CN104832175B - The method that a kind of other up second mining of bilateral part filling of post pedals sky coal seam - Google Patents

The method that a kind of other up second mining of bilateral part filling of post pedals sky coal seam Download PDF

Info

Publication number
CN104832175B
CN104832175B CN201510116512.9A CN201510116512A CN104832175B CN 104832175 B CN104832175 B CN 104832175B CN 201510116512 A CN201510116512 A CN 201510116512A CN 104832175 B CN104832175 B CN 104832175B
Authority
CN
China
Prior art keywords
coal seam
sky
tool post
exploiting field
pedals
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510116512.9A
Other languages
Chinese (zh)
Other versions
CN104832175A (en
Inventor
冯国瑞
白锦文
李振
张玉江
戚庭野
郭军
张钰亭
康立勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Technology
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN201510116512.9A priority Critical patent/CN104832175B/en
Publication of CN104832175A publication Critical patent/CN104832175A/en
Application granted granted Critical
Publication of CN104832175B publication Critical patent/CN104832175B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/08Filling-up hydraulically or pneumatically

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses the method that a kind of other up second mining of bilateral part filling of post pedals sky coal seam.This invention is on the basis of differentiation is pedaled sky coal seam Upward mining feasibility, verified tool post formula residual exploiting field coal column group and dead zone group's distribution situation, using the method for the other bilateral part filling of post, side has been protected and is pedaled sky coal seam and underlie tool post formula residual exploiting field coal column group successively, and gradually sky coal resources are pedaled in extraction.The other bilateral obturator of post that this invention is formed in the group of dead zone can not only be all risen to side to tool post formula coal column and be protected effect, and common supporting body can be formed therewith, and then reduce stress concentration degree and the deformation of creep of coal column group, strengthen long-time stability, avoid the unstable failure of Local Instantaneous unstability or " dominoes " formula, and ultimate guarantee tool post formula residual exploiting field overlying pedals the safe working in sky coal seam.

Description

The method that a kind of other up second mining of bilateral part filling of post pedals sky coal seam
Technical field
The present invention relates to technical field of coal exploitation, especially relate to a kind of other up second mining of bilateral part filling of post and pedal sky The method in coal seam, is primarily adapted for use in the safe working that tool post formula residual exploiting field overlying pedals sky coal seam.
Background technology
Currently, the contradiction of coal resources finiteness and its consumption demand unlimitedness.Residual coal second mining is to slow down The Important Action of above-mentioned contradiction.Residual coal second mining not only can improve the recovery ratio of coal resources, enterprise economic benefit, and Mine service-life can be extended, promote sustainable development.
In recent years, the residual exploiting field in colliery Upward mining increasingly becomes focus of concern.By mining influence in advance, residual adopt The integrity of area Deng Kong coal seam and its floor strata and stability all suffer from different degrees of damage, and then may cause ore deposit Well disaster, impact safety in production.Therefore, residual exploiting field overlying is pedaled sky safely mining of coalbed feasibility assessment and is determined to be up opening The top priority adopted.Traditionally, the method for discrimination of residual exploiting field Upward mining feasibility mainly includes:" three bands " diagnostic method, country rock Counterbalanced procedure, ratio discriminatory method and mathematics analytic process etc..CN101109283B is from the angle quantitative identification of interlayer strata structure Pedal the feasibility of sky coal seam Upward mining;CN104239697A is first modeled to Upward mining influence factor using PCA, then Weight calculation is carried out using variance contribution ratio to institute's established model, and then have rated the feasibility of Upward mining; CN103147737A provides a kind of detection method of Upward mining Overburden Failure Law, discloses overlying strata during Upward mining The temporal and spatial evolution destroyed, solves the problems, such as that Upward mining work surface and roadway layout rationally determine it is ensured that up open The safety adopted.The aforementioned method of discrimination pedaling sky coal seam Upward mining feasibility is mainly from interlayer depth of stratum and its stability Angularly start with research, it can be realized the differentiation in advance and evaluation to residual exploiting field Deng Kong coal seam Upward mining feasibility, enter And instruct engineering practice.
However, the theoretical research of existing Upward mining and engineering practice rarely have stablizing of concern tool post formula residual exploiting field coal column group Property is to the impact pedaling sky safely mining of coalbed.The stability of tool post formula residual exploiting field coal column group governs pedals sky coal seam Upward mining Safety is carried out, and it pedals sky coal seam with overlying and its floor strata forms a cogeneration system.With the residual exploiting field of tool post formula gradually Formed, stope stress redistributes because of the releasing of coal column lateral stress.The stress of so tool post formula Remnant mining coal column will It is changed into the load of Relatively centralized distribution from equally distributed load originally, and gradually pedal diffusion in sky seat earth rock stratum to overlying With transmission.In the process, tool post formula residual exploiting field coal column from outward appearance to inner essence can occur creep rupture, its effective bearing area also by Decrescence little, the distribution again of concentrated stress thus can be caused to expand the surrender width of coal column further, reduce its elastic kernel The width in area.When the effective bearing area of tool post formula residual exploiting field coal column continues to be reduced to its ultimate bearing area, will occur Instantaneous unstable failure.Now, the destruction ripple that the instantaneous unstability of above-mentioned coal column produces may shift and be diffused into adjacent coal column, Cause the unstable failure of tool post formula residual exploiting field coal column group " dominoes " formula, and then affect overlying and pedal sky coal seam and its base plate rock The globality of layer and stability, or even produce the disasters such as bump, threaten safe and efficient production.
To sum up, need badly to find a kind of reinforcement and pedal sky coal seam and underlie the method for tool post coal column group's stability, and then effectively solving There is the unstability of Local Instantaneous unstability or " dominoes " formula in tool post formula residual exploiting field coal column group during pedaling sky seam mining Destroy, and ultimate guarantee is pedaled the safety of sky coal seam Upward mining and carried out.
Content of the invention
The technical problem to be solved is:Provide a kind of other up second mining of bilateral part filling of post and pedal sky coal seam Method, efficiently solve tool post formula residual exploiting field coal column group pedal sky coal seam Upward mining process occur Local Instantaneous unstability or The unstable failure of " dominoes " formula, has ensured the safety pedaling sky coal seam Upward mining.
For solving above-mentioned technical problem, the technical scheme is that:A kind of other up second mining of bilateral part filling of post is pedaled The method in empty coal seam is pedaled sky coal seam Upward mining feasibility, is verified tool post formula residual exploiting field coal column group and dead zone group distribution shape in differentiation On the basis of condition, using the method for the other bilateral part filling of post, side has been protected and is pedaled sky coal seam and underlie tool post formula residual exploiting field coal column successively Group, and gradually sky coal resources are pedaled in extraction.Described technical scheme specifically follows the steps below:
(1) differentiate that tool post formula residual exploiting field overlying pedals the feasibility of sky coal seam Upward mining;
(2) combine the original geology of mine, technical data, exploration find out pedal sky coal seam underlie tool post formula residual exploiting field coal column group and The distribution situation of dead zone group, the distributional pattern figure drawing tool post formula residual exploiting field coal column group with dead zone group is to instruct safety life to adopt;
(3) driving pedals the stope drift active workings in sky coal seam, and arrangement pedals sky working face of coal seam;
(4) from top to bottom hole pedaling sky working face of coal seam base plate, arrangement tool post formula residual exploiting field dead zone group's paste body filling Transfer pipeline;
(5) prepare fill paste, the transfer pipeline along step (4) will be uniform for the mastic preparing in the presence of filling pump So as to setting and hardening produces side shield effect to tool post formula residual exploiting field end coal column in injection tool post formula residual exploiting field end dead zone;
(6) sky working face of coal seam is pedaled in propulsion, when exploiting 3-8m before line is advanced into next tool post dead zone boundary line, stops Propulsioning face;
(7) with the gradually propulsion pedaling sky coal seam, the construction technology of repeat step (4), (5) and (6), using the other bilateral of post The mode of part filling side shield tool post formula residual exploiting field coal column group successively, and gradually sky coal resources are pedaled in extraction.
Preferably, described step (1) is using " three bands " diagnostic method, country rock counterbalanced procedure, ratio discriminatory method, mathematical analysis method Carry out comprehensive distinguishing tool post formula residual exploiting field overlying with quantitative identification method described in CN101109283B for the Authorization Notice No. and pedal sky coal seam The feasibility of Upward mining.
Preferably, by investigating the original geology of mine, technical data, described step (2) investigates thoroughly that pedaling sky coal seam underlies tool post The width of formula residual exploiting field dead zone group and coal column group, highly, precisely detects tool post formula residual exploiting field dead zone using three-dimensional laser scanner The distribution orientation of group, size and volume.
Preferably, the top arrangement of the tool post formula residual exploiting field end coal column that described step (3) is verified in step (2) pedals sky The stope drift active workings in coal seam and work surface.
Preferably, in described step (4), drilling construction is carried out using casing drilling technology, bore dia be 60 120mm, Pitch of holes is 5 20m, hole inclination angle is 10 ° 60 °, drilling depth h is determined by interlayer depth of stratum and bore inclining angle.
Preferably, described step (5) is gangue/discarded concrete according to mass percent:Flyash:Cement:Subtract Water preparation:Water=45% 55%:15% 20%:10% 15%:3% 5%:15% 25% ratio, compound concentration Fill paste for 75% 85%, the distributed dimension of each dead zone in the residual exploiting field of tool post formula that amount of preparation is found out by step (2) exploration To determine with volume of distribution.
Preferably, in described step (5) Stress control of filling pump in 2 6MPa.
Preferably, the advance distance pedaling sky working face of coal seam in described step (6) is [(a+b) ± 5] m;Wherein, a is Tool post formula residual exploiting field depletion region width, b is tool post formula residual exploiting field coal pillar width.
Preferably, width sum c of the other bilateral obturator of described step (7) center pillar1+c2Empty less than the residual exploiting field of tool post formula The width a in area.
Using technique scheme, the invention has effective effect that:
This invention is pedaled sky coal seam Upward mining feasibility, is verified tool post formula residual exploiting field coal column group and dead zone group distribution in differentiation On the basis of situation, using the method for the other bilateral part filling of post, side has been protected and is pedaled sky coal seam and underlie tool post formula residual exploiting field coal column successively Group, and gradually sky coal resources are pedaled in extraction.The other bilateral obturator of post that this invention is formed in the group of dead zone can not only be to tool post formula Coal column is all risen and is protected effect to side, and can form common supporting body therewith, and then reduces the stress concentration degree of coal column group and compacted Deformation, strengthens long-time stability, it is to avoid the unstable failure of Local Instantaneous unstability or " dominoes " formula occurs, and finally protects Barrier tool post formula residual exploiting field overlying pedals the safe working in sky coal seam.
Brief description
Fig. 1 pedals sky working face of coal seam arrangement schematic diagram for tool post formula residual exploiting field overlying;
Fig. 2 is the other filling schematic diagram of tool post formula residual exploiting field end coal column post;
Fig. 3 pedals sky working face of coal seam propulsion schematic diagram for tool post formula residual exploiting field overlying;
Fig. 4 is the other bilateral part filling three-dimensional effect diagram of tool post formula residual exploiting field dead zone bundle pillar;
Fig. 5 is the other bilateral part filling planar effect picture of tool post formula residual exploiting field dead zone bundle pillar.
In figure:1 pedals sky coal seam;2 interlayer rock stratum;3 tool post formula residual exploiting field coal columns;4 tool post formula residual exploiting fields dead zone; 5 pedal sky working face of coal seam;The other bilateral part fill line road of 6 posts;7 tool post formulas residual exploiting field Filling mine-out area body;A knife Pillar residual exploiting field depletion region width;B tool post formula residual exploiting field coal pillar width;c1Obturator width on the left of the dead zone of tool post formula residual exploiting field Degree;c2Obturator width on the right side of the dead zone of tool post formula residual exploiting field.
Specific embodiment
Following examples are intended to make schematic illustration and explanation to the present invention, not delimit the scope of the invention.
In order to have clearer understanding to the technical goal of the present invention, feature and effect, in conjunction with accompanying drawing to post side bilateral The method that the up second mining of part filling pedals sky coal seam is described in further detail.
The nineties in 20th century, Xishan coal electricity group Bai Jiazhuan colliery surmounts No. 6 coal seams and has preferentially exploited bottom 8 coal Layer.At present, Bai Jiazhuan colliery 6 coal seam 36703 work surface ground location is located at smelting valley ventilating shaft west and south mountain area, and down-hole is located at south Cheat 1001 horizontal seven panel right flanks, left front portion is 36502 work face goafs, and left back portion is unworked country, and right part is 36701 work Face unworked country, bottom is 38502 tool post formula goafs, belongs to typical tool post formula residual exploiting field overlying and pedals sky coal seam.No. 8 coal seams The stability of 36502 tool post formulas residual exploiting field coal column group seriously governs No. 6 coal seam 36703 work surfaces and pedals null resource Upward mining Safety carry out.For above-mentioned situation, below in conjunction with the accompanying drawings the implementation process of the present invention is described in further detail.
Step one, using " three bands " diagnostic method, country rock counterbalanced procedure, ratio discriminatory method, mathematical analysis method and Authorization Notice No. Quantitative identification method described in CN101109283B, the feasibility of No. 6 Deng Kong coal seam 1 Upward mining in dialogue man village colliery is made comprehensively Differentiate:Pedal in the warp damage that sky coal seam 1 is located at interlayer rock stratum 2, structural deterioration degree is less, only there occurs and moves integrally;8 Above number residual exploiting field of coal seam tool post formula, there is the thick hard limestone that can play balanced action, it can ensure that pedaling sky coal seam 1 does not occur The step changing of the relative positions;Pedaling sky coal seam 1 and the mining influence multiple in No. 8 coal seams is 6.8;The necessary interlamellar spacing of Upward mining is 10.4m, bright Aobvious being less than pedals sky coal seam 1 and the thickness 27.9m of No. 8 coal seams interlayer rock stratum 2;Pedal sky coal seam 1 Upward mining and meet quantitative identification method Described adopted situation.To sum up, Bai Jiazhuan colliery 8 coal seam 36502 tool post formula residual exploiting field overlying pedals sky coal seam 1 Upward mining is Feasible.
Step 2, knows according to original geology, technical data, Bai Jiazhuan colliery 8 coal seam 36502 tool post formula residual exploiting field coal column 3 groups and the width respectively 5m 15m and 15 40m of tool post formula residual exploiting field dead zone 4 groups, highly it is 3.8m;Swashed using three-dimensional Photoscanner precisely reconnoitres the distribution orientation of 36502 tool post formula residual exploiting field coal column 3 groups and tool post formula residual exploiting field dead zone 4 groups, size And volume, draw the distributional pattern figure of No. 8 coal seam 36502 tool post formula residual exploiting field coal columns 3 groups and tool post formula residual exploiting field dead zone 4 groups with Instruct the safe second mining pedaling sky coal seam 1 coal resources.
Step 3, starts to tunnel the back production pedaling sky coal seam 1 above the tool post formula residual exploiting field end coal column that step 2 is detected Tunnel, arrangement pedals the work surface 5 in sky coal seam.
Step 4, is pedaling sky working face of coal seam 5 base plate from top to bottom using casing drilling technology (setting of casing in drilling) Boring, bore dia is 80mm, pitch of holes L is 12m, hole inclination angle is 30 °, drilling depth h is 30 36m, the other bilateral of arrangement post Part fill line road 6.
Step 5, is gangue/discarded concrete according to mass percent:Flyash:Cement:Water reducer:Water=50%: 15%:15%:5%:15% ratio, compound concentration is 80% fill paste, and its amount of preparation explores, by step 2,8 finding out The distributed dimension of number each dead zone in the residual exploiting field of coal seam 36502 tool post formula and volume determine.
Step 6, in the presence of filling pump, along step 4 arrangement the other bilateral part fill line road 6 of post by step The mastic preparing in five is uniformly injected into be pedaled sky coal seam 1 and underlies in dead zone so as to diffusion is enriched, to No. 8 coal seams 36502 tool post formula Residual exploiting field end coal column produces side shield effect.
Step 7, sky working face of coal seam 5 (advance distance is 20 25m) is pedaled in propulsion, and line to be exploited is advanced into next knife Before the boundary line of pillar residual exploiting field dead zone 4 during 5m, stop propulsion and pedal sky working face of coal seam 5.
Step 8, the construction technology of repeat step four, five, six and seven, by the way of the other bilateral part filling of post successively No. 8 coal seam 36502 tool post formula residual exploiting field coal columns 3 groups are protected in side, and gradually sky coal seam 1 coal resources are pedaled in extraction.
The above be the preferred embodiment of the present invention it is noted that without departing from technical spirit of the present invention with Any improvement on the premise of principle, above-mentioned implementation made with polish, belong to the protection model of technical solution of the present invention Enclose.

Claims (9)

1. a kind of other up second mining of bilateral part filling of post pedals the method in sky coal seam it is characterised in that comprising the following steps:
(1) differentiate that tool post formula residual exploiting field overlying pedals the feasibility of sky coal seam Upward mining;
(2) the original geology of mine, technical data are combined, exploration finds out that pedaling sky coal seam underlies tool post formula residual exploiting field coal column group and dead zone The distribution situation of group, the distributional pattern figure drawing tool post formula residual exploiting field coal column group with dead zone group is to instruct safety in production;
(3) driving pedals the stope drift active workings in sky coal seam, and arrangement pedals sky working face of coal seam;
(4) from top to bottom hole pedaling sky working face of coal seam base plate, the conveying of arrangement tool post formula residual exploiting field dead zone group's paste body filling Pipeline;
(5) prepare fill paste, along the transfer pipeline of step (4), the mastic preparing is uniformly injected in the presence of filling pump So as to setting and hardening produces side shield effect to tool post formula residual exploiting field end coal column in the end dead zone of tool post formula residual exploiting field;
(6) sky working face of coal seam is pedaled in propulsion, when exploiting 3-8m before line is advanced into next tool post dead zone boundary line, stops propulsion Work surface;
(7) with the gradually propulsion pedaling sky coal seam, the construction technology of repeat step (4), (5) and (6), using the other bilateral part of post The mode of filling side shield tool post formula residual exploiting field coal column group successively, and gradually sky coal resources are pedaled in extraction.
2. the other up second mining of bilateral part filling of post according to claim 1 pedals the method in sky coal seam it is characterised in that institute The step (2) stated by investigate the original geology of mine, technical data investigate thoroughly pedal sky coal seam underlie tool post formula residual exploiting field dead zone group and The width of coal column group, highly, precisely detect distribution orientation, the size of tool post formula residual exploiting field dead zone group using three-dimensional laser scanner And volume.
3. the other up second mining of bilateral part filling of post according to claim 1 pedals the method in sky coal seam it is characterised in that institute The top arrangement of the tool post formula residual exploiting field end coal column that the step (3) stated is detected in step (2) pedal the stope drift active workings in sky coal seam with Work surface.
4. the other up second mining of bilateral part filling of post according to claim 1 pedals the method in sky coal seam it is characterised in that institute The step (4) stated carries out drilling construction using casing drilling technology, and bore dia is 60 120mm, pitch of holes L is 5 20m, brill Hole inclination angle is 10 ° 60 °, drilling depth h is determined by interlayer depth of stratum and bore inclining angle.
5. the other up second mining of bilateral part filling of post according to claim 1 pedals the method in sky coal seam it is characterised in that institute In the step (5) stated, fill paste is gangue/discarded concrete according to mass percent:Flyash:Cement:Water reducer:Water =45% 55%:15% 20%:10% 15%:3% 5%:15% 25% proportions form, and its concentration is For 75% 85%.
6. the other up second mining of bilateral part filling of post according to claim 1 pedals the method in sky coal seam it is characterised in that institute In the step (5) stated, the amount of preparation of fill paste explores dividing of each dead zone in the residual exploiting field of tool post formula found out according to described step (2) Cloth size and volume of distribution are determining.
7. the other up second mining of bilateral part filling of post according to claim 1 pedals the method in sky coal seam it is characterised in that institute In the step (5) stated, the Stress control of filling pump is in 2 6MPa.
8. the other up second mining of bilateral part filling of post according to claim 1 pedals the method in sky coal seam it is characterised in that institute The advance distance pedaling sky working face of coal seam in the step (6) stated is [(a+b) ± 5] m;Wherein, a is tool post formula residual exploiting field dead zone Width, b is the width of tool post formula residual exploiting field coal column.
9. the other up second mining of bilateral part filling of post according to claim 1 pedals the method in sky coal seam it is characterised in that institute The width sum of the other bilateral obturator of step (7) center pillar stated should be less than the width of tool post formula residual exploiting field dead zone.
CN201510116512.9A 2015-03-17 2015-03-17 The method that a kind of other up second mining of bilateral part filling of post pedals sky coal seam Active CN104832175B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510116512.9A CN104832175B (en) 2015-03-17 2015-03-17 The method that a kind of other up second mining of bilateral part filling of post pedals sky coal seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510116512.9A CN104832175B (en) 2015-03-17 2015-03-17 The method that a kind of other up second mining of bilateral part filling of post pedals sky coal seam

Publications (2)

Publication Number Publication Date
CN104832175A CN104832175A (en) 2015-08-12
CN104832175B true CN104832175B (en) 2017-03-01

Family

ID=53810317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510116512.9A Active CN104832175B (en) 2015-03-17 2015-03-17 The method that a kind of other up second mining of bilateral part filling of post pedals sky coal seam

Country Status (1)

Country Link
CN (1) CN104832175B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105545309B (en) * 2015-12-11 2018-05-04 太原理工大学 A kind of method that coal column is left in filling second mining residual exploiting field in bilateral part by column
CN106121645B (en) * 2016-06-24 2018-05-04 太原理工大学 The method that coal column group is left in a kind of residual exploiting field of step construction filling second mining
CN109236297B (en) * 2018-09-14 2020-07-14 太原理工大学 Coal mining method for remaining coal seam in residual mining area of cracking and filling combined ascending re-mining cutter column

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101109283A (en) * 2007-08-20 2008-01-23 太原理工大学 quantitative decision method for feasibility of mining above hollow
CN101302934A (en) * 2008-06-25 2008-11-12 闫振东 Coal mining method with three steps
CN101725352A (en) * 2009-12-04 2010-06-09 中国矿业大学 Method for filling solid and fully mechanizing and recovering room type coal pillar
CN101858217A (en) * 2010-05-18 2010-10-13 中南大学 House pillar changeable panel upward demix filling mining method
CN102251773A (en) * 2011-06-22 2011-11-23 大冶有色金属股份有限公司 Route type upward horizontal layered filling mining method suitable for extremely complex ore body mining
CN102953732A (en) * 2011-08-17 2013-03-06 彭康 Room-and-pillar major-diameter longhole inverted-step-like segmented lateral caving subsequent filling mining method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101109283A (en) * 2007-08-20 2008-01-23 太原理工大学 quantitative decision method for feasibility of mining above hollow
CN101302934A (en) * 2008-06-25 2008-11-12 闫振东 Coal mining method with three steps
CN101725352A (en) * 2009-12-04 2010-06-09 中国矿业大学 Method for filling solid and fully mechanizing and recovering room type coal pillar
CN101858217A (en) * 2010-05-18 2010-10-13 中南大学 House pillar changeable panel upward demix filling mining method
CN102251773A (en) * 2011-06-22 2011-11-23 大冶有色金属股份有限公司 Route type upward horizontal layered filling mining method suitable for extremely complex ore body mining
CN102953732A (en) * 2011-08-17 2013-03-06 彭康 Room-and-pillar major-diameter longhole inverted-step-like segmented lateral caving subsequent filling mining method

Also Published As

Publication number Publication date
CN104832175A (en) 2015-08-12

Similar Documents

Publication Publication Date Title
CN104832174B (en) The method that the other bilateral up second mining of whole filling of a kind of post pedals sky coal seam
CN104790952B (en) The other unilateral up second mining of part filling of a kind of post pedals the method in sky coal seam
Wang et al. Safe strategy for coal and gas outburst prevention in deep-and-thick coal seams using a soft rock protective layer mining
CN107313778B (en) A kind of second mining super high seam stops the method for adopting line coal column
CN101122235B (en) Method for controlling wall rock of fully mechanized coal face goaf side coalbed laneway
CN107559008B (en) A method of joint second mining super high seam stops adopting line coal column
CN109763822A (en) Face in steep thick coal seam Multi sectional is without coal column placement method between coal column staggered floor Hu Xiang and section
CN106050283B (en) A kind of three soft coal layer re-exploration laneway support design method and device
CN109236297B (en) Coal mining method for remaining coal seam in residual mining area of cracking and filling combined ascending re-mining cutter column
CN105422099A (en) Method for completely filling two sides of pillars with repeated mining and residual mining area remaining coal pillars
CN106150545B (en) A kind of method that the filling of goaf part is carried out according to roof caving feature
CN104832175B (en) The method that a kind of other up second mining of bilateral part filling of post pedals sky coal seam
CN113216967B (en) Facing safety mining method for adjacent working surfaces under shallow-buried close-range room-pillar goaf
CN104775818B (en) Method for performing ascending re-mining on hollow coal bed by column with one completely-filled side
CN110644994A (en) Roof cutting method in small coal pillar mining technology
CN102102518B (en) Top coal caving coordinated mining method for thick coal seam under dam body of reservoir
Zhang et al. Control technology of direct passing karstic collapse pillar in longwall top-coal caving mining
CN114382483A (en) Method for preventing and controlling strong mine pressure of hard roof working face under left coal pillar
CN111810197B (en) Pre-grouting reinforcement method for fault structural zone of working face
CN113622952A (en) Comprehensive treatment method for water damage of mountain green coal in structurally complex area
CN113250613A (en) Directional drilling and checking method for coal seam in small coal kiln goaf
Sun Research on the deformation mechanism of mining roadway stratiform surrounding rock with nonuniform stress field
CN209483345U (en) A kind of face in steep thick coal seam Multi sectional protects lane without coal column staggered floor
CN110219592A (en) A kind of cubic network destressing borehole method for arranging for realizing the abundant release of high seam
Wang et al. Analysis of proper position of extraction roadway on roof in high-strength gas emission workface: A case study of Zhaozhuang coal mine in southern Qinshui Basin

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant