CN104818775A - Novel prefabricated frame structure - Google Patents
Novel prefabricated frame structure Download PDFInfo
- Publication number
- CN104818775A CN104818775A CN201510210691.2A CN201510210691A CN104818775A CN 104818775 A CN104818775 A CN 104818775A CN 201510210691 A CN201510210691 A CN 201510210691A CN 104818775 A CN104818775 A CN 104818775A
- Authority
- CN
- China
- Prior art keywords
- steel
- embedded
- frame structure
- reinforced concrete
- connecting framework
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention belongs to the technical field of architectural engineering and particularly relates to a novel prefabricated frame structure. The novel prefabricated frame structure comprises I-steel beams and reinforced concrete columns; an embedded connecting framework is embedded inside the beam-column joints of the reinforced concrete columns; the I-steel beams are arranged on the circumferential surface of the reinforced concrete columns and fastened with the embedded connecting framework. The embedded connecting framework is arranged inside the prefabricated concrete columns, and the embedded connecting framework and the prefabricated concrete columns are connected through high-strength bolts, so that the beams and the columns are convenient to connect, the joints are definite in stress and force transmission, and the anti-seismic aim of 'strong columns and weak beams' is easy to achieve.
Description
Technical field
The invention belongs to construction engineering technical field, be specifically related to a kind of novel prefabricated assembling frame structure.
Background technology
Frame construction is a kind of form of structure that construction engineering technical field is commonly used, and mainly contain steel framed structure and concrete frame structure, concrete frame structure comprises again cast-in-situ concrete frame construction and prefabricated assembled concrete frame construction.Steel framed structure has the advantages such as good integrity, speed of application be fast, but has the shortcomings such as cost is higher, apyrous is poor simultaneously; Although cast-in-situ concrete frame construction good integrity still has the shortcomings such as speed of application is slow, wet trade is many, quality not easily ensures.
In view of this, therefore the applicant will abandon both shortcomings as far as possible, and the advantage both merging, provide a kind of novel prefabricated assembling frame structure, this case produces thus.
Summary of the invention
The object of the present invention is to provide a kind of novel prefabricated assembling frame structure, by connecting framework pre-buried in precast concrete column, with high-strength bolt, the two is coupled together, make beam-to-column joint convenience, joints power transmission clearly, be easy to the antidetonation target realizing " strong column and weak beam ".
For achieving the above object, the technical scheme that the present invention specifically provides is: a kind of novel prefabricated assembling frame structure, comprise i-shape steel beam and reinforced concrete post, reinforced concrete post is embedded with pre-buried connecting framework in bean column node position, and described i-shape steel beam to be arranged on reinforced concrete post outer peripheral face and fixing tight with pre-buried connecting framework.
Further, described pre-buried connecting framework is formed by some pre-embedded steel slabs and some steel-pipe weldings, and described some steel pipe right-angled intersections arrange and form class cylinder, and the steel pipe of both direction is not in same level in length and breadth; Some steel pipe right-angled intersections arrange form class cylinder peripheric surface on be fixedly welded with four pieces of pre-embedded steel slabs, pre-embedded steel slab is distributed with some bolts hole, the distribution of some bolts hole is corresponding with steel pipe end.
Further, described pre-embedded steel slab exposed face and steel concrete cylinder are located in the same horizontal plane, and pre-embedded steel slab exposed face and the end plate being welded on i shaped steel beam-ends are fitted fixing tight.
Beneficial effect of the present invention: the present invention is by pre-buried connecting framework in post, prefabricated reinforced concrete column and i-shape steel beam are combined preferably, comparatively to save steel, apyrous good for pure steel structure framework, purer prefabricated assembling type reinforced concrete frame construction industrialization degree is high, speed of application fast, from heavy and light, stressed clear and definite, be easy to the antidetonation target realizing " strong column and weak beam ".
Next by reference to the accompanying drawings, the present invention is described in further detail.
accompanying drawing illustrates:
Fig. 1 is the structural representation of invention;
Fig. 2 is each component schematic diagram of invention;
Fig. 3 is pre-buried connecting framework schematic diagram in reinforced concrete post.
Specific embodiment
Embodiment one:
As Figure 1-3, what the present invention disclosed is a kind of novel prefabricated assembling frame structure, comprise i-shape steel beam 2 and reinforced concrete post 1, reinforced concrete post 1 is embedded with pre-buried connecting framework 5 in bean column node position, and described i-shape steel beam 2 to be arranged on reinforced concrete post 1 outer peripheral face and fixing tight with pre-buried connecting framework 5.
Further, described pre-buried connecting framework 5 is welded by some pre-embedded steel slabs 3 and some steel pipes 4, and the right-angled intersection of described some steel pipes 4 arranges and forms class cylinder, and the steel pipe 4 of both direction is not in same level in length and breadth; The right-angled intersection of some steel pipes 4 arrange form class cylinder peripheric surface on be fixedly welded with four pieces of pre-embedded steel slabs 3, pre-embedded steel slab 3 is distributed with some bolts hole 31, the distribution of some bolts hole 31 is corresponding with steel pipe 4 end; Described pre-embedded steel slab 3 exposed face and reinforced concrete post 1 face are located in the same horizontal plane, and pre-embedded steel slab 3 exposed face and the end plate 21 being welded on i-shape steel beam 2 end are fitted fixing tight.
The present invention installs producing principle: comprise prefabricated reinforced concrete column 1 and i-shape steel beam 2; Prefabricated reinforced concrete column 1 is the pre-buried pre-buried connecting framework 5 be welded by pre-embedded steel slab 3 and steel pipe 4 in bean column node position, the bolt hole 31 of reserved some on pre-embedded steel slab 3, steel pipe 4 is welded on bolt hole 31 position of pre-embedded steel slab 3, and the steel pipe 4 of both direction is not in same level in length and breadth; I-shape steel beam 2 is welded to form by the i iron 22 of mid portion and the end plate 21 at two ends, the fixed bolt hole 211 of reserved some on end plate 21, fixed bolt hole 211 and bolt hole 31 one_to_one corresponding on pre-embedded steel slab 3 in prefabricated reinforced concrete column 1; Prefabricated reinforced concrete column 1 is connected by high-strength bolt 6 at the construction field (site) with girder steel 2.
Above-mentioned fact Example is only for explaining the design that patent of the present invention is described, but not the restriction to patent right protection of the present invention, all changes utilizing this design patent of the present invention to be carried out to unsubstantiality, all should fall into the protection domain of patent of the present invention.
Claims (3)
1. a novel prefabricated assembling frame structure, it is characterized in that: comprise i-shape steel beam and reinforced concrete post, reinforced concrete post is embedded with pre-buried connecting framework in bean column node position, and described i-shape steel beam to be arranged on reinforced concrete post outer peripheral face and fixing tight with pre-buried connecting framework.
2. the novel prefabricated assembling frame structure of one according to claim 1, it is characterized in that: described pre-buried connecting framework is formed by some pre-embedded steel slabs and some steel-pipe weldings, described some steel pipe right-angled intersections arrange and form class cylinder, and the steel pipe of both direction is not in same level in length and breadth; Some steel pipe right-angled intersections arrange form class cylinder peripheric surface on be fixedly welded with four pieces of pre-embedded steel slabs, pre-embedded steel slab is distributed with some bolts hole, the distribution of some bolts hole is corresponding with steel pipe end.
3. the novel prefabricated assembling frame structure of one according to claim 2, it is characterized in that: described pre-embedded steel slab exposed face and steel concrete cylinder are located in the same horizontal plane, pre-embedded steel slab exposed face and the end plate being welded on i shaped steel beam-ends are fitted fixing tight.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510210691.2A CN104818775A (en) | 2015-04-29 | 2015-04-29 | Novel prefabricated frame structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510210691.2A CN104818775A (en) | 2015-04-29 | 2015-04-29 | Novel prefabricated frame structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104818775A true CN104818775A (en) | 2015-08-05 |
Family
ID=53729237
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510210691.2A Pending CN104818775A (en) | 2015-04-29 | 2015-04-29 | Novel prefabricated frame structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104818775A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105804262A (en) * | 2016-03-25 | 2016-07-27 | 合肥工业大学 | Energy consumption support and assembly type concrete framework dual energy consumption node and assembly method |
CN106088398A (en) * | 2016-08-12 | 2016-11-09 | 陶忠 | A kind of combined wall board |
CN106121084A (en) * | 2016-08-12 | 2016-11-16 | 陶忠 | A kind of frame structure of assembled body of wall |
CN106284655A (en) * | 2016-10-13 | 2017-01-04 | 哈尔滨工业大学 | Precast concrete beam stud connects node and method of attachment in succession |
CN107419802A (en) * | 2017-08-10 | 2017-12-01 | 中冶天工集团天津有限公司 | A kind of Precast Concrete Frame and construction method |
CN107654021A (en) * | 2017-10-25 | 2018-02-02 | 程丹松 | A kind of assembling prefabricated reinforced concrete column and assembled combination frame building system |
CN109537811A (en) * | 2019-01-17 | 2019-03-29 | 中建科技有限公司深圳分公司 | The assembly method of steel structure node, prefabricated post and preparation method thereof, column beam |
CN109537810A (en) * | 2019-01-17 | 2019-03-29 | 中建科技有限公司深圳分公司 | The assembly method of steel structure node, prefabricated post and preparation method thereof, column beam |
CN110080393A (en) * | 2019-05-14 | 2019-08-02 | 浙江大东吴集团建设有限公司 | A kind of public building assembling type steel structure |
CN111997193A (en) * | 2020-07-27 | 2020-11-27 | 河北工业大学 | Assembly type prefabricated beam column connecting joint and construction method |
CN112681531A (en) * | 2021-01-12 | 2021-04-20 | 昆明理工大学 | Assembled precast concrete piece square steel post and girder steel node |
CN113389271A (en) * | 2021-07-15 | 2021-09-14 | 辽宁工程技术大学 | Novel assembled concrete beam column node |
CN113638504A (en) * | 2021-07-26 | 2021-11-12 | 中国能源建设集团广东省电力设计研究院有限公司 | Rigid connection method and connection structure of roof solid-web steel beam and concrete column |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001303666A (en) * | 2000-04-24 | 2001-10-31 | Kajima Corp | Joint section structure between reinforced concrete column and steel frame beam |
CN202131678U (en) * | 2011-05-04 | 2012-02-01 | 福建荣盛钢结构实业有限公司 | Connection node of energy-saving fireproof beam column |
CN103669572A (en) * | 2012-09-24 | 2014-03-26 | 贵阳铝镁设计研究院有限公司 | Construction method and structure for beam column joints in steel reinforced concrete structure |
CN204590261U (en) * | 2015-04-29 | 2015-08-26 | 浙江工业职业技术学院 | A kind of novel prefabricated assembling frame structure |
-
2015
- 2015-04-29 CN CN201510210691.2A patent/CN104818775A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001303666A (en) * | 2000-04-24 | 2001-10-31 | Kajima Corp | Joint section structure between reinforced concrete column and steel frame beam |
CN202131678U (en) * | 2011-05-04 | 2012-02-01 | 福建荣盛钢结构实业有限公司 | Connection node of energy-saving fireproof beam column |
CN103669572A (en) * | 2012-09-24 | 2014-03-26 | 贵阳铝镁设计研究院有限公司 | Construction method and structure for beam column joints in steel reinforced concrete structure |
CN204590261U (en) * | 2015-04-29 | 2015-08-26 | 浙江工业职业技术学院 | A kind of novel prefabricated assembling frame structure |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105804262A (en) * | 2016-03-25 | 2016-07-27 | 合肥工业大学 | Energy consumption support and assembly type concrete framework dual energy consumption node and assembly method |
CN105804262B (en) * | 2016-03-25 | 2019-08-02 | 合肥工业大学 | Energy dissipation brace and the dual energy dissipation node of assembly concrete frame and assembly method |
CN106088398A (en) * | 2016-08-12 | 2016-11-09 | 陶忠 | A kind of combined wall board |
CN106121084A (en) * | 2016-08-12 | 2016-11-16 | 陶忠 | A kind of frame structure of assembled body of wall |
CN106284655A (en) * | 2016-10-13 | 2017-01-04 | 哈尔滨工业大学 | Precast concrete beam stud connects node and method of attachment in succession |
CN106284655B (en) * | 2016-10-13 | 2018-09-07 | 哈尔滨工业大学 | Precast concrete beam stud connects connecting node and connection method |
CN107419802A (en) * | 2017-08-10 | 2017-12-01 | 中冶天工集团天津有限公司 | A kind of Precast Concrete Frame and construction method |
CN107654021A (en) * | 2017-10-25 | 2018-02-02 | 程丹松 | A kind of assembling prefabricated reinforced concrete column and assembled combination frame building system |
CN109537810A (en) * | 2019-01-17 | 2019-03-29 | 中建科技有限公司深圳分公司 | The assembly method of steel structure node, prefabricated post and preparation method thereof, column beam |
CN109537811A (en) * | 2019-01-17 | 2019-03-29 | 中建科技有限公司深圳分公司 | The assembly method of steel structure node, prefabricated post and preparation method thereof, column beam |
CN109537811B (en) * | 2019-01-17 | 2020-03-31 | 中建科技有限公司深圳分公司 | Manufacturing method of prefabricated column and assembling method of column beam |
CN109537810B (en) * | 2019-01-17 | 2020-04-24 | 中建科技有限公司深圳分公司 | Manufacturing method of prefabricated column and assembling method of column beam |
CN110080393A (en) * | 2019-05-14 | 2019-08-02 | 浙江大东吴集团建设有限公司 | A kind of public building assembling type steel structure |
CN111997193A (en) * | 2020-07-27 | 2020-11-27 | 河北工业大学 | Assembly type prefabricated beam column connecting joint and construction method |
CN112681531A (en) * | 2021-01-12 | 2021-04-20 | 昆明理工大学 | Assembled precast concrete piece square steel post and girder steel node |
CN113389271A (en) * | 2021-07-15 | 2021-09-14 | 辽宁工程技术大学 | Novel assembled concrete beam column node |
CN113638504A (en) * | 2021-07-26 | 2021-11-12 | 中国能源建设集团广东省电力设计研究院有限公司 | Rigid connection method and connection structure of roof solid-web steel beam and concrete column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104818775A (en) | Novel prefabricated frame structure | |
CN103104039B (en) | Assembled framework beam-column joint adopting cover plate connection and construction method thereof | |
CN103243652B (en) | A kind of large-span non-floor type cast-in-place beam falsework and construction method thereof | |
CN104912190A (en) | Dry type joggle frame structure | |
CN103184762B (en) | Multi-story/high-rise fabricated steel structural prestressed supporting system capable of realizing rigid connection of joints | |
CN103924797B (en) | Rural area assembling type steel structure dwelling house system and construction method | |
CN102995756B (en) | Concrete-filled rectangular steel tube column-box girder full-bolt connection node and construction method | |
CN103276795B (en) | Steel-concrete slab-column structure system | |
CN104652705A (en) | Prefabricated and assembly type steel reinforced concrete column with high-performance concrete frame and construction method | |
CN201962844U (en) | Hollow composition board internally provided with steel pipes and steel plates | |
CN104818772A (en) | Large-span long-cantilever connection structure and construction technique | |
CN104532964A (en) | Building beam-column joint connecting structure and process | |
CN202202412U (en) | Rectangular steel pipe concrete special-shaped column-steel beam framework middle node | |
CN203755443U (en) | Assembly integrated type overlapping frame structure | |
CN205875394U (en) | Antidetonation concrete beam column that dry process is connected | |
CN204590261U (en) | A kind of novel prefabricated assembling frame structure | |
CN103758208B (en) | Assembled integral composite frame structure | |
CN101435237A (en) | Novel hollow combined board | |
CN203347007U (en) | Steel-concrete slab-column structure system | |
CN204645318U (en) | A kind of overlaid plate type shear wall | |
CN203129322U (en) | Concrete cavity type assembled house | |
CN203701386U (en) | Steel-structure floor slab group | |
CN104631642A (en) | Reinforced concrete swing wall component with bolt type connection | |
CN108412036A (en) | Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node | |
CN108625491A (en) | Assembled H profile steel column-isolated footing-concrete collar tie beam L-shaped connecting node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150805 |