CN104819345A - Reinforced steel anti-corrosion relay - Google Patents

Reinforced steel anti-corrosion relay Download PDF

Info

Publication number
CN104819345A
CN104819345A CN201410282188.3A CN201410282188A CN104819345A CN 104819345 A CN104819345 A CN 104819345A CN 201410282188 A CN201410282188 A CN 201410282188A CN 104819345 A CN104819345 A CN 104819345A
Authority
CN
China
Prior art keywords
oil cylinder
plate
arc
welded
rear end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410282188.3A
Other languages
Chinese (zh)
Other versions
CN104819345B (en
Inventor
刘加准
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANGZHOU SIPUSEN MACHINERY MANUFACTURING CO LTD
Original Assignee
YANGZHOU SIPUSEN MACHINERY MANUFACTURING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANGZHOU SIPUSEN MACHINERY MANUFACTURING CO LTD filed Critical YANGZHOU SIPUSEN MACHINERY MANUFACTURING CO LTD
Priority to CN201410282188.3A priority Critical patent/CN104819345B/en
Publication of CN104819345A publication Critical patent/CN104819345A/en
Application granted granted Critical
Publication of CN104819345B publication Critical patent/CN104819345B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

A reinforced steel anti-corrosion relay relates to the technical field of engineering construction, in particular to a detachable relay. The reinforced steel anti-corrosion relay comprises a front end pipe assembly, a rear end pipe assembly and an O-shaped ejecting ring; an oil cylinder backrest bracket is connected in the front end pipe assembly and is provided with a plurality of oil cylinders; each oil cylinder is fixed on the oil cylinder backrest bracket by an oil cylinder fixing plate; a telescopic end of each oil cylinder is connected with the O-shaped ejecting ring respectively; a pump station is connected in the rear end pipe assembly; the O-shaped ejecting ring comprises 6-20 groups of arc ejecting frames same in structure; the oil cylinder backrest bracket comprises 6-20 groups of arc supports same in structure. The O-shaped ejecting ring is divided into a plurality of groups of arc ejecting frames same in structure, the oil cylinder backrest bracket is divided into a plurality of groups of arc supports same in structure, after construction, internal parts are taken out and conveyed, the detaching parts (the O-shaped ejecting ring and the oil cylinder backrest bracket) are equally divided into a plurality of same parts so as to reduce the weight during detaching.

Description

The anticorrosion relay well of concrete pipe
Technical field
The present invention relates to Construction Technology field, particularly relate to dismountable relay well.
Background technique
Long-distance pipe jacking refers to that the continuous distance advanced of each section is all at the jacking construction of more than 200m-300m, reached at the 800m-1500m had.Because one-time continuous advance distance is longer, to construct many differences with ordinary topping pipe, although long-distance pipe jacking adopts mud lubrication measure can reduce jacking frictional resistance, no matter what degree is top power reduce to, be subject to certain restrictions after all.In jack-in process, when back intensity or pipe bearing capacity are restricted, whole jacking section can be divided into some sections and adopt relay jacking, the object extending apex distance can be reached.
Relay well is the relay jacking working room arranged in the middle of the jacking pipeline section, and this inside working chamber installs oil cylinder, the pipeline section jacking before undertaking between interruption, and oil cylinder advances above after pipeline section, and oil cylinder advances relay well pipeline section below again.Existing steel pipe relay well, carries out anti-corrosion measure inconvenience after construction completes.After jacking construction completes, inner oil cylinder and fixing device are not quick detachable.After dismounting completes, do anticorrosive work amount excessive, and antiseptic effect is bad, after of long duration, just there will be obscission.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, providing a kind of concrete pipe of convenient disassembly anticorrosion relay well.
The object of the present invention is achieved like this: the anticorrosion relay well of concrete pipe, comprise front tube assembly, rear end pipe assembly, O shape apical ring, the front end of rear end pipe assembly is plugged on the rear end of front tube assembly, in the periphery, front end of rear end pipe assembly, step is set, O shape apical ring is arranged on the step of the rear end pipe assembly in front tube assembly, oil cylinder back bracket is connected in described front tube assembly, oil cylinder back bracket arranges some oil cylinders, every platform oil cylinder is fixed in oil cylinder back bracket respectively by oil cylinder fixed plate, the telescopic end of every platform oil cylinder is connected with described O shape apical ring respectively, pumping plant is connected in rear end pipe assembly, described O shape apical ring comprises six groups of arc upper frames to 20 groups of same structures, and described oil cylinder back bracket comprises the identical curved support frame of six groups to 20 groups structures.
O shape apical ring is divided into the arc upper frame of some groups of same structures by the present invention, oil cylinder back bracket is divided into the identical curved support frame of some groups of structures, after having constructed, inner body is dismantled, transport, dismounting part (O shape apical ring and oil cylinder back bracket) is divided into some equal portions, to reduce weight during dismounting.
As improvement of the present invention, often organize curved support frame and comprise outer arc plate, base plate, fixed plate, two pieces of connecting plates respectively, outer arc plate is arc, base plate and fixed plate are welded on outer arc plate respectively, and fixed plate is arranged on the rear side of base plate, and fixed plate arranges oil cylinder mounting groove, two pieces of connecting plates are welded on the two ends of outer arc plate respectively, connecting plate on adjacent two pieces of outer arc plates is bolted, and described oil cylinder is arranged in oil cylinder mounting groove, and the cylinder barrel of oil cylinder is connected with base plate.All adopt bolt welding to fix with anchor ear on barrel because former oil cylinder is fixing, vibration time during construction owing to running, generation fixing bolt welding ends comes off and causes oil cylinder to damage sometimes, curved support frame is provided with the mounting groove of oil cylinder, can well fix after oil cylinder is put into, there will not be the phenomenon that drops, install straightness accuracy better, jacking efficiency is higher.
In order to strengthen the intensity often organizing curved support frame, often organize curved support frame and also comprise stiffening rib respectively, one end of stiffening rib is welded with fixed plate, the other end welds with base plate.
Improve further as the present invention, often organize arc upper frame and comprise the first coaming plate, the second coaming plate, gusset, inner flange, two outward flanges respectively, first coaming plate is arc, inner flange is welded on the rear side in the first coaming plate, two outward flanges are welded on the both sides, front and back outside the first coaming plate respectively, second coaming plate is arc and is arranged on the outside of the first coaming plate, the both sides, front and back of the second coaming plate are welded with corresponding outward flange respectively, gusset is welded on the outside of the second coaming plate, and the rear and front end of gusset is welded with corresponding outward flange respectively.
Improve further as the present invention, bird shape seal ring is set between described front tube assembly and rear end pipe assembly; Described front tube assembly comprises pipe in front spring outer tube and front cement, and in front cement, pipe is connected in front spring outer tube; Described rear end pipe assembly comprises pipe in rear steel plate outer tube and rear cement, and in rear cement, pipe is connected in rear steel plate outer tube.Adopt the mixing tube (front tube assembly and rear end pipe assembly) that steel plate cement makes, just completely anticorrosion before jacking, dismantled by inner body after having constructed, transport, after having dismantled, two concrete pipes are merged by fitting tight circle.Do not need to carry out anticorrosion, good sealing effect.Decrease greatly corrosion-resistant workload, improve construction period.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of the present invention.
Fig. 2 is the stereogram of Fig. 1.
Fig. 3 is the structural representation of oil cylinder back bracket.
Fig. 4 is the side view of Fig. 3.
Fig. 5 is the stereogram of Fig. 3.
Fig. 6 is the structural representation of O shape apical ring.
Fig. 7 is the side view of Fig. 6.
Fig. 8 is the stereogram of Fig. 6.
Embodiment
As shown in Figure 1, 2, for the anticorrosion relay well of concrete pipe, comprise front tube assembly 1, rear end pipe assembly 2, the front end of rear end pipe assembly 2 is plugged on the rear end of front tube assembly 1, bird shape seal ring 8 is set between front tube assembly 1 and rear end pipe assembly 2, in rear end pipe assembly 2, connects pumping plant 9.Front tube assembly 1 comprises pipe 1-2 in front spring outer tube 1-1 and front cement, and in front cement, pipe 1-2 is connected in front spring outer tube 1-1, and rear end pipe assembly 2 comprises pipe 2-2 in rear steel plate outer tube 2-1 and rear cement, and in rear cement, pipe 2-2 is connected in rear steel plate outer tube 2-1.
Step 7 is set in the periphery, front end of rear end pipe assembly 2, the step 7 of the rear end pipe assembly 2 in front tube assembly 1 is arranged the arc upper frame 31 that O shape apical ring 3, O shape apical ring 3 comprises eight groups of same structures.In front tube assembly 1, connect oil cylinder back bracket 5, oil cylinder back bracket 5 arranges some oil cylinders 6, and oil cylinder 6 is fixed in oil cylinder back bracket 5 by oil cylinder fixed plate 4, and oil cylinder back bracket 5 comprises the identical curved support frame 51 of eight groups of structures.
As Figure 1-5, often organize curved support frame 51 and comprise outer arc plate 511 respectively, base plate 512, fixed plate 513, stiffening rib 514, two pieces of connecting plates 515, outer arc plate 511 is arc, base plate 512 and fixed plate 513 are welded on outer arc plate 511 respectively, fixed plate 513 is arranged on the rear side of base plate 512, fixed plate 513 arranges oil cylinder mounting groove 516, one end of stiffening rib 514 is welded with fixed plate 513, the other end welds with base plate 512, two pieces of connecting plates 515 are welded on the two ends of outer arc plate 511 respectively, connecting plate 515 on adjacent two pieces of outer arc plates 511 is bolted.Oil cylinder 6 is arranged in oil cylinder mounting groove 516, and the cylinder barrel of oil cylinder 6 is connected with base plate 512, and the piston rod of oil cylinder 6 is connected with O shape apical ring 3.
As Fig. 1, 2, 6, 7, shown in 8, often organize arc upper frame 31 and comprise the first coaming plate 311 respectively, second coaming plate 312, gusset 313, inner flange 314, two outward flanges 315, first coaming plate 311 is arc, inner flange 314 is welded on the rear side in the first coaming plate 311, two outward flanges 315 are welded on the both sides, front and back outside the first coaming plate 311 respectively, second coaming plate 312 is arc and is arranged on the outside of the first coaming plate 311, the both sides, front and back of the second coaming plate 312 are welded with corresponding outward flange 315 respectively, gusset 313 is welded on the outside of the second coaming plate 312, and the rear and front end of gusset 313 is welded with corresponding outward flange 315 respectively.

Claims (5)

1. the anticorrosion relay well of concrete pipe, comprise front tube assembly, rear end pipe assembly, O shape apical ring, the front end of rear end pipe assembly is plugged on the rear end of front tube assembly, in the periphery, front end of rear end pipe assembly, step is set, O shape apical ring is arranged on the step of the rear end pipe assembly in front tube assembly, oil cylinder back bracket is connected in described front tube assembly, oil cylinder back bracket arranges some oil cylinders, every platform oil cylinder is fixed in oil cylinder back bracket respectively by oil cylinder fixed plate, the telescopic end of every platform oil cylinder is connected with described O shape apical ring respectively, pumping plant is connected in rear end pipe assembly, it is characterized in that: described O shape apical ring comprises six groups of arc upper frames to 20 groups of same structures, described oil cylinder back bracket comprises the identical curved support frame of six groups to 20 groups structures.
2. the anticorrosion relay well of concrete pipe according to claim 1, it is characterized in that: often organize curved support frame and comprise outer arc plate, base plate, fixed plate, two pieces of connecting plates respectively, outer arc plate is arc, base plate and fixed plate are welded on outer arc plate respectively, fixed plate is arranged on the rear side of base plate, fixed plate arranges oil cylinder mounting groove, two pieces of connecting plates are welded on the two ends of outer arc plate respectively, connecting plate on adjacent two pieces of outer arc plates is bolted, described oil cylinder is arranged in oil cylinder mounting groove, and the cylinder barrel of oil cylinder is connected with base plate.
3. the anticorrosion relay well of concrete pipe according to claim 2, is characterized in that: often organize curved support frame and also comprise stiffening rib respectively, one end of stiffening rib is welded with fixed plate, the other end welds with base plate.
4. the anticorrosion relay well of concrete pipe according to claim 1 and 2, it is characterized in that: often organize arc upper frame and comprise the first coaming plate respectively, second coaming plate, gusset, inner flange, two outward flanges, first coaming plate is arc, inner flange is welded on the rear side in the first coaming plate, two outward flanges are welded on the both sides, front and back outside the first coaming plate respectively, second coaming plate is arc and is arranged on the outside of the first coaming plate, the both sides, front and back of the second coaming plate are welded with corresponding outward flange respectively, gusset is welded on the outside of the second coaming plate, and the rear and front end of gusset is welded with corresponding outward flange respectively.
5. the anticorrosion relay well of concrete pipe according to claim 1 and 2, is characterized in that: between described front tube assembly and rear end pipe assembly, arrange bird shape seal ring; Described front tube assembly comprises pipe in front spring outer tube and front cement, and in front cement, pipe is connected in front spring outer tube; Described rear end pipe assembly comprises pipe in rear steel plate outer tube and rear cement, and in rear cement, pipe is connected in rear steel plate outer tube.
CN201410282188.3A 2014-06-23 2014-06-23 Reinforced steel anti-corrosion relay Active CN104819345B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410282188.3A CN104819345B (en) 2014-06-23 2014-06-23 Reinforced steel anti-corrosion relay

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410282188.3A CN104819345B (en) 2014-06-23 2014-06-23 Reinforced steel anti-corrosion relay

Publications (2)

Publication Number Publication Date
CN104819345A true CN104819345A (en) 2015-08-05
CN104819345B CN104819345B (en) 2017-04-19

Family

ID=53729741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410282188.3A Active CN104819345B (en) 2014-06-23 2014-06-23 Reinforced steel anti-corrosion relay

Country Status (1)

Country Link
CN (1) CN104819345B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927791A (en) * 2016-07-13 2016-09-07 安阳青龙管业有限责任公司 Jacking-construction-method prestress steel cylinder concrete pipe intermediate relaying jacking pipe
CN106402493A (en) * 2016-12-12 2017-02-15 新兴铸管股份有限公司 Nodular cast iron jacking pipe intermediate relaying jacking device and pipe-jacking construction method utilizing nodular cast iron jacking pipe intermediate relaying jacking device
CN112360479A (en) * 2020-11-06 2021-02-12 中冶建工集团有限公司 Pipe jacking construction system
CN112879660A (en) * 2021-01-28 2021-06-01 安徽唐兴机械装备有限公司 Relay room suitable for pipe jacking

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1133839C (en) * 2001-07-27 2004-01-07 卢清国 Resistance increasing automatic drive conduit jacking method between pipe and soil and its jacking device
CN201265702Y (en) * 2008-08-08 2009-07-01 余彬泉 Dismountable steel structure relay chamber
CN201672144U (en) * 2010-03-24 2010-12-15 上海宝冶集团有限公司 Relay power system for double-layer sealing of long-distance pipe-jacking construction
CN202812462U (en) * 2012-08-10 2013-03-20 中铁上海工程局有限公司 Detachable intermediate relaying jacking station hydraulic cylinder steel support
CN203240090U (en) * 2013-04-18 2013-10-16 天津市威力工程千斤顶有限公司 Detachable relaying chamber
CN203892710U (en) * 2014-06-23 2014-10-22 扬州斯普森机械制造有限公司 Steel and concrete tube corrosion prevention intermediate jacking station

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927791A (en) * 2016-07-13 2016-09-07 安阳青龙管业有限责任公司 Jacking-construction-method prestress steel cylinder concrete pipe intermediate relaying jacking pipe
CN106402493A (en) * 2016-12-12 2017-02-15 新兴铸管股份有限公司 Nodular cast iron jacking pipe intermediate relaying jacking device and pipe-jacking construction method utilizing nodular cast iron jacking pipe intermediate relaying jacking device
CN112360479A (en) * 2020-11-06 2021-02-12 中冶建工集团有限公司 Pipe jacking construction system
CN112879660A (en) * 2021-01-28 2021-06-01 安徽唐兴机械装备有限公司 Relay room suitable for pipe jacking

Also Published As

Publication number Publication date
CN104819345B (en) 2017-04-19

Similar Documents

Publication Publication Date Title
CN104819345A (en) Reinforced steel anti-corrosion relay
CN103953807A (en) Socket structure for connecting steel pipes
CN104929148A (en) Reverse installation reinforcement system and method of wind power generation tower foundation ring foundation
CN108868817B (en) Connection structure of cable channel and shield tunnel comprising connection structure
CN104265306A (en) Municipal shield tunnel
CN203795829U (en) Hoop assembly
CN203892710U (en) Steel and concrete tube corrosion prevention intermediate jacking station
CN203880273U (en) Split type flange
CN202825037U (en) Moving type steel cylinder assembly machine
CN203514821U (en) Conveyer pipe fixing frame for concrete pump truck
CN109252682A (en) A kind of rope bearing structure hound installation method
CN203907009U (en) Detachable steel structure intermediate jacking station for jacking pipe
CN202392319U (en) Joint for steel pipes
CN204416673U (en) Earth source heat pump grout lines carries pipe machine
CN204530516U (en) Large-scale assembling type steel corrugated culvert
CN204532755U (en) Body, extend neck structure in compressor integral type
CN209876213U (en) Steel pipe butt joint auxiliary device
CN203795932U (en) Spray tower cylinder support device
CN211258628U (en) Shield segment splicing structure
CN204371413U (en) A kind of highstrenghtpiston's pipe for escaping
CN205241151U (en) Hydraulic jack for vehicle
CN205745715U (en) A kind of fiber glass reinforced plastic chimney fixed structure
CN214839096U (en) Engineering machine tool chain link flange
CN205744738U (en) A kind of fiber glass reinforced plastic chimney double fixed structures
CN104121237A (en) Split type steam ejection vacuum pump

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Liu Jiahuai

Inventor before: Liu Jiazhun