CN104863305B - The preparation method of green assembled architecture wallboard - Google Patents

The preparation method of green assembled architecture wallboard Download PDF

Info

Publication number
CN104863305B
CN104863305B CN201510301777.6A CN201510301777A CN104863305B CN 104863305 B CN104863305 B CN 104863305B CN 201510301777 A CN201510301777 A CN 201510301777A CN 104863305 B CN104863305 B CN 104863305B
Authority
CN
China
Prior art keywords
inner frame
core layer
wainscot
lightweight core
skeleton
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510301777.6A
Other languages
Chinese (zh)
Other versions
CN104863305A (en
Inventor
张健
刘玉魁
董先林
胡晓萌
郭庆亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Lutai Building Industrialization Material Co ltd
Original Assignee
Shandong Shandong Safe Building Materials Science And Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Shandong Safe Building Materials Science And Technology Group Co Ltd filed Critical Shandong Shandong Safe Building Materials Science And Technology Group Co Ltd
Priority to CN201510301777.6A priority Critical patent/CN104863305B/en
Publication of CN104863305A publication Critical patent/CN104863305A/en
Application granted granted Critical
Publication of CN104863305B publication Critical patent/CN104863305B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/244Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires

Landscapes

  • Building Environments (AREA)
  • Finishing Walls (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The invention provides a kind of preparation method of green assembled architecture wallboard, building wall board, it is composited by outer panels, outer skeleton, warming plate, inner frame and wainscot successively, there is outer lightweight core layer between outer panels and outer skeleton, there is interior lightweight core layer between wainscot and inner frame, it is bonded as one by bonding mortar between outer panels and outer lightweight core layer and wainscot and interior lightweight core layer, outer panels are all bolted with inner frame with outer skeleton and wainscot and are integrated.The preparation method of building wall board, comprises the following steps:Prefabricated outer skeleton and inner frame;Glass fibre anchor is arranged on warming plate;Warming plate is arranged between outer skeleton and inner frame;Wainscot bolt is connected with inner frame;Lightweight core layer in formation;Form outer lightweight core layer, upper outer panels, with bolt, outer panels are connected with outer skeleton.

Description

The preparation method of green assembled architecture wallboard
Technical field
The present invention relates to a kind of wallboard, more particularly, to a kind of green assembled architecture wallboard and preparation method.
Background technology
With wideling popularize of assembled architecture system in the last few years, beyond the region of objective existence built by reinforced concrete structure, steel construction etc. Wall adopts prefabricated panel increasingly universal.
Traditional prefabricated panel there is a problem of from heavy sensation of the body, is not easy to prefabricated construction and prepares production inconvenience.
Content of the invention
It is an object of the present invention to provide a kind of green assembled architecture wallboard, not only from heavy and light, be easy to assemble, and heat insulating ability Good, and structure is firm.
The present invention another object is that the preparation method providing a kind of above-mentioned green assembled architecture wallboard.
To achieve these goals, the present invention adopts below scheme:
A kind of green assembled architecture wallboard, is combined by outer panels, outer skeleton, warming plate, inner frame and wainscot successively Form, between outer panels and outer skeleton, be filled with outer lightweight core layer, wainscot and the internal skeleton of foam cement or granular polystyrene mortar Be filled with the interior lightweight core layer of foam cement or granular polystyrene mortar between frame, outer panels and outer lightweight core layer and wainscot with interior It is bonded as one by bonding mortar between lightweight core layer, outer panels are all connected by bolt with inner frame with outer skeleton and wainscot It is connected in one, outer panels and wainscot are calcium silicate board with microporous.
Preferably, it also includes multiple spaced glass fibre anchors, glass to above-mentioned green assembled architecture wallboard Glass fiber anchor runs through warming plate, and two ends are condensed in outer lightweight core layer and interior lightweight core layer respectively.
Above-mentioned green assembled architecture wallboard preferably, it also includes hoisting component, hoisting component pre-buried in outer lightweight Sandwich layer top.
Preferably, it also includes connecting elements to above-mentioned green assembled architecture wallboard, and connecting elements is embedded in interior lightweight Sandwich layer top, and connecting elements has been bolted angle steel.
Preferably, outer skeleton and inner frame surrounding side are provided with for placing marine glue above-mentioned green assembled architecture wallboard The groove of bar.
A kind of preparation method of green assembled architecture wallboard, comprises the following steps:
1)Prefabricated outer skeleton and inner frame, and reserved on outer skeleton and inner frame be used on glass fibre anchor and wear The duct crossed;
2)Glass fibre anchor is arranged on warming plate;
3)Vertically place outer skeleton and inner frame, the warming plate with glass fibre anchor is arranged on outer skeleton and internal skeleton Between frame, and by the anchor head at glass fibre anchor two ends, outer skeleton and inner frame are connected with warming plate;
4)Outer skeleton, inner frame and warming plate that horizontal positioned connects, wainscot bolt is connected with inner frame, simultaneously Carry out connecting elements and inner frame, the connection work of wainscot;Wainscot as bed die, is sprayed one layer of binding sand by rotation on demand Slurry, in sash, cast in situs foam cement or granular polystyrene mortar light material form interior lightweight core layer, and embedded lifting structure Part;
5)After maintenance terminates, one layer of adhesive mortar, cast in situs foam cement in sash will be sprayed on warming plate again Or granular polystyrene mortar light material forms outer lightweight core layer, upper outer panels, finally, with bolt, outer panels are connected with outer skeleton Connect.
Beneficial effects of the present invention:
(1)Wallboard adopts skeleton and light material filling, forms sandwich style force structure it is achieved that high-strength light, Little surface density can achieve < 100kg/m2, far smaller than similar wallboard;
(2)There is inside and outside panel and warming plate it is achieved that waterproof, insulation, fire prevention, hard-cover integration, and scene is quick Assembling construction, and wallboard has extensive adaptability it is adaptable to the different structure such as assembly concrete and assembling type steel structure Type, motility is big, standardization is high, versatility is wide;
(3)Wallboard can greatly reduce production cost with industrialized production.
Brief description
Fig. 1 is present invention green assembled architecture wallboard schematic perspective view.
Fig. 2 is present invention green assembled architecture wallboard cross-sectional schematic.
Fig. 3 is present invention green assembled architecture wallboard schematic side view.
Fig. 4 is connecting elements and Bolted angle connection schematic diagram.
In figure 1. wallboard shell, 2. skeleton, 3. warming plate, 4. angle steel, 5. groove, 6. hoisting component, 7. glass fibers Dimension anchor, 8. connecting elements, 9. bolt, 101. outer panels, 102. wainscots, 201. outer skeletons, 202. inner frames.
Specific embodiment
It is better understood from the present invention for the ease of those skilled in the art, with specific embodiment, the present invention is done below in conjunction with the accompanying drawings Further describe, following is only exemplary not limit protection scope of the present invention.
A kind of green assembled architecture wallboard, including wallboard shell 1, skeleton 2 and warming plate 3, wallboard shell 1 includes outside Plate 101 and wainscot 102, skeleton 2 includes outer skeleton 201 and inner frame 202, outer panels 101, outer skeleton 201, warming plate 3, interior Skeleton 202 and wainscot 102 ecto-entad are sequentially compounding, and are filled with foam cement between outer panels 101 and outer skeleton 201 Or the outer lightweight core layer of granular polystyrene mortar, it is filled with foam cement or granular polystyrene sand between wainscot 102 and inner frame 202 The interior lightweight core layer of slurry, passes through bonding mortar and glues between outer panels 101 and outer lightweight core layer and wainscot 102 and interior lightweight core layer It is connected in one, outer panels 101 are all connected as one by bolt 9 with inner frame 202 with outer skeleton 201 and wainscot 102, outside Plate 101 and wainscot 102 are calcium silicate board with microporous.
Firm in view of structure, also include multiple spaced glass fibre anchors 7, glass fibre in the present embodiment Anchor 7 runs through warming plate 3, and two ends are condensed in outer lightweight core layer and interior lightweight core layer respectively.
In view of easy construction, in the present embodiment, also include hoisting component 6 and connecting elements 8, hoisting component 6 is embedded in Outer lightweight core layer top;Connecting elements 8 is embedded in interior lightweight core layer top, and connecting elements 8 is connected with angle steel 4 by bolt 9.
In the present embodiment, outer skeleton 201 and inner frame 202 surrounding side are provided with the groove 5 for placing waterproof adhesive tape.
A kind of preparation method of green assembled architecture wallboard, comprises the following steps:
1)Prefabricated outer skeleton 201 and inner frame 202, and reserved on outer skeleton 201 and inner frame 202 it is used on glass The duct that glass fiber anchor 7 passes through;
2)Glass fibre anchor 7 is arranged on warming plate 3;
3)Vertically place outer skeleton 201 and inner frame 202, the warming plate 3 with glass fibre anchor 7 is arranged on dermoskeleton Between frame 201 and inner frame 202, and by the anchor head at glass fibre anchor 7 two ends, outer skeleton 201 and inner frame 202 and guarantor Warm plate 3 connects;
4)Outer skeleton 201, inner frame 202 and warming plate 3 that horizontal positioned connects, wainscot 102 bolt 9 and internal skeleton Frame 202 connects, and carries out connecting elements 8 and inner frame 202, the connection work of wainscot 102 simultaneously;Wainscot 102 is made by rotation For bed die, spray one layer of adhesive mortar, cast in situs foam cement or granular polystyrene mortar light material shape in sash on demand Lightweight core layer in one-tenth, and embedded hoisting component 6;
5)After maintenance terminates, one layer of adhesive mortar, cast in situs foam cement in sash will be sprayed on warming plate 3 again Or granular polystyrene mortar light material forms outer lightweight core layer, outer panels 101 in placement, finally, with bolt 9 by outer panels 101 It is connected with outer skeleton 201.
Above only describes ultimate principle and the preferred implementation of the present invention, those skilled in the art can be according to foregoing description Many changes may be made and improves, and these changes and improvements should belong to protection scope of the present invention.

Claims (2)

1. a kind of preparation method of green assembled architecture wallboard, described green assembled architecture wallboard is successively by outer panels, outer Skeleton, warming plate, inner frame and wainscot are composited, and are filled with foam cement or granular polystyrene between outer panels and outer skeleton The outer lightweight core layer of mortar, is filled with the interior lightweight core layer of foam cement or granular polystyrene mortar between wainscot and inner frame, It is bonded as one by bonding mortar between outer panels and outer lightweight core layer and wainscot and interior lightweight core layer, outer panels and dermoskeleton Frame and wainscot are all bolted with inner frame and are integrated, and outer panels and wainscot are calcium silicate board with microporous;Green assembled is built Walling plate also includes multiple spaced glass fibre anchors, and glass fibre anchor runs through warming plate, and two ends are coagulated respectively Tie in outer lightweight core layer and interior lightweight core layer;Green assembled architecture wallboard also includes hoisting component and connecting elements, rises Hang component pre-buried at outer lightweight core layer top, connecting elements is embedded in interior lightweight core layer top, and connecting elements is by bolt even It is connected to angle steel it is characterised in that comprising the following steps:
1)Prefabricated outer skeleton and inner frame, and reserved on outer skeleton and inner frame it is used on what glass fibre anchor passed through Duct;
2)Glass fibre anchor is arranged on warming plate;
3)Vertically place outer skeleton and inner frame, by the warming plate with glass fibre anchor be arranged on outer skeleton and inner frame it Between, and by the anchor head at glass fibre anchor two ends, outer skeleton and inner frame are connected with warming plate;
4)Outer skeleton, inner frame and warming plate that horizontal positioned connects, wainscot bolt is connected with inner frame, carries out simultaneously Connecting elements and inner frame, the connection work of wainscot;Wainscot as bed die, is sprayed one layer of adhesive mortar by rotation on demand, In sash, cast in situs foam cement or granular polystyrene mortar light material form interior lightweight core layer, and embedded hoisting component;
5)After maintenance terminates, one layer of adhesive mortar will be sprayed on warming plate again, cast in situs foam cement or poly- in sash Benzene granule mortar light material forms outer lightweight core layer, upper outer panels, finally, is connected outer panels with outer skeleton with bolt.
2. according to claim 1 green assembled architecture wallboard preparation method it is characterised in that:Outer skeleton and inner frame Surrounding side is provided with the groove for placing waterproof adhesive tape.
CN201510301777.6A 2015-06-05 2015-06-05 The preparation method of green assembled architecture wallboard Active CN104863305B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510301777.6A CN104863305B (en) 2015-06-05 2015-06-05 The preparation method of green assembled architecture wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510301777.6A CN104863305B (en) 2015-06-05 2015-06-05 The preparation method of green assembled architecture wallboard

Publications (2)

Publication Number Publication Date
CN104863305A CN104863305A (en) 2015-08-26
CN104863305B true CN104863305B (en) 2017-03-01

Family

ID=53909437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510301777.6A Active CN104863305B (en) 2015-06-05 2015-06-05 The preparation method of green assembled architecture wallboard

Country Status (1)

Country Link
CN (1) CN104863305B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781007A (en) * 2016-04-26 2016-07-20 镇江港和新型建材有限公司 Concrete prefabricated wall body convenient to fix
CN106149966A (en) * 2016-08-29 2016-11-23 齐齐哈尔维思科技有限公司 A kind of multi-layer combined skeleton sandwich layer self-insulating external wall panel
CN108999331A (en) * 2018-07-05 2018-12-14 山东优派斯房屋工程有限公司 Internal frame assembled wallboard production technology
CN108729554B (en) * 2018-08-15 2023-10-13 中建集成房屋有限公司 Detachable awning cloth house and construction method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2649676Y (en) * 2003-10-30 2004-10-20 开平伟雄绿色板业有限公司 Composite light wall board
CN100385083C (en) * 2005-10-28 2008-04-30 广州市天座企业发展有限公司 Light compound side fascia and its manufacturing method
US8877329B2 (en) * 2012-09-25 2014-11-04 Romeo Ilarian Ciuperca High performance, highly energy efficient precast composite insulated concrete panels
CN103899036B (en) * 2013-12-31 2015-12-02 河北金源建材科技有限公司 A kind of calcium silicate board with microporous compound insulating material wallboard
CN203924475U (en) * 2014-06-28 2014-11-05 陕西纵达新型材料有限公司 Heat preservation composite wall material
CN204738444U (en) * 2015-06-05 2015-11-04 赵德存 Green assembly type structure wallboard

Also Published As

Publication number Publication date
CN104863305A (en) 2015-08-26

Similar Documents

Publication Publication Date Title
CN102691366B (en) Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure
CN104863305B (en) The preparation method of green assembled architecture wallboard
CN104652668B (en) Armored integrated wall and construction method thereof
CN205688655U (en) Prefabricated wall panel member
CN108842944A (en) A kind of assembled light composite thermo-insulating wall board and preparation method thereof and installation method
CN205046685U (en) External heated board of prefabricated masonry wall
CN202809892U (en) Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure
CN105421816B (en) Insulation energy-saving assembling house and construction method
CN104695662A (en) Stone facing prefabricated external wall plate as well as production method and external wall system thereof
CN204738444U (en) Green assembly type structure wallboard
CN204491984U (en) Stone facing precast wall panel and external wall system
CN206233401U (en) Assembled cast-in-place concrete frame insulating wall body construction
CN207829207U (en) Steel construction assembled architecture unit combined wall
CN202152508U (en) Light composite wallboard
CN206916990U (en) Assembled cast-in-place concrete sandwiched thermal-insulating wall steel skeleton template system and connector
CN107246095A (en) A kind of compound floor modules of steel skeleton
CN207776129U (en) A kind of thermal insulation board for exterior insulation
CN209293242U (en) A kind of compound internal partition wall of precast light
CN206529951U (en) A kind of compound floor modules of steel skeleton
CN206752744U (en) A kind of two-chamber heat-preserving wall component
CN107119815B (en) With lead pipe-coarse sand energy-dissipating and shock-absorbing key assembled linear type heat-preserving wall and the practice
CN206220303U (en) A kind of assembled architecture outer wall light insulating wall
CN206110422U (en) Prefabricated sound insulation floor that keeps warm of lattice formula
CN106522408A (en) Assembly type cast-in-place concrete frame thermal-insulating wall component
CN112323967A (en) Light and anti-seismic fabricated passive house and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20161108

Address after: 271600 Shandong city of Jining province Feicheng City, Yan Ji Road, No. 024

Applicant after: Shandong Lutai Building Materials Technology Group Co.,Ltd.

Address before: 271604 Shandong city of Tai'an province Feicheng City, Yan Ji Road, No. 024

Applicant before: Zhao Decun

CB02 Change of applicant information

Address after: 271600 Shandong city of Tai'an province Feicheng City, Yan Ji Road, No. 024

Applicant after: Shandong Lutai Building Materials Technology Group Co.,Ltd.

Address before: 271600 Shandong city of Jining province Feicheng City, Yan Ji Road, No. 024

Applicant before: Shandong Lutai Building Materials Technology Group Co.,Ltd.

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Preparation method for green assembly type building wallboard

Effective date of registration: 20190905

Granted publication date: 20170301

Pledgee: Taian Bank Co.,Ltd. Feicheng Branch

Pledgor: Shandong Lutai Building Materials Technology Group Co.,Ltd.

Registration number: Y2019370000029

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20201104

Granted publication date: 20170301

Pledgee: Taian Bank Co.,Ltd. Feicheng Branch

Pledgor: Shandong Lutai Building Materials Technology Group Co.,Ltd.

Registration number: Y2019370000029

PC01 Cancellation of the registration of the contract for pledge of patent right
TR01 Transfer of patent right

Effective date of registration: 20240106

Address after: 271600 Muzhuang village, Wangguadian sub district office, Feicheng City, Tai'an City, Shandong Province

Patentee after: SHANDONG LUTAI BUILDING INDUSTRIALIZATION MATERIAL Co.,Ltd.

Address before: No. 024 Jiyan Road, Feicheng City, Taian City, Shandong Province, 271600

Patentee before: Shandong Lutai Building Materials Technology Group Co.,Ltd.

TR01 Transfer of patent right