CN1048306C CN 94103717 CN94103717A CN1048306C CN 1048306 C CN1048306 C CN 1048306C CN 94103717 CN94103717 CN 94103717 CN 94103717 A CN94103717 A CN 94103717A CN 1048306 C CN1048306 C CN 1048306C
Authority
CN
China
Prior art keywords
stake
basement
enclosing structure
space enclosing
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 94103717
Other languages
Chinese (zh)
Other versions
CN1110352A (en
Inventor
曹时中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 94103717 priority Critical patent/CN1048306C/en
Publication of CN1110352A publication Critical patent/CN1110352A/en
Application granted granted Critical
Publication of CN1048306C publication Critical patent/CN1048306C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Foundations (AREA)

Abstract

The present invention provides a method for forming an enclosure structure of a basement with a soft soil foundation, which is characterized in that the enclosure structure uses an annular plane and comprises double rows or three rows of enclosure piles arranged loosely, wherein the pile length is 1.6 to 2.5 times of the width of a foundation pit, the pile diameter is 1/20 to 1/25 of the pile length, and the space between two adjacent enclosure piles is 1 to 2 times of the pile diameter. Cement mixing piles are arranged between two rows of enclosure piles, one pulling anchor is arranged at every 5 to 8 pile positions outside the enclosure piles, or stack piles are arranged at one side of the corresponding cement mixing piles, wherein supports are arranged between the stack piles or the corresponding enclosure piles and the foundation bed of a basement, and one end of each pulling anchor or the pile tops of the stack piles and the pile tops of all enclosure piles and cement mixing piles are connected into a whole through a top beam.

Description

The construction method of soft foundation basement space enclosing structure
The invention belongs to the method for arranging of building of Foundation Design foundation dredging retaining wall or protecting wall.Particularly soft foundation excavates the construction method of basement space enclosing structure.
The delta of great river estuary is mostly formed by silt alluviation all over the world, and the weak soil layer is grown obvious especially, and modern age, the metropolis much all was positioned on these deltas, and high building stands in great numbers in the city, often caves in when making basement in high rise building excavation soft foundation.How rectangular the foundation ditch plane of basement foundation dredging is in the prior art, the perisporium of foundation ditch is the plane, adopt the big diameter borehole filling pile of beating cantilever sheet pile wall or solid matter in the perisporium, the space enclosing structure during as basement foundation dredging and construction is to prevent the landslide of weak soil.But because the spatial form of foundation ditch has determined that space enclosing structure is curved to be subjected on the whole, therefore the fender post as the space enclosing structure part also is to be subjected to curved structural element, and be in the cantilever duty, its effect of being bent is fairly obvious, the calculation of Bending Moment formula is Ma=Ph/3, wherein thrust P=1/2rh 2Tg 2(45 °-Φ/2), thrust of earth P and excavation of foundation pit degree of depth h square are directly proportional, obviously heal when dark when cutting depth, the diameter of fender post also will increase considerably with stake is long, general stake is long to be 3~3.5 times of foundation depth, the stake footpath be stake long 1/20~1/25 (general stake footpath is 800mm~1500mm), not only take a lot of work, take material, and the landslide accident in basement when excavation still constantly takes place, and of becoming in the Foundation Design is long-standing.
The objective of the invention is to provide a kind of construction method of improved soft foundation basement space enclosing structure.Build space enclosing structure in this way, not only can reduce cost significantly, and safe and reliable, can prevent the peripheral ground of foundation ditch earth fall side effectively.
Task of the present invention is finished as follows.
A kind of construction method of soft foundation basement space enclosing structure, comprise: the flat shape of basement space enclosing structure is selected the annular of sealing for use, the shape trend is provided with fender posts double or three row's white-outs along the space enclosing structure of setting is flat, described fender post stake is long be foundation depth 1.6-2.5 doubly, the stake footpath is the long 1/20-1/25 of stake, clearance distance between adjacent two is 1-2 a times of stake footpath, between two row's fender posts, be provided with cement mixing pile, the long foundation depth of slightly being longer than of stake of described cement mixing pile, the stake footpath is the long 1/10-1/15 of stake, outside described fender post, being provided with one every 5-8 stake position draws anchor or is drawing the anchor position to put corresponding cement mixing pile inwall buttress is set with described, a described end of anchor or the stake top of buttress stake of drawing, and the stake top of all fender posts and cement mixing pile links together by back timber and constitutes space enclosing structure integral body, in the bed course on basement basis and buttress stake or with drawing the anchor position to put to arrange between the fender post in corresponding support is set.
Basement space enclosing structure construction method of the present invention, its fender post can be vibrations castinplace pile or preformed pile or bored pile.
The construction method of basement space enclosing structure of the present invention, its pull bar that draws anchor is a reinforcing bar, the other end of pull bar and anchor into the welding of underground steel sheet pile.
The construction method of basement space enclosing structure of the present invention, the stake of its buttress stake is long, the stake footpath can be identical with fender post with pilework.
The construction method of basement space enclosing structure of the present invention, its support can be with reinforced concrete member or shaped steel or round log.
The construction method of basement space enclosing structure of the present invention, the triangle soil of row's fender post inboard in keeping during its basement foundation ditch excavation.
The construction method of soft foundation basement space enclosing structure of the present invention is because the foundation ditch flat shape is selected the annular of sealing for use, the space enclosing structure spatial form of She Dinging has determined space enclosing structure on the whole based on pressurized thus, the formula that is stressed is Na=Kahr, wherein r is the closed ring radius, COEFFICIENT K a=tg 2(45 °-Φ/2), pressure only and the first power of foundation depth h be directly proportional, the foundation ditch lateral thrust of weak soil on every side reduces greatly.Obviously more much smaller based on the member of pressurized than being subjected to curved scantling, on fender post stake top back timber is set, draw anchor or buttress stake every a determining deviation setting, after between basement foundation pad and the buttress stake horizontal support being set, the effect of leaving behind on having played and supportting, therefore the strength of the rigidity of whole space enclosing structure and retaining soil increases greatly, and the fender post size of bearing pressure is also reduced thereupon greatly.After being set, cement mixing pile can prevent foundation ditch foundation soil infiltration on every side.(the basement absolute altitude is-7.4m the about 3000m of land area to same experimental project with known technology and the technology of the present invention 2) design done, comparing result is listed as follows:
The contrast project Known technology The technology of the present invention
The flat shape of space enclosing structure Rectangle, girth 220m Annular, girth 200m have shortened 20 meters
Fender post Adopt 250 of solid matter bored piles, the long 22m of stake, stake footpath 900mm, the about 3500m of steel concrete amount 3 Adopt 5 40 of double white-out vibrations castinplace piles, the long average 10m of stake, stake footpath 426mm, the about 770m of steel concrete amount 3
Accessory structure Back timber 1.3 * 0.3 * 220=85.83 250 of cement mixing piles, the long 7m of stake, stake footpath 500mm, cement mixing pile cumulative volume 340m 3, back timber size 1.3 * 0.3 * 200m, steel concrete consumption 80m 3Draw anchor and support 35 pairs
The fender post duty The easy horizontal movement of cantilever pile and caving in On the support of leaving behind, the main annular pressurized of whole space enclosing structure, rigidity strengthens, fender post is not easy horizontal shift, the percolation-proof performance is good
Cost About 4,900,000 About 1,200,000
The space enclosing structure duration Can only beat 1-2 root bored pile every day, completion in 5 months Can beat 25-30 vibrations castinplace pile every day, completion in 3 months
Above-mentioned theory and design result show that the present invention can prevent the peripheral ground of foundation ditch earth fall side compared to the prior art effectively, have safely, can reduce significantly the advantage of cost.
Below with reference to accompanying drawing the technology of the present invention is described in further detail
Fig. 1 is the layout plan of basement space enclosing structure of the present invention
Fig. 2 is along the sectional view of A-A line among Fig. 1
Fig. 3 is along the sectional view of B-B line among Fig. 1
Consult Fig. 1, fender post 1 adopts double-row pile, clearance distance between adjacent two fender posts is 1-2 a times of stake footpath, be provided with cement mixing pile 2 between two row's fender posts, be provided with every 5-8 (among the figure being 7) stake and draw anchor 3, it is described that to draw the pull bar of anchor be that the major diameter reinforcing bar (is generally Φ 28-Φ 36 screw-thread steels, length is generally 12-18m), one end of reinforcing bar is welded on the steel sheet pile of squeezing into terrace and (is generally three, squeeze into that the degree of depth is about 3 meters in the soil), when the place outside the space enclosing structure is limited, also can 2-3 buttress stake 4 be set in the cement mixing pile inboard of correspondence with drawing anchor to change into.Corresponding with the position of drawing anchor 3 or buttress stake 4, between fender post 1 or buttress stake 4 and basement foundation pad 6, support 7 is set, described support can be used reinforced concrete member, shaped steel, also can use round log.The stake top of the described other end that draws anchor or buttress stake stake top and fender post, cement mixing pile constitutes space enclosing structure integral body together by back timber 5.Fender post, buttress stake can be with shaking castinplace pile or steel sheet pile or bored pile or preformed pile, label is generally C20 on the coagulation, the length of fender post is 1.6-2.5 times of foundation depth, the present embodiment foundation depth is 7-8m, therefore stake is long is 9-12m, and the stake footpath is Φ 426, and cement mixing pile forms after stirring water leaking-in or underground water with straight cement, the stake footpath is Φ 500, and the long foundation depth of slightly being longer than of stake gets final product.The cross sectional dimensions of back timber is 1500 * 300mm.Shown the situation of drawing anchor 3 that is provided with among Fig. 2.Shown the inconvenient situation of using buttress stake 4 when drawing anchor instead of establishing among Fig. 3.In order to strengthen the ability of space enclosing structure retaining soil, keep on the triangle 8 in the inboard of lining row's fender post, triangle soil is not answered disturbance, and the outer surface water of space enclosing structure is got rid of by gutter 9, and the surface water in the space enclosing structure in the foundation ditch adopts collecting well to concentrate discharging.Having only could excavation pit when the concrete strength of back timber 5 reaches 70%.

Claims (9)

1, a kind of construction method of soft foundation basement space enclosing structure comprises:
The flat shape of a, basement space enclosing structure is selected the annular of sealing for use,
B, fender posts (1) double or three row's white-outs are set along the space enclosing structure flat shape trend of setting, described fender post stake is long be foundation depth 1.6-2.5 doubly, the stake footpath is the long 1/20-1/25 of stake, the clearance distance between adjacent two be the stake footpath 1-2 doubly,
C, be provided with cement mixing pile (2) between the fender posts two rows, the long foundation depth of slightly being longer than of stake of described cement mixing pile, the stake footpath be a long 1/10-1/15,
D, outside described fender post, be provided with one every 5-8 stake position and draw anchor (3) or drawing the anchor position to put corresponding cement mixing pile inwall buttress (4) is set with described
The stake top of e, a described end that draws anchor or buttress stake, and the stake top of all fender posts and cement mixing pile is by back timber (5) the formation space enclosing structure integral body that links together,
F, basement foundation pad (6) and buttress stake (4) or with draw anchor (3) position corresponding in arrange support (7) be set between the fender post (1).
2, the construction method of basement space enclosing structure according to claim 1 is characterized in that described fender post is vibrations castinplace pile or preformed pile or bored pile.
3, the construction method of basement space enclosing structure according to claim 1 and 2 is characterized in that described to draw the pull bar of anchor be reinforcing bar, the other end of pull bar and anchor into underground steel sheet pile welding.
4, the construction method of basement space enclosing structure according to claim 1 and 2 is characterized in that the stake of described buttress stake is long, the stake footpath is identical with fender post (1) with pilework.
5, the construction method of basement space enclosing structure according to claim 1 and 2 is characterized in that described support makes horizontal support with reinforced concrete member or shaped steel or round log.
6, the construction method of basement space enclosing structure according to claim 1 and 2, the triangle soil (8) of row's fender post inboard in keeping when it is characterized in that the basement foundation ditch excavation.
7, the construction method of basement space enclosing structure according to claim 3, the triangle soil (8) of row's fender post inboard in keeping when it is characterized in that the basement foundation ditch excavation.
8, the construction method of basement space enclosing structure according to claim 4, the triangle soil (8) of row's fender post inboard in keeping when it is characterized in that the basement foundation ditch excavation.
9, the construction method of basement space enclosing structure according to claim 5, the triangle soil (8) of row's fender post inboard in it is characterized in that keeping when described basement foundation ditch excavates, an end that supports (7) contacts with lining row's fender post (1) through the bottom of described triangle soil.
CN 94103717 1994-04-04 1994-04-04 Method for making soft foundation basement protecting structure Expired - Fee Related CN1048306C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 94103717 CN1048306C (en) 1994-04-04 1994-04-04 Method for making soft foundation basement protecting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 94103717 CN1048306C (en) 1994-04-04 1994-04-04 Method for making soft foundation basement protecting structure

Publications (2)

Publication Number Publication Date
CN1110352A CN1110352A (en) 1995-10-18
CN1048306C true CN1048306C (en) 2000-01-12

Family

ID=5031237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 94103717 Expired - Fee Related CN1048306C (en) 1994-04-04 1994-04-04 Method for making soft foundation basement protecting structure

Country Status (1)

Country Link
CN (1) CN1048306C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1313681C (en) * 2005-02-28 2007-05-02 王凯 Binding anti-slide pile structure and construction method

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775807B (en) * 2010-03-03 2011-09-21 天津二十冶建设有限公司 Structure for supporting deep foundation pit of soft soil foundation
CN102383432A (en) * 2011-02-23 2012-03-21 上海城地建设发展有限公司 Enclosure method for inserting H-shaped reinforced concrete slab piles in three-axis (two-axis) cement mixing pile
CN103469800A (en) * 2012-06-06 2013-12-25 中国二十冶集团有限公司 Cement mixing pile composite supporting system provided with peripheral concrete members
CN102966108B (en) * 2012-11-23 2014-10-08 中铁四局集团建筑工程有限公司 Construction method of deep foundation pit close to building and adopting underground structure as internal support
CN103215959B (en) * 2013-04-17 2016-03-09 杨众 The support construction method that V-arrangement preformed pile is combined with agitation pile
CN105019472B (en) * 2015-07-14 2017-01-18 周兆弟 Composite fender pile for building basement
CN105019400B (en) * 2015-07-14 2017-01-04 周兆弟 Compound supporting pile structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1313681C (en) * 2005-02-28 2007-05-02 王凯 Binding anti-slide pile structure and construction method

Also Published As

Publication number Publication date
CN1110352A (en) 1995-10-18

Similar Documents

Publication Publication Date Title
CN105155554B (en) A kind of deep basal pit of arching system
KR100660379B1 (en) Plantable reinforced earth wall and its block and construction method of reinforced earth wall
CN205975658U (en) Steel platform tower crane foundation
CN1048306C (en) Method for making soft foundation basement protecting structure
US4648752A (en) Marine template retaining wall and method of construction
JPH03158525A (en) High horizontal load bearing foundation practice using solidification method
CN108035360A (en) A kind of method for pattern foundation pit supporting structure
CN207405632U (en) The cantilever supporting structure of anchor after a kind of band
CN114250744B (en) Ecological combined river slope retaining wall revetment
CN215483004U (en) Expansive soil stratum ultra-deep shaft supporting structure
CN216739642U (en) Lower through hole directional drilling working well
CN108005086A (en) A kind of high buttress counter pull type inclined support structure for pattern foundation pit supporting structure
CN207176696U (en) A kind of buttress type supporting and protecting row pile pit structure
CN212316937U (en) Composite steel plate wall semi-rigid cantilever foundation pit supporting system
CN210529716U (en) Adjacent foundation pit soil body supporting construction
JPH04119837U (en) Underground structures to prevent liquefaction
CN206607595U (en) A kind of T-shaped pattern foundation pit supporting structure
CN112681333A (en) Foundation pit supporting structure of waterside bridge abutment foundation and construction method thereof
JP4502442B2 (en) Seismic foundation, seismic building, and pile reinforcement method
CN217379017U (en) Counterweight system for preventing shield tunnel from floating upwards
CN220266531U (en) Double-row type isolation pile structure for protecting surrounding building of foundation pit
CN217712677U (en) Subway tunnel both sides protection pile isolation structure
CN211571734U (en) Composite multi-row pile foundation pit supporting structure
CN219137637U (en) Recoverable combination steel sheet pile support
CN214695732U (en) Utility tunnel's branch mouth structure that unearths

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee