CN104842823B - A kind of bus-bar joint mechanism of subway tunnel - Google Patents

A kind of bus-bar joint mechanism of subway tunnel Download PDF

Info

Publication number
CN104842823B
CN104842823B CN201510108894.0A CN201510108894A CN104842823B CN 104842823 B CN104842823 B CN 104842823B CN 201510108894 A CN201510108894 A CN 201510108894A CN 104842823 B CN104842823 B CN 104842823B
Authority
CN
China
Prior art keywords
section
bus
fixed
bar
linkage section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510108894.0A
Other languages
Chinese (zh)
Other versions
CN104842823A (en
Inventor
高华喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Ocean University ZJOU
Original Assignee
Zhejiang Ocean University ZJOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ocean University ZJOU filed Critical Zhejiang Ocean University ZJOU
Priority to CN201510108894.0A priority Critical patent/CN104842823B/en
Publication of CN104842823A publication Critical patent/CN104842823A/en
Application granted granted Critical
Publication of CN104842823B publication Critical patent/CN104842823B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Installation Of Indoor Wiring (AREA)
  • Power-Operated Mechanisms For Wings (AREA)

Abstract

The invention provides a kind of bus-bar joint mechanism of subway tunnel.The linkage section that it solves bus-bar joint mechanism in existing subway tunnel drops the technical problem having some setbacks.The bus-bar joint mechanism of this subway tunnel, linkage section including left section of bus-bar, right section of bus-bar and in being used to connect between the two, described linkage section is detachably arranged between left section of bus-bar and right section of bus-bar, described Flood gate is hinged in tunnel inner body wall, and described linkage section is at the track of closing the door of Flood gate.The present invention there is time-consuming, in hgher efficiency, good stability, using safer.

Description

A kind of bus-bar joint mechanism of subway tunnel
Technical field
The present invention relates to a kind of subway tunnel, the bus-bar joint mechanism of particularly a kind of subway tunnel.
Background technology
With the fast development that urban rail transit in China is built, the form of rigid suspension catenary is widely adopted.Just Property suspension contact net be that the system that bus-bar from beginning to end is constituted is embedded in by contact line, it is electric railway locomotive and rail The visual plant of road vehicular traffic power supply, its quality good or not directly influences the operation of locomotive.
Flood gate is all devised in urban subway tunnel construction, when the special circumstances of war and serious leak are run into, The Flood gate and Flood gate in quick closedown tunnel are needed, to ensure tunnel and personal security.But, under the stop of bus-bar, Flood gate cannot be closed thoroughly, it is necessary to send special personnel to enter into tunnel, by one section of bus-bar at Flood gate from whole Disassembled on contact net system, when the situation is critical or water is larger, personnel cannot propagate into tunnel, even if can enter Tunnel, because existing design problem also causes that dismounting is more time-consuming.
In order to solve this problem, by retrieval find Chinese patent disclose a kind of rigid contact net can breakaway-element conflux Row's piecing devices (Application No.:201110361724.5) a kind of dis-connectable busbar joint device of rigid catenary, including Bus-bar A ends, bus-bar B ends and the linkage section in being used to connect between the two, it is characterised in that described bus-bar A ends It is connected with the two ends of linkage section by a sliding-type bus-bar joint respectively with bus-bar B ends, described slideable remittance Stream row's joint includes power supply arm support, quiet joint and dynamic joint, and described quiet joint is fixed on power supply arm support, and described is dynamic Joint is arranged in power supply arm support, and can be along supply arm bracket slide;Above-mentioned dynamic joint is respectively sleeved at linkage section On two ends, and slidable connection is formed with linkage section, above-mentioned quiet joint is fixedly connected with bus-bar A ends and bus-bar B ends respectively; The linkage that can make joint that linkage section is moved out towards quiet joint is provided with dynamic joint;Described linkage section and remittance An electrical connection band is additionally provided between stream row A ends or bus-bar B ends, described electrical connection band one end is fixed on linkage section, another End is fixed on bus-bar A ends or bus-bar B ends;Described linkage includes at least one pulley and steel wire rope, described Pulley is fixed on above-mentioned quiet joint, and steel wire rope one end is fixed on dynamic joint, and the described steel wire rope other end is passed through to be slided Wheel is connected with the power set that can provide pulling force.
In specification disclosed in the patent described in the 35th section of page 7, linkage section is at the Flood gate in tunnel, when even Connect section to be connected to when between bus-bar A ends and bus-bar B ends, Flood gate or closed guard gate cannot close.Prevent when needing to close When flooding door or closed guard gate, Flood gate passes through pulley three, pulley five, pulley two, pulley can to one active force of steel wire rope, steel wire rope Four and pulley one, the elastic force for overcoming spring to produce finally pulls dynamic joint towards dynamic joint movement, is set in linkage section two ends On dynamic joint after mobile one section of process, dynamic joint and linkage section are separated from, and now, linkage section is just by bus-bar A ends and remittance Stream row B is dropped down between end;Then, Flood gate or closed guard gate continue to close, and continue to exist to steel wire rope active force, steel wire rope It is pulled off in the presence of the active force, such linkage section is suspended on bus-bar A ends in the presence of band is electrically connected, and makes Flood gate Or closed guard gate can completely close.
But in actual use, the closing strength of Flood gate possibly cannot break steel wire rope, simultaneously as setting Too many pulley, steel wire rope is easily blocked, and leading actuating armature cannot move, so cause linkage section smoothly to drop.
The content of the invention
The purpose of the present invention is directed to existing technology and there is above mentioned problem, it is proposed that it is a kind of when being intake in tunnel can and When close Flood gate subway tunnel bus-bar joint mechanism, the piecing devices also have the spy that can make that linkage section smoothly drops Point.
The purpose of the present invention can be realized by following technical proposal:A kind of bus-bar joint mechanism of subway tunnel, institute The subway tunnel stated includes tunnel body, and the Flood gate that can close tunnel body is provided with described tunnel body;Its feature exists Include left section of bus-bar, right section of bus-bar and between the two for the linkage section for connecting, institute in this bus-bar joint mechanism The Flood gate stated is hinged in tunnel inner body wall, and described linkage section is at the track of closing the door of Flood gate, and described confluxes Location-plate is fixed with left section of row, perforating is offered on described location-plate, described location-plate lower hinge has supporting plate, The described supporting plate other end is provided with the location structure that the supporting plate end can be made to be resisted against at the right pars infrasegmentalis of bus-bar, described Linkage section is set on the supporting plate, and linkage section one end is in contact for left section through described perforating with bus-bar, and linkage section is another Right section with bus-bar of end is in contact, the rectangular in cross-section shape of the supporting plate, the section of the linkage section also rectangular shape, described Less than the length of supporting plate, the width of the linkage section is less than the width of supporting plate to the length of linkage section, in described supporting plate The locating piece one and locating piece two being parallel to each other are fixed with, the distance between the locating piece one and locating piece two are more than the company Connect the width of section, and described linkage section is between the locating piece one and locating piece two, described locating piece one and connection Spring one is provided between section, one end of the spring one is fixed on locating piece one, the other end of the spring one fixes limited Position plate one, described limiting plate one can be resisted against at described linkage section sidepiece, be set between described locating piece two and linkage section The one end for having spring two, the spring two is fixed on locating piece two, and the other end of the spring two is fixed with limiting plate two, institute The limiting plate two stated can be resisted against at described linkage section sidepiece;Described location structure includes opening up positioning on the supporting plate Hole, positioning rope and connection ring, described location hole are opened in supporting plate near one end of right section of bus-bar, and described location hole At sidepiece in linkage section, described positioning rope one end is fixed in location hole, and described positioning rope is in tensioned state, fixed The position rope other end is fixed in connection ring, and described connection ring is fixed on the roof of tunnel body, and described connection ring is in The surface of location hole;PLC is further fixed on the side wall of described tunnel body, described PLC may be programmed Controller has the output port that can be connected with external computer, and being additionally provided with the roof of described tunnel body can cut off fixed The chopping up apparatus of position rope, described chopping up apparatus include cutting off motor, and the described motor that cuts off can with described PLC by circuit Programmable controller is connected;Described chopping up apparatus also include saw blade, guide rail, sliding block and cylinder, and described saw blade is fixed on and cuts On the output shaft of power machine, described guide rail is fixed on the roof of tunnel body, and described sliding block is acted on guide rail, described The motor that cuts off be fixed on sliding block, described cylinder is fixed on the roof of tunnel body, the piston rod of cylinder with it is described Sliding block is mutually fixed, and cylinder is connected with described PLC, and described saw blade can connect with described positioning rope Touch;Right steel cable is provided between right section described of linkage section and bus-bar, described right steel cable one end is fixed on the right-hand member of linkage section, The right steel cable other end is fixed on right section of bus-bar through described connection ring, and described right steel cable is in tensioned state, described Right steel cable can be in contact with described positioning rope;Left steel cable, the left side are provided between left section described of linkage section and bus-bar Steel cable one end is fixed on the left end of linkage section, and the left steel cable other end is fixed on left section of bus-bar, the left steel cable and Fixing point and the fixing point between left steel cable and the left end of linkage section between left section of bus-bar distance between the two are a, institute The length for stating left steel cable is apart from least three times of a.
Left section of bus-bar, right section of bus-bar and linkage section are all to provide electric energy for the traveling to train, and PLC may be programmed The output port of controller is connected by circuit with the computer in the external world.Linkage section is at the Flood gate in tunnel, works as connection Section is connected to when between left section of bus-bar and right section of bus-bar, and Flood gate cannot be closed.When needing to close Flood gate, lead to Crossing computer gives PLC one signal, and motor start-up operation is cut off in PLC control, cuts off electricity The output shaft of machine starts to rotate, and saw blade is with rotation;Giving one signal of PLC, PLC again by computer can compile Range controller control cylinder is started working, and along slide, sliding block drives cutting motor to move to cylinder band movable slider again;Work as saw When piece touches left steel cable and positioning rope, saw blade can cut off left steel cable and positioning rope;After positioning rope is cut off, due to branch Fagging is hinged on location-plate, and under gravity, supporting plate can smoothly to lower swing, and linkage section is also to the bottom Dynamic, the direction of supporting plate is identical with gravity direction, and now, linkage section and supporting plate are prevented not in the track of closing the door in Flood gate Flooding door can live the intrinsic space-closed in tunnel in the presence of cylinder or motor.Linkage section limiting plate one, spring one, Without departing from supporting plate in the presence of limiting plate two and spring two, in case linkage section is lost;Even if in addition, spring one and spring two Failure, in the presence of left steel cable, linkage section is suspended on left section of bus-bar, will not be lost, and enables linkage section to continue to make next time With.
Supporting plate, location-plate, left steel cable and right steel cable are all made of stainless steel material, linkage section one end with conflux Left section of row is in contact, and the linkage section other end is in contact for right section with bus-bar, the electricity of left section of bus-bar is passed by linkage section Pass right section of bus-bar;The electricity that left section of bus-bar passes to supporting plate by location-plate, and linkage section is put on the supporting plate, supporting plate Linkage section is passed fax, the end of supporting plate is resisted against at right section of bottom of bus-bar, therefore, left section of bus-bar, connection What section and right section of bus-bar were all switched on;In addition, in the presence of left steel cable and right steel cable, left section of bus-bar, right section of bus-bar Can be powered with linkage section three.In sum, by way of retrocession, make left section of bus-bar, right section of bus-bar and connect Meeting section three can be powered, it is ensured that with enough electric energy when train passes through.
Both fixing point between left steel cable and left section of bus-bar and the fixing point between left steel cable and the left end of linkage section The distance between be a, the length of the left steel cable is apart from least three times of a.Such benefit is that left steel cable will not hinder to connect The swing of section is connect, left steel cable can make linkage section be powered, can prevent linkage section from dropping on the ground again, prevent linkage section from damaging, at one stroke Three.
Positioning lock is fixed with the roof of described tunnel body, above-mentioned connection ring is fixed on positioning lock.
Described connection ring includes inner ring body and outer ring body, and described inner ring body is made of high manganese steel material, described Outer ring body is made of elastomeric material, and described outer ring body is fixed on inner ring body by way of vulcanization.
The location-plate lower vertical is fixed with mounting blocks one and mounting blocks two, on described mounting blocks one and mounting blocks two Mounting hole one and mounting hole two are offered respectively, and one end of described supporting plate is fixed with jointed shaft, the described He of mounting hole one Mounting hole two is respectively fixed with positioning bearing one and positioning bearing two, and described jointed shaft is arranged on mounting blocks one and mounting blocks two Between, the two ends of described jointed shaft are separately fixed at the inner ring of the inner ring of positioning bearing one and positioning bearing two.
Alternatively situation, the location-plate lower vertical is fixed with mounting blocks one and mounting blocks two, described peace Mounting hole one and mounting hole two are offered respectively on dress block one and mounting blocks two, and one end of described supporting plate is fixed with and is hinged Axle, the two ends of described jointed shaft are located in mounting hole one and mounting hole two respectively, and described jointed shaft two ends have to be fixed Limited location disk, the external diameter of the spacing disk is more than mounting hole one and the aperture of mounting hole two.
Protective jacket is respectively fixed with outside described mounting blocks one and mounting blocks two, shape has lubricating oil in described protective jacket, Above-mentioned positioning bearing one and positioning bearing two is in lubricating oil.
Compared with prior art, the present invention has advantages below:
1st, linkage section and supporting plate is departed from the track of closing the door of Flood gate by operating computer, enable Flood gate and When closing, improve security.
2nd, cut off by saw blade in left steel cable compares background technology with positioning rope and steel wire rope broken by Flood gate, It is more time-consuming, in hgher efficiency, meanwhile, be also not in that cannot break steel wire rope and cause the feelings that Flood gate cannot close Condition, greatly improves security performance.
3rd, in the presence of using gravity, linkage section and supporting plate are enable to lower swing, so as to depart from the rail of closing the door of Flood gate Mark, is not in the situation that steel wire rope is stuck compared to many pulley structures are eliminated in background technology, improves stabilization Property, linkage section and supporting plate slowly break steel wire rope in swing phase is than background technology directly down, save many times, carry The high efficiency for closing Flood gate.
4th, make the dust in the external world not interfere with the normal of bearing by setting protective jacket to use, meanwhile, made using lubricating oil More preferably, service life is more permanent, enables supporting plate smoothly to lower swing for the using effect of bearing.
Brief description of the drawings
Fig. 1 is structural representation of the invention.
Fig. 2 is the top view of supporting plate.
Fig. 3 is the structural representation of chopping up apparatus.
In figure, 1, left section of bus-bar;2nd, right section of bus-bar;3rd, linkage section;4th, location-plate;5th, supporting plate;6th, locating piece one; 7th, locating piece two;8th, spring one;9th, spring two;10th, limiting plate one;11st, limiting plate two;12nd, location hole;13rd, positioning rope;14、 Connection ring;15th, motor is cut off;16th, saw blade;17th, guide rail;18th, sliding block;19th, cylinder;20th, left steel cable;21st, right steel cable;22nd, tunnel The roof of road body;23rd, positioning lock.
Specific embodiment
The following is specific embodiment of the invention and with reference to accompanying drawing, technical scheme is further described, But the present invention is not limited to these embodiments.
Embodiment one:
As shown in Figure 1, Figure 2 and Figure 3, subway tunnel includes tunnel body, and being provided with described tunnel body can close tunnel The Flood gate of road body;This bus-bar joint mechanism includes left section 1 of bus-bar, right section 2 of bus-bar and is used between the two The linkage section 3 of connection, described Flood gate is hinged in tunnel inner body wall, and described linkage section 3 is in closing the door for Flood gate At track, location-plate 4 is fixed with left section 1 of described bus-bar, perforating is offered on described location-plate 4, described determines The position lower hinge of plate 4 has supporting plate 5, and the described other end of supporting plate 5 is provided with can make the end of supporting plate 5 be resisted against the bus-bar right side Location structure at 2 bottoms of section, described linkage section 3 is arranged in supporting plate 5, perforating of the one end of linkage section 3 described in Left section 1 is in contact with bus-bar, and the other end of linkage section 3 is in contact for right section 2 with bus-bar, the rectangular in cross-section of the supporting plate 5 Shape, the section of the linkage section 3 also rectangular shape, the length of the length less than supporting plate 5 of the linkage section 3, the linkage section 3 Width less than supporting plate 5 width, the locating piece 1 and locating piece 27 being parallel to each other are fixed with described supporting plate 5, , more than the width of the linkage section 3, and described linkage section 3 is in institute for the distance between the locating piece 1 and locating piece 27 State between locating piece 1 and locating piece 27, spring 1, the spring one are provided between described locating piece 1 and linkage section 3 8 one end is fixed on locating piece 1, and the other end of the spring 1 is fixed with limiting plate 1, described limiting plate 1 Can be resisted against at the described sidepiece of linkage section 3, spring 29, the spring are provided between described locating piece 27 and linkage section 3 29 one end is fixed on locating piece 27, and the other end of the spring 29 is fixed with limiting plate 2 11, described limiting plate two 11 can be resisted against at the described sidepiece of linkage section 3;Described location structure includes the location hole 12 being opened in supporting plate 5, determines Position rope 13 and connection ring 14, described location hole 12 are opened in supporting plate 5 near one end of right section 2 of bus-bar, and described determine Position hole 12 is at the sidepiece of linkage section 3, and described one end of positioning rope 13 is fixed in location hole 12, at described positioning rope 13 In tensioned state, the other end of positioning rope 13 is fixed in connection ring 14, and described connection ring 14 is fixed on the roof of tunnel body On 22, described connection ring 14 is in the surface of location hole 12;Being further fixed on PLC on the side wall of described tunnel body can compile Range controller, described PLC has the output port that can be connected with external computer, described tunnel sheet The chopping up apparatus that can cut off positioning rope 13 are additionally provided with the roof 22 of body, described chopping up apparatus include cutting off motor 15, described The motor 15 that cuts off be connected with described PLC by circuit;Described chopping up apparatus also include saw blade 16, Guide rail 17, sliding block 18 and cylinder 19, described saw blade 16 are fixed on the output shaft for cutting off motor 15, and described guide rail 17 is fixed On the roof 22 of tunnel body, described sliding block 18 is acted on guide rail 17, and the described motor 15 that cuts off is fixed on sliding block 18 On, described cylinder 19 is fixed on the roof 22 of tunnel body, and the piston rod of cylinder 19 is mutually fixed with described sliding block 18, and Cylinder 19 is connected with described PLC, and described saw blade 16 can be in contact with described positioning rope 13;It is described Linkage section 3 and right section 2 of bus-bar between be provided with right steel cable 21, described one end of right steel cable 21 is fixed on the right-hand member of linkage section 3, The other end of right steel cable 21 is fixed on right section 2 of bus-bar through described connection ring 14, and described right steel cable 21 is in tightens shape State, described right steel cable 21 can be in contact with described positioning rope 13;It is provided between left section 1 of described linkage section 3 and bus-bar Left steel cable 20, described one end of left steel cable 20 is fixed on the left end of linkage section 3, and the other end of left steel cable 20 is fixed on bus-bar On left section 1, between the fixing point and the left end of left steel cable 20 and linkage section 3 between left section 1 of the left steel cable 20 and bus-bar Fixing point distance between the two is a, the length of the left steel cable 20 be apart from least three times of a, it is left in the present embodiment one The length of steel cable 20 is apart from four times of a.
Left section 1 of bus-bar, right section 2 of bus-bar and linkage section 3 are all to provide electric energy for the traveling to train, and PLC can The output port of programmable controller is connected by circuit with the computer in the external world.Linkage section 3 is at the Flood gate in tunnel, when Linkage section 3 is connected to when between right section 2 of left section 1 of bus-bar and bus-bar, and Flood gate cannot be closed.When need close flood Men Shi, gives PLC one signal by computer, and PLC control cuts off motor 15 and starts work Make, the output shaft for cutting off motor 15 starts to rotate, and saw blade 16 is with rotation;PLC one is given again by computer Individual signal, PLC control cylinder 19 is started working, and cylinder 19 is slided with movable slider 18 along guide rail 17, sliding block 18 drive cutting motor to move again;When saw blade 16 touches left steel cable 20 and positioning rope 13, saw blade 16 can be by the He of left steel cable 20 Positioning rope 13 cuts off;After positioning rope 13 is cut off, because supporting plate 5 is hinged on location-plate 4, in the effect of gravity Under, supporting plate 5 can smoothly to lower swing, and linkage section 3 is also to lower swing, and the direction of supporting plate 5 is identical with gravity direction, this When, linkage section 3 and supporting plate 5 be not in the track of closing the door in Flood gate, Flood gate energy in the presence of cylinder 19 or motor The intrinsic space-closed in tunnel is lived.Work of the linkage section 3 in limiting plate 1, spring 1, limiting plate 2 11 and spring 29 Without departing from supporting plate 5 under, in case linkage section 3 is lost;Even if in addition, spring 1 and spring 29 fail, in left steel cable 20 In the presence of, linkage section 3 is suspended on left section 1 of bus-bar, will not be lost, and linkage section 3 is continuing with next time.
Supporting plate 5, location-plate 4, left steel cable 20 and right steel cable 21 are all made of stainless steel material, linkage section 3 one Left section 1 with bus-bar of end is in contact, and the other end of linkage section 3 is in contact for right section 2 with bus-bar, so makes the electricity of left section 1 of bus-bar Bus-bar is passed to right section 2 by linkage section 3;The electricity that left section 1 of bus-bar passes to supporting plate 5, linkage section 3 by location-plate 4 It is placed in supporting plate 5, supporting plate 5 passs linkage section 3 fax, the end of supporting plate 5 is resisted against at right section of 2 bottoms of bus-bar , therefore, what left section 1 of bus-bar, linkage section 3 and bus-bar were all switched on for right section 2;
In addition, in the presence of left steel cable 20 and right steel cable 21, left section 1 of bus-bar, right section 2 of bus-bar and linkage section 3 three Person can be powered.In sum, by way of retrocession, left section 1 of bus-bar, right section 2 of bus-bar and the three of linkage section 3 are made Can be powered, it is ensured that with enough electric energy when train passes through.Fixing point and left steel between left section 1 of left steel cable 20 and bus-bar The fixing point restricted between 20 and the left end of linkage section 3 distance between the two is a, and the length of the left steel cable 20 is apart from a's At least three times.Such benefit is the swing that left steel cable 20 will not hinder linkage section 3, and left steel cable 20 can make linkage section 3 be powered, and Can prevent linkage section 3 from dropping on the ground, prevent linkage section 3 from damaging, killing three birds with one stone.
Positioning lock 23 is fixed with the roof 22 of tunnel body, above-mentioned connection ring 14 is fixed on positioning lock 23.Institute The connection ring 14 stated includes inner ring body and outer ring body, and described inner ring body is made of high manganese steel material, and described outer ring body is adopted It is made of elastomeric material, described outer ring body is fixed on inner ring body by way of vulcanization.
The lower vertical of the location-plate 4 is fixed with mounting blocks one and mounting blocks two, described mounting blocks one and mounting blocks two Upper to offer mounting hole one and mounting hole two respectively, one end of described supporting plate 5 is fixed with jointed shaft, described mounting hole one Positioning bearing one and positioning bearing two are respectively fixed with mounting hole two, described jointed shaft is arranged on mounting blocks one and mounting blocks Between two, the two ends of described jointed shaft are separately fixed at the inner ring of the inner ring of positioning bearing one and positioning bearing two.It is described Mounting blocks one and mounting blocks two outside be respectively fixed with protective jacket, shape has lubricating oil, above-mentioned locating shaft in described protective jacket Hold one and position bearing two and be in lubricating oil.
Embodiment two:
Content in the present embodiment two is substantially identical with the content in embodiment one, except that the institute in embodiment one State the lower vertical of location-plate 4 and be fixed with mounting blocks one and mounting blocks two, opened up respectively on described mounting blocks one and mounting blocks two The one end for having mounting hole one and mounting hole two, described supporting plate 5 is fixed with jointed shaft, described mounting hole one and mounting hole two Positioning bearing one and positioning bearing two are respectively fixed with, described jointed shaft is arranged between mounting blocks one and mounting blocks two, institute The two ends of the jointed shaft stated are separately fixed at the inner ring of the inner ring of positioning bearing one and positioning bearing two;And in the present embodiment two In, the lower vertical of the location-plate 4 is fixed with mounting blocks one and mounting blocks two, on described mounting blocks one and mounting blocks two respectively Mounting hole one and mounting hole two are offered, one end of described supporting plate 5 is fixed with jointed shaft, and the two ends of described jointed shaft are divided It is not located in mounting hole one and mounting hole two, described jointed shaft two ends have fixed limited location disk, the spacing disk Aperture of the external diameter more than mounting hole one and mounting hole two.
Specific embodiment described herein is only to the spiritual explanation for example of the present invention.Technology neck belonging to of the invention The technical staff in domain can be made various modifications or supplement to described specific embodiment or be replaced using similar mode Generation, but without departing from spirit of the invention or surmount scope defined in appended claims.
Although more having used left section of 1, bus-bar herein;2nd, right section of bus-bar;3rd, linkage section;4th, location-plate;5th, prop up Fagging;6th, locating piece one;7th, locating piece two;8th, spring one;9th, spring two;10th, limiting plate one;11st, limiting plate two;12nd, position Hole;13rd, positioning rope;14th, connection ring;15th, motor is cut off;16th, saw blade;17th, guide rail;18th, sliding block;19th, cylinder;20th, left steel cable; 21st, right steel cable;22nd, the roof of tunnel body;23rd, the term such as positioning lock, but it is not precluded from using the possibility of other terms.Make It is used for the purpose of more easily describing and explaining essence of the invention with these terms;It is construed as what any one was added Limitation is all disagreed with spirit of the present invention.

Claims (3)

1. a kind of bus-bar joint mechanism of subway tunnel, described subway tunnel includes tunnel body, described tunnel body Inside being provided with can close the Flood gate of tunnel body;It is characterized in that this bus-bar joint mechanism includes left section of bus-bar, bus-bar Right section and the linkage section in being used to connect between the two, described Flood gate are hinged in tunnel inner body wall, described company Connect section to be at the track of closing the door of Flood gate, location-plate is fixed with left section of described bus-bar, opened up on described location-plate There is perforating, described location-plate lower hinge has supporting plate, and the described supporting plate other end is provided with can make the supporting plate end The location structure at the right pars infrasegmentalis of bus-bar is resisted against, described linkage section is set on the supporting plate, and linkage section one end passes through institute The perforating stated is in contact for left section with bus-bar, and the linkage section other end is in contact for right section with bus-bar, the section of the supporting plate Rectangular shape, the section of the linkage section also rectangular shape, the length of the length less than supporting plate of the linkage section, the connection The width of section is fixed with the locating piece one and locating piece two being parallel to each other, institute less than the width of supporting plate in described supporting plate The width of the distance between locating piece one and locating piece two more than the linkage section is stated, and described linkage section is in the positioning Between block one and locating piece two, spring one is provided between described locating piece one and linkage section, one end of the spring one is fixed On locating piece one, the other end of the spring one is fixed with limiting plate one, and described limiting plate one can be resisted against described company Connect at section sidepiece, spring two is provided between described locating piece two and linkage section, one end of the spring two is fixed on locating piece On two, the other end of the spring two is fixed with limiting plate two, and described limiting plate two can be resisted against described linkage section sidepiece Place;Described location structure includes opening up location hole on the supporting plate, positioning rope and connection ring, and described location hole is opened in Supporting plate is at the sidepiece of linkage section near one end of right section of bus-bar, and described location hole, described positioning rope one end It is fixed in location hole, described positioning rope is in tensioned state, and the positioning rope other end is fixed in connection ring, described connection Ring is fixed on the roof of tunnel body, and described connection ring is in the surface of location hole;The side wall of described tunnel body On be further fixed on PLC, described PLC has the output that can be connected with external computer Port, is additionally provided with the chopping up apparatus that can cut off positioning rope on the roof of described tunnel body, described chopping up apparatus include cutting Power machine, the described motor that cuts off is connected by circuit with described PLC;Described chopping up apparatus are also wrapped Saw blade, guide rail, sliding block and cylinder are included, described saw blade is fixed on the output shaft for cutting off motor, and described guide rail is fixed on tunnel On the roof of road body, described sliding block is acted on guide rail, and the described motor that cuts off is fixed on sliding block, and described cylinder is consolidated It is scheduled on the roof of tunnel body, the piston rod of cylinder is mutually fixed with described sliding block, and cylinder and described PLC programmable controls Device processed is connected, and described saw blade can be in contact with described positioning rope;It is provided between right section described of linkage section and bus-bar Right steel cable, described right steel cable one end is fixed on the right-hand member of linkage section, and the right steel cable other end is fixed on through described connection ring On right section of bus-bar, described right steel cable is in tensioned state, and described right steel cable can be in contact with described positioning rope;It is described Linkage section and left section of bus-bar between be provided with left steel cable, described left steel cable one end is fixed on the left end of linkage section, the left side The steel cable other end is fixed on left section of bus-bar, the fixing point between the left steel cable and left section of bus-bar and left steel cable and is connected Fixing point distance between the two between the left end of section is a, and the length of the left steel cable is apart from four times of a;The positioning Plate lower vertical is fixed with mounting blocks one and mounting blocks two, and mounting hole is offered respectively on described mounting blocks one and mounting blocks two One and mounting hole two, one end of described supporting plate is fixed with jointed shaft, and the two ends of described jointed shaft are located in installation respectively In hole one and mounting hole two, described jointed shaft two ends have fixed limited location disk, and the external diameter of the spacing disk is more than peace Dress hole one and the aperture of mounting hole two.
2. the bus-bar joint mechanism of subway tunnel according to claim 1, it is characterised in that described tunnel body Positioning lock is fixed with roof, above-mentioned connection ring is fixed on positioning lock.
3. the bus-bar joint mechanism of subway tunnel according to claim 2, it is characterised in that described connection ring includes Inner ring body and outer ring body, described inner ring body are made of high manganese steel material, and described outer ring body is made of elastomeric material, institute The outer ring body stated is fixed on inner ring body by way of vulcanization.
CN201510108894.0A 2013-08-16 2013-08-16 A kind of bus-bar joint mechanism of subway tunnel Expired - Fee Related CN104842823B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510108894.0A CN104842823B (en) 2013-08-16 2013-08-16 A kind of bus-bar joint mechanism of subway tunnel

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201310359635.6A CN103419678B (en) 2013-08-16 2013-08-16 A kind of bus-bar joint device of subway tunnel
CN201510108894.0A CN104842823B (en) 2013-08-16 2013-08-16 A kind of bus-bar joint mechanism of subway tunnel

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201310359635.6A Division CN103419678B (en) 2013-08-16 2013-08-16 A kind of bus-bar joint device of subway tunnel

Publications (2)

Publication Number Publication Date
CN104842823A CN104842823A (en) 2015-08-19
CN104842823B true CN104842823B (en) 2017-06-13

Family

ID=49645222

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201510108894.0A Expired - Fee Related CN104842823B (en) 2013-08-16 2013-08-16 A kind of bus-bar joint mechanism of subway tunnel
CN201310359635.6A Expired - Fee Related CN103419678B (en) 2013-08-16 2013-08-16 A kind of bus-bar joint device of subway tunnel

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201310359635.6A Expired - Fee Related CN103419678B (en) 2013-08-16 2013-08-16 A kind of bus-bar joint device of subway tunnel

Country Status (1)

Country Link
CN (2) CN104842823B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103434419B (en) * 2013-08-16 2015-08-26 浙江海洋学院 A kind of subway tunnel
CN107482384B (en) * 2017-09-11 2024-02-20 长沙勤凯智能科技有限公司 Automatic disconnection joint device of rigid contact net
WO2020011236A1 (en) * 2018-07-12 2020-01-16 广州地铁设计研究院股份有限公司 Automatic disconnection and re-connection device for rigid overhead lines
CN110203110B (en) * 2019-07-15 2024-02-13 中国铁建电气化局集团第五工程有限公司 Disconnectable joint device of rigid contact net busbar
CN111806307A (en) * 2020-06-05 2020-10-23 天津中铁电气化设计研究院有限公司 Movable contact net at civil air defense partition door

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4846478B2 (en) * 2006-07-27 2011-12-28 東海旅客鉄道株式会社 Support device for the rigid rail line in Shinji
JP5105530B2 (en) * 2008-01-30 2012-12-26 三和テッキ株式会社 Short-circuit bar for ground detection device
CN202319964U (en) * 2011-11-15 2012-07-11 浙江旺隆轨道交通设备有限公司 Sliding mechanism in severable bus-bar piecing device of rigid contact net
CN102501781B (en) * 2011-11-15 2013-12-25 浙江旺隆轨道交通设备有限公司 Disconnectable busbar joint device of rigid contact network
CN202319968U (en) * 2011-11-15 2012-07-11 浙江旺隆轨道交通设备有限公司 Link gear in dis-connectable busbar joint device of rigid catenary
CN202319963U (en) * 2011-11-15 2012-07-11 浙江旺隆轨道交通设备有限公司 Guide mechanism in breakable bus bar joint device of rigid contact network
CN202319967U (en) * 2011-11-15 2012-07-11 浙江旺隆轨道交通设备有限公司 Limit mechanism in interruptable busbar joint device of rigid contact network

Also Published As

Publication number Publication date
CN103419678A (en) 2013-12-04
CN103419678B (en) 2015-09-23
CN104842823A (en) 2015-08-19

Similar Documents

Publication Publication Date Title
CN104842823B (en) A kind of bus-bar joint mechanism of subway tunnel
CN104790967B (en) Subway tunnel provided with programmable logic controllers (PLCs)
CN102501781B (en) Disconnectable busbar joint device of rigid contact network
CN104709116B (en) The bus-bar joint device of subway tunnel
CN105128680A (en) Three-freedom-degree series-parallel type pantograph
CN202319968U (en) Link gear in dis-connectable busbar joint device of rigid catenary
CN202319963U (en) Guide mechanism in breakable bus bar joint device of rigid contact network
CN204383201U (en) A kind of charging unit of energy storage electric motor vehicle
CN102390289B (en) Sliding-type bus-bar joint
CN104723904B (en) The bus-bar joint device of the subway tunnel improved
CN202686385U (en) Inclined roadways full section steel wire rope vehicle-blocking device
CN203345874U (en) Lateral protection device of footboard of flexible guiding special elevator
CN103231110B (en) Busbar cut-off device used for vertical rotation type anti-flooding door of subway
CN208428997U (en) Rigid contact net is from dynamic circuit breaker apparatus for coating
CN206985319U (en) A kind of track traffic cable actinobacillus device
CN202139987U (en) Safe pneumatic metro shield door
CN102330533A (en) Pneumatic safety underground shielding door
CN202319961U (en) Rigid contact net disconnected-type bus-bar connector device
CN106986223A (en) A kind of track traffic cable actinobacillus device
CN202319962U (en) Slideable busbar joint
CN209700640U (en) A kind of lifting gate
CN208615725U (en) A kind of mobile power supply system of Underground-Ditch-Pattern
CN201159028Y (en) Standard fan door mechanism for underground ticket checking passage
CN208201530U (en) A kind of railway construction machine guard rail device device
CN109484195B (en) Novel rotary contact rail current collector and protection cover matched with same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170613

Termination date: 20170816

CF01 Termination of patent right due to non-payment of annual fee