can guarantee that efficiency of construction, and damaged structure steel is avoided that again The concrete of muscle rises the method for repairing and mending of mould, while can effectively ensure that flatness and the perpendicularity requirement of concrete surface, prevent because Influence of the carbonization of concrete to reinforcing bar, and it is effectively guaranteed the thickness of reinforced concrete protective layer.
To realize above-mentioned technique effect, a kind of method for repairing and mending for the mould that rises the invention discloses concrete, including step:
Polished, enclosed with being formed located at the mould portion outboard that rises in the outside of the mould part of rising of concrete structural surface Smooth surface section;
Using electric tool to the smooth surface section within described in rise mould part carry out engraving tool remove, obtain the coagulation removed by engraving tool Native face;
The thin formation hair side of concrete surface chisel that the process engraving tool is removed;
The surface of the concrete structure is repaired.
Further improve of the invention is, the smooth surface is formed in the outside for rising by mould part by following steps Section:
The repairing scope line for mould part of rising delimited out in the surface of concrete structure, the repairing scope line is enclosed located at described Rise the outside of mould part;
Polished to form the smooth surface section enclosed located at the mould portion outboard that rises along the repairing scope line.
Further improve of the invention is, inwardly polishes 2cm to 3cm to be formed along the repairing scope line with toothless saw The smooth surface section.
Further improve of the invention is, the mould part of rising is carried out as the electric tool using tip electric pick Large area is carved and removed line by line.
Further improve of the invention is that the thin hair side that formed of the concrete surface chisel for removing the process engraving tool includes:
Carry out digging thin for the first time using electric tool, form coarse wool face;
Second is carried out to the coarse wool face by hand and digs thin, smart hair side is formed.
Further improve of the invention is, the first time chisel is carried out as the electric tool using alloy head electric pick Carefully, the coarse wool face with regular veins is formed, the alloy head electric pick includes electric pick and the output end located at the electric pick On alloy hammer tup.
Further improve of the invention is that described second is carried out to the coarse wool face using alloy leadman work digs thin, Form the smart hair side.
Further improve of the invention is that the surface progress repairing to the concrete structure includes:
In coating repair layer on the smart hair side and smooth surface section, make the surface of the repair layer and the concrete knot Structure surface is flushed.
Further improve of the invention is that the repair layer uses 1:2 or 1:2.5 cement mortar.
Further improve of the invention is that the repair layer uses the concrete grade than the concrete structural surface The fine-stone concrete of a high grade.
The present invention makes it have following beneficial effect as a result of above technical scheme:
By using concrete of the electric tool (tip electric pick) to mould part of rising first, large area engraving tool is removed the present invention line by line, Substantially increase efficiency of construction;And a transitional region is formd by the setting of smooth surface section, it is ensured that entered using electric tool Row large area carves the concrete surface in addition to smooth surface section is not interfered with during.
Then, it is electronic by the thin formation coarse wool face of the concrete surface removed by engraving tool chisel, the conjunction using homemade alloy head electric pick Alloy hammer tup of the golden head electric pick by electric pick and in electric pick output end is constituted, compared to tip electric pick, alloy head electric pick chisel Face is finer, will not destroy concrete surface;Afterwards, then second is carried out to coarse wool face using alloy leadman work and digs thin, form essence Hair side, obtains satisfactory concrete surface, moreover it is possible to avoid damage to bar construction.
Finally with 1:2 or 1:2.5 the fine-stone concrete of one grade of cement mortar or raising is filled repairing to smart hair side with shape Into repair layer, and the surface of repair layer is flushed with the surface of concrete structure, be effectively guaranteed the thickness of cover to reinforcement, And the working face for closing rule is provided for follow-up float work, meet flatness and the perpendicularity requirement of concrete structural surface.
Brief description of the drawings
Fig. 1 be concrete of the present invention rise mould method for repairing and mending in rise the floor map of mould part.
Fig. 2 be concrete of the present invention rise mould method for repairing and mending in rise the side sectional view of mould part.
Fig. 3 be concrete of the present invention rise mould method for repairing and mending FB(flow block).
Fig. 4 be concrete of the present invention rise mould method for repairing and mending be hit by a bullet repairing scope line schematic diagram.
Fig. 5 be concrete of the present invention rise mould method for repairing and mending in construction smooth surface section schematic diagram.
Fig. 6 be concrete of the present invention rise mould method for repairing and mending in construction smooth surface section side sectional view.
Fig. 7 be concrete of the present invention rise mould method for repairing and mending in electronic engraving tool remove the signal of the concrete surface behind mould part of rising Figure.
Fig. 8 be concrete of the present invention rise mould method for repairing and mending in electronic engraving tool remove the side, sectional risen behind mould part.
Fig. 9 be concrete of the present invention rise mould method for repairing and mending in dig for the first time it is thin after concrete surface schematic diagram.
Figure 10 be concrete of the present invention rise mould method for repairing and mending in dig for the first time it is thin after side sectional view.
Figure 11 be concrete of the present invention rise mould method for repairing and mending in second dig it is thin after concrete surface schematic diagram.
Figure 12 be concrete of the present invention rise mould method for repairing and mending in second dig it is thin after side sectional view.
Figure 13 be concrete of the present invention rise mould method for repairing and mending in construct repairing face schematic diagram.
Figure 14 be concrete of the present invention rise mould method for repairing and mending in construct repairing face side sectional view.
Embodiment
Below in conjunction with the accompanying drawings and embodiment the present invention is further detailed explanation.
Referring initially to shown in Fig. 1 and Fig. 2, reinforced concrete structure 10 is by bar construction 16 and is cast on bar construction 16 Concrete constitute, the concrete on the surface of bar construction 16 formation cover to reinforcement, for protecting bar construction, is prevented because of coagulation Influence of the carbonization of soil to bar construction.
In the pouring concrete construction of reinforced concrete structure 10, due to there is the slump of casting concrete and flowing The problems such as larger and template of property is shifted, often rise mould phenomenon, the concrete surface 11 of the position of the mould that rises after pouring The mould part 12 of rising of outwardly protruding concrete block, referred to as concrete can be formed, so as to cause the out-of-flatness of concrete surface 11 Degree and the low problem of perpendicularity, influence the Forming Quality of concrete surface 11.
The present invention concrete rise mould method for repairing and mending purpose be to reinforced concrete structure 10 construct in concrete table The concrete of the mould part 12 of rising of the large area in face 11 effectively carve and removes and repair, it is ensured that the concrete surface carved after removing is whole It is neat attractive in appearance, coordinate shown in Fig. 3, specifically include following steps:
S001:Polished, risen with being formed to enclose to be located at outside mould part in the outside of the mould part of rising of concrete structural surface The smooth surface section of side.
Wherein, with reference to shown in Fig. 4~6, smooth surface section 14 is formed in the outside for mould part 12 of rising by following steps:
As shown in figure 4, ejecting the repairing scope for mould part 12 of rising on the concrete surface 11 of reinforced concrete structure 10 Line 13, makes the repairing scope line 13 be coated on the outside for mould part 12 of rising, and the shapes and sizes of repairing scope line 13 depend on rising The profile and size of mould part 12, for the ease of construction, the general rectangular shape for being shaped as rule for repairing scope line 13, because The rectangular shape of rule is easy to the engraving tool in later stage to dig operation, and repairs the size of scope line 13 to reach that the mould part 12 that will rise is complete The minimum area being enclosed in repairing scope line 13 is optimal, can so reduce boundary of works area, improve efficiency of construction;
In conjunction with shown in Fig. 5 and Fig. 6, inwardly polish 2cm to 3cm or so to form smooth surface section along repairing scope line 13 14, smooth surface section 14 is enclosed the outside located at mould part 12 of rising.
S002:Engraving tool is carried out to the mould part of rising within smooth surface section to remove, obtain the concrete removed by engraving tool using electric tool Face.
With reference to shown in Fig. 7 and Fig. 8, rise mould portion of the electric tool the big face within smooth surface section 14 is used as using tip electric pick Divide 12 concrete to carry out engraving tool line by line to remove, carve and remove to the first depth, large area engraving tool protrudes from concrete surface except mould part 12 of rising Part, formed through carving the concrete surface 15 that removes, wherein, first depth is pre-set according to the thickness of cover to reinforcement , it is desirable to less than the thickness of cover to reinforcement, to avoid damage to bar construction.It is manual compared to now universal used workman The engraving tool of the mould part of rising for the concrete surface that hand hammer is carefully dug removes way, and the present invention, which using electronic tip electric pick carve, removes work Make, can large area, rapidly carve and chisel out the mould part 12 of rising of concrete surface 11, substantially increase efficiency of construction;And pass through light The setting of face section 14 forms a transitional region, it is ensured that being carried out using electric tool will not shadow during large area engraving tool is removed The concrete surface outside smooth surface section 14 is rung, the flatness and perpendicularity of concrete structural surface can be improved.
S003:By the thin formation hair side of concrete surface chisel removed by engraving tool;
With reference to shown in Fig. 9 and Figure 10, first, carry out digging thin for the first time as electric tool using alloy head electric pick, formed Coarse wool face 17 with regular veins, the regular veins in the coarse wool face 17 are generally the striated of continuous regular, are clouded in repairing In scope line 13.Wherein, alloy head electric pick is homemade electric tool, the alloy hammer hammer by electric pick and in electric pick output end Head composition, compared to common tip electric pick, the alloy head electric pick after improvement can dig out more fine chisel face, it is to avoid damage Bar construction.
In conjunction with shown in Figure 11 and Figure 12, then, second is carried out to coarse wool face 17 using alloy leadman work and digs thin, chisel is thin To the second depth, the high smart hair side 18 of surfacing, perpendicularity is obtained, dig carefully that chisel is thin by hand for workman for second, can avoid Damaged structure reinforcing bar, wherein, the second depth is more than the first depth, and the second depth is less than the cover to reinforcement of concrete structure Thickness, it is ensured that bar construction is not exposed, it is to avoid concrete carbonization bar construction.
S004:The surface of concrete structure is repaired.
With reference to shown in Figure 13 and Figure 14, using 1:2 or 1:2.5 cement mortar or the concrete than concrete surface 11 Obtained smart hair side 18 and the smooth surface section 14 pre-set are applied after the fine-stone concrete of grade one grade of raising is dug carefully to second Repairing is covered, to form repair layer 19, the surface of repair layer 19 is flushed with concrete surface 11, it is ensured that reinforced concrete structure The thickness of protective layer, and provided for follow-up float work and meet defined working face.
The present invention carves chisel to coagulation by the way of electronic engraving tool is removed, electronic chisel is thin and chisel is carefully combined by hand using three times The mould part of rising on native surface 11 carries out engraving tool chisel successively, can both improve efficiency of construction, moreover it is possible to using the smooth surface section 14 polished in advance, Ensure the engraving tool chisel scope that electronic engraving tool is removed, it is to avoid damage normal concrete surface and avoid damage to bar construction.
The last surface dug of the invention is the higher smart hair side 18 of fineness, is conducive to improving smart hair side 18 and follow-up painting Adhesive ability between the repair layer 19 covered, it is easier to the coating of repair layer 19, obtains the repairing that flatness is good and perpendicularity is high 19 surface of layer, and the surface of repair layer 19 is flushed with concrete surface 11, the thickness of cover to reinforcement is effectively guaranteed, and The working face for closing rule is provided for follow-up float work, flatness and the perpendicularity requirement of concrete structural surface is met.
The present invention is described in detail above in association with drawings and Examples, those skilled in the art can basis Described above makes many variations example to the present invention.Thus, some of embodiment details should not constitute limitation of the invention, The present invention regard the scope defined using appended claims as protection scope of the present invention.

Claims (7)

  1. The method for repairing and mending of mould 1. a kind of concrete rises, it is characterised in that including step:
    Polished in the outside of the mould part of rising of concrete structural surface, to form the light enclosed located at the mould portion outboard that rises Face section;
    Using electric tool to the smooth surface section within described in rise mould part carry out engraving tool remove, obtain the concrete removed by engraving tool Face;
    The thin formation hair side of concrete surface chisel that the process engraving tool is removed;
    The surface of the concrete structure is repaired;
    Wherein, the smooth surface section is formed in the outside for rising by mould part by following steps:
    The repairing scope line for mould part of rising delimited out in the surface of concrete structure, the repairing scope line is enclosed located at the mould that rises Partial outside;
    2cm to 3cm is polished into concrete structure with toothless saw along the repairing scope line to enclose located at the mould portion of rising to be formed Exceptionally the smooth surface section of side, forms the transitional region to concrete structure sunken inside;
    The thin formation hair side of concrete surface chisel for being removed the process engraving tool by following steps:
    Carry out digging thin for the first time using electric tool, form coarse wool face;
    Second is carried out to the coarse wool face by hand and digs thin, smart hair side is formed.
  2. The method for repairing and mending of mould 2. concrete as claimed in claim 1 rises, it is characterised in that:The electricity is used as using tip electric pick Power driven tools carry out large area engraving tool line by line to the mould part of rising and removed.
  3. The method for repairing and mending of mould 3. concrete as claimed in claim 2 rises, it is characterised in that:Using alloy head electric pick as described Electric tool carries out the first time chisel carefully, forms the coarse wool face with regular veins, and the alloy head electric pick includes electricity Pick and the alloy hammer tup in the output end of the electric pick.
  4. The method for repairing and mending of mould 4. concrete as claimed in claim 3 rises, it is characterised in that:Using alloy leadman work to described thick Hair side carries out described second and digs thin, forms the smart hair side.
  5. The method for repairing and mending of mould 5. concrete as claimed in claim 4 rises, it is characterised in that to the surface of the concrete structure Carrying out repairing includes:
    In coating repair layer on the smart hair side and smooth surface section, make the surface of the repair layer and the concrete structure table Face is flushed.
  6. The method for repairing and mending of mould 6. concrete as claimed in claim 5 rises, it is characterised in that:The repair layer uses 1:2 or 1: 2.5 cement mortar.
  7. The method for repairing and mending of mould 7. concrete as claimed in claim 5 rises, it is characterised in that:The repair layer uses more mixed than described The fine-stone concrete of the high grade of concrete grade on Xtah Crude Clay structure surface.
CN201510233569.7A 2015-05-08 2015-05-08 Concrete rises the method for repairing and mending of mould Active CN104863378B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510233569.7A CN104863378B (en) 2015-05-08 2015-05-08 Concrete rises the method for repairing and mending of mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510233569.7A CN104863378B (en) 2015-05-08 2015-05-08 Concrete rises the method for repairing and mending of mould

Publications (2)

Publication Number Publication Date
CN104863378A CN104863378A (en) 2015-08-26
CN104863378B true CN104863378B (en) 2017-09-15

Family

ID=53909509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510233569.7A Active CN104863378B (en) 2015-05-08 2015-05-08 Concrete rises the method for repairing and mending of mould

Country Status (1)

Country Link
CN (1) CN104863378B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839935A (en) * 2016-03-29 2016-08-10 上海科焱建筑装饰工程有限公司 Concrete surface repairing method
CN109610871A (en) * 2018-12-20 2019-04-12 马鞍山十七冶工程科技有限责任公司 A kind of swollen mould position restorative procedure of foam concrete light steel-framed composite wall
CN117225863B (en) * 2023-09-21 2024-03-12 黄山徽建工程有限公司 Construction waste recycling process

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101284602B1 (en) * 2012-11-19 2013-07-10 주식회사 에코이앤씨 Method of repairing surface of concrete structure according to result of safety inspection and check-up of the concrete structure
CN104806031B (en) * 2013-06-21 2017-06-16 罗海军 Timber structure reinforced construction method
JP2015055044A (en) * 2013-09-10 2015-03-23 合同会社ビーテック Repair method for concrete structure
CN104405170A (en) * 2014-11-26 2015-03-11 国家电网公司 Using method of composite penetration protection reinforcing material

Also Published As

Publication number Publication date
CN104863378A (en) 2015-08-26

Similar Documents

Publication Publication Date Title
CN106760598A (en) Out-wall crack repairs structure
CN104863378B (en) Concrete rises the method for repairing and mending of mould
CN103266767A (en) Construction method for preventing and treating cracks between concrete structure and filler wall
CN108104502A (en) Ancient building brick wall surface protection and crack repairing method based on structural integrity
CN106401205A (en) Construction method for reinforcement of externally bonded profile steel of reinforced concrete structure
CN205558920U (en) Fissured repair structure of last lining cutting of tunnel wall
CN110284724A (en) GRC plate method for repairing and mending
CN109025338B (en) Method for repairing reinforced concrete wall crack
CN107191006A (en) A kind of guiding gutter refractory concrete soil layer removes restorative procedure
WO2020029308A1 (en) Construction method for quickly repairing concrete pavement crack in zipper-manner
CN112281768A (en) Method for repairing spillway high-speed water flow deep large pit
CN203741792U (en) Concrete tooth groove stilling basin
CN105714739B (en) Preventing secondary cracking process of repairing in fluting method seepage treatment
CN103741651A (en) Concrete tooth groove stilling pool and construction method thereof
CN106677550A (en) Maintenance method for outer-wall crevices
CN104452813B (en) A kind of underground power house gate shaft protected against the effects of immersion method
CN110777855A (en) Method suitable for polishing, bonding and waterproofing deep foundation pit pile body concrete
CN218061243U (en) Wall concrete high-pressure water jet roughening robot
CN113789764B (en) Hydropower station hydraulic tunnel surface pit flushing repairing method
CN204715502U (en) To ride well system
CN210316414U (en) Masonry engineering pointing die
CN210002940U (en) Crack pouring base
CN214144815U (en) Multifunctional mortar joint repairing knife
CN219366064U (en) Short side wall roughening structure of tunnel
JP5068013B2 (en) Repair method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant